CN216042679U - Unsettled pipeline mounting tool - Google Patents

Unsettled pipeline mounting tool Download PDF

Info

Publication number
CN216042679U
CN216042679U CN202122169538.3U CN202122169538U CN216042679U CN 216042679 U CN216042679 U CN 216042679U CN 202122169538 U CN202122169538 U CN 202122169538U CN 216042679 U CN216042679 U CN 216042679U
Authority
CN
China
Prior art keywords
pipeline
frame
pipes
long
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122169538.3U
Other languages
Chinese (zh)
Inventor
随吉才
崔树学
白岩
周帅
董智博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Northeast No1 Electric Power Construction Co ltd
Original Assignee
China Energy Engineering Group Northeast No1 Electric Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Northeast No1 Electric Power Construction Co ltd filed Critical China Energy Engineering Group Northeast No1 Electric Power Construction Co ltd
Priority to CN202122169538.3U priority Critical patent/CN216042679U/en
Application granted granted Critical
Publication of CN216042679U publication Critical patent/CN216042679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of engineering construction auxiliary tools, and particularly provides a suspended pipeline mounting tool which comprises a plurality of pipeline temporary fixing frames, a connecting frame and a plurality of operation platform frames, wherein the operation platform frames are fixedly connected between the pipeline temporary fixing frames and the connecting frame at intervals according to the vertical sequence, a plurality of pipeline temporary fixing structures are arranged on the pipeline temporary fixing frames at intervals according to the vertical sequence, an operation platform is arranged on the operation platform frame, and a lifting point structure is arranged at the upper end of the suspended pipeline mounting tool. Compared with the method that a plurality of cranes are used for separately lifting and installing equipment and constructors, the tool greatly increases the construction safety, can reduce the use of machinery and saves the construction cost.

Description

Unsettled pipeline mounting tool
Technical Field
The utility model relates to the technical field of engineering construction auxiliary tools, and particularly provides a suspended pipeline installation tool.
Background
In the engineering work progress, often can meet the installation to the pipeline, some pipelines need install in unsettled position, for example between two buildings, the installation of pipeline this moment is located half empty and do not have the construction footing, can't adopt conventional mode to install, need hang up the pipeline on the one hand, and on the other hand hangs up constructor workstation, all hangs the two to the target location, just can normally install, very loaded down with trivial details and easy danger that takes place.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a suspended pipeline installation tool.
The utility model is realized in such a way that a suspended pipeline installation tool comprises a plurality of pipeline temporary fixing frames, a connecting frame and an operation platform frame, wherein the plurality of operation platform frames are fixedly connected between the pipeline temporary fixing frames and the connecting frame at intervals according to the vertical sequence, a plurality of pipeline temporary fixing structures are arranged on the pipeline temporary fixing frames at intervals according to the vertical sequence, an operation platform is arranged on the operation platform frame, and a lifting point structure is arranged at the upper end of the suspended pipeline installation tool.
Preferably, the temporary pipeline fixing frame comprises two first long pipes and two first short pipes, and the two first short pipes are respectively and fixedly connected to two ends of the two first long pipes; each working platform frame comprises two second long pipes and two second short pipes, and the two second short pipes are fixedly connected to the two ends of the two second long pipes respectively; the connecting frame comprises two third long pipes and two third short pipes, and the two third short pipes are fixedly connected to the two ends of the two third long pipes respectively; and one end of each second long pipe of each operation platform frame is fixedly connected with the first long pipe on the corresponding side, and the other end of each second long pipe is fixedly connected with the third long pipe on the corresponding side.
It is further preferred, every pipeline temporary fixation structure includes U type spacing groove and shelves pole, and U type spacing groove is fixed on the pipeline temporary fixation frame, the one end of shelves pole passes through torsional spring with one side end in U type spacing groove to be connected, the other end overlap joint of shelves pole is at the opposite side end in U type spacing groove.
Further preferably, a pipe placing structure is provided at a lower end of the pipe temporarily fixing frame, and the pipe placing structure includes a bottom surface and a fence surrounding the bottom surface.
Preferably, the middle part of the operation platform frame is provided with two reinforced long pipes which are respectively positioned at two sides of all the operation platform frames to connect the operation platform frames.
Compared with the prior art, the utility model has the advantages that:
when the tool is used for installing the suspended pipeline, the pipeline is fixed on the tool in advance, the pipeline is erected by using a hoisting machine, and then a constructor climbs an operation platform of the installation tool and hoists to an installation position. Compared with the use of a plurality of cranes, the lifting tool has the advantages that equipment and constructors are lifted and installed separately, the construction safety is greatly improved, the use of machinery can be reduced, and the construction cost is saved.
Drawings
The utility model is described in further detail below with reference to the following figures and embodiments:
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the installation of the pipeline on the present invention;
FIG. 3 is a view showing a structure of a temporary fixing frame for a pipe;
FIG. 4 is a view of a connecting frame structure;
FIG. 5 is a diagram of a work platform frame configuration;
fig. 6 is a schematic view of a temporary pipeline fixing structure.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1, 2, 3, 4, 5 and 6, the present invention provides a suspended pipeline installation tool, which includes a pipeline temporary fixing frame 1, a connecting frame 2 and a plurality of work platform frames 3, wherein the plurality of work platform frames 3 are fixedly connected between the pipeline temporary fixing frame 1 and the connecting frame 2 at a certain interval in an up-down sequence, a plurality of pipeline temporary fixing structures 101 are arranged on the pipeline temporary fixing frame 1 at a certain interval in an up-down sequence, a work platform 301 is arranged on the work platform frame 3, and a hanging point structure 4 is arranged at an upper end of the suspended pipeline installation tool.
In the construction process, the pipelines to be installed in the air are temporarily arranged on the plurality of pipeline temporary fixing structures 101, then a constructor stands on the operation platform 301 of a target position, the hoisting point structure 4 is hoisted by a crane, and the installation tool, the pipelines and the constructor are integrally hoisted to the target construction position, so that the pipeline installation construction can be carried out.
As a specific implementation manner of the pipeline temporary fixing frame 1, the operation platform frame 3 and the connecting frame 2, the pipeline temporary fixing frame 1 includes two first long pipes 102 and two first short pipes 103, and the two first short pipes 103 are respectively fixedly connected to two ends of the two first long pipes 102; each work platform frame 3 comprises two second long pipes 302 and two second short pipes 303, and the two second short pipes 303 are fixedly connected to two ends of the two second long pipes 302 respectively; the connecting frame 2 comprises two third long pipes 201 and two third short pipes 202, and the two third short pipes 202 are respectively fixedly connected to two ends of the two third long pipes 201; one end of each second long pipe 302 of each work platform frame 3 is fixedly connected with the first long pipe 102 on the corresponding side, and the other end is fixedly connected with the third long pipe 201 on the corresponding side.
The pipe temporary fixing frame 1, the work platform frame 3 and the connecting frame 2 form a nearly triangular structure, and the pipe temporary fixing frame 1 can be specially customized according to the shape of the pipe.
In order to facilitate the transfer of the constructors from one work platform 301 to another work platform 301, ladder stands may be provided on the work platform frame 3 to connect different work platforms 301. The ladder stand may be positioned on the side of the work platform 301 and fixedly connected to the work platform frame 3.
Because pipeline temporary fixing structure 101 both can be spacing temporarily with the pipeline, again when the installation can be convenient break away from the pipeline from the inside, as technical scheme's improvement, every pipeline temporary fixing structure 101 includes U type spacing groove 1011 and shelves pole 1012, and U type spacing groove 1011 is fixed on pipeline temporary fixing frame 1, the one end of shelves pole 1012 passes through torsional spring with one side end of U type spacing groove 1011, and the other end overlap joint of shelves pole 1012 is at the opposite side end of U type spacing groove 1011.
When the pipeline needs to be separated from the pipeline temporary fixing structure 101, the constructor applies an outward force to the pipeline to push the stopping rod 1012 open by the pipeline, so that the pipeline can be separated.
In order to prevent the pipe from being separated from the lower end of the installation tool, as a modification of the technical solution, at the lower end of the pipe temporary fixing frame 1, a pipe placing structure 104 is provided, and the pipe placing structure 104 includes a bottom surface and a fence surrounding the bottom surface.
In order to increase the overall strength of the installation tool, as an improvement of the technical scheme, two reinforced long pipes 5 are arranged in the middle of the operation platform frame 3, and the two reinforced long pipes 5 are respectively positioned at two sides of all the operation platform frames 3 to connect the operation platform frames 3.
The embodiments of the present invention have been described in detail with reference to the drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.

Claims (5)

1. The utility model provides a unsettled pipeline mounting tool, a serial communication port, including pipeline temporary fixation frame (1), connecting frame (2) and operation platform frame (3), operation platform frame (3) are equipped with a plurality ofly, interval certain distance fixed connection is between pipeline temporary fixation frame (1) and connecting frame (2) according to upper and lower order, interval certain distance is equipped with a plurality of pipeline temporary fixation structure (101) according to upper and lower order on pipeline temporary fixation frame (1), be equipped with operation platform (301) on operation platform frame (3), upper end at unsettled pipeline mounting tool is equipped with hoisting point structure (4).
2. The suspended pipeline installation tool as claimed in claim 1, wherein the pipeline temporary fixing frame (1) comprises two first long pipes (102) and two first short pipes (103), and the two first short pipes (103) are fixedly connected to two ends of the two first long pipes (102), respectively; each work platform frame (3) comprises two second long pipes (302) and two second short pipes (303), and the two second short pipes (303) are fixedly connected to two ends of the two second long pipes (302) respectively; the connecting frame (2) comprises two third long pipes (201) and two third short pipes (202), and the two third short pipes (202) are fixedly connected to the two ends of the two third long pipes (201) respectively; one end of each second long pipe (302) of each operation platform frame (3) is fixedly connected with the first long pipe (102) on the corresponding side, and the other end of each second long pipe is fixedly connected with the third long pipe (201) on the corresponding side.
3. The suspended pipeline installation tool as claimed in claim 1, wherein each pipeline temporary fixing structure (101) comprises a U-shaped limiting groove (1011) and a stop lever (1012), the U-shaped limiting groove (1011) is fixed on the pipeline temporary fixing frame (1), one end of the stop lever (1012) is connected with one end of the U-shaped limiting groove (1011) through a torsion spring, and the other end of the stop lever (1012) is lapped on the other end of the U-shaped limiting groove (1011).
4. The suspended duct installation tool of claim 3, wherein at the lower end of the duct temporary holding frame (1), a duct placement structure (104) is provided, the duct placement structure (104) comprising a bottom surface and a fence surrounding the bottom surface.
5. The suspended pipeline installation tool as claimed in claim 1, wherein two long reinforcing pipes (5) are arranged in the middle of the work platform frame (3), and the two long reinforcing pipes (5) are respectively arranged on two sides of all the work platform frames (3) to connect the work platform frames (3).
CN202122169538.3U 2021-09-08 2021-09-08 Unsettled pipeline mounting tool Active CN216042679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122169538.3U CN216042679U (en) 2021-09-08 2021-09-08 Unsettled pipeline mounting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122169538.3U CN216042679U (en) 2021-09-08 2021-09-08 Unsettled pipeline mounting tool

Publications (1)

Publication Number Publication Date
CN216042679U true CN216042679U (en) 2022-03-15

Family

ID=80597955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122169538.3U Active CN216042679U (en) 2021-09-08 2021-09-08 Unsettled pipeline mounting tool

Country Status (1)

Country Link
CN (1) CN216042679U (en)

Similar Documents

Publication Publication Date Title
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN108930228A (en) The construction method of bent cap hoop bracket overall pulling down
CN109236012A (en) A kind of dry font Guywire tower hanging method of transmission line of electricity
CN216042679U (en) Unsettled pipeline mounting tool
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN105836640A (en) Self-climbing fixing device and method for climbing tower crane
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN212609006U (en) Hoisting tool for cooling pipeline of flexible direct-current converter valve
CN214326895U (en) Steel reinforcement cage location installation suspension system
CN211971577U (en) Tower crane system
CN202529744U (en) Structure of auxiliary hoist of fixed mast and crawler crane equipped with structure
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN209538270U (en) A kind of bucket body fishing device
CN210713748U (en) Fixed construction hanging basket
CN103015323B (en) Beam body hoisting device
CN207030738U (en) Claw hook device
CN109941900A (en) A kind of sound barrier plate simply installs equipment
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN205875410U (en) A hang module system all for tube structure room panel construction
CN204199271U (en) A kind of filling pile cage of reinforcement hangs fastening devices
CN205616430U (en) Railway T beam mold board dismouting hoist and hang and move device
CN217229918U (en) Hoisting connecting device
CN219469634U (en) Simple and easy convenient many pipe fittings automatic lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant