CN210713748U - Fixed construction hanging basket - Google Patents

Fixed construction hanging basket Download PDF

Info

Publication number
CN210713748U
CN210713748U CN201921481926.1U CN201921481926U CN210713748U CN 210713748 U CN210713748 U CN 210713748U CN 201921481926 U CN201921481926 U CN 201921481926U CN 210713748 U CN210713748 U CN 210713748U
Authority
CN
China
Prior art keywords
fixing frame
connecting arm
base
fixed construction
bending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921481926.1U
Other languages
Chinese (zh)
Inventor
孙卓
王艳君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianrun Construction Co Ltd
Original Assignee
Beijing Tianrun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianrun Construction Co Ltd filed Critical Beijing Tianrun Construction Co Ltd
Priority to CN201921481926.1U priority Critical patent/CN210713748U/en
Application granted granted Critical
Publication of CN210713748U publication Critical patent/CN210713748U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the construction tool, a fixed construction hanging flower basket is disclosed, including suspending in midair platform, fixed knot structure, first linking arm, second linking arm and lifting rope. The suspension platform is used for carrying operating personnel and construction tools; the fixing structure comprises a first fixing frame and a second fixing frame, the first fixing frame can be connected to a first flower frame beam on the roof, the second fixing frame can be connected to a second flower frame beam on the roof, and the height of the first fixing frame is higher than that of the second fixing frame; the first connecting arm is connected with the first fixing frame; the second connecting arm is respectively connected to one end of the first fixing frame and one end of the second fixing frame, and the second connecting arm and the first connecting arm are positioned on the same straight line; the lifting rope lifts the suspension platform and is sequentially connected to the end part of the first connecting arm, the top of the first fixing frame and the end part of the second connecting arm. The utility model provides a pair of fixed construction hanging flower basket need not install the counter weight additional, and the cost is lower, and the security is higher.

Description

Fixed construction hanging basket
Technical Field
The utility model relates to a construction tool technical field especially relates to a fixed construction hanging flower basket.
Background
In high-altitude operations such as exterior wall construction and curtain wall installation of a multi-story building, a hanging basket is usually required. At present, most hanging baskets on the market can both run from top to bottom, the fixing device of the hanging basket is located on the roof, the lifting machine pulls the steel wire rope to realize the up-and-down movement of the hanging basket, and meanwhile, the balancing weight is added on the hanging basket fixing device to achieve the mechanical balance of the lever. On the building construction site, some construction operations need to adopt the hanging flower basket to carry on the operation personnel, but the hanging flower basket need not reciprocate, if adopt the hanging flower basket that has the counter weight and can reciprocate, the cost is higher, has certain safety problem moreover, simultaneously because the counter weight dead weight of hanging flower basket is great for the local load of roofing increases, influences the roofing structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fixed construction hanging flower basket need not install the counter weight additional, can connect on the flower frame roof beam of roofing, and the cost is lower, and the security is higher.
To achieve the purpose, the utility model adopts the following technical proposal:
there is provided a fixed construction basket, comprising:
a suspended platform configured to carry a worker and a work tool;
the fixing structure comprises a first fixing frame and a second fixing frame, the first fixing frame can be connected to a first flower frame beam on a roof, the second fixing frame can be connected to a second flower frame beam on the roof, and the height of the first fixing frame is higher than that of the second fixing frame;
the first connecting arm is connected to the first fixing frame;
the second connecting arm is respectively connected to one end of the first fixing frame and one end of the second fixing frame, and the second connecting arm and the first connecting arm are positioned on the same straight line;
and the lifting rope is used for lifting the suspension platform and is sequentially connected with the end part of the first connecting arm, the top of the first fixing frame and the end part of the second connecting arm.
Preferably, the fixed construction hanging basket further comprises a reinforcing arm, one end of the reinforcing arm is connected to the second fixing frame, and the other end of the reinforcing arm is connected to the second connecting arm.
Preferably, the first fixing frame can be connected to the first truss beam by a locking structure.
Preferably, the first fixing frame is provided with a base, and the base can be connected to the first truss beam through the locking structure.
Preferably, the locking structure comprises a leveling member, the leveling member being disposed between the base and the first planter beam.
Preferably, the locking structure includes a tie wrapped around the base and the first truss beam.
Preferably, the locking structure comprises a bending-resistant piece and a fastening piece, the bending-resistant piece is arranged on the base, the fastening piece is of a U-shaped structure, the fastening piece is clamped on the first truss beam and the outer side of the base, and two ends of the fastening piece can penetrate through the bending-resistant piece to connect the base to the first truss beam.
Preferably, the bending-resistant part and the fastening piece are provided with two, the bending-resistant part is arranged on the base in parallel at intervals, the fastening piece is arranged in parallel at intervals, the fastening piece is clamped on the outer sides of the first truss beam and the base, and two ends of one fastening piece can penetrate through one bending-resistant part.
Preferably, two of said bending-resistant members are connected by a reinforcement member.
Preferably, the second fixing frame is provided with a second base, and the second base can be connected to the second truss beam through the locking structure.
The utility model has the advantages that:
the fixed construction hanging basket is provided with a suspension platform which does not need to move up and down, and an operator stands on the suspension platform to perform construction operation, so that the safety is high; the device is provided with a first fixing frame and a second fixing frame, the first fixing frame can be connected to a first flower frame beam on the roof, the second fixing frame can be connected to a second flower frame beam on the roof, and the first flower frame beam and the second flower frame beam can provide supporting force for the device so that the device can keep balance; the lifting rope of the lifting suspension platform is sequentially connected to the end portion of the first connecting arm, the top of the first fixing frame and the end portion of the second connecting frame, so that the device can be stressed uniformly, and the service life is long.
Drawings
FIG. 1 is a schematic structural view of a fixed construction basket according to an embodiment of the present invention;
fig. 2 is a schematic structural view illustrating a connection between the first fixing frame and the first flower shelf beam according to the embodiment of the present invention.
In the figure:
1. a suspended platform; 21. a first fixing frame; 211. a base; 212. a vertical support; 213. an inclined bracket; 214. connecting a bracket; 22. a second fixing frame; 221. a second base; 3. a first connecting arm; 4. a second connecting arm; 5. a lifting rope; 6. a reinforcing arm; 7. a locking structure; 71. leveling parts; 72. a binding member; 73. a bend-resistant member; 74. a fastener; 75. a reinforcement; 100. a first truss beam; 200. a second truss beam.
Detailed Description
Reference will now be made in detail to the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "connected," "connected," and "fixed" are to be construed broadly and can include, for example, fixed or removable connections, mechanical or electrical connections, direct connections, indirect connections through an intermediary, communication between two elements, or an interaction between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the description of the present invention, unless otherwise expressly specified or limited, the first feature "on" or "under" the second feature may include both the first and second features being in direct contact, and may also include the first and second features being in contact, not in direct contact, but with another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
As shown in fig. 1-2, the utility model provides a fixed construction hanging basket, including hanging platform 1 in midair, fixed knot constructs, first linking arm 3, second linking arm 4 and lifting rope 5. The suspended platform 1 is used for carrying a worker and a work tool. The fixing structure comprises a first fixing frame 21 and a second fixing frame 22, the first fixing frame 21 can be connected to a first flower frame beam 100 on the roof, the second fixing frame 22 can be connected to a second flower frame beam 200 on the roof, and the height of the first fixing frame 21 is higher than that of the second fixing frame 22. The first connecting arm 3 is connected to the first fixing frame 21, the second connecting arm 4 is connected to one end of the first fixing frame 21 and one end of the second fixing frame 22, and the second connecting arm 4 and the first connecting arm 3 are located on the same straight line. The lifting rope 5 lifts the suspended platform 1 and is connected to the end of the first connecting arm 3, the top of the first fixing frame 21 and the end of the second connecting arm 4 in sequence.
The suspension platform 1 does not need to move up and down, and the safety is high. This fixed construction hanging flower basket passes through fixed knot to be constructed the flower frame roof beam on the roofing, and first flower frame roof beam 100 and second flower frame roof beam 200 can provide the holding power for the device can keep balance, and consequently the device need not install the counter weight additional, has reduced manufacturing cost, can not cause the influence to the roofing structure simultaneously. The lifting rope 5 for lifting the suspension platform 1 sequentially passes through the end part of the first connecting arm 3 and the top part of the first fixing frame 21 and is connected to the end part of the second connecting arm 4, wherein the lifting rope 5 passes through the end part of the first connecting arm 3 and is connected to the end part of the first connecting arm 3 through a rope clamp, and the lifting rope 5 also passes through the top part of the first fixing frame 21 and is connected to the top part of the first fixing frame 21 through the rope clamp. The lifting rope 5 is connected to the end of the first connecting arm 3, the top of the first fixing frame 21 and the end of the second connecting arm 4 in sequence, so that the device can be stressed uniformly and has long service life.
The first fixing frame 21 can be connected to the first truss beam 100 by the locking structure 7. Referring to fig. 2, the first fixing frame 21 includes a base 211, a vertical bracket 212, two inclined brackets 213, and two connecting brackets 214, and the base 211 can be connected to the first truss beam 100 by a locking mechanism 7.
Optionally, the locking structure 7 includes a leveling member 71, and the leveling member 71 is disposed between the base 211 and the first truss beam 100. Because there is uneven place between base 211 and the first flower frame roof beam 100, the piece 71 of making level can fill up the level, and the piece 71 of making level can set up a plurality ofly according to on-the-spot actual conditions.
The locking structure 7 further comprises an anti-bending piece 73 and a fastener 74, the anti-bending piece 73 is arranged on the base 211, the fastener 74 is of a U-shaped structure, the fastener 74 is clamped on the outer sides of the first truss beam 100, the leveling piece 71 and the base 211, and two ends of the fastener 74 can penetrate through the anti-bending piece 73 to connect the base 211 to the first truss beam 100. In this embodiment, fastener 74 selects for U type bolt, and anti curved member 73 selects for U shaped steel, and the opening of U shaped steel up, and U shaped steel compares with ordinary steel sheet, and bending resistance is stronger, and when U shaped steel adopted the nut to screw up, U shaped steel can not be crooked because of the effort that receives the nut when the both ends of U type bolt passed U shaped steel to produce the clearance between with base 211.
Preferably, two bending-resistant pieces 73 and two fastening pieces 74 are provided. Two anti-bending pieces 73 are arranged on the base 211 in parallel and at intervals, one anti-bending piece 73 and one inclined bracket 213 are arranged on one side of the vertical bracket 212, and the other anti-bending piece 73 and the other inclined bracket 213 are arranged on the other side of the vertical bracket 212. The two fasteners 74 are arranged in parallel and at intervals, the two fasteners 74 are clamped on the outer sides of the first truss beam 100, the leveling piece 71 and the base 211, and two ends of one fastener 74 can penetrate through one bending-resistant piece 73. The two bending resistant members 73 are connected by a reinforcement member 75, the reinforcement member 75 being provided in two, the reinforcement member 75 being optionally a narrow steel plate.
In order to make the connection between the first fixing frame 21 and the first truss beam 100 more stable, the locking structure 7 further includes a binding member 72, and the binding member 72 is wound around the two reinforcing members 75, the base 211, the leveling member 71 and the first truss beam 100. Alternatively, two strapping members 72 are provided, and two strapping members 72 are provided on both sides of the vertical bracket 212, respectively. Alternatively, the strapping 72 may be a wire rope.
In this embodiment, the second fixing frame 22 is provided with a second base 221, and the second base 221 can also be connected to the second truss beam 200 through the locking structure 7. The structure of the second fixing frame 22 may be the same as or different from that of the first fixing frame 21, and the specific structure of the second fixing frame 22 may be set by those skilled in the art according to actual circumstances.
In order to improve the strength of the fixed construction basket, the fixed construction basket is further provided with a reinforcing arm 6, one end of the reinforcing arm 6 is connected to the second fixing frame 22, and the other end is connected to the second connecting arm 4.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. A fixed construction basket, comprising:
a suspended platform (1), the suspended platform (1) being configured to carry a worker and a work tool;
the fixing structure comprises a first fixing frame (21) and a second fixing frame (22), the first fixing frame (21) can be connected to a first flower frame beam (100) on a roof, the second fixing frame (22) can be connected to a second flower frame beam (200) on the roof, and the height of the first fixing frame (21) is higher than that of the second fixing frame (22);
a first connecting arm (3) connected to the first fixing frame (21);
the second connecting arm (4) is respectively connected to one end of the first fixing frame (21) and one end of the second fixing frame (22), and the second connecting arm (4) and the first connecting arm (3) are located on the same straight line;
and the lifting rope (5) is used for lifting the suspension platform (1) and is sequentially connected with the end part of the first connecting arm (3), the top part of the first fixing frame (21) and the end part of the second connecting arm (4).
2. A fixed construction basket according to claim 1, further comprising a reinforcing arm (6), said reinforcing arm (6) being connected at one end to said second fixing frame (22) and at the other end to a second connecting arm (4).
3. A fixed construction basket according to claim 1, characterized in that said first fixing frame (21) can be connected to said first basket beam (100) by means of locking structures (7).
4. A fixed construction basket according to claim 3, characterized in that said first fixing frame (21) is provided with a base (211), said base (211) being connectable to said first basket beam (100) by said locking structure (7).
5. A fixed construction basket according to claim 4, characterized in that said locking structure (7) comprises a leveling (71), said leveling (71) being arranged between said base (211) and said first basket beam (100).
6. A fixed construction basket according to claim 4, characterized in that said locking structure (7) comprises ties (72), said ties (72) being wound on said base (211) and on said first truss beam (100).
7. The fixed construction basket according to claim 4, wherein the locking structure (7) comprises a bending-resistant member (73) and a fastening member (74), the bending-resistant member (73) is disposed on the base (211), the fastening member (74) is a U-shaped structure, the fastening member (74) is clamped on the outer sides of the first truss beam (100) and the base (211), and both ends of the fastening member (74) can pass through the bending-resistant member (73) to connect the base (211) to the first truss beam (100).
8. The fixed construction basket according to claim 7, wherein the bending resistant members (73) and the fastening members (74) are provided in two numbers, two bending resistant members (73) are provided in parallel and spaced on the base (211), two fastening members (74) are provided in parallel and spaced, two fastening members (74) are each clamped to the outer sides of the first basket (100) and the base (211), and both ends of one fastening member (74) can pass through one bending resistant member (73).
9. A fixed construction basket according to claim 8, characterized in that two said bending resistant members (73) are connected by a reinforcement (75).
10. A fixed construction basket according to any one of claims 4 to 9, characterized in that said second fixing frame (22) is provided with a second base (221), said second base (221) being connectable to said second truss beam (200) by said locking structure (7).
CN201921481926.1U 2019-09-06 2019-09-06 Fixed construction hanging basket Active CN210713748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921481926.1U CN210713748U (en) 2019-09-06 2019-09-06 Fixed construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921481926.1U CN210713748U (en) 2019-09-06 2019-09-06 Fixed construction hanging basket

Publications (1)

Publication Number Publication Date
CN210713748U true CN210713748U (en) 2020-06-09

Family

ID=70966915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921481926.1U Active CN210713748U (en) 2019-09-06 2019-09-06 Fixed construction hanging basket

Country Status (1)

Country Link
CN (1) CN210713748U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737745A (en) * 2022-03-21 2022-07-12 五冶集团上海有限公司 Method for fixing support legs of hanging basket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737745A (en) * 2022-03-21 2022-07-12 五冶集团上海有限公司 Method for fixing support legs of hanging basket

Similar Documents

Publication Publication Date Title
CN112942661B (en) Construction method of stay cable with flexible cable net boundary
CN210713748U (en) Fixed construction hanging basket
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
EP3569550B1 (en) Lift
CN202324574U (en) Lifting scaffold with simple and convenient operations
CN113958131B (en) Suspended ceiling structure of steel structure truss string system roof and construction method thereof
CN113738089A (en) Hanging basket integral installation construction method of specially-made hanging mechanism device
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN201809032U (en) Self-adjusting stay device with combinable hanger
CN217676265U (en) Pre-assembled elevator module
CN112962948B (en) Hanging basket suspension mechanism fixing structure without counter weight and construction method thereof
CN210563320U (en) Hanging basket suspension structure without support and counterweight
CN114684694A (en) Pre-assembled elevator module and method of assembling a pre-assembled elevator module
CN210888045U (en) Assembled lifting die
CN111634797A (en) Steel bar lifting appliance for building construction
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN216339062U (en) Auxiliary assembly for mounting bridge diaphragm beam template
CN217128915U (en) Hanging flower basket equipment rack
JPH0734069Y2 (en) Lifting device for car or counterweight in elevator
CN216042679U (en) Unsettled pipeline mounting tool
CN221346265U (en) Wall-attached inclined-pulling hanging basket hanging device for parapet wall
CN221029624U (en) Anti-collision wall construction mobile hanging basket
CN113833289B (en) Shed frame anti-falling system and construction method thereof
CN219241277U (en) Hanging basket safety rope tying and hanging device on flat roof
CN213569398U (en) Hanging basket device fixed by steel wire rope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant