CN215926640U - Novel scaffold for building engineering - Google Patents

Novel scaffold for building engineering Download PDF

Info

Publication number
CN215926640U
CN215926640U CN202122225870.7U CN202122225870U CN215926640U CN 215926640 U CN215926640 U CN 215926640U CN 202122225870 U CN202122225870 U CN 202122225870U CN 215926640 U CN215926640 U CN 215926640U
Authority
CN
China
Prior art keywords
supporting column
base
scaffold
fixedly connected
installation pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122225870.7U
Other languages
Chinese (zh)
Inventor
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122225870.7U priority Critical patent/CN215926640U/en
Application granted granted Critical
Publication of CN215926640U publication Critical patent/CN215926640U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a novel scaffold for constructional engineering, which comprises a base and main supporting columns, wherein the bottoms of the main supporting columns and the top of the base are detachably assembled, first side frames are arranged on the front side and the rear side above the base, second side frames are arranged on the left side and the right side above the base, the first side frames and the second side frames are fixed with the side walls of the main supporting columns, supporting frames are fixedly connected to the tops of the main supporting columns, a workbench is arranged on the supporting frames, and a fence is arranged on the tops of the workbench; this novel scaffold for building engineering is through the block assembly of first installation pole and second installation pole, the height of multiplicable scaffold, and can dismantle in the bottom of main tributary dagger and be equipped with the base, the effectual stability that has increased the device has avoided the scaffold problem of empting easily, and the top of support frame can be dismantled and be equipped with the lifting frame body, transmits article each other between the staff on the ground of being convenient for and the scaffold.

Description

Novel scaffold for building engineering
Technical Field
The utility model relates to the technical field of building construction, in particular to a novel scaffold for constructional engineering.
Background
The scaffold is various supports erected for workers to operate and work at high altitude on a construction site, is a general term in the field of buildings, is mainly used in places where external walls, interior decoration or high floor height cannot be directly constructed on the construction site, is made of bamboo, wood, steel pipes or synthetic materials and the like, is also used as a template in partial projects at present, and is also widely used in the fields of advertising industry, municipal administration, traffic roads, bridges, mines and the like;
common scaffolds in the market are usually composed of simple steel pipes, the stability is not high, so that the scaffolds are easy to collapse, some potential safety hazards are generated, workers are injured, the common scaffolds are highly fixed, the heights of the scaffolds cannot be changed through a splicing mode, great inconvenience is brought to the construction work of the workers, and when articles are transferred to the workers on the scaffolds, a throwing mode is usually adopted, and great potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model provides a novel scaffold for construction engineering, the novel scaffold for construction engineering can increase the height of the scaffold through the clamping assembly of a first mounting rod and a second mounting rod, and is convenient for workers to use, a base is detachably assembled at the bottom of a main support column, so that the stability of the device is effectively increased, the problem that the scaffold is easy to topple is avoided, a lifting mechanism is detachably assembled at the top of the support column, and the lifting mechanism can be convenient for the workers on the ground and the workers on the scaffold to mutually transfer articles.
In order to solve the problems, the utility model provides a novel scaffold for constructional engineering, which comprises a base and a main supporting column, wherein the bottom of the main supporting column is detachably assembled with the top of the base, first side frames are arranged on the front side and the rear side above the base, second side frames are arranged on the left side and the right side above the base, the first side frames and the second side frames are both fixed with the side walls of the main supporting column, a supporting frame is fixedly connected to the top of the main supporting column, a workbench is arranged on the supporting frame, a fence is arranged on the top of the workbench, and a lifting mechanism is detachably assembled on the top of the supporting frame.
The further improvement lies in that: elevating system includes lifting frame body, motor, pulley and belt, the motor fixed assembly is in one side of lifting frame body, the pulley rotates the assembly and is in lifting frame body's top, the one end and the belt fixed connection of motor output shaft, the other end fixedly connected with of belt puts the thing basket.
The further improvement lies in that: the first side frame comprises a first supporting column, handrails and first connecting rods, the handrails are fixedly connected to one side of the first supporting column, the first connecting rods are provided with multiple groups, and two ends of each first connecting rod are fixedly connected with the first supporting column and the main supporting column respectively.
The further improvement lies in that: the second side frame comprises a second supporting column and a second connecting rod, wherein two ends of the second connecting rod are fixedly connected with the main supporting column and the second supporting column respectively, and form a triangular structure with the main supporting column and the second supporting column.
The further improvement lies in that: the fixed first installation pole that is provided with in bottom of main tributary dagger, the outer wall fixedly connected with stopper of main tributary dagger, the top of base is provided with the block groove, the block groove and first installation pole looks adaptation.
The further improvement lies in that: the top of main tributary dagger is fixed and is provided with the second installation pole, the bottom of first installation pole is provided with the spacing groove, second installation pole and spacing groove looks adaptation.
The utility model has the beneficial effects that: this novel scaffold for building engineering is through the block assembly of first installation pole and second installation pole, the height of multiplicable scaffold, the staff of being convenient for uses, and can dismantle in the bottom of main tributary dagger and be equipped with the base, the effectual stability that has increased the device, the problem of scaffold empting easily has been avoided, staff's safety has been guaranteed, the top of support frame can be dismantled and be equipped with elevating system, it rotates to drive the belt through the motor, thereby drive the lift of belt other end object, the staff on the ground of being convenient for and the staff on the scaffold transmit article each other, the potential safety hazard that traditional transmission article mode exists has been reduced.
Drawings
Fig. 1 is an overall perspective view of the present invention.
Fig. 2 is a front view of a first side frame structure of the present invention.
Fig. 3 is a front view of a second side frame structure of the present invention.
Fig. 4 is a cross-sectional view of the base structure of the present invention.
FIG. 5 is an enlarged view of the structure at A in FIG. 2 according to the present invention.
Wherein: 1. a base; 2. a main support column; 3. a first side frame; 4. a second side frame; 5. a support frame; 6. a work table; 7. a fence; 8. a lifting mechanism; 9. a lifting frame body; 10. a motor; 11. a pulley; 12. a belt; 13. a first support column; 14. a handrail; 15. a first connecting rod; 16. a second support column; 17. a second connecting rod; 18. a first mounting bar; 19. a limiting block; 20. a clamping groove; 21. a second mounting bar; 22. a storage basket; 23. a limiting groove.
Detailed Description
In order to further understand the present invention, the following detailed description will be made with reference to the following examples, which are only used for explaining the present invention and are not to be construed as limiting the scope of the present invention.
According to shown in fig. 1, 2, 3, 4, 5, this embodiment provides a novel scaffold for building engineering, including base 1 and main tributary dagger 2, the bottom of main tributary dagger 2 with the top demountable assembly of base 1, both sides are equipped with first side bearer 3 around the base 1 top, and the left and right sides of base 1 top is equipped with second side bearer 4, first side bearer 3 and second side bearer 4 all are fixed with main tributary dagger 2 lateral wall, the top fixedly connected with support frame 5 of main tributary dagger 2, be equipped with workstation 6 on the support frame 5, the top of workstation 6 is equipped with rail 7, the top of support frame 5 can be dismantled and be equipped with elevating system 8.
Elevating system 8 includes elevator body 9, motor 10, pulley 11 and belt 12, motor 10 fixed assembly is in one side of elevator body 9, pulley 11 rotates the assembly and is in elevator body 9's top, the one end and the belt 12 fixed connection of motor 10 output shaft, the thing basket 22 is put to the other end fixedly connected with of belt 12, and it reciprocates to put thing basket 22 through rotating the drive of motor 10, the staff's transmission tool of being convenient for.
The first side frame 3 comprises a first supporting column 13, handrails 14 and a first connecting rod 15, wherein the handrails 14 are fixedly connected to one side of the first supporting column 13, multiple groups of the first connecting rods 15 are arranged, and two ends of the first connecting rods 15 are fixedly connected with the first supporting column 13 and the main supporting column 2 respectively, so that a stepped structure is formed and workers can climb conveniently.
The second side frame 4 comprises a second supporting column 16 and a second connecting rod 17, two ends of the second connecting rod 17 are respectively fixedly connected with the main supporting column 2 and the second supporting column 16, and form a triangular structure with the main supporting column 2 and the second supporting column 16, so that the stability of the scaffold is effectively improved.
The fixed first installation pole 18 that is provided with in bottom of main tributary dagger 2, the outer wall fixedly connected with stopper 19 of main tributary dagger 2, the top of base 1 is provided with block groove 20, block groove 20 and first installation pole 18 looks adaptation, through the bottom demountable assembly base 1 at main tributary dagger 2, the effectual stability that has increased the device has avoided the problem that the scaffold was emptyd easily.
The fixed second installation pole 21 that is provided with in top of main tributary dagger 2, the bottom of first installation pole 18 is provided with spacing groove 23, second installation pole 21 and spacing groove 23 looks adaptation, the form of spacing groove 23 accessible cup joint at second installation pole 21 outer wall is spliced two scaffolds from top to bottom to increase the height of scaffold, the staff's of being convenient for use.
This novel scaffold for building engineering passes through the block assembly of first installation pole 18 with second installation pole 21, the height of multiplicable scaffold, the staff of being convenient for uses, and can dismantle in the bottom of main tributary dagger 2 and be equipped with base 1, the effectual stability that has increased the device, the problem of the scaffold is emptyd easily has been avoided, staff's safety has been guaranteed, the top of support frame 5 can be dismantled and be equipped with elevating system 8, it rotates to drive belt 12 through motor 10, thereby drive the lift of 12 other end objects on the belt, the staff on the ground of being convenient for and the staff on the scaffold transmit article each other, the potential safety hazard that traditional transmission article mode exists has been reduced.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a novel scaffold frame for building engineering which characterized in that: including base (1) and main tributary dagger (2), the bottom of main tributary dagger (2) with the top demountable assembly of base (1), the preceding back both sides of base (1) top are equipped with first side bearer (3), and the left and right sides of base (1) top is equipped with second side bearer (4), first side bearer (3) and second side bearer (4) all with main tributary dagger (2) lateral wall fixed, the top fixedly connected with support frame (5) of main tributary dagger (2), be equipped with workstation (6) on support frame (5), the top of workstation (6) is equipped with rail (7), the top of support frame (5) can be dismantled and be equipped with elevating system (8).
2. The novel scaffold for construction engineering according to claim 1, wherein: elevating system (8) are including lifting frame body (9), motor (10), pulley (11) and belt (12), motor (10) fixed assembly is in one side of lifting frame body (9), pulley (11) rotate the assembly and are in the top of lifting frame body (9), the one end and belt (12) fixed connection of motor (10) output shaft, thing basket (22) are put to the other end fixedly connected with of belt (12).
3. The novel scaffold for construction engineering according to claim 1, wherein: the first side frame (3) comprises a first supporting column (13), handrails (14) and first connecting rods (15), wherein the handrails (14) are fixedly connected to one side of the first supporting column (13), multiple groups of the first connecting rods (15) are arranged, and two ends of each first connecting rod (15) are fixedly connected with the first supporting column (13) and the main supporting column (2) respectively.
4. The novel scaffold for construction engineering according to claim 1, wherein: the second side frame (4) comprises a second supporting column (16) and a second connecting rod (17), two ends of the second connecting rod (17) are fixedly connected with the main supporting column (2) and the second supporting column (16) respectively, and form a triangular structure with the main supporting column (2) and the second supporting column (16).
5. The novel scaffold for construction engineering according to claim 1, wherein: the bottom of main tributary dagger (2) is fixed and is provided with first installation pole (18), the outer wall fixedly connected with stopper (19) of main tributary dagger (2), the top of base (1) is provided with block groove (20), block groove (20) and first installation pole (18) looks adaptation.
6. The novel scaffold for construction engineering according to claim 5, wherein: the top of main tributary dagger (2) is fixed and is provided with second installation pole (21), the bottom of first installation pole (18) is provided with spacing groove (23), second installation pole (21) and spacing groove (23) looks adaptation.
CN202122225870.7U 2021-09-14 2021-09-14 Novel scaffold for building engineering Active CN215926640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122225870.7U CN215926640U (en) 2021-09-14 2021-09-14 Novel scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122225870.7U CN215926640U (en) 2021-09-14 2021-09-14 Novel scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN215926640U true CN215926640U (en) 2022-03-01

Family

ID=80415990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122225870.7U Active CN215926640U (en) 2021-09-14 2021-09-14 Novel scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN215926640U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892966A (en) * 2022-06-27 2022-08-12 中交二公局第七工程有限公司 Inverted cone shell water tower water tank integral casting concrete supporting assembly and supporting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892966A (en) * 2022-06-27 2022-08-12 中交二公局第七工程有限公司 Inverted cone shell water tower water tank integral casting concrete supporting assembly and supporting method

Similar Documents

Publication Publication Date Title
CN215926640U (en) Novel scaffold for building engineering
CN210395652U (en) Steel structure for assembly type building
CN211473327U (en) Building external climbing type building construction operation platform
CN210635680U (en) Guide frame lifting platform
CN213011597U (en) ALC board mounting machine
CN212453549U (en) Liftable scaffold for building decoration
CN210152199U (en) Scaffold for civil and industrial building construction
CN211369454U (en) Scaffold for building engineering
CN210316437U (en) Multi-functional large-span air corridor erection equipment
CN210828241U (en) Detachable building scaffold
CN210013140U (en) Fixed scaffold for bridge maintenance
CN211078166U (en) Pipeline vertical hoisting device
CN209855215U (en) Safe type combination formula scaffold frame
CN219316345U (en) Wall building platform
CN220537431U (en) Portable vertical conveyer for material in building
CN213654166U (en) Novel modular scaffold frame for building goes up and down device
CN216664932U (en) Connecting assembly for hanging frame of building machine
CN218562943U (en) Construction platform convenient to remove
CN211572485U (en) Lifting integrated scaffold for building construction
CN216428961U (en) Over-and-under type concatenation scaffold frame for construction
CN211286559U (en) Scaffold for building construction
CN216971877U (en) Lift is used in supply chain management convenient to equipment
CN220978736U (en) Scaffold for building construction
CN218933768U (en) Prefabricated stair mounting rack
CN212832703U (en) Lifting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant