CN216664932U - Building machine hanger connection components - Google Patents

Building machine hanger connection components Download PDF

Info

Publication number
CN216664932U
CN216664932U CN202122203756.4U CN202122203756U CN216664932U CN 216664932 U CN216664932 U CN 216664932U CN 202122203756 U CN202122203756 U CN 202122203756U CN 216664932 U CN216664932 U CN 216664932U
Authority
CN
China
Prior art keywords
sliding
hanger
building machine
base
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122203756.4U
Other languages
Chinese (zh)
Inventor
朱正明
舒豪
瞿晶亮
郭凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Dameng Security Technology Co ltd
Original Assignee
Guangzhou Dameng Security Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Dameng Security Technology Co ltd filed Critical Guangzhou Dameng Security Technology Co ltd
Priority to CN202122203756.4U priority Critical patent/CN216664932U/en
Application granted granted Critical
Publication of CN216664932U publication Critical patent/CN216664932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a building machine hanger connecting assembly, which comprises a Bailey frame unit, a hanger, two first sliding hanger head assemblies, a hanging beam and a second sliding hanger head assembly, wherein the upright rods can move left and right along a lower tension rod of a Bailey frame truss by arranging the two first sliding hanger head assemblies, the hanging beam and the second sliding hanger head assembly, so that the distance between the left upright rod and the right upright rod can be conveniently adjusted, and the building machine hanger connecting assembly is suitable for hangers with different sizes; the second sliding hanging head assembly is directly hung on the hanging beam, so that the hanging device is convenient and quick and is convenient to disassemble and assemble; the two cross beams are provided with the strip holes, and the distance between the front upright post and the rear upright post can be adjusted, so that the problem that the width of the walkway plate is smaller than that of the bailey truss is solved; set up the corner column cap, but the high-speed joint bailey frame further sets up fixed first subassembly that hangs, hangs first subassembly with first slip and mutually supports, prevents the whole horizontal migration of stores pylon.

Description

造楼机挂架连接组件Building machine hanger connection components

技术领域technical field

本实用新型涉及建筑施工领域,尤其涉及一种造楼机挂架连接组件。The utility model relates to the field of building construction, in particular to a connecting assembly for a hanger of a building machine.

背景技术Background technique

传统的高层建筑施工平台,一般称之为爬架或者脚手架,通过顶升机构,驱动挂架上升,施工人员在挂架上进行施工作业。The traditional high-rise building construction platform is generally called climbing frame or scaffolding. Through the jacking mechanism, the pylon is driven to rise, and the construction personnel carry out construction work on the pylon.

随着近年来人工成本的快速攀升,建筑行业也面临人力资源不足的情况,于是,造楼机的概念被顺势提出,其在传统爬架或者脚手架的顶部设置了大型作业平台,通过顶升机构,驱动大型作业平台和挂架上升,通过大型作业平台和挂架上搭载的自动化设备,从而快速施工,降低人力资源需求。With the rapid rise of labor costs in recent years, the construction industry is also facing the situation of insufficient human resources. Therefore, the concept of building machines was proposed, which sets up a large-scale operation platform on top of traditional climbing frames or scaffolding. Through the jacking mechanism , Drive the large-scale operation platform and the pylon to rise, and through the automatic equipment carried on the large-scale operation platform and the pylon, the construction can be carried out quickly and the demand for human resources can be reduced.

新型造楼机的大型作业平台可采用贝雷架搭建,为了保证大型作业平台与挂架能快速、高强度的连接,就需要重新设计大型作业平台与挂架的连接组件。The large-scale operation platform of the new building machine can be built with Bailey frame. In order to ensure the fast and high-strength connection between the large-scale operation platform and the pylon, it is necessary to redesign the connection components of the large-scale operation platform and the pylon.

挂架一般包括水平设置的走道板、竖直设置的立杆和竖直设置、连接相邻立杆的防护板,并通过立杆连接大型作业平台。由于走道板的宽度往往小于贝雷架宽度,如果直接在贝雷架下方固定挂架,就会出现挂架立杆倾斜设置的问题,其受力与重力方向不重合,长期受力容易发生断裂。The hanger generally includes a horizontally arranged walkway board, a vertically arranged vertical pole, and a vertically arranged protective plate connecting adjacent vertical poles, and is connected to a large work platform through the vertical pole. Since the width of the walkway board is often smaller than the width of the beret, if the hanger is fixed directly under the beret, there will be a problem of tilting the hanger pole, the force of which does not coincide with the direction of gravity, and long-term stress is prone to fracture .

实用新型内容Utility model content

有鉴于此,本实用新型提出了一种造楼机挂架连接组件,能实现立杆之间的间距可调节,从而适应不同宽度和数量的防护板。In view of this, the utility model proposes a building machine hanger connection assembly, which can realize the adjustable spacing between the vertical poles, thereby adapting to different widths and numbers of protective panels.

本实用新型的技术方案是这样实现的:本实用新型提供了一种造楼机挂架连接组件,其包括贝雷架单元和挂架,贝雷架单元包括两个贝雷架桁架和螺杆,贝雷架桁架上、下玄杆两端分别设置有接头,同一贝雷架单元的两个贝雷架桁架并排设置且中间由螺杆紧固连接;所述挂架包括走道板、立杆和防护板,其中,走道板水平设置并与竖直设置的立杆固定,相邻的立杆之间固定连接防护板,还包括两第一滑动吊头组件、悬挂横梁和第二滑动吊头组件,第一滑动吊头组件与贝雷架桁架下玄杆滑动连接且底部连接立杆;悬挂横梁包括两横梁和一挂梁,两横梁相互平行设置且相对固定,二者之间形成一滑动槽,挂梁纵向设置于滑动槽内且两端分别与两横梁固定;同一贝雷架单元的两个贝雷架桁架下玄杆上的第一滑动吊头组件分别穿过滑动槽并与两横梁连接;第二滑动吊头组件呈“n”形,其挂在悬挂横梁并穿过挂梁后底部连接立杆。The technical scheme of the present utility model is achieved as follows: the present utility model provides a building machine hanger connection assembly, which includes a beret frame unit and a hanger, and the beray frame unit includes two beray frame trusses and a screw rod, Joints are respectively provided at both ends of the upper and lower black poles of the belay frame truss, and the two belay frame trusses of the same belay frame unit are arranged side by side and are fastened and connected by screws in the middle; A board, wherein the walkway board is arranged horizontally and fixed to the vertical poles, and the adjacent poles are fixedly connected to the protective plate, and also includes two first sliding lifting head assemblies, a suspension beam and a second sliding lifting head assembly, The first sliding lifting head assembly is slidably connected to the lower rod of the Bailey truss and the bottom is connected to the vertical rod; the suspension beam includes two beams and a suspension beam, the two beams are arranged in parallel with each other and are relatively fixed, and a sliding groove is formed between them. The hanging beam is longitudinally arranged in the sliding groove, and the two ends are respectively fixed with the two beams; the first sliding lifting head components on the lower rods of the two beret trusses of the same beray frame unit respectively pass through the sliding groove and are connected with the two beams ; The second sliding hanging head assembly is in the shape of "n", which is hung on the hanging beam and is connected to the vertical pole at the bottom after passing through the hanging beam.

在以上技术方案的基础上,优选的,所述滑动吊头组件包括第一滑动底座、两组卡爪和第一连接板,其中,第一连接板顶部与第一滑动底座固定且底部连接立杆,第一滑动底座设置于贝雷架桁架下玄杆下方,两组卡爪分别相对固定在第一滑动底座并与贝雷架桁架下玄杆滑动连接。On the basis of the above technical solutions, preferably, the sliding lifting head assembly includes a first sliding base, two sets of claws and a first connecting plate, wherein the top of the first connecting plate is fixed to the first sliding base and the bottom is connected vertically. The rod, the first sliding base is arranged below the lower rod of the berley truss, and the two sets of claws are respectively fixed on the first sliding base and are slidably connected with the lower rod of the bailey truss.

进一步优选的,所述卡爪从外侧环抱贝雷架桁架下玄杆。Further preferably, the clamping claw surrounds the lower rod of the beret truss from the outside.

进一步优选的,所述第一连接板设置有两块,相对设置且二者之间设置有可供立杆伸入的通道,第一连接板上设置有第一通孔,所述立杆伸入两第一连接板之间并通过螺栓穿过第一通孔和立杆进行连接。Further preferably, the first connecting plate is provided with two pieces, which are arranged opposite to each other and a channel through which the vertical rod can be inserted is provided between the two, the first connecting plate is provided with a first through hole, and the vertical rod is extended. It is inserted between the two first connecting plates and connected through the first through hole and the vertical rod by bolts.

更进一步优选的,所述横梁采用槽钢,两横梁背对设置且二者侧面正对开设有两组长条孔,螺栓穿过长条孔和第一通孔并与螺母连接。More preferably, the beams are made of channel steel, the two beams are arranged opposite to each other and two sets of elongated holes are formed on the sides of the two beams, and the bolts pass through the elongated holes and the first through holes and are connected with nuts.

在以上技术方案的基础上,优选的,所述第二滑动吊头组件包括第二底座和两第二连接板,两第二连接板相对设置且顶部连接第二底座,第二底座设置于两横梁上表面,两第二连接板从挂梁侧面穿过且底部连接立杆。On the basis of the above technical solutions, preferably, the second sliding lifting head assembly includes a second base and two second connecting plates, the two second connecting plates are arranged opposite to each other and the top is connected to the second base, and the second base is arranged on the two second bases. On the upper surface of the beam, the two second connecting plates pass through the side of the hanging beam and the bottom is connected to the vertical rod.

在以上技术方案的基础上,优选的,还包括转角柱头,所述转角柱头为立方框架结构,立方框架结构八个顶角处分别水平向外延伸设置有转角接头,并通过所述转角接头与贝雷架单元的接头连接,所述转角柱头设置有至少4个,相邻的转角柱头之间连接若干个贝雷架单元。On the basis of the above technical solutions, it is preferable to further include a corner column head, the corner column head is a cubic frame structure, and corner joints are respectively extended horizontally outward at the eight corners of the cubic frame structure, and are connected to the corner joints through the corner joints. The joints of the Bailey frame units are connected, the corner column heads are provided with at least 4, and several Bailey frame units are connected between adjacent corner column heads.

进一步优选的,还包括固定吊头组件,所述固定吊头组件与转角柱头底部固定并连接立杆。Further preferably, it also includes a fixed lifting head assembly, the fixed lifting head assembly is fixed to the bottom of the corner column head and connected to the vertical pole.

更进一步优选的,固定吊头组件包括第四底座、第四连接板和U形螺栓,其中,第四底座设置于贝雷架桁架下玄杆下表面并通过U形螺栓紧固连接贝雷架桁架与第四底座,第四连接板顶部与第四底座固定且底部连接立杆。Further preferably, the fixed lifting head assembly includes a fourth base, a fourth connecting plate and a U-shaped bolt, wherein the fourth base is arranged on the lower surface of the lower black pole of the beret truss and is fastened and connected to the beret through U-shaped bolts. The truss is connected with the fourth base, the top of the fourth connecting plate is fixed with the fourth base, and the bottom is connected with the vertical rod.

在以上技术方案的基础上,优选的,所述立杆上从上至下依次开设有若干第二通孔,并通过螺栓穿过第一通孔和第二通孔进行连接。On the basis of the above technical solutions, preferably, a plurality of second through holes are formed on the vertical rod in sequence from top to bottom, and are connected by bolts passing through the first through holes and the second through holes.

本实用新型的造楼机挂架连接组件相对于现有技术具有以下有益效果:Compared with the prior art, the building machine hanger connection assembly of the present invention has the following beneficial effects:

(1)通过设置两第一滑动吊头组件、悬挂横梁和第二滑动吊头组件,立杆可沿贝雷架桁架下玄杆左右移动,能方便调节左右立杆之间的间距,适应不同尺寸的挂架;第二滑动吊头组件直接挂在悬挂横梁上,方便快捷,拆装方便;(1) By arranging two first sliding lifting head components, hanging beams and second sliding lifting head components, the vertical pole can move left and right along the lower pole of the Bailey truss, which can easily adjust the distance between the left and right vertical poles to adapt to different The size of the hanger; the second sliding lifting head assembly is directly hung on the hanging beam, which is convenient and quick, and easy to disassemble;

(2)在两横梁上设置长条孔,可调节前后立杆之间的间距,从而克服走道板的宽度小于贝雷架宽度的问题;(2) Long holes are arranged on the two beams to adjust the distance between the front and rear vertical poles, thereby overcoming the problem that the width of the walkway board is smaller than the width of the beret;

(3)设置转角柱头,可快速连接贝雷架,进一步设置固定吊头组件,与第一滑动吊头组件相互配合,防止挂架整体水平移动;(3) The corner column head is provided, which can be quickly connected to the Bailey frame, and the fixed lifting head assembly is further arranged to cooperate with the first sliding lifting head assembly to prevent the overall horizontal movement of the hanger;

(4)本实用新型的造楼机挂架连接组件,具有零部件易得、成本低、强度高,且便于快速组装和拆卸的优点,便于大规模推广应用。(4) The building machine hanger connection assembly of the present invention has the advantages of easy-to-obtain parts, low cost, high strength, convenient quick assembly and disassembly, and is convenient for large-scale popularization and application.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本实用新型的造楼机挂架连接组件的立体图;1 is a perspective view of a building machine hanger connection assembly of the present invention;

图2为本实用新型的造楼机挂架连接组件的部分结构立体图;2 is a perspective view of a part of the structure of the building machine hanger connection assembly of the present invention;

图3为本实用新型的造楼机挂架连接组件的部分结构立体图;3 is a perspective view of the partial structure of the connecting assembly of the building machine hanger of the present invention;

图4为图2中右侧椭圆区域的放大图;Fig. 4 is an enlarged view of the right elliptical region in Fig. 2;

图5为第一滑动吊头组件的立体图;5 is a perspective view of the first sliding head assembly;

图6为悬挂横梁的立体图;Figure 6 is a perspective view of a suspension beam;

图7为第二滑动吊头组件的立体图;7 is a perspective view of the second sliding head assembly;

图8为图2中左侧椭圆区域的放大图;Figure 8 is an enlarged view of the left elliptical region in Figure 2;

图9为固定吊头组件的立体图。FIG. 9 is a perspective view of the fixed lifting head assembly.

具体实施方式Detailed ways

下面将结合本实用新型实施方式,对本实用新型实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式仅仅是本实用新型一部分实施方式,而不是全部的实施方式。基于本实用新型中的实施方式,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施方式,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

如图1所示,结合图2~图9,本实用新型的造楼机挂架连接组件,其包括若干贝雷架单元1、挂架2、两第一滑动吊头组件3、悬挂横梁4、第二滑动吊头组件5、转角柱头6和固定吊头组件7。As shown in FIG. 1 , in conjunction with FIGS. 2 to 9 , the building machine hanger connection assembly of the present invention includes a plurality of Bailey frame units 1 , a hanger 2 , two first sliding lifting head assemblies 3 , and a suspension beam 4 , the second sliding lifting head assembly 5 , the corner column head 6 and the fixed lifting head assembly 7 .

贝雷架单元1,设置有若干个,首尾相互连接,形成直线排列的承重结构,这部分可采用现有技术。具体的,所述承重结构由顶升机构驱动,进行升降。具体的,贝雷架单元1包括两个贝雷架桁架11和螺杆12,贝雷架桁架11上、下玄杆两端分别设置有接头13,同一贝雷架单元1的两个贝雷架桁架11并排设置且中间由螺杆12紧固连接。The Bailey rack unit 1 is provided with several pieces, and the ends are connected to each other to form a load-bearing structure arranged in a straight line, and the existing technology can be used for this part. Specifically, the load-bearing structure is driven by a jacking mechanism to lift and lower. Specifically, the Bailey frame unit 1 includes two Bailey frame trusses 11 and screws 12 , the upper and lower black rods of the Bailey frame truss 11 are respectively provided with joints 13 , and the two Bailey frames of the same Bailey frame unit 1 are provided with joints 13 respectively. The trusses 11 are arranged side by side and are fastened by screws 12 in the middle.

所述挂架2包括走道板21、立杆22和防护板23,其中,走道板21水平设置并与竖直设置的立杆22固定,相邻的立杆22之间固定连接防护板23。具体的,所述走道板21上对应设置有多个立杆22,多个立杆22分别与顶部的承重结构连接,而相邻的立杆22之间各设置防护板23。The hanger 2 includes a walkway board 21 , a vertical rod 22 and a protective board 23 , wherein the walkway board 21 is arranged horizontally and fixed to the vertical vertical rod 22 , and the protective board 23 is fixedly connected between adjacent vertical rods 22 . Specifically, a plurality of vertical rods 22 are correspondingly disposed on the walkway board 21 , and the plurality of vertical rods 22 are respectively connected to the load-bearing structure at the top, and a protective plate 23 is provided between adjacent vertical rods 22 .

第一滑动吊头组件3,用于连接贝雷架桁架11和挂架2,并可沿贝雷架桁架11左右滑动。具体的,第一滑动吊头组件3与贝雷架桁架11下玄杆滑动连接且底部连接立杆22。更具体的,所述滑动吊头组件3包括第一滑动底座31、两组卡爪32和第一连接板33,其中,第一连接板33顶部与第一滑动底座31固定且底部连接立杆22,第一滑动底座31设置于贝雷架桁架11下玄杆下方,两组卡爪32分别相对固定在第一滑动底座31并与贝雷架桁架11下玄杆滑动连接。具体的,所述两组卡爪32可从贝雷架桁架11中间通道穿过,也能从贝雷架桁架11外侧环抱设计,在本实施例中,采用后一种方案。具体的,所述卡爪32从外侧环抱贝雷架桁架11下玄杆。具体的,所述第一连接板33设置有两块,相对设置且二者之间设置有可供立杆22伸入的通道,第一连接板33上设置有第一通孔30,所述立杆22伸入两第一连接板33之间并通过螺栓穿过第一通孔30和立杆22进行连接。The first sliding hanger assembly 3 is used to connect the beret truss 11 and the hanger 2 , and can slide left and right along the beret truss 11 . Specifically, the first sliding lifting head assembly 3 is slidably connected to the lower pole of the Bailey truss 11 and the bottom is connected to the vertical pole 22 . More specifically, the sliding lifting head assembly 3 includes a first sliding base 31, two sets of claws 32 and a first connecting plate 33, wherein the top of the first connecting plate 33 is fixed to the first sliding base 31 and the bottom is connected to a vertical rod. 22. The first sliding base 31 is arranged below the lower rod of the beret truss 11 . Specifically, the two sets of claws 32 can pass through the middle channel of the beret truss 11 , and can also be designed to be surrounded by the outside of the beret truss 11 . In this embodiment, the latter solution is adopted. Specifically, the clamping claw 32 surrounds the lower pole of the Bailey truss 11 from the outside. Specifically, the first connecting plate 33 is provided with two pieces, which are arranged opposite to each other and a channel through which the vertical rod 22 can be inserted is provided between the two. The first connecting plate 33 is provided with a first through hole 30, and the The upright rod 22 extends between the two first connecting plates 33 and is connected to the upright rod 22 through the first through hole 30 by bolts.

悬挂横梁4,用于连接第一滑动吊头组件3并悬挂第二滑动吊头组件5,将第二滑动吊头组件5承受的拉力传导到第一滑动吊头组件3。具体的,悬挂横梁4包括两横梁41和一挂梁42,两横梁41相互平行设置且相对固定,二者之间形成一滑动槽40,挂梁42纵向设置于滑动槽40内且两端分别与两横梁41固定;同一贝雷架单元1的两个贝雷架桁架11下玄杆上的第一滑动吊头组件3分别穿过滑动槽40并与两横梁41连接。作为第一滑动吊头组件3与悬挂横梁4的具体连接方式,所述横梁41采用槽钢,两横梁41背对设置且二者侧面正对开设有两组长条孔43,螺栓穿过长条孔43和第一通孔30并与螺母连接。如此,可调节悬挂横梁4相对第一滑动吊头组件3前后移动,从而调节第一滑动吊头组件3上的立杆22与第二滑动吊头组件5连接的立杆22之间的间距,从而适应不同尺寸的走道板21。The suspension beam 4 is used for connecting the first sliding lifting head assembly 3 and suspending the second sliding lifting head assembly 5 so as to transmit the tensile force borne by the second sliding lifting head assembly 5 to the first sliding lifting head assembly 3 . Specifically, the suspension beam 4 includes two beams 41 and a hanging beam 42. The two beams 41 are arranged parallel to each other and are relatively fixed, and a sliding groove 40 is formed therebetween. The hanging beam 42 is longitudinally arranged in the sliding groove 40 and has two ends respectively. It is fixed with the two beams 41 ; the first sliding lifting head assemblies 3 on the lower poles of the two beret trusses 11 of the same beret unit 1 respectively pass through the sliding grooves 40 and are connected with the two beams 41 . As a specific connection method between the first sliding head assembly 3 and the suspension beam 4, the beam 41 is made of channel steel, the two beams 41 are arranged back to face, and two sets of elongated holes 43 are opened on the sides of the two, and the bolts pass through the long holes 43. The strip hole 43 and the first through hole 30 are connected with the nut. In this way, the adjustable suspension beam 4 moves back and forth relative to the first sliding lifting head assembly 3, thereby adjusting the distance between the vertical rod 22 on the first sliding lifting head assembly 3 and the vertical rod 22 connected with the second sliding lifting head assembly 5, So as to adapt to the walkway boards 21 of different sizes.

第二滑动吊头组件5,悬挂在悬挂横梁4上并连接立杆22,其呈“n”形,其挂在悬挂横梁4并穿过挂梁42后底部连接立杆22。具体的,所述第二滑动吊头组件5包括第二底座51和两第二连接板52,两第二连接板52相对设置且顶部连接第二底座51,第二底座51设置于两横梁41上表面,两第二连接板52从挂梁42侧面穿过且底部连接立杆22。The second sliding hanger assembly 5 is hung on the hanging beam 4 and connected to the vertical rod 22 , which is in an "n" shape, and is hung on the hanging cross beam 4 and is connected to the vertical rod 22 at the bottom after passing through the hanging beam 42 . Specifically, the second sliding lifting head assembly 5 includes a second base 51 and two second connecting plates 52 . The two second connecting plates 52 are arranged opposite to each other and are connected to the second base 51 at the top. The second base 51 is disposed on the two beams 41 . On the upper surface, the two second connecting plates 52 pass through the side of the hanging beam 42 and are connected to the vertical rod 22 at the bottom.

转角柱头6,设置于转角部位,连接1~4个贝雷架单元1。所述转角柱头6为立方框架结构,立方框架结构八个顶角处分别水平向外延伸设置有转角接头60,并通过所述转角接头40与贝雷架单元1的接头13连接。具体的,转角柱头4包括八根型材、8根斜杆、16个转角接头60,所述八根型材首尾连接形成立方框架,具体的,所述八根型材可采用方管钢材焊接而成。8根斜杆两两交叉设置于立方框架的前、后、左和右四个面内。具体的,所述斜杆起斜向支撑作用,可采用方管钢材,处于避位考虑,每根斜杆可以通过两根方管钢材焊接而成。如此,通过在转角柱头6上连接两个、三个或四个贝雷架单元1,形成“L”形、“丁”字形或“十”字形的承重结构。具体的,所述转角柱头4设置有至少4个,相邻的转角柱头6之间连接若干个贝雷架单元1。The corner column head 6 is arranged at the corner position and is connected to 1 to 4 beret units 1 . The corner column head 6 is a cubic frame structure, and corner joints 60 extend horizontally outwards at the eight top corners of the cubic frame structure respectively, and are connected to the joint 13 of the Bailey frame unit 1 through the corner joints 40 . Specifically, the corner column head 4 includes eight profiles, eight inclined rods, and 16 corner joints 60. The eight profiles are connected end to end to form a cubic frame. Specifically, the eight profiles can be welded from square tube steel. Eight oblique rods are arranged in two crosses on the front, rear, left and right sides of the cubic frame. Specifically, the oblique rods play an oblique support role, and can be made of square tube steel. Considering the avoidance of position, each oblique rod can be formed by welding two square tube steels. In this way, by connecting two, three or four Bailey frame units 1 on the corner column head 6, an "L"-shaped, "T"-shaped or "cross"-shaped load-bearing structure is formed. Specifically, there are at least four corner post heads 4 , and a plurality of beret frame units 1 are connected between adjacent corner post heads 6 .

固定吊头组件7,一方面连接立杆22,另一方面对挂架2进行整体限位,防止其整体沿贝雷架桁架11移动。具体的,所述固定吊头组件7与转角柱头6底部固定并连接立杆22。具体的,固定吊头组件7包括第四底座71、第四连接板72和U形螺栓73,其中,第四底座71设置于贝雷架桁架11下玄杆下表面并通过U形螺栓73紧固连接贝雷架桁架11与第四底座71,第四连接板72顶部与第四底座71固定且底部连接立杆22。The hanging head assembly 7 is fixed, on the one hand, the vertical rod 22 is connected, and on the other hand, the hanger 2 is restrained as a whole to prevent it from moving along the Bailey truss 11 as a whole. Specifically, the fixed hanging head assembly 7 is fixed to the bottom of the corner column head 6 and connected to the vertical rod 22 . Specifically, the fixed lifting head assembly 7 includes a fourth base 71 , a fourth connecting plate 72 and U-shaped bolts 73 , wherein the fourth base 71 is arranged on the lower surface of the lower rod of the Bailey truss 11 and is fastened by the U-shaped bolts 73 The beret truss 11 is fixedly connected with the fourth base 71 , the top of the fourth connecting plate 72 is fixed with the fourth base 71 and the bottom is connected with the vertical rod 22 .

为了便于与第一滑动吊头组件3、第二滑动吊头组件5和固定吊头组件7快速连接并调节挂架2的高度,所述立杆22上从上至下依次开设有若干第二通孔20,并通过螺栓穿过第一通孔30和第二通孔220进行紧固连接。In order to facilitate quick connection with the first sliding lifting head assembly 3 , the second sliding lifting head assembly 5 and the fixed lifting head assembly 7 and adjust the height of the hanger 2 , the vertical rod 22 is provided with a number of second The through hole 20 is fastened through the first through hole 30 and the second through hole 220 through bolts.

以上所述仅为本实用新型的较佳实施方式而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only the preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the within the scope of protection of the present invention.

Claims (10)

1.一种造楼机挂架连接组件,其包括贝雷架单元(1)和挂架(2),贝雷架单元(1)包括两个贝雷架桁架(11)和螺杆(12),贝雷架桁架(11)上、下玄杆两端分别设置有接头(13),同一贝雷架单元(1)的两个贝雷架桁架(11)并排设置且中间由螺杆(12)紧固连接;所述挂架(2)包括走道板(21)、立杆(22)和防护板(23),其中,走道板(21)水平设置并与竖直设置的立杆(22)固定,相邻的立杆(22)之间固定连接防护板(23),其特征在于:还包括两第一滑动吊头组件(3)、悬挂横梁(4)和第二滑动吊头组件(5),第一滑动吊头组件(3)与贝雷架桁架(11)下玄杆滑动连接且底部连接立杆(22);悬挂横梁(4)包括两横梁(41)和一挂梁(42),两横梁(41)相互平行设置且相对固定,二者之间形成一滑动槽(40),挂梁(42)纵向设置于滑动槽(40)内且两端分别与两横梁(41)固定;同一贝雷架单元(1)的两个贝雷架桁架(11)下玄杆上的第一滑动吊头组件(3)分别穿过滑动槽(40)并与两横梁(41)连接;第二滑动吊头组件(5)呈“n”形,其挂在悬挂横梁(4)并穿过挂梁(42)后底部连接立杆(22)。1. A building machine hanger connection assembly, comprising a beret unit (1) and a hanger (2), the beret unit (1) comprising two beray trusses (11) and a screw (12) joints (13) are respectively provided at both ends of the upper and lower rods of the beret truss (11); Fastened connection; the hanger (2) includes a walkway board (21), a vertical pole (22) and a protective plate (23), wherein the walkway board (21) is horizontally arranged and connected with the vertical pole (22) Fixed, the protective plate (23) is fixedly connected between the adjacent vertical rods (22), and is characterized in that: it also includes two first sliding lifting head assemblies (3), a suspension beam (4) and a second sliding lifting head assembly ( 5), the first sliding lifting head assembly (3) is slidably connected to the lower pole of the Bailey truss (11) and the bottom is connected to the vertical pole (22); the suspension beam (4) includes two beams (41) and a suspension beam ( 42), the two beams (41) are arranged parallel to each other and are relatively fixed, a sliding groove (40) is formed between the two, and the hanging beam (42) is longitudinally arranged in the sliding groove (40) and the two ends are respectively connected with the two beams (41). ) is fixed; the first sliding lifting head assemblies (3) on the lower poles of the two beret trusses (11) of the same beret unit (1) respectively pass through the sliding groove (40) and connect with the two beams (41) Connection; the second sliding hanger assembly (5) is in the shape of "n", which is hung on the hanging beam (4) and is connected to the vertical rod (22) at the bottom after passing through the hanging beam (42). 2.如权利要求1所述的造楼机挂架连接组件,其特征在于:所述滑动吊头组件(3)包括第一滑动底座(31)、两组卡爪(32)和第一连接板(33),其中,第一连接板(33)顶部与第一滑动底座(31)固定且底部连接立杆(22),第一滑动底座(31)设置于贝雷架桁架(11)下玄杆下方,两组卡爪(32)分别相对固定在第一滑动底座(31)并与贝雷架桁架(11)下玄杆滑动连接。2. The building machine hanger connection assembly according to claim 1, characterized in that: the sliding lifting head assembly (3) comprises a first sliding base (31), two sets of claws (32) and a first connection A plate (33), wherein the top of the first connecting plate (33) is fixed with the first sliding base (31) and the bottom is connected to the vertical rod (22), and the first sliding base (31) is arranged under the beret truss (11) Below the profound rod, two sets of clamping claws (32) are respectively relatively fixed on the first sliding base (31) and slidably connected with the lower profound rod of the Bailey truss (11). 3.如权利要求2所述的造楼机挂架连接组件,其特征在于:所述卡爪(32)从外侧环抱贝雷架桁架(11)下玄杆。3. The connecting assembly of the hanger of a building building machine according to claim 2, characterized in that: the clamping claw (32) surrounds the lower rod of the beret truss (11) from the outside. 4.如权利要求2所述的造楼机挂架连接组件,其特征在于:所述第一连接板(33)设置有两块,相对设置且二者之间设置有可供立杆(22)伸入的通道,第一连接板(33)上设置有第一通孔(30),所述立杆(22)伸入两第一连接板(33)之间并通过螺栓穿过第一通孔(30)和立杆(22)进行连接。4. The building machine hanger connection assembly according to claim 2, characterized in that: the first connecting plate (33) is provided with two pieces, which are arranged oppositely and are provided with an available vertical rod (22) between the two. ) into the channel, the first connecting plate (33) is provided with a first through hole (30), the vertical rod (22) extends between the two first connecting plates (33) and passes through the first connecting plate (33) through bolts The through hole (30) is connected with the upright rod (22). 5.如权利要求4所述的造楼机挂架连接组件,其特征在于:所述横梁(41)采用槽钢,两横梁(41)背对设置且二者侧面正对开设有两组长条孔(43),螺栓穿过长条孔(43)和第一通孔(30)并与螺母连接。5. The building machine hanger connection assembly as claimed in claim 4, characterized in that: the beam (41) adopts channel steel, and the two beams (41) are arranged opposite to each other and two sets of lengths are arranged on the opposite sides of the two beams (41). The strip hole (43), the bolt passes through the long strip hole (43) and the first through hole (30) and is connected with the nut. 6.如权利要求1所述的造楼机挂架连接组件,其特征在于:所述第二滑动吊头组件(5)包括第二底座(51)和两第二连接板(52),两第二连接板(52)相对设置且顶部连接第二底座(51),第二底座(51)设置于两横梁(41)上表面,两第二连接板(52)从挂梁(42)侧面穿过且底部连接立杆(22)。6. The building machine hanger connection assembly according to claim 1, wherein the second sliding lifting head assembly (5) comprises a second base (51) and two second connecting plates (52), two The second connecting plates (52) are arranged opposite to each other and the top is connected to the second base (51), the second base (51) is arranged on the upper surfaces of the two beams (41), and the two second connecting plates (52) extend from the sides of the hanging beams (42). Pass through and connect the upright rod (22) at the bottom. 7.如权利要求1所述的造楼机挂架连接组件,其特征在于:还包括转角柱头(6),所述转角柱头(6)为立方框架结构,立方框架结构八个顶角处分别水平向外延伸设置有转角接头(60),并通过所述转角接头(60)与贝雷架单元(1)的接头(13)连接,所述转角柱头(6)设置有至少4个,相邻的转角柱头(6)之间连接若干个贝雷架单元(1)。7. The building machine hanger connection assembly according to claim 1, characterized in that: it also comprises a corner column head (6), the corner column head (6) is a cubic frame structure, and the eight top corners of the cubic frame structure are respectively A corner joint (60) is provided extending horizontally outward, and is connected with the joint (13) of the Bailey frame unit (1) through the corner joint (60), and the corner column head (6) is provided with at least four, corresponding to each other. A plurality of belay frame units (1) are connected between adjacent corner post heads (6). 8.如权利要求7所述的造楼机挂架连接组件,其特征在于:还包括固定吊头组件(7),所述固定吊头组件(7)与转角柱头(6)底部固定并连接立杆(22)。8. The building machine hanger connection assembly according to claim 7, characterized in that: it further comprises a fixed lifting head assembly (7), and the fixed lifting head assembly (7) is fixed and connected to the bottom of the corner column head (6) Pole (22). 9.如权利要求8所述的造楼机挂架连接组件,其特征在于:固定吊头组件(7)包括第四底座(71)、第四连接板(72)和U形螺栓(73),其中,第四底座(71)设置于贝雷架桁架(11)下玄杆下表面并通过U形螺栓(73)紧固连接贝雷架桁架(11)与第四底座(71),第四连接板(72)顶部与第四底座(71)固定且底部连接立杆(22)。9. The building machine hanger connection assembly according to claim 8, wherein the fixed lifting head assembly (7) comprises a fourth base (71), a fourth connecting plate (72) and a U-shaped bolt (73) , wherein, the fourth base (71) is arranged on the lower surface of the lower black pole of the Bere frame truss (11) and is fastened and connected to the Bere frame truss (11) and the fourth base (71) through U-shaped bolts (73). The top of the four connecting plates (72) is fixed with the fourth base (71) and the bottom is connected to the vertical rod (22). 10.如权利要求1所述的造楼机挂架连接组件,其特征在于:所述立杆(22)上从上至下依次开设有若干第二通孔(20),并通过螺栓穿过第一通孔(30)和第二通孔(20)进行连接。10. The connecting assembly for a building machine hanger according to claim 1, characterized in that: a plurality of second through holes (20) are sequentially opened on the vertical rod (22) from top to bottom, and are passed through by bolts The first through hole (30) and the second through hole (20) are connected.
CN202122203756.4U 2021-09-10 2021-09-10 Building machine hanger connection components Active CN216664932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122203756.4U CN216664932U (en) 2021-09-10 2021-09-10 Building machine hanger connection components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122203756.4U CN216664932U (en) 2021-09-10 2021-09-10 Building machine hanger connection components

Publications (1)

Publication Number Publication Date
CN216664932U true CN216664932U (en) 2022-06-03

Family

ID=81757468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122203756.4U Active CN216664932U (en) 2021-09-10 2021-09-10 Building machine hanger connection components

Country Status (1)

Country Link
CN (1) CN216664932U (en)

Similar Documents

Publication Publication Date Title
CN216276809U (en) Building machine bailey frame connecting assembly
CN212002170U (en) Adjustable support for elevator shaft operating platform
CN212535007U (en) A cantilever platform for segmental dismantling of cantilever frame
CN216276816U (en) Connecting assembly for hanging frame of building machine
CN216664932U (en) Building machine hanger connection components
CN214740171U (en) Ancient building wall body hoist and mount migration device
CN220599110U (en) Movable bridge type operation platform
CN216276808U (en) Building machine is made to intelligence steel bar welding
CN220319071U (en) A suspension mechanism with adjustable spacing for hanging baskets
CN216276813U (en) Building machine walkway plate connecting assembly
CN216276814U (en) Building machine walkway plate connecting assembly
CN216276815U (en) Connecting assembly for hanging frame of building machine
CN217711647U (en) Hanging basket suspension device suitable for high parapet
CN211037766U (en) Attached lifting scaffold body structure
CN110097807A (en) Hv cable termination experiment porch
CN216276810U (en) Connecting assembly for hanging frame of building machine
CN116290917A (en) Temporary support device for construction support of a suspension dome
CN209817424U (en) A mobile adjustable cantilevered operating platform suitable for super-long cantilevered structures
CN217871732U (en) Steel construction pergola Liang Muqiang hanging flower basket erects device
CN223119482U (en) A rear support device for a non-counterweight hanging basket and a hanging basket
CN219952637U (en) Overlength hanging flower basket support reinforced structure
CN223813901U (en) Mounting platform for steel plate shear wall
CN219491651U (en) Floor type scaffold with protective structure
CN217106080U (en) Aluminum alloy-steel combined attached lifting scaffold
CN223256422U (en) Multi-span assembled operating platform hung under steel beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240103

Granted publication date: 20220603

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20250220

Granted publication date: 20220603