CN211286559U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN211286559U
CN211286559U CN201922116674.9U CN201922116674U CN211286559U CN 211286559 U CN211286559 U CN 211286559U CN 201922116674 U CN201922116674 U CN 201922116674U CN 211286559 U CN211286559 U CN 211286559U
Authority
CN
China
Prior art keywords
roof
groups
bottom plate
pipe
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922116674.9U
Other languages
Chinese (zh)
Inventor
关辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922116674.9U priority Critical patent/CN211286559U/en
Application granted granted Critical
Publication of CN211286559U publication Critical patent/CN211286559U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a scaffold frame for construction, including bottom plate, support piece, stand and roof, support piece has all been welded in the four corners department of the diapire of bottom plate, support piece includes backing plate, screw rod and screw thread post, the four corners department of the roof of bottom plate has all welded the square column, and the top of four group's square columns all overlaps there is first square pipe, stand and first square pipe adaptation, the four corners department of the diapire of roof has all welded the landing leg, and four group's landing legs all insert in the first square pipe, the roof is located the top of stand, be provided with the drawknot piece between roof and the bottom plate, the drawknot piece includes second side pipe, horizontal pole and cylinder, the roof of roof is fixed with the protection piece, one side of bottom plate and roof all is fixed with even wall spare, even wall spare includes sleeve pipe, connecting rod and riser. This scaffold frame for construction has improved holistic stability, has ensured constructor's safety.

Description

Scaffold for building construction
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to scaffold frame for construction.
Background
The scaffold refers to various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site, and is a general term in the building industry, and the scaffold is made of materials which are generally as follows: bamboo, wood, steel pipes or synthetic materials, and scaffolds are also used as templates in some projects, and are also widely used in advertising, municipal, traffic roads and bridges, mines and other departments. Traditional scaffold frame passes through the horizontal pole and is connected with the pole setting to set up the frame, but the holistic stable form of this kind of frame is not high, and the workman is at work, because the gravity on the workstation distributes inhomogeneously can make the scaffold frame rock or even topple over, influences normal construction, threatens personal safety.
Therefore, in order to meet the current situation, the design and production of the scaffold for building construction are urgently needed to meet the actual use requirement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame for construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a scaffold frame for construction, includes bottom plate, support piece, stand and roof, support piece has all been welded in the four corners department of the diapire of bottom plate, the four corners department of the roof of bottom plate has all welded the square column, and the top of four groups of square columns all overlaps there is first square pipe, stand and first square pipe adaptation, the four corners department of the diapire of roof has all welded the landing leg, and four groups of landing legs all insert in the first square pipe, the roof is located the top of stand, be provided with the drawknot piece between roof and the bottom plate, the roof of roof is fixed with the protection piece, one side of bottom plate and roof all is fixed with even wall spare.
Preferably, support piece includes backing plate, screw rod and screw thread post, the screw with vertical screw rod adaptation is all seted up to the four corners department of backing plate, the roof welding of backing plate has the pipe, pipe and screw thread post threaded connection, the top welding of screw thread post has the connecting block of round platform form.
Preferably, even the wall spare includes sleeve pipe, connecting rod and riser, sheathed tube one end seted up with the draw-in groove, the connecting rod has been inserted to the sheathed tube other end, the multiunit screw has all been seted up to the roof of sleeve pipe and connecting rod, the connecting rod is kept away from sheathed tube one end welding and is had the riser, multiunit through-hole has been seted up to the inside of riser.
Preferably, the drawknot spare includes second side pipe, horizontal pole and cylinder, the welding of cylindrical lateral wall has four groups of horizontal poles, four groups the horizontal pole is kept away from cylindrical one end and is all welded second side pipe, four groups the screw has all been seted up to the lateral wall of second side pipe.
Preferably, the protection piece includes baffle, card strip and pillar, baffle and pillar all are provided with four groups, four groups the bottom of pillar all welds with the roof, four groups the draw-in groove of T shape is all seted up to the inside of pillar, four groups the equal integrated into one piece in both sides of baffle has the card strip with the draw-in groove adaptation of T shape, four groups the handle has all been welded to the lateral wall of baffle.
The utility model discloses a technological effect and advantage: according to the scaffold for building construction, the round pipe and the screw rod are rotated, the height of the supporting piece at the four corners of the bottom wall of the bottom plate can be adjusted, the bottom end of the screw rod is screwed into a soil layer, the stability of the bottom plate can be improved, and the bottom plate is suitable for outdoor uneven ground; the connecting rod is pulled and screwed in the bolt of the top wall of the sleeve, the vertical plate is connected with the embedded part or structure of the wall body through the bolt, the bottom plate, the top plate and the wall body can be tied, the whole body is prevented from falling, the second square tube is fixed outside the stand column, the second square tube, the cross rod and the cylinder are combined, the tie is formed among a plurality of groups of stand columns, and the deformation of the whole body is reduced; the clamping strips on the two sides of the baffle are inserted into the T-shaped clamping grooves of the support columns, workers on the top plate can be prevented from falling, the baffle can be detached only by lifting the baffle, the space is saved, the scaffold for building construction improves the overall stability, and the safety of constructors is ensured.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic structural view of the supporting member of the present invention;
fig. 3 is a top view of the drawknot article of the present invention;
fig. 4 is a top view of the protective member of the present invention.
In the figure: the structure comprises a base plate 1, a support 2, a base plate 20, a screw rod 21, a threaded column 22, a wall connecting piece 3, a sleeve 30, a connecting rod 31, a vertical plate 32, a square tube 4, a first square tube 5, a vertical column 6, a tie piece 60, a second square tube 61, a cross rod 62, a top plate 7, a protective piece 8, a baffle 80, a clamping strip 81 and a supporting column 82.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a scaffold for building construction as shown in figures 1-4, which comprises a bottom plate 1, a support piece 2, a vertical column 5 and a top plate 7, the four corners of the bottom wall of the bottom plate 1 are welded with supporting pieces 2, the four corners of the top wall of the bottom plate 1 are welded with square columns, the top ends of the four groups of square columns are sleeved with first square pipes 4, the upright post 5 is matched with the first square tube 4, the first square tube 4 is connected with the upright post 5 and the square column through bolts, the four corners of the bottom wall of the top plate 7 are welded with supporting legs, the four groups of supporting legs are all inserted into the first square pipe 4, the supporting legs are connected with the first square pipe 4 through bolts, the top plate 7 is positioned at the top end of the upright post 5, a drawknot piece 6 is arranged between the top plate 7 and the bottom plate 1, the top wall of the top plate 7 is fixed with a protection piece 8, and one sides of the bottom plate 1 and the top plate 7 are fixed with a wall connecting piece 3 through bolts.
Specifically, support piece 2 includes backing plate 20, screw rod 21 and screw thread post 22, the screw with vertical screw rod 21 adaptation is all seted up to the four corners department of backing plate 20, the roof welding of backing plate 20 has the pipe, pipe and screw thread post 22 threaded connection, the top welding of screw thread post 22 has the connecting block of round platform form, and rotatory pipe and screw rod 21 can adjust four group support piece 2's height, with the bottom screw in soil layer of screw rod 21, can improve bottom plate 1's stability, make bottom plate 1 adapt to the ground of outdoor unevenness.
Specifically, even wall part 3 includes sleeve pipe 30, connecting rod 31 and riser 32, sleeve pipe 30's one end seted up with the draw-in groove, connecting rod 31 has been inserted to sleeve pipe 30's the other end, the multiunit screw has all been seted up to sleeve pipe 30 and connecting rod 31's roof, the one end welding that sleeve pipe 30 was kept away from to connecting rod 31 has riser 32, multiunit through-hole has been seted up to riser 32's inside, and pull connecting rod 31 is connected sleeve pipe 30 and roof 7 or bottom plate 1 with the screw of the bolt screw in connecting rod 31 roof of sleeve pipe 30 roof, is connected riser 32 and wall body's built-in fitting or structural connection through the bolt, can realize the drawknot of bottom plate 1, roof 7 and wall body, prevents wholly to empty.
Specifically, drawknot spare 6 includes second side pipe 60, horizontal pole 61 and cylinder 62, the lateral wall welding of cylinder 62 has four groups of horizontal poles 61, four groups the one end that cylinder 62 was kept away from to horizontal pole 61 has all been welded second side pipe 60, four groups the screw has all been seted up to second side pipe 60's lateral wall, manages 60 covers the outside at stand 5 with second side pipe, utilizes bolt fastening second side pipe 60, and second side pipe 60, horizontal pole 61 and cylinder 62 combine, can form the drawknot between multiunit stand 5, have reduced holistic deformation.
Specifically, the protection part 8 includes baffle 80, card strip 81 and pillar 82, baffle 80 and pillar 82 all are provided with four groups, four groups the bottom of pillar 82 all welds with roof 7, four groups the draw-in groove of T shape, four groups are all seted up to the inside of pillar 82 the equal integrated into one piece in both sides of baffle 80 have with the card strip 81 of the draw-in groove adaptation of T shape, four groups the handle has all been welded to the lateral wall of baffle 80, inserts the draw-in groove of the T shape of pillar 82 with the card strip 81 of baffle 80 both sides, can prevent that the workman on the roof 7 from falling, only needs to lift baffle 80, can lift baffle 80 off, has saved the space.
Specifically, the scaffold for building construction can adjust the heights of four groups of supporting pieces 2 by rotating the circular pipes and the screw rods 21, screw the bottom ends of the screw rods 21 into the soil layer, improve the stability of the bottom plate 1, enable the bottom plate 1 to adapt to the outdoor uneven ground, pull the connecting rods 31, screw the bolts on the top wall of the sleeve 30 into the screw holes on the top wall of the connecting rods 31, connect the sleeve 30 with the top plate 7 or the bottom plate 1 through the bolts, connect the vertical plates 32 with the embedded parts or structures of the wall body through the bolts, realize the drawknot of the bottom plate 1, the top plate 7 and the wall body, prevent the whole from falling, sleeve the second square pipes 60 outside the upright columns 5, fix the second square pipes 60 through the bolts, combine the second square pipes 60 and the cross rods 61 with the cylinders 62, form drawknots among a plurality of upright columns 5, reduce the deformation of the whole, insert the clamping strips 81 on the two sides of the baffle 80 into the T-, the baffle 80 can be detached only by lifting the baffle 80, so that the space is saved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. The utility model provides a scaffold frame for construction, includes bottom plate (1), support piece (2), stand (5) and roof (7), its characterized in that: support piece (2) have all been welded in the four corners department of the diapire of bottom plate (1), the four corners department of the roof of bottom plate (1) has all welded the square column, and the top of four groups of square columns all overlaps there is first side pipe (4), stand (5) and first side pipe (4) adaptation, the landing leg has all been welded in the four corners department of the diapire of roof (7), and four groups of landing legs all insert first side pipe (4), roof (7) are located the top of stand (5), be provided with drawknot spare (6) between roof (7) and bottom plate (1), the roof of roof (7) is fixed with protection piece (8), one side of bottom plate (1) and roof (7) all is fixed with even wall spare (3).
2. A scaffold for construction according to claim 1, wherein: support piece (2) include backing plate (20), screw rod (21) and screw thread post (22), the screw with vertical screw rod (21) adaptation is all seted up to the four corners department of backing plate (20), the roof welding of backing plate (20) has the pipe, pipe and screw thread post (22) threaded connection, the top welding of screw thread post (22) has the connecting block of round platform form.
3. A scaffold for construction according to claim 1, wherein: even wall spare (3) include sleeve pipe (30), connecting rod (31) and riser (32), the one end of sleeve pipe (30) seted up with the draw-in groove, connecting rod (31) have been inserted to the other end of sleeve pipe (30), the multiunit screw has all been seted up to the roof of sleeve pipe (30) and connecting rod (31), the one end welding that sleeve pipe (30) were kept away from in connecting rod (31) has riser (32), multiunit through-hole has been seted up to the inside of riser (32).
4. A scaffold for construction according to claim 1, wherein: drawknot spare (6) include second side pipe (60), horizontal pole (61) and cylinder (62), the lateral wall welding of cylinder (62) has four groups of horizontal poles (61), four groups the one end that cylinder (62) were kept away from in horizontal pole (61) all welds second side pipe (60), four groups the screw has all been seted up to the lateral wall of second side pipe (60).
5. A scaffold for construction according to claim 1, wherein: guard piece (8) are including baffle (80), card strip (81) and pillar (82), baffle (80) and pillar (82) all are provided with four groups, four groups the bottom of pillar (82) all welds with roof (7), four groups the draw-in groove of T shape, four groups are all seted up to the inside of pillar (82) the card strip (81) with the draw-in groove adaptation of T shape, four groups the equal integrated into one piece in both sides of baffle (80) have, four groups the handle has all been welded to the lateral wall of baffle (80).
CN201922116674.9U 2019-12-02 2019-12-02 Scaffold for building construction Expired - Fee Related CN211286559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922116674.9U CN211286559U (en) 2019-12-02 2019-12-02 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922116674.9U CN211286559U (en) 2019-12-02 2019-12-02 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN211286559U true CN211286559U (en) 2020-08-18

Family

ID=72015406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922116674.9U Expired - Fee Related CN211286559U (en) 2019-12-02 2019-12-02 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN211286559U (en)

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN201786036U (en) Temporary protective barrier for building construction
CN207829505U (en) A kind of pin-connected panel floor edge protective fence
CN205675473U (en) A kind of precast stair lateral recumbent posture rack
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN211548680U (en) Scaffold for building construction
CN211286559U (en) Scaffold for building construction
CN209975987U (en) Outer wall scaffold with safety protection structure
CN112065013A (en) Outer wall scaffold reinforcing mechanism for construction
CN209429487U (en) A kind of scaffold of architectural engineering
CN210947854U (en) Support frame for steel structure construction with good stability
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN112723094A (en) Integrated wall-attached device based on synchronous climbing of light steel platform
CN209874424U (en) Building assembled safety scaffold
CN211143689U (en) Scaffold
CN210888010U (en) Construction handling frame
CN210369827U (en) Scaffold for building external wall construction
CN220620961U (en) Building construction has building construction frame of anti falling structure
CN206753006U (en) A kind of construction scaffold
CN205934748U (en) Support arrangement for be used for prestressing force stretch -draw of bent cap bottom surface
CN218508488U (en) Concrete axillary corner support stand column supporting system
CN217299928U (en) Outer frame faces limit protective structure
CN218091902U (en) Support connection structure for civil engineering
CN207110416U (en) A kind of modular workbench for how high-rise box column
CN213508793U (en) A template system for construction of municipal concrete drainage pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200818

Termination date: 20211202