CN215759596U - Bamboo wood tenon fourth of twelve earthly branches veneer connected node - Google Patents
Bamboo wood tenon fourth of twelve earthly branches veneer connected node Download PDFInfo
- Publication number
- CN215759596U CN215759596U CN202122023621.XU CN202122023621U CN215759596U CN 215759596 U CN215759596 U CN 215759596U CN 202122023621 U CN202122023621 U CN 202122023621U CN 215759596 U CN215759596 U CN 215759596U
- Authority
- CN
- China
- Prior art keywords
- bamboo
- raw bamboo
- raw
- steel bar
- barb
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the technical field of bamboo buildings, and discloses a bamboo tenon-and-mortise gluing connection node which comprises a first raw bamboo and a second raw bamboo, wherein the first raw bamboo and the second raw bamboo are in joggle joint, a first reinforcing steel bar assembly is fixedly arranged in the first raw bamboo, a second reinforcing steel bar assembly is arranged in the second raw bamboo, the first reinforcing steel bar assembly is connected with the second reinforcing steel bar assembly, and bar-planting glue is arranged at the joggle joint of the first raw bamboo and the second raw bamboo. The utility model provides a novel bamboo wood connecting node which has the advantages of simple processing and reliable connection, wherein a first reinforcing steel bar assembly and a second reinforcing steel bar assembly are respectively arranged in a first raw bamboo and a second raw bamboo, so that the first raw bamboo and the second raw bamboo can be firmly connected, the structural strength of the first raw bamboo and the second raw bamboo can be enhanced, the problems of position point splitting damage and shearing damage easily caused by adopting bolts and nails for connection are avoided, and the effect of enhancing connection and sealing can be achieved by arranging a bar planting adhesive.
Description
Technical Field
The utility model relates to the technical field of bamboo building materials, in particular to a bamboo tenon-and-mortise gluing connection node for mutual connection between bamboo materials.
Background
The bamboo wood is a green and environment-friendly material, and under the social background of promoting green and environment protection at present, the wide application of the bamboo wood is a trend, when the bamboo wood is used for building buildings, bolts, nails and the like are mostly adopted for connection between the bamboo wood, and the components are easy to crack and break at the positions of the bolts and the nails and shear damage. The implanted steel may enhance the tensile properties of the structure, but cleavage easily occurs. Modern glued joint has good corrosion resistance and strong shock resistance, but once the early damage occurs, the overall collapse of the joint part is easily caused, and the combination mode of the traditional single-form reinforcing steel bar and bamboo wood is limited. In addition, the traditional combination mode of the reinforcing steel bars and the bamboo wood needs to be processed and assembled by mechanical equipment, and the application scene of the bamboo wood nodes is a mountainous bamboo bridge which lacks mechanical processing, so that the reinforcing steel bars and the bamboo wood need to be completely processed and assembled, and then the finished product is transported to an application area, so that the transportation difficulty and the transportation cost are increased, and the application range of the bamboo wood is limited.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to overcome the defects in the prior art, and provides a bamboo tenon-and-mortise glued connection node which has the advantages of simplicity in processing and reliability in connection aiming at the defects in the prior art.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a bamboo timber tenon fourth of twelve earthly branches veneer connected node, includes the former bamboo of first former bamboo and second, first former bamboo with the former bamboo joggle of second, fixed mounting has first reinforcing bar subassembly in the first former bamboo, install second reinforcing bar subassembly in the former bamboo of second, first reinforcing bar subassembly with second reinforcing bar subassembly is connected, first former bamboo with the joggle department of the former bamboo of second is provided with the bar planting and glues.
Further, the first steel bar assembly comprises two oppositely-folded steel bars fixed in the first raw bamboo and 8-shaped steel bars connected with the two oppositely-folded steel bars.
Further, the second reinforcing bar subassembly is including installing barb winding reinforcing bar in the former bamboo of second, the one end of barb winding reinforcing bar sets up first barb, first barb with former bamboo fixed connection of second, the other end of barb winding reinforcing bar sets up the second barb, the second barb with 8 style of calligraphy steel bar connection.
Furthermore, a mortise is arranged on the first raw bamboo, a tenon is arranged at one end of the second raw bamboo, and the tenon is inserted into the mortise.
The utility model has the beneficial effects that:
the utility model provides a novel bamboo wood connecting node which has the advantages of simple processing and reliable connection, wherein a first reinforcing steel bar assembly and a second reinforcing steel bar assembly are respectively arranged in a first raw bamboo and a second raw bamboo, and are mutually connected, so that the first raw bamboo and the second raw bamboo can be firmly connected, the structural strength of the first raw bamboo and the second raw bamboo can be enhanced, the problems of position point fracture damage and shearing damage easily caused by adopting bolt and nail connection are avoided, and the arrangement of the bar planting glue can play a role in enhancing connection and sealing. According to the utility model, the first raw bamboo and the second raw bamboo are respectively implanted with the reinforcing steel bars and then are transported to a construction site for assembly, so that the bamboo can be used, the assembly operation is simple and convenient, and the problem of transportation cost increase caused by the space occupied by transporting finished products is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic structural view of an embodiment of the present invention before assembly;
FIG. 3 is an exploded view of an embodiment of the present invention;
wherein the reference numerals are: 1-first raw bamboo; 2-second raw bamboo; 3, mortising; 4-tenon; 5, planting bar glue; 6, winding steel bars by using barbs; 7 — a first barb; 8-a second barb; 9-8 shaped steel bars; and 10, folding the steel bars in half.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention are clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is apparent that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments that can be derived by one skilled in the art from the embodiments given herein are intended to be within the scope of the utility model.
It should be noted that all the directional indicators (such as the upper and lower … …) in the embodiment of the present invention are only used to explain the relative position relationship, movement, etc. of the components in a specific posture (as shown in the drawings), and if the specific posture is changed, the directional indicator is changed accordingly.
Referring to fig. 1 ~ 3, this embodiment provides a bamboo timber tenon fourth of twelve earthly branches veneer connected node, including first former bamboo 1 and the former bamboo 2 of second, first former bamboo 1 and the former bamboo 2 joggle of second, fixed mounting has first reinforcing bar subassembly in the first former bamboo 1, installs the second reinforcing bar subassembly in the former bamboo 2 of second, and first reinforcing bar subassembly is connected with the second reinforcing bar subassembly, and the joggle department of first former bamboo 1 and the former bamboo 2 of second is provided with bar planting glue 5.
In this embodiment, the first steel bar assembly includes two oppositely folded steel bars 10 fixed in the first raw bamboo 1 and 8-shaped steel bars 9 connected with the two oppositely folded steel bars 10. A double-over steel bar 10 is hooked at the left end and the right end of the 8-shaped steel bar 9, and the connecting mode is simple and is not easy to fall off.
The second reinforcing bar subassembly in this embodiment sets up first barb 7 including installing barb winding reinforcing bar 6 in the former bamboo 2 of second, barb winding reinforcing bar 6's one end, first barb 7 and the former bamboo 2 fixed connection of second, and barb winding reinforcing bar 6's the other end sets up second barb 8, and second barb 8 is connected with 8 style of calligraphy reinforcing bar 9.
In this embodiment, the first raw bamboo 1 is provided with the mortise 3, one end of the second raw bamboo 2 is provided with the tenon 4, and the tenon 4 is inserted into the mortise 3.
First former bamboo 1 diameter is greater than the 50 ~ 60mm of the former bamboo 2 diameter of second to when carrying out the tenon fourth of twelve earthly branches and handling, 50 ~ 60 mm's position can be left out in the first former bamboo 1 of mortise 3 place and not handle, then beat fifty percent discount reinforcing bar 10 and 8 style of calligraphy reinforcing bar 9 in first former bamboo 1, beat barb winding reinforcing bar 6 in the former bamboo 2 of second, the lower extreme and the 8 style of calligraphy reinforcing bar 9 of 6 reinforcing bar of barb winding are connected, set up mortise 3 on the first former bamboo 1, the one end of the former bamboo 2 of second is provided with tenon 4, then set up mortise 3 on tenon 4 of the former bamboo 2 of second and the first former bamboo 1 and carry out the joggle can.
In this embodiment, the depth of the upper barb winding steel bar 6 inserted into the first raw bamboo 1 is larger than the length of the tenon, and the diameter of the used steel bar is smaller than half of the thickness of the raw bamboo layer.
The specific manufacturing process of the embodiment is as follows: the first raw bamboo 1 and the second raw bamboo 2 are processed in a factory, mortises are formed in the first raw bamboo 1 through processing, and tenons are formed in the second raw bamboo through processing. Punching is performed at one end of a first raw bamboo 1 close to a bamboo joint, a folded steel bar 10 is implanted, then punching is performed at the other end of the first raw bamboo 1 close to the bamboo joint, the folded steel bar 10 is also implanted, then an 8-shaped steel bar 9 is implanted, the left end and the right end of the 8-shaped steel bar 8 are respectively connected with the folded steel bar 10, a second barb 8 at one end of a barb winding steel bar 6 is connected with the 8-shaped steel bar 8, then the position of a first barb 7 of the barb winding steel bar 6 on a second raw bamboo 2 is measured and punched, then the first barb 7 is bent after penetrating through a hole of the second raw bamboo 2, then a tenon 4 is inserted into the mortise 3, after connection is completed, rebar planting glue 5 is poured into a connecting gap between the mortise 3 and the tenon 4, and then the well-made bamboo tenon-mortise gluing connecting node is conveyed to a construction site to be assembled for use.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, it is not intended to limit the scope of the present invention, and it should be understood by those skilled in the art that various modifications or variations may be made without inventive faculty based on the technical solutions of the present invention.
Claims (3)
1. The utility model provides a novel bamboo timber connected node, includes the former bamboo of first former bamboo and second, its characterized in that, first former bamboo is pegged graft on the former bamboo of second, be provided with cross reinforcing bar and last barb reinforcing bar in the former bamboo of second, be provided with two cross reinforcing bars down in the first former bamboo relatively, two through barb reinforcing bar interconnect down between the cross reinforcing bar, the upper end of going up the barb reinforcing bar with go up cross steel bar connection, the lower extreme of going up the barb reinforcing bar inserts in the first former bamboo with barb steel bar connection down.
2. The novel bamboo wood connecting node as claimed in claim 1, wherein a joint between the first raw bamboo and the second raw bamboo is provided with a bar planting glue.
3. The novel bamboo wood connection node as claimed in claim 1, wherein the second raw bamboo is provided with a tenon, the first raw bamboo is provided with a mortise, and the tenon is inserted into the mortise to connect the second raw bamboo and the first raw bamboo.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122023621.XU CN215759596U (en) | 2021-08-26 | 2021-08-26 | Bamboo wood tenon fourth of twelve earthly branches veneer connected node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122023621.XU CN215759596U (en) | 2021-08-26 | 2021-08-26 | Bamboo wood tenon fourth of twelve earthly branches veneer connected node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215759596U true CN215759596U (en) | 2022-02-08 |
Family
ID=80078847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122023621.XU Active CN215759596U (en) | 2021-08-26 | 2021-08-26 | Bamboo wood tenon fourth of twelve earthly branches veneer connected node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215759596U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115627843A (en) * | 2022-10-26 | 2023-01-20 | 中国五冶集团有限公司 | Bamboo arch closure connecting structure and connecting method |
-
2021
- 2021-08-26 CN CN202122023621.XU patent/CN215759596U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115627843A (en) * | 2022-10-26 | 2023-01-20 | 中国五冶集团有限公司 | Bamboo arch closure connecting structure and connecting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9783985B2 (en) | Thermal break wood stud with rigid insulation with non-metal fasteners and wall framing system | |
US20070227095A1 (en) | Separated Member Wood Framing | |
CN202023297U (en) | Wooden structure member | |
CN215759596U (en) | Bamboo wood tenon fourth of twelve earthly branches veneer connected node | |
CN107386445B (en) | A kind of enhanced timber structure Tenon node of tenon shallow-layer bar planting | |
CN212478125U (en) | Recombined bamboo-reinforced concrete combined beam column joint | |
CN108162519B (en) | Longitudinal reinforced orthogonal laminated wood and manufacturing method thereof | |
CN102561168A (en) | Bamboo plywood beam structure | |
CN113719012A (en) | Shearing-resistant orthogonal laminated wood-concrete combined floor slab | |
US10195821B1 (en) | Bamboo laminated construction panel and method of manufacture | |
CN109072613B (en) | Structural member with paired flanges and webs | |
CN214941578U (en) | CLBT wallboard with built-in reinforcing steel bars | |
CN113463834B (en) | Combined rectangular beam and manufacturing method thereof | |
CN104526792B (en) | Functional bidirectional reinforced node plate for connecting wood structural members and preparation method and application thereof | |
CN113463837A (en) | Combined rectangular beam and manufacturing method thereof | |
CN202430625U (en) | I-shaped bamboo plywood beam structure | |
CN113463838B (en) | Combined T-shaped beam and manufacturing method thereof | |
CN113463835B (en) | Combined I-shaped beam and manufacturing method thereof | |
US20100279058A1 (en) | Building construction element made of bamboo | |
CN113463833B (en) | Combined T-shaped beam and manufacturing method thereof | |
KR101848060B1 (en) | Reinforcing method of wood structure using steel bar embedded lamination wood | |
JP4034322B2 (en) | Connection structure of wood and structure for wooden building using the same | |
KR101892224B1 (en) | Reinforced wood structure using steel bar embedded lamination wood | |
CN205712725U (en) | A kind of combined wall panel | |
CN205242644U (en) | Embedded connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |