CN215510915U - Support of high-efficient quick installation weir plate - Google Patents
Support of high-efficient quick installation weir plate Download PDFInfo
- Publication number
- CN215510915U CN215510915U CN202121694703.0U CN202121694703U CN215510915U CN 215510915 U CN215510915 U CN 215510915U CN 202121694703 U CN202121694703 U CN 202121694703U CN 215510915 U CN215510915 U CN 215510915U
- Authority
- CN
- China
- Prior art keywords
- ladder
- vertical main
- pipe
- guardrail
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The support comprises an operation platform, a guardrail and a ladder stand, wherein the top of the ladder stand is provided with a hook, the operation platform is arranged on the ladder stand, and the guardrail is arranged on the operation platform; after the support is assembled, the hook is hung on a working bridge in a mud scraper, then a worker descends onto the working platform along the ladder stand, the worker stands on the working platform to install and disassemble the weir plate and the slag baffle plate in the sedimentation tank, and the safety of the worker is protected by using the guardrail; the basket type structure formed by the guardrail and the operation platform can be fixedly connected with a plurality of positions with different heights on the ladder stand through bolts, so that the height of the operation platform can be increased or decreased; the bracket and the operation platform thereof also rotate together with the working bridge in the sedimentation tank, and can rotate to the next installation position for installation; to sum up, this support can prevent that the workman from falling into in the sewage, has guaranteed workman's safety, has reduced the time of installation and dismantlement, has improved efficiency.
Description
Technical Field
The utility model relates to the technical field of sewage treatment equipment, in particular to a support for efficiently and quickly installing a weir plate.
Background
The sedimentation tank is a structure for removing suspended matters in water by applying sedimentation and is equipment for purifying water. The suspended substances in the water are removed by utilizing the natural sedimentation or coagulating sedimentation of the water. The sedimentation tank is divided into a horizontal sedimentation tank and a vertical sedimentation tank according to the water flow direction. A horizontal sedimentation tank is usually provided with a travelling scraper for scraping sludge at the bottom of the tank.
In the prior art, in the installation process of a weir plate and a slag trap in a sedimentation tank, people mainly stand on an inclined ladder or a scaffold for installation or disassembly, or the people directly stand in sewage in the tank for installation or disassembly, the installation is dangerous for workers, the workers can fall into the sewage in the tank due to carelessness, the skin of the workers is burned or the workers enter the bodies of the workers by acidic, alkaline or toxic sewage, and the body health of the workers is seriously damaged, moreover, the installation needs to be carried out by replacing the next position after the installation of one weir plate and the slag trap, the inclined ladder or the scaffold needs to be moved, so that the time is wasted when the inclined ladder or the scaffold is moved again and again, and the installation and disassembly efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a support for efficiently and quickly mounting a weir plate, which is used for preventing workers from falling into sewage, ensuring the safety of the workers, reducing the time for mounting and dismounting and improving the efficiency for mounting and dismounting.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows:
a support for efficiently and quickly installing a weir plate comprises a working platform, a guardrail and a ladder stand;
the top of the ladder stand is provided with a hook, and the hook is used for being hung on a working bridge in a mud scraper;
the operation platform is arranged on the ladder stand, and the guardrail is arranged on the operation platform and used for protecting the safety of workers by utilizing the guardrail when the workers stand on the operation platform.
Preferably, the guardrail is welded on the operation platform so as to enable the guardrail and the operation platform to form a basket type structure;
the pipe wall of the left vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom, and the pipe wall of the right vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom;
a plurality of through holes are sequentially arranged on the pipe wall of the left vertical main supporting pipe in the guardrail and the welded operation platform from top to bottom, and a plurality of through holes are sequentially arranged on the pipe wall of the right vertical main supporting pipe in the guardrail and the welded operation platform from top to bottom;
a screw rod of a first left bolt is inserted into a through hole in a left vertical main supporting pipe of the crawling ladder and a through hole in a left vertical main supporting pipe of the operation platform and the guardrail which are welded together, and a nut is rotatably sleeved on the screw rod of the first left bolt to form bolt connection;
the screw rod of a first right bolt is inserted into a through hole in the vertical main supporting pipe on the right side of the crawling ladder and a through hole in the vertical main supporting pipe on the right side of the operation platform and the guardrail which are welded together, and the screw rod of the first right bolt is rotatably sleeved with a nut to form bolt connection.
Preferably, the operation platform, the guardrail and the ladder stand are all made of galvanized steel pipes through welding.
Preferably, the ladder stand is an extension ladder.
Preferably, the ladder comprises an upper ladder and a lower ladder, a plurality of through holes are sequentially formed in the pipe wall of a left vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially formed in the pipe wall of a right vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially formed in the pipe wall of a left vertical main supporting pipe of the lower ladder from top to bottom, and a plurality of through holes are sequentially formed in the pipe wall of a right vertical main supporting pipe of the lower ladder from top to bottom;
the left vertical main support pipe of the upper section ladder is inserted into the left vertical main support pipe of the lower section ladder, the screw rod of a second left bolt is inserted into the through hole in the left vertical main support pipe of the upper section ladder and the through hole in the left vertical main support pipe of the lower section ladder, and a nut is rotatably sleeved on the screw rod of the second left bolt to form bolt connection;
the vertical main support pipe in right side of upper segment ladder inserts in the vertical main support pipe in right side of hypomere ladder, the screw rod of the right bolt of second insert in the through-hole on the vertical main support pipe in right side of upper segment ladder with in the through-hole on the vertical main support pipe in right side of hypomere ladder rotatory cover establishes the nut on the screw rod of the right bolt of second and forms bolted connection.
The support comprises an operation platform, a guardrail and a ladder stand, wherein a hook is arranged at the top of the ladder stand, the operation platform is arranged on the ladder stand, and the guardrail is arranged on the operation platform;
after the support is assembled, the hook is hung on a working bridge in a mud scraper, then a worker descends onto a working platform along a ladder, the worker stands on the working platform to install and disassemble a weir plate and a slag baffle plate in a sedimentation tank, and the safety of the worker is protected by using a guardrail, so that the worker can operate on the ground;
the basket type structure formed by the guardrail and the operation platform is connected with the ladder stand through the bolts, the basket type structure can be detached, the basket type structure formed by the guardrail and the operation platform can be connected and fixed on the ladder stand at a plurality of positions with different heights through the bolts, and therefore the height of the operation platform can be increased or decreased, and workers can conveniently mount and detach weir plates and slag plates with different heights on the operation platform;
the working bridge of the mud scraper is rotated, so that the bracket and the working platform thereof rotate together with the working bridge in the sedimentation tank, and a worker can rotate to the next installation position to install after finishing installing a weir plate and a slag baffle every time, without moving an inclined ladder or a scaffold once and again like the prior art;
in conclusion, the support for efficiently and quickly installing the weir plate is provided, so that workers can be prevented from falling into sewage, the safety of the workers is ensured, the time for installing and disassembling is shortened, and the efficiency for installing and disassembling is improved; and the support has the advantages of fast assembly, light equipment, convenient and fast assembly and disassembly, convenient transportation, low noise, small failure rate, safety, energy conservation and the like.
Drawings
Fig. 1 is a schematic structural diagram of a support for efficiently and rapidly installing a weir plate according to an embodiment of the present invention (the view is from the outer diameter end of a working bridge to the middle point of the length of the working bridge along the length direction of the working bridge);
in the figure: 1 work platform, 2 guardrails, 3 cat ladders, 301 couple, 4 working bridges in the mud scraper.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
In the description of the present invention, it is to be understood that the terms "central," "axial," "radial," "longitudinal," "transverse," "length," "width," "upper," "lower," "front," "rear," "left," "right," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," and the like are used in the orientations and positional relationships indicated in the drawings and are only used for convenience in describing and simplifying the description, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the utility model.
Referring to fig. 1, in the figure: the working platform comprises a working platform 1, a guardrail 2, a ladder stand 3, a hook 301 and a working bridge 4 in the mud scraper.
The application provides a support for efficiently and quickly installing a weir plate, which comprises an operation platform 1, a guardrail 2 and a ladder stand 3;
the top of the ladder stand 3 is provided with a hook 301, and the hook 301 is used for being hung on a working bridge 4 in a mud scraper;
the operation platform 1 is arranged on the ladder stand 3, and the guardrail 2 is arranged on the operation platform 1, so that when a worker stands on the operation platform 1, the safety of the worker is protected by the guardrail 2.
In one embodiment of the application, the guardrail 2 is welded on the work platform 1 so that the guardrail 2 and the work platform 1 form a basket type structure;
the pipe wall of the left vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom, and the pipe wall of the right vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom;
a plurality of through holes are sequentially arranged on the pipe wall of the left vertical main supporting pipe in the basket type structure formed by the welded operation platform 1 and the guardrail 2 from top to bottom, and a plurality of through holes are sequentially arranged on the pipe wall of the right vertical main supporting pipe in the basket type structure formed by the welded operation platform 1 and the guardrail 2 from top to bottom;
a screw rod of a first left bolt is inserted into a through hole in a left vertical main supporting pipe of the ladder stand and a through hole in the left vertical main supporting pipe in a basket-type structure formed by the operation platform 1 and the guardrail 2 which are welded together, and a nut is rotatably sleeved on the screw rod of the first left bolt to form bolt connection;
a screw rod of a first right bolt is inserted into a through hole in a right vertical main supporting pipe of the crawling ladder and a through hole in the right vertical main supporting pipe in a basket-type structure formed by the operation platform 1 and the guardrail 2 which are welded together, and a nut is rotatably sleeved on the screw rod of the first right bolt to form bolt connection;
here, be bolted connection between basket formula structure that guardrail 2 and operation platform 1 enclose and cat ladder 3, this bolted connection has realized dismantling of basket formula structure, and when first left bolt and first right bolt insert the through-hole of co-altitude on the cat ladder in, realized that this guardrail 2 and basket formula structure that operation platform 1 encloses can fix in a plurality of positions of co-altitude on cat ladder 3 by bolted connection to realized that operation platform 1's height can be high or low, made things convenient for the workman to stand installation and dismantlement not co-altitude's weir plate and slag trap on operation platform 1.
In one embodiment of the application, the work platform 1, the guardrail 2 and the ladder stand 3 are all made of galvanized steel pipe by welding.
In one embodiment of the application, the ladder stand 3 is a telescopic ladder.
In an embodiment of the present application, the ladder stand 3 includes an upper ladder and a lower ladder, a plurality of through holes are sequentially arranged on a pipe wall of a left vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially arranged on a pipe wall of a right vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially arranged on a pipe wall of a left vertical main supporting pipe of the lower ladder from top to bottom, and a plurality of through holes are sequentially arranged on a pipe wall of a right vertical main supporting pipe of the lower ladder from top to bottom;
the left vertical main support pipe of the upper section ladder is inserted into the left vertical main support pipe of the lower section ladder, the screw rod of a second left bolt is inserted into the through hole in the left vertical main support pipe of the upper section ladder and the through hole in the left vertical main support pipe of the lower section ladder, and a nut is rotatably sleeved on the screw rod of the second left bolt to form bolt connection;
the right vertical main support pipe of the upper section ladder is inserted into the right vertical main support pipe of the lower section ladder, a screw rod of a second right bolt is inserted into a through hole in the right vertical main support pipe of the upper section ladder and a through hole in the right vertical main support pipe of the lower section ladder, and a nut is rotatably sleeved on the screw rod of the second right bolt to form bolt connection;
so fall into the cat ladder two sections of components of a whole that can function independently about upper segment ladder and hypomere ladder like this, and for the bolted connection in the bolt insertion through-hole between upper segment ladder and the hypomere ladder, so when the through-hole of co-altitude is inserted with the right bolt of second in, can become the cat ladder with the cat ladder, the length of cat ladder can grow or shorten, and then realized that the height of operation platform 1 can rise or reduce, made things convenient for the workman to stand installation and dismantlement checkboards and the slag trap of co-altitude on operation platform 1.
The support comprises an operation platform 1, a guardrail 2 and a ladder stand 3, wherein a hook 301 is arranged at the top of the ladder stand 3, the operation platform 1 is arranged on the ladder stand 3, and the guardrail 2 is arranged on the operation platform 1;
after the support is assembled, the hook 301 is hung on a working bridge 4 in a mud scraper, then a worker descends onto the working platform 1 along the ladder stand 3, the worker stands on the working platform 1 to install and detach the weir plate and the slag baffle in the sedimentation tank, and the safety of the worker is protected by the guardrail 2, so that the worker operates on the ground;
the basket type structure formed by the guardrail 2 and the operation platform 1 is connected with the ladder stand 3 through bolts, and the bolts can not only realize the disassembly of the basket type structure, but also realize the bolt connection of the basket type structure formed by the guardrail 2 and the operation platform 1 and fix the basket type structure on the ladder stand 3 at a plurality of positions with different heights, thereby realizing the height of the operation platform 1 which can be high or low, and facilitating the installation and disassembly of the weir plates and the slag plates with different heights by workers standing on the operation platform 1;
the working bridge 4 of the mud scraper rotates, so that the bracket and the working platform 1 thereof rotate together with the working bridge 4 in the sedimentation tank, and a worker can rotate to the next installation position to install after finishing installing a weir plate and a slag baffle every time, without moving an inclined ladder or a scaffold once and again like the prior art;
in conclusion, the support for efficiently and quickly installing the weir plate is provided, so that workers can be prevented from falling into sewage, the safety of the workers is ensured, the time for installing and disassembling is shortened, and the efficiency for installing and disassembling is improved; and the support has the advantages of fast assembly, light equipment, convenient and fast assembly and disassembly, convenient transportation, low noise, small failure rate, safety, energy conservation and the like.
Methods and devices not described in detail in the present invention are all the prior art and are not described in detail.
The above description of the embodiments is only intended to facilitate the understanding of the method of the utility model and its core idea. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.
Claims (5)
1. The support for efficiently and quickly installing the weir plate is characterized by comprising an operation platform, a guardrail and a ladder stand;
the top of the ladder stand is provided with a hook, and the hook is used for being hung on a working bridge in a mud scraper;
the operation platform is arranged on the ladder stand, and the guardrail is arranged on the operation platform and used for protecting the safety of workers by utilizing the guardrail when the workers stand on the operation platform.
2. A support for efficient and rapid installation of a weir plate according to claim 1, wherein the guardrail is welded to the work platform for enclosing the guardrail and the work platform into a basket-type structure;
the pipe wall of the left vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom, and the pipe wall of the right vertical main supporting pipe of the crawling ladder is sequentially provided with a plurality of through holes from top to bottom;
a plurality of through holes are sequentially arranged on the pipe wall of the left vertical main supporting pipe in the guardrail and the welded operation platform from top to bottom, and a plurality of through holes are sequentially arranged on the pipe wall of the right vertical main supporting pipe in the guardrail and the welded operation platform from top to bottom;
a screw rod of a first left bolt is inserted into a through hole in a left vertical main supporting pipe of the crawling ladder and a through hole in a left vertical main supporting pipe of the operation platform and the guardrail which are welded together, and a nut is rotatably sleeved on the screw rod of the first left bolt to form bolt connection;
the screw rod of a first right bolt is inserted into a through hole in the vertical main supporting pipe on the right side of the crawling ladder and a through hole in the vertical main supporting pipe on the right side of the operation platform and the guardrail which are welded together, and the screw rod of the first right bolt is rotatably sleeved with a nut to form bolt connection.
3. A support for efficient and rapid installation of a weir plate according to claim 1, wherein the work platform, the guardrail and the ladder are made of galvanized steel pipe by welding.
4. A high efficiency and rapid erected weir plate support according to claim 1 wherein the ladder is a telescopic ladder.
5. A support for efficient and rapid installation of a weir plate according to claim 4, wherein the ladder comprises an upper ladder and a lower ladder, a plurality of through holes are sequentially formed in the pipe wall of a left vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially formed in the pipe wall of a right vertical main supporting pipe of the upper ladder from top to bottom, a plurality of through holes are sequentially formed in the pipe wall of a left vertical main supporting pipe of the lower ladder from top to bottom, and a plurality of through holes are sequentially formed in the pipe wall of a right vertical main supporting pipe of the lower ladder from top to bottom;
the left vertical main support pipe of the upper section ladder is inserted into the left vertical main support pipe of the lower section ladder, the screw rod of a second left bolt is inserted into the through hole in the left vertical main support pipe of the upper section ladder and the through hole in the left vertical main support pipe of the lower section ladder, and a nut is rotatably sleeved on the screw rod of the second left bolt to form bolt connection;
the vertical main support pipe in right side of upper segment ladder inserts in the vertical main support pipe in right side of hypomere ladder, the screw rod of the right bolt of second insert in the through-hole on the vertical main support pipe in right side of upper segment ladder with in the through-hole on the vertical main support pipe in right side of hypomere ladder rotatory cover establishes the nut on the screw rod of the right bolt of second and forms bolted connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121694703.0U CN215510915U (en) | 2021-07-23 | 2021-07-23 | Support of high-efficient quick installation weir plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121694703.0U CN215510915U (en) | 2021-07-23 | 2021-07-23 | Support of high-efficient quick installation weir plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215510915U true CN215510915U (en) | 2022-01-14 |
Family
ID=79787384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121694703.0U Active CN215510915U (en) | 2021-07-23 | 2021-07-23 | Support of high-efficient quick installation weir plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215510915U (en) |
-
2021
- 2021-07-23 CN CN202121694703.0U patent/CN215510915U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
CN110158988A (en) | A kind of building protection steel structure support and its quick method for dismounting | |
CN107217836A (en) | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge | |
CN215887959U (en) | Hanging flower basket of encorbelmenting is used in aqueduct construction | |
CN215510915U (en) | Support of high-efficient quick installation weir plate | |
CN211736310U (en) | Movable hanging basket for bridge | |
CN210263832U (en) | Movable cantilever platform | |
CN107720580B (en) | Quick construction hoisting device and method for boiler construction water-cooled wall | |
CN211974390U (en) | Assembly type welding platform suitable for steel plate shear wall structure | |
CN107879261A (en) | A kind of tilting arch trash rack hanging apparatus and hanging method | |
CN210316439U (en) | Movable operating platform for installing high-altitude pipeline equipment | |
JP2004232366A (en) | Suspended scaffolding | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN203067936U (en) | High-altitude pipeline installation safe lifting bracket | |
CN207330284U (en) | A kind of moveable Overhauling for Hydraulic Generator Set platform | |
CN207063488U (en) | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge | |
CN214302798U (en) | Prevent hot wall inserted scaffold frame | |
CN210485627U (en) | Lamp bracket for building construction | |
CN115110530B (en) | Reinforced concrete support dismantling structure for ultra-deep foundation pit and construction method thereof | |
CN220058983U (en) | Quick-dismantling horizontal safety protection device | |
CN212176822U (en) | Municipal construction is with rail guard convenient to transport | |
CN203834365U (en) | Assembly device for continuous beam pier construction supporting frames | |
CN211396544U (en) | A clean system for sewage treatment field | |
CN219473279U (en) | Modularized supporting device for prying sand remover | |
CN219059723U (en) | Wet joint connection module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |