CN215167932U - Flower basket pull rod type hanging scaffold support - Google Patents

Flower basket pull rod type hanging scaffold support Download PDF

Info

Publication number
CN215167932U
CN215167932U CN202121407342.7U CN202121407342U CN215167932U CN 215167932 U CN215167932 U CN 215167932U CN 202121407342 U CN202121407342 U CN 202121407342U CN 215167932 U CN215167932 U CN 215167932U
Authority
CN
China
Prior art keywords
pull rod
connecting piece
basket
support
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121407342.7U
Other languages
Chinese (zh)
Inventor
曹磊
祝园园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xianxian Noda Construction Equipment Co ltd
Original Assignee
Xianxian Noda Construction Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xianxian Noda Construction Equipment Co ltd filed Critical Xianxian Noda Construction Equipment Co ltd
Priority to CN202121407342.7U priority Critical patent/CN215167932U/en
Application granted granted Critical
Publication of CN215167932U publication Critical patent/CN215167932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a basket of flowers pull rod formula hangs scaffold support, including shaped steel support, pull rod combination, the shaped steel support includes the shaped steel main part that the level set up and the connecting plate of vertical setting, the vertical fixed support connecting piece that is equipped with in shaped steel main part top, the connecting plate is fixed to be set up the tip of shaped steel main part, be equipped with two bolt holes on the connecting plate, the connecting plate is connected the combination and is connected with the building structure bulk phase through the bottom. Compared with the prior art, the utility model the advantage lie in: the structure is clear and definite, convenient to use connects two pull rods through the basket of flowers pull rod, and the installation is swift, demolish the convenience, and overall structure has fine stability. Under the condition of ensuring the construction safety, the arrangement speed of the scaffold is accelerated, the efficiency of project construction is effectively improved, the construction period can be shortened, and therefore expenses in all aspects of people, materials and machines are saved. Has strong practicability and market popularization value.

Description

Flower basket pull rod type hanging scaffold support
Technical Field
The utility model relates to a construction accessory technical field specifically indicates a basket of flowers pull rod formula hangs scaffold support.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form. And the buildings on higher floors mainly adopt overhanging type scaffolds so as to facilitate the high-rise construction process. And to encorbelmenting formula scaffold frame, it need follow the internal girder steel of choosing outward of building at the installation to set up buckle connection scaffold frame subassembly on the girder steel, form scaffold structure, the installation procedure is comparatively complicated, and it is comparatively inconvenient to use, therefore await the opportune moment and appear a neotype basket of flowers pull rod formula and hang scaffold structure, can effectively improve the installation rate of whole scaffold frame, thereby accelerate construction speed, improve the economic benefits of project.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem mentioned in the background art and providing a basket of flowers pull rod formula hangs scaffold support.
In order to solve the technical problem, the utility model provides a technical scheme does: a basket pull rod type hanging scaffold support comprises a profile steel support and a pull rod combination, wherein the profile steel support comprises a profile steel main body arranged horizontally and a connecting plate arranged vertically, a support connecting piece is vertically and fixedly arranged at the top end of the profile steel main body, the connecting plate is fixedly arranged at the end part of the profile steel main body, two bolt holes are formed in the connecting plate, and the connecting plate is connected with a building structure main body through a bottom connecting combination;
the pull rod assembly comprises a first pull rod and a second pull rod, the first pull rod and the second pull rod are connected through a basket pull rod, the first pull rod comprises a first connecting piece and a first pull rod welded and fixed with the first connecting piece, the second pull rod comprises a second connecting piece and a second pull rod welded and fixed with the second connecting piece, bolt holes are formed in the first connecting piece and the second connecting piece respectively, the basket pull rod comprises two hollow cylindrical sleeves, the two sleeves are connected through a plurality of basket pull rods, internal threads are formed in the sleeves, external threads are formed in the outer side, away from the first connecting piece, of the first pull rod, external threads are formed in the outer side, away from the second connecting piece, of the second pull rod, and the external threads of the first pull rod and the second pull rod are matched with the internal threads of the sleeves;
the first connecting piece is fixedly connected with the building structure main body through a top connecting component, and the second connecting piece is fixedly connected with the support connecting piece through a bolt;
the bottom coupling assembling includes the bottom gasket, be equipped with two connecting bolt on the bottom gasket perpendicularly, top coupling assembling includes the top gasket, be equipped with a connecting bolt on the top gasket perpendicularly.
Preferably, the steel section main body is an I-shaped steel.
As a preferable scheme, the number of the basket pull rods is not less than 2.
Preferably, the bolt and the connecting bolt are both provided with a gasket.
Compared with the prior art, the utility model the advantage lie in: the structure is clear and definite, convenient to use connects two pull rods through the basket of flowers pull rod, and the installation is swift, demolish the convenience, and overall structure has fine stability. Under the condition of ensuring the construction safety, the arrangement speed of the scaffold is accelerated, the efficiency of project construction is effectively improved, the construction period can be shortened, and therefore expenses in all aspects of people, materials and machines are saved. Has strong practicability and market popularization value.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an exploded view of the present invention.
FIG. 3 is a schematic structural view of the steel support of the present invention.
Fig. 4 is a schematic structural view of the first pull rod of the present invention.
Fig. 5 is a schematic structural view of the second pull rod of the present invention.
Fig. 6 is a schematic structural view of the flower basket pull rod of the present invention.
Fig. 7 is a schematic structural view of the top connector of the present invention.
Fig. 8 is a schematic structural view of the bottom connector of the present invention.
As shown in the figure: 1. the shaped steel support, 2, the pull rod combination, 3, the shaped steel main part, 4, the connecting plate, 5, the support connecting piece, 6, bottom coupling assembling, 7, the building structure main part, 8, first pull rod, 9, the second pull rod, 10, the basket of flowers pull rod, 11, first connecting piece, 12, first pull rod, 13, the second connecting piece, 14, the second pull rod, 15, the sleeve, 16, the basket of flowers pull rod, 17, top coupling assembling, 18, the bolt, 19, the bottom gasket, 20, connecting bolt, 21, the top gasket.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", "front", "back" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the resulting manner or original must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or point connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
With the aid of the attached drawings, the basket pull rod type suspended scaffold support comprises a profile steel support 1 and a pull rod combination 2, wherein the profile steel support 1 comprises a profile steel main body 3 arranged horizontally and a connecting plate 4 arranged vertically, a support connecting piece 5 is vertically and fixedly arranged at the top end of the profile steel main body 3, the connecting plate 4 is fixedly arranged at the end part of the profile steel main body 3, two bolt holes are formed in the connecting plate 4, and the connecting plate 4 is connected with a building structure main body 7 through a bottom connecting assembly 6;
the pull rod assembly 2 comprises a first pull rod 8 and a second pull rod 9, the first pull rod 8 and the second pull rod 9 are connected through a basket pull rod 10, the first pull rod 8 comprises a first connecting piece 11 and a first pull rod 12 fixed with the first connecting piece by welding, the second pull rod 9 comprises a second connecting piece 13 and a second pull rod 14 fixed with the second connecting piece by welding, the first connecting piece 11 and the second connecting piece 13 are respectively provided with bolt holes, the basket pull rod 10 comprises two hollow cylindrical sleeves 15, the two sleeves 15 are connected through a plurality of basket pull rods 16, the sleeve 15 is internally provided with internal threads, the outer side of the end part of the first tension rod 12 far away from the first connecting piece 11 is provided with external threads, the outer side of the end part, far away from the second connecting piece 13, of the second tension rod 14 is provided with an external thread, and the external threads of the first tension rod 12 and the second tension rod 14 are matched with the internal thread of the sleeve 15;
the first connecting piece 11 is fixedly connected with the building structure main body 7 through a top connecting piece 17, and the second connecting piece 13 is fixedly connected with the support connecting piece 5 through a bolt 18;
bottom coupling assembling 6 includes bottom gasket 19, be equipped with two connecting bolt 20 on the bottom gasket 19 perpendicularly, top coupling assembling 17 includes top gasket 21, be equipped with a connecting bolt 20 on the top gasket 21 perpendicularly.
The section steel main body 3 is I-shaped steel.
The number of the basket tension rods 16 is not less than 2.
The bolt 18 and the connecting bolt 20 are provided with gaskets.
The utility model discloses when concrete implementation, connect first pull rod, second pull rod through the basket of flowers pull rod and assemble for use, drill on building structure main part atress component to through top connecting piece, bottom connecting piece with pull rod combination and shaped steel support installation fixed, the back with pull rod combination and shaped steel support pass through the bolt fastening can. And subsequent installation and construction work of a pedal of a scaffold board and the like is carried out on the profile steel support.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a scaffold support is hung to basket pull rod formula, includes shaped steel support, draw bar assembly, its characterized in that: the profile steel support comprises a profile steel main body and a connecting plate, wherein the profile steel main body is horizontally arranged, the connecting plate is vertically arranged, a support connecting piece is vertically and fixedly arranged at the top end of the profile steel main body, the connecting plate is fixedly arranged at the end part of the profile steel main body, two bolt holes are formed in the connecting plate, and the connecting plate is connected with the building structure main body through a bottom connecting assembly;
the pull rod assembly comprises a first pull rod and a second pull rod, the first pull rod and the second pull rod are connected through a basket pull rod, the first pull rod comprises a first connecting piece and a first pull rod welded and fixed with the first connecting piece, the second pull rod comprises a second connecting piece and a second pull rod welded and fixed with the second connecting piece, bolt holes are formed in the first connecting piece and the second connecting piece respectively, the basket pull rod comprises two hollow cylindrical sleeves, the two sleeves are connected through a plurality of basket pull rods, internal threads are arranged in the sleeves, external threads are arranged on the outer side of the end portion, away from the first connecting piece, of the first pull rod, external threads are arranged on the outer side of the end portion, away from the second connecting piece, of the second pull rod, and the external threads of the first pull rod and the second pull rod are matched with the internal threads of the sleeves;
the first connecting piece is fixedly connected with the building structure main body through a top connecting component, and the second connecting piece is fixedly connected with the support connecting piece through a bolt;
the bottom coupling assembling includes the bottom gasket, be equipped with two connecting bolt on the bottom gasket perpendicularly, top coupling assembling includes the top gasket, be equipped with a connecting bolt on the top gasket perpendicularly.
2. The basket tie-bar suspended scaffold support of claim 1, wherein: the section steel main body is I-shaped steel.
3. The basket tie-bar suspended scaffold support of claim 1, wherein: the number of the flower basket tension rods is not less than 2.
4. The basket tie-bar suspended scaffold support of claim 1, wherein: the bolts and the connecting bolts are both provided with gaskets.
CN202121407342.7U 2021-06-24 2021-06-24 Flower basket pull rod type hanging scaffold support Active CN215167932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121407342.7U CN215167932U (en) 2021-06-24 2021-06-24 Flower basket pull rod type hanging scaffold support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121407342.7U CN215167932U (en) 2021-06-24 2021-06-24 Flower basket pull rod type hanging scaffold support

Publications (1)

Publication Number Publication Date
CN215167932U true CN215167932U (en) 2021-12-14

Family

ID=79382388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121407342.7U Active CN215167932U (en) 2021-06-24 2021-06-24 Flower basket pull rod type hanging scaffold support

Country Status (1)

Country Link
CN (1) CN215167932U (en)

Similar Documents

Publication Publication Date Title
CN113152873A (en) Heightening hanging basket system
CN215167932U (en) Flower basket pull rod type hanging scaffold support
CN211173007U (en) Novel tripod of encorbelmenting
CN211974274U (en) No counter weight hanging flower basket structure for construction
CN113309337A (en) Flower basket pull rod type hanging scaffold support
CN213139095U (en) Adjustable cage hanging scaffold operation tool for ship construction
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN201502170U (en) Horizontal supporting device of building external frame
CN215368621U (en) Construction support device for elevator shaft
CN218406331U (en) Anti-tilting scaffold
CN2216104Y (en) Hanging lift scaffold
CN218522201U (en) Hanging basket supporting platform at high parapet wall
CN216042530U (en) Heightening hanging basket system
CN217458557U (en) Attachment structure of main building tower crane
CN216921309U (en) Embrace post and link wall spare
CN214061676U (en) Steel construction high rim of a cup basis operation platform of portable
CN216787787U (en) Manual operation platform for tower crane dismantling
CN215329415U (en) Suspension cross beam for guyed cradle
CN216974142U (en) Non-standard hanging basket mounting structure
CN214942133U (en) High-safety scaffold for building
CN2267294Y (en) Hanging scaffolds made of steel rope
CN214785897U (en) Mount for construction
CN212562404U (en) Overhanging scaffold
CN220414810U (en) Double-hanging-point hanging basket
CN212562403U (en) Overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant