CN2267294Y - Hanging scaffolds made of steel rope - Google Patents

Hanging scaffolds made of steel rope Download PDF

Info

Publication number
CN2267294Y
CN2267294Y CN 96211541 CN96211541U CN2267294Y CN 2267294 Y CN2267294 Y CN 2267294Y CN 96211541 CN96211541 CN 96211541 CN 96211541 U CN96211541 U CN 96211541U CN 2267294 Y CN2267294 Y CN 2267294Y
Authority
CN
China
Prior art keywords
building
scaffold
wire rope
lifting
sliding sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96211541
Other languages
Chinese (zh)
Inventor
徐俊祥
陆江
唐俊杰
Original Assignee
徐俊祥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐俊祥 filed Critical 徐俊祥
Priority to CN 96211541 priority Critical patent/CN2267294Y/en
Application granted granted Critical
Publication of CN2267294Y publication Critical patent/CN2267294Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a scaffold which is hung on a wire rope fixed on a building. A guide rod of the scaffold is fastened by a sliding sleeve which is fixed on the building and stretches out of the building. In a lifting operation, a small transverse rod for inward pressing which is used for pushing against the building and is arranged on the bottom of the scaffold is loosened, and a lifting device under a steel beam hung on the wire rope fixed on the building can be started synchronously, so that the process of creeping lifting of the scaffold can be performed through the guide rod on the scaffold under the limitation of the sliding sleeve. The utility model has the advantages of possibility of being divided into slices freely in the construction of a high building, fewer steel work pieces for using, fewer lifting devices, low producing cost, low using cost, good performance for preventing overturn and dropping, and safe and convenient operation in the construction.

Description

Wire rope suspension type climbing frame
The utility model belongs to exterior wall scaffold for building.
In high-building construction, flying scaffold has obtained more application.When the moulding of highrise building was relatively more special, exterior wall scaffold needed burst, and the advantage of burst is that equipment investment is few, and cost is low.Adopt and divide the known technology of horse that attaching beam formula, tieform, post bolt formula etc. are arranged, as Chinese patent " outrigger supporting type lifting false work " (patent No. 92207902.1), need manually up (to descend) one deck carrying cantilever steel girder, and be welded into base with shaped steel, cost is artificial and material is more.
The purpose of this utility model provides a kind of burst flexibly, and easy construction is cheap, in lifting process and when static all tractive building, the anti-good unsettled exterior wall scaffold of drop function down of anti-turning over.
The utility model is achieved in that sets up 7-8 high exterior wall scaffold 1 of step, it adopts leger 2, vertical rod 4, little cross bar 3, bridging, diagonal brace and fastener, form a common stressed fastener steel tube structure, hung by the wire rope or the round steel 5,6 that are fixed on the floor, the guide rod 7 on the scaffold is fastened by sliding sleeve 8 fixing on the building and that stretch out; During lift work, loosen the scaffold bottom and withstand the little cross bar 3 that building is inwardly pressed, be enabled on the building lifting facility 10 below the girder steel 9 that fixing wire rope or round steel 11,12 hanging then synchronously, make the guide rod 7 on the scaffold limited the lifting of creeping of finishing scaffold 1 by sliding sleeve 8.Afterwards, adopt lifting facility 13 that girder steel 9 and lifting facility 10 are sling, fix behind lifting one deck.
The wire rope of scaffold cradle 1 and girder steel 9 or round steel 5,6,11,12 connect by the hoist cable 14 that stretches out in shackle 15 and the building preformed hole; Perhaps wire rope directly passes preformed hole, adopts steel pipe or a tree, used in making timber for boats wood fixing.
In scaffold 1 was creeped lifting process, sliding sleeve 8 can be made the reinforcing bar hook that is fixed on the building, fastened the guide rod 7 on the scaffold; Perhaps, adopt through special processing, the sliding sleeve 8 of more convenient dismounting, entangle the guide rod 7 on the scaffold, sliding sleeve 8 by with the steel pipe of its welding, adopt the fastener that connects with steel pipe to catch pre-buried short steel pipes on the building, fix with fastener after perhaps passing wall, beam preformed hole, make scaffold creeping lifting process and when static, have good anti-turning over and anti-drop function down.
The utility model adopts the steel workpiece seldom, burst flexibly in high-building construction, and the lifting facility are few, and are cheap, and use cost is low, and the anti-tenesmus of the anti-turning over of climbing frame performance is good, and constructing operation had not only made things convenient for but also safety.
Concrete structure of the present utility model passes through the accompanying drawing detailed presentations by following embodiment.Accompanying drawing 1 is a drawing in side sectional elevation of the present utility model, illustrates among the figure: 1, scaffold, 2, leger, 3, little cross bar, 4, vertical rod, 5,6, wire rope or round steel, 7, guide rod, 8, sliding sleeve, 9, girder steel, 10, lifting facility, 11,12, wire rope or round steel, 13, the lifting facility.
Accompanying drawing 2,3 is fixed on detail drawing on the building for wire rope or round steel, among the figure: 6, wire rope or round steel, 14, hoist cable, 15, shackle, 16, steel pipe.Wire rope should add rig thimbler, with the bend radius of assurance wire rope, and unlikely bad by folding.
Accompanying drawing 4,5 is that sliding sleeve and guide rod connect detail drawing, and Fig. 4 is a sectional drawing, and Fig. 5 is a plan view, among the figure: 7, guide rod, 8, sliding sleeve.Sliding sleeve can make convenient disassembly, through the combiner of special processing, after the steel pipe welding, catch short steel pipes pre-buried on the building by fastener, fix with fastener after perhaps passing wall, beam preformed hole.
Realize best way of the present utility model, should study the decision constructure scheme by the professional and technical personnel, adjust the load of climbing frame and the stress-bearing capability of wire rope or each parts of round steel, stress performance in the checking computations construction behind the beam slab suspension climbing frame, organize special construction team then, under unified leadership and commander, finish the lift work of climbing frame.

Claims (3)

1, a kind of wire rope suspension type climbing frame, form by scaffold 1, girder steel 9, lifting facility 10 etc., it is characterized in that: scaffold 1 is hung by the wire rope or the round steel 5,6 that are fixed on the building, and the guide rod 7 on the scaffold is fastened by sliding sleeve 8 fixing on the building and that stretch out; Below the girder steel 9 that wire rope of fixing or round steel 11,12 are hanging lifting facility 10 are arranged on building.
2, wire rope suspension type climbing frame according to claim 1 is characterized in that: wire rope or round steel 5,6,11,12 by shackle 15, connect with the hoist cable 14 that stretches out in the building preformed hole.
3, wire rope suspension type climbing frame according to claim 1, it is characterized in that: sliding sleeve 8 is the reinforcing bar hooks that are fixed on the building, fastens the guide rod 7 on the scaffold.
CN 96211541 1996-05-18 1996-05-18 Hanging scaffolds made of steel rope Expired - Fee Related CN2267294Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96211541 CN2267294Y (en) 1996-05-18 1996-05-18 Hanging scaffolds made of steel rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96211541 CN2267294Y (en) 1996-05-18 1996-05-18 Hanging scaffolds made of steel rope

Publications (1)

Publication Number Publication Date
CN2267294Y true CN2267294Y (en) 1997-11-12

Family

ID=33894438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96211541 Expired - Fee Related CN2267294Y (en) 1996-05-18 1996-05-18 Hanging scaffolds made of steel rope

Country Status (1)

Country Link
CN (1) CN2267294Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343614A (en) * 2013-07-25 2013-10-09 北京建工博海建设有限公司 Scaffold unloading steel wire rope setting method
CN109826411A (en) * 2019-02-02 2019-05-31 广东博智林机器人有限公司 A kind of climbing frame and its operation method for building
WO2020156560A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Climbing tower crane apparatus and control method therefor, traveling crane system and fault handling method and control method therefor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343614A (en) * 2013-07-25 2013-10-09 北京建工博海建设有限公司 Scaffold unloading steel wire rope setting method
CN109826411A (en) * 2019-02-02 2019-05-31 广东博智林机器人有限公司 A kind of climbing frame and its operation method for building
WO2020156560A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Climbing tower crane apparatus and control method therefor, traveling crane system and fault handling method and control method therefor

Similar Documents

Publication Publication Date Title
CN107055347B (en) A kind of Tower crane disassembly structures and methods of high-rise installation
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
CN201598820U (en) Single-point suspension external hanging rack
US4452337A (en) Sectional scaffolding raising apparatus
US2136696A (en) Scaffold
CN110043020A (en) A kind of light-duty self-crawling type shielding frame system and its construction method
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN2267294Y (en) Hanging scaffolds made of steel rope
CN216918357U (en) Hoisting device utilizing building internal structure
CN213596814U (en) Movable three-dimensional spanning multi-purpose suspension bridge construction platform
US5058708A (en) Scaffold and hoist structure
CN210563357U (en) Construction safety supporting rod for building scaffold
CN218406382U (en) A operation platform that encorbelments for construction of roofing overlength structure of encorbelmenting
CN219260998U (en) An anchor cable tensioner
CN209293395U (en) Construction adhesion type safety work protective platform
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN217000799U (en) A combined hanging basket jib device for high-rise building exterior wall construction
CN215167932U (en) Flower basket pull rod type hanging scaffold support
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN2216104Y (en) Hanging lift scaffold
JP2948433B2 (en) Dismantling method of steel freestanding chimney
CN222757825U (en) A tower crane attachment frame installation tool
CN219906752U (en) Hoisting device for anti-floating anchor rod
CN218376312U (en) Operating hanging rack for sewage pool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee