CN215160368U - Be used for climbing frame and demolish artifical hoisting device - Google Patents

Be used for climbing frame and demolish artifical hoisting device Download PDF

Info

Publication number
CN215160368U
CN215160368U CN202121291402.3U CN202121291402U CN215160368U CN 215160368 U CN215160368 U CN 215160368U CN 202121291402 U CN202121291402 U CN 202121291402U CN 215160368 U CN215160368 U CN 215160368U
Authority
CN
China
Prior art keywords
support
suspension beam
support main
climbing frame
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121291402.3U
Other languages
Chinese (zh)
Inventor
陈志军
王炎伟
彭建良
李小玥
闫新宇
陈稳德
曹建红
尹伟贤
厉楠
文诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Huanan Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Huanan Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Huanan Construction Investment Group Co ltd, Zhongtian Construction Group Co Ltd filed Critical Zhongtian Huanan Construction Investment Group Co ltd
Priority to CN202121291402.3U priority Critical patent/CN215160368U/en
Application granted granted Critical
Publication of CN215160368U publication Critical patent/CN215160368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a be used for climbing frame and demolish artifical hoisting device, including support main part and hoist mechanism, support main part upper end is equipped with one and hangs the roof beam, it all is equipped with at least one regulation hole that is linked together to hang the roof beam both sides, hang the arbitrary of roof beam through both sides regulation hole and bolt cooperation and the adjustable installation of support main part, the one end and the middle part of hanging the roof beam respectively are equipped with a pulley, each a wire rope has been set up jointly on the pulley and is connected with hoist mechanism. The utility model discloses a suspension beam and support main part cooperation are demolishd climbing the frame, need not the artifical construction in high altitude, are equipped with a plurality of regulation holes on the suspension beam simultaneously, and the regulation hole through different positions is connected the length that the tip of fixed adjustable suspension beam externally stretches out with the support main part, conveniently demolishs the frame of climbing with the different distances in house, demolishs fastly, the effectual engineering time that has reduced.

Description

Be used for climbing frame and demolish artifical hoisting device
Technical Field
The utility model relates to a construction building technical field specifically is a be used for climbing frame and demolish artifical hoisting device.
Background
At present, climb the frame and use at housing construction engineering more and more extensively, nevertheless because climb the frame and climb to the top layer after, adopt the tower crane branch to stride to hang and tear open usually, nevertheless because the tower crane is arranged to run into often and can't cover the whole floor, lead to the part to climb the frame and can't demolish through the tower crane, traditional way is artifical demolishs, demolish the artifical walkways board that will walk of process, the safety net, the pole setting etc. and demolish respectively, transport to ground through people goods ladder after demolising, this method is inefficient, demolish the cycle length, and demolish the in-process, safety measure can't be ensured, there is the high risk of weighing down.
The prior climbing frame dismantling method always faces the following problems:
the climbing frame can not be detached through the tower crane in partial scenes, the manual detaching mode is used, the detaching speed is low, the detaching time is long, the climbing frame with different distances between the climbing frame and a house is difficult to detach, and the high-falling risk exists.
SUMMERY OF THE UTILITY MODEL
The utility model provides a be arranged in climbing frame and demolish artifical hoisting device in order to solve the problem that proposes among the above-mentioned background art.
In order to solve the above problem, the utility model adopts the following technical scheme:
the utility model provides a be used for climbing frame and demolish artifical hoisting device, includes support main part and hoist mechanism, support main part upper end is equipped with a suspended beam, the suspended beam both sides all are equipped with at least one regulation hole that is linked together, suspended beam passes through the arbitrary of both sides regulation hole and bolt cooperation and the adjustable installation of support main part, the one end and the middle part of suspended beam respectively are equipped with a pulley, each a wire rope has been set up jointly on the pulley and is connected with hoist mechanism.
Preferably, the support main body comprises two support main beams which are parallel to each other and two support cross beams which are parallel to each other, the support main beams and the support cross beams are combined to form a square base, support frames are further fixedly mounted on the support cross beams, a diagonal draw bar is further arranged between the support frames to be connected and fixed, the diagonal draw bars are arranged on two side faces of the support frames and are arranged in a crossed mode in opposite directions, the strength of the support frames is enhanced, and the support frames are prevented from being damaged due to the fact that the support frames climb over heavy when in use.
Preferably, the upper end of each support frame is provided with a connecting hole, the adjusting holes are arranged on the suspension beam at the same interval along the length direction of the suspension beam, and the suspension beam is fixed on the support frame through the matching of any adjusting hole and the connecting hole, so that the suspension beam can be connected with the support frame through different adjusting holes to determine the length of the suspension beam extending outwards.
Preferably, the square base is far away from two one side of pulley still is equipped with the counter weight base, placed the counter weight on the counter weight base, prevented to lead to the condition that the device turned on one's side because of the barycenter skew in the use.
Preferably, the lifting mechanism is fixed above the two main beams of the support.
Compared with the prior art, the utility model discloses there is following beneficial effect to be:
the utility model discloses a placer demolishs climbing the frame on the house floor, need not tower crane or high altitude manual construction, prevents that the artifical high danger that weighs down that appears, hangs simultaneously and is equipped with a plurality of regulation holes on the roof beam, and the regulation hole through different positions is connected the length that the tip of fixed adjustable hanging beam externally stretches out with the support main part, conveniently demolishs the climbing frame with the different distances in house, demolishs fastly, the effectual engineering time that has reduced.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
1-support main body, 11-support frame, 111-connecting hole, 12-support beam, 13-support main beam, 14-diagonal draw bar, 2-suspension beam, 21-adjusting hole, 3-counterweight base, 31-counterweight, 4-lifting mechanism, 5-pulley and 6-steel wire rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the manual lifting device for scaffold removal comprises a support main body 1 and a lifting mechanism 4, wherein a suspension beam 2 is arranged at the upper end of the support main body 1, at least one adjusting hole 21 communicated with each other is formed in each of two sides of the suspension beam 2, the suspension beam 2 is adjustably mounted with the support main body 1 through the cooperation of any adjusting hole 21 in each of the two sides and a bolt, a pulley 5 is arranged at each of one end and the middle of the suspension beam 2, the distance between the two pulleys 5 is 1m, and a steel wire rope 6 is jointly erected on each pulley 5 and connected with the lifting mechanism 4.
The support main body 1 comprises two support main beams 13 which are parallel to each other and two support cross beams 12 which are parallel to each other, the support main beams 13 and the support cross beams 12 are combined to form a square base, support frames 11 are further fixedly mounted on the support cross beams 12, a diagonal draw bar 14 is further arranged between the support frames 11 to be connected and fixed, the diagonal draw bars 14 are arranged on two side faces of the support frames 11 and are arranged in a crossed mode in opposite directions, the strength of the support frames 11 is enhanced, and the support frames 11 are prevented from being damaged due to too heavy climbing when in use.
The upper end of each support frame 11 is provided with a connecting hole 111, the adjusting holes 21 are arranged on the suspension beam 2 at the same interval along the length direction of the suspension beam 2, the distance between the adjusting holes 21 is 100mm, the diameter of each adjusting hole 21 is 16mm, the suspension beam 2 is installed and fixed on the support frame 11 through any adjusting hole 21 and the connecting hole 111 in a matching manner, so that the suspension beam 2 can be connected with the support frame 11 through different adjusting holes 21 to determine the outward extending length of the suspension beam 2.
Keep away from two square base one side of pulley 5 still is equipped with the counter weight base, counter weight 31 has been placed on counter weight base 3, prevents to lead to the condition that the device turned on one's side because of barycentric shift in the use.
The lifting mechanism 4 is fixed above the two main support beams 13.
The utility model discloses during the use, with suspension beam 2 and support main part 1 in corresponding floor department equipment installation, the length that suspension beam 2 stretches out is adjusted through the regulation hole 21 on suspension beam 2 according to the position of climbing the frame simultaneously, places counter weight 31 on support main part 1's counter weight base 3, is fixed with hoist mechanism 4 on support main part 1's the support girder 13, is equipped with pulley 5 on suspension beam 2. After the device is determined to be stable, the steel wire rope 6 is erected on the two pulleys 5 and is connected with the lifting mechanism 4, the other end of the steel wire rope 6 is locked with a lifting point of the climbing frame, and the lifting mechanism 4 is started to integrally lift the climbing frame to the ground for manual removal.
The utility model discloses a suspension beam 2 removes climbing frame with the cooperation of support main part 1, need not the artifical construction in high altitude, is equipped with a plurality of regulation holes 21 on suspension beam 2 simultaneously, and the regulation hole 21 through different positions is connected the length that the tip of fixed adjustable suspension beam 2 externally stretches out with support main part 1, conveniently demolishs the climbing frame with the different distances in house, demolishs fastly, the effectual engineering time that has reduced.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a be used for climbing frame and demolish artifical hoisting device, includes support main part (1) and hoist mechanism (4), its characterized in that: the support is characterized in that a suspension beam (2) is arranged at the upper end of the support main body (1), at least one adjusting hole (21) communicated with each other is formed in each of two sides of the suspension beam (2), the suspension beam (2) is matched with a bolt through any adjusting hole (21) in each of two sides and is adjustably mounted on the support main body (1), a pulley (5) is arranged at each of one end and the middle of the suspension beam (2), and a steel wire rope (6) is jointly erected on each pulley (5) to be connected with a lifting mechanism (4).
2. A climbing frame dismantling artificial lift device according to claim 1, characterized in that: the support main body (1) comprises two support main beams (13) which are parallel to each other and two support cross beams (12) which are parallel to each other, the support main beams (13) and the support cross beams (12) are combined to form a square base, support frames (11) are further fixedly mounted on the support cross beams (12), oblique pull rods (14) are further arranged between the support frames (11) to be connected and fixed, and the oblique pull rods (14) are arranged on two side faces of the support frames (11) and are arranged in a crossed mode in opposite directions.
3. A climbing frame dismantling artificial lift device according to claim 2, characterized in that: the upper end of each support frame (11) is provided with a connecting hole (111), the adjusting holes (21) are arranged on the suspension beam (2) at the same interval along the length direction of the suspension beam (2), and the suspension beam (2) is matched with the connecting holes (111) through any one adjusting hole (21) and is fixedly arranged on the support frame (11).
4. A climbing frame dismantling artificial lift device according to claim 3, characterized in that: one side of the square base, which is far away from the two pulleys (5), is also provided with a counterweight base, and a counterweight (31) is placed on the counterweight base (3).
5. A climbing frame dismantling artificial lift device according to claim 2, characterized in that: the lifting mechanism (4) is fixed above the two main beams (13) of the bracket.
CN202121291402.3U 2021-06-09 2021-06-09 Be used for climbing frame and demolish artifical hoisting device Expired - Fee Related CN215160368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121291402.3U CN215160368U (en) 2021-06-09 2021-06-09 Be used for climbing frame and demolish artifical hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121291402.3U CN215160368U (en) 2021-06-09 2021-06-09 Be used for climbing frame and demolish artifical hoisting device

Publications (1)

Publication Number Publication Date
CN215160368U true CN215160368U (en) 2021-12-14

Family

ID=79388480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121291402.3U Expired - Fee Related CN215160368U (en) 2021-06-09 2021-06-09 Be used for climbing frame and demolish artifical hoisting device

Country Status (1)

Country Link
CN (1) CN215160368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114571392A (en) * 2022-03-02 2022-06-03 湖北中科产业技术研究院有限公司 Climbing frame net piece renovates automatic dismounting device for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114571392A (en) * 2022-03-02 2022-06-03 湖北中科产业技术研究院有限公司 Climbing frame net piece renovates automatic dismounting device for building

Similar Documents

Publication Publication Date Title
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN103523683A (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN215160368U (en) Be used for climbing frame and demolish artifical hoisting device
CN107954306A (en) Precast stair Lift-on/Lift-off System and hanging method
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN206034880U (en) Attached type lifting scaffold
CN203128099U (en) Slipping type pipeline lifting device
CN213418441U (en) Safety protection and operation platform for light production well
CN220376298U (en) Hanging basket lifting device
CN110745683A (en) Hoisting device and method for reinforcement cage of underground continuous wall
CN207699024U (en) Precast stair Lift-on/Lift-off System
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN211946009U (en) Tower crane pedestrian passageway device
CN209957241U (en) Steel hanger
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN215558540U (en) Movable hanging basket
CN214272878U (en) Attached lifting scaffold
CN216110020U (en) Small-diameter super-high-rise annular steel structure construction mechanism
CN211521273U (en) Cable suspender of building construction elevator
CN218149673U (en) Truss type lower hanging rack device for climbing frame
CN211419396U (en) Integral hoisting device for amplitude-variable derrick mast of large equipment
CN218758804U (en) Guide rail frame dismouting auxiliary device
CN220550838U (en) Building construction external platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214

CF01 Termination of patent right due to non-payment of annual fee