CN215047173U - Cargo fast assembly formula loading platform - Google Patents

Cargo fast assembly formula loading platform Download PDF

Info

Publication number
CN215047173U
CN215047173U CN202121701762.6U CN202121701762U CN215047173U CN 215047173 U CN215047173 U CN 215047173U CN 202121701762 U CN202121701762 U CN 202121701762U CN 215047173 U CN215047173 U CN 215047173U
Authority
CN
China
Prior art keywords
guide rail
pulley guide
pulley
quick
elevating gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121701762.6U
Other languages
Chinese (zh)
Inventor
杨辉亮
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjing Wuli Xiamen Industry And Trade Co ltd
Original Assignee
Zhongjing Wuli Xiamen Industry And Trade Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjing Wuli Xiamen Industry And Trade Co ltd filed Critical Zhongjing Wuli Xiamen Industry And Trade Co ltd
Priority to CN202121701762.6U priority Critical patent/CN215047173U/en
Application granted granted Critical
Publication of CN215047173U publication Critical patent/CN215047173U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The application discloses goods fast assembly formula loading platform belongs to handling equipment technical field, and its technical scheme main points include the elevating gear of two relative settings, two can dismantle between the elevating gear and be provided with two first pulley guide rails that are parallel to each other, the one end of first pulley guide rail is connected with and is used for the overlap joint to accept the board on the carriage bottom plate, the other end of first pulley guide rail articulates has the second pulley guide rail that is used for linking up with ground, and the loading and unloading of charge boat can be accomplished fast in this application, and easy dismounting does benefit to the transportation.

Description

Cargo fast assembly formula loading platform
Technical Field
This application belongs to handling equipment technical field, and more specifically it relates to a goods fast assembly formula loading platform that says so.
Background
Large container trucks are one of the main modes of modern freight transportation, and when goods are loaded and unloaded, the large-size and heavy objects cannot be transported and loaded and unloaded manually, and the large-size and heavy objects are usually loaded and unloaded by using a loading and unloading platform, but the existing loading and unloading platform is heavy and inconvenient to move, and has certain limitation in use.
As is well known, troops military vehicles or fire fighting vehicles generally need to use a assault boat when carrying out overwater rescue, and the assault boat is generally stacked on a transfer trolley in order to facilitate transportation of the assault boat. However, even if the assault boat is stacked on the transfer trolley, the assault boat still needs to be lifted up and down manually when being loaded and unloaded from the vehicle, which wastes time and labor.
Therefore, it is an urgent need to solve the problem of designing an assembled loading platform for rapidly loading and unloading the assault boat to the vehicle.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a goods fast assembly formula loading platform to solve above-mentioned problem.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a goods fast assembly formula loading and unloading platform, includes the elevating gear of two relative settings, two can dismantle between the elevating gear and be provided with two first pulley guide rails that are parallel to each other, the one end of first pulley guide rail is connected with and is used for the overlap joint to accept the board on the carriage bottom plate, the other end of first pulley guide rail articulates there is the second pulley guide rail that is used for linking up with ground.
By adopting the technical scheme, when in use, the two lifting devices are firstly lifted to the ground from the carriage on the vehicle, then horizontally installing the two first pulley guide rails on an upper platform of the lifting device, controlling the two lifting devices to simultaneously lift until the bottom surfaces of the first pulley guide rails are flush with the bottom plate of the carriage, the bearing plate is lapped on the bottom plate of the carriage, then the transfer trolley loaded with the assault boat is manually pushed onto the lifting device, the wheels of the transfer trolley are arranged in the first pulley guide rail through the bearing plate, the assault boat can be transferred to the lifting devices, and finally the two lifting devices are controlled to descend simultaneously, when the second pulley guide rail is connected with the ground, the transfer trolley for loading the assault boat can smoothly slide down to the ground along the second pulley guide rail only by manually pushing the assault boat, so that the assault boat is unloaded, and the step of loading the assault boat is opposite to the step of unloading.
To sum up, adopt above-mentioned assembled lift platform can accomplish the loading and unloading of assault boat fast, and this assembled loading and unloading platform easy dismounting does benefit to the transportation.
The utility model discloses further set up to: the lifting device is a scissor lift.
The utility model discloses further set up to: the lifting device is characterized in that first guide rail fixing grooves are formed in the left side and the right side of an upper platform of the lifting device, fixing plates are extended from the two sides of the outer walls of the two ends of the first pulley guide rail, fixing holes are formed in the fixing plates, and first quick-release pins which are connected to the first guide rail fixing grooves in an inserting mode and offset with the side walls of the first pulley guide rail are fixed in the fixing holes in a rotating mode.
Through adopting above-mentioned technical scheme, after placing elevating gear's upper mounting plate with first pulley guide rail, only need earlier make the tip of first quick detach round pin penetrate fixed orifices and first guide rail fixed slot in proper order, then rotate first quick detach round pin, make the upper end lateral wall of first quick detach round pin offset with first pulley guide rail lateral wall, and the lower extreme of first quick detach round pin parallels with first guide rail fixed slot, can carry on spacingly to the first pulley guide rail left and right sides.
The utility model discloses further set up to: the first guide rail fixing groove extends along the length direction of the upper platform of the lifting device, and the extending direction of the first guide rail fixing groove is perpendicular to the length direction of the first pulley guide rail.
Through adopting above-mentioned technical scheme, when using, can adjust the interval between two first pulley guide rails at will to this demand that satisfies different loading and unloading heavy objects.
The utility model discloses further set up to: and second guide rail fixing grooves are formed in the front side and the rear side of an upper platform of the lifting device, and the extending direction of the second guide rail fixing grooves is parallel to the length direction of the first pulley guide rail.
Through adopting above-mentioned technical scheme, when the small-size heavy object of loading and unloading, generally can adopt the first pulley guide rail of relative short, the installation of first quick detach round pin is realized with the cooperation of fixed plate to accessible second guide rail fixed slot this moment.
The utility model discloses further set up to: the bearing plate is of a U-shaped structure, the bearing plate is rotatably connected with the first pulley guide rail, and when the bearing plate rotates to the position above the first pulley guide rail, the first pulley guide rail is located in the bearing plate.
Through adopting above-mentioned technical scheme, when accomodating first pulley guide rail, the board is accepted in the rotatable, makes to accept the board and cover in first pulley guide rail top to effectively reduce whole occupation space size, conveniently store and transport.
The utility model discloses further set up to: the connecting part of the second pulley guide rail and the first pulley guide rail is provided with two first connecting blocks which are parallel to each other, the first pulley guide rail is provided with a second connecting block which is positioned between the two first connecting blocks, the first connecting block and the second connecting block are coaxially provided with connecting holes, and second quick-dismantling pins are arranged in the connecting holes.
Through adopting above-mentioned technical scheme, when installing the second pulley guide rail, only need earlier pass the connecting hole between second connecting block and the first connecting block in proper order with the second quick detach round pin, screw up the nut with the end of second quick detach round pin again, can realize the fixed of second pulley guide rail.
To sum up, the utility model has the advantages of it is following:
1. the assembling type loading and unloading platform can quickly complete the loading and unloading of the assault boat, is convenient to assemble and disassemble and is beneficial to transportation;
2. when the device is used, the distance between the two first pulley guide rails can be adjusted at will, so that the requirements of different loading and unloading heavy objects are met;
3. when accomodating first pulley guide rail, the board is accepted in the rotatable, makes and accepts the board cover in first pulley guide rail top to effectively reduce whole occupation space size, conveniently store and transport.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic structural diagram of the lifting device in the present embodiment;
FIG. 3 is an enlarged view of A in FIG. 1;
FIG. 4 is a schematic structural view of a first sheave guide rail in the present embodiment;
FIG. 5 is an enlarged view of B in FIG. 1;
fig. 6 is a schematic structural diagram of the assault boat transfer trolley in the embodiment when the assault boat transfer trolley is positioned on the lifting device.
Description of reference numerals: 1. a lifting device; 2. a first pulley rail; 21. a second connecting block; 211. a second quick release pin; 3. a bearing plate; 4. a second sheave guide; 41. a first connection block; 5. a first rail fixing groove; 51. a fixing plate; 511. a first quick release pin; 6. a second rail fixing groove.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a goods fast assembly formula loading and unloading platform, as shown in figure 1, includes two elevating gear 1 that set up relatively, can dismantle between two elevating gear 1 and be provided with two first pulley guide rails 2 that are parallel to each other, and the one end of first pulley guide rail 2 is connected with and is used for the overlap joint to accept board 3 on the carriage bottom plate, and the other end of first pulley guide rail 2 articulates there is the second pulley guide rail 4 that is used for linking up with ground.
In one embodiment, as shown in fig. 2-3, the lifting device 1 is a scissor lift, the left and right sides of the upper platform of the lifting device 1 are provided with first rail fixing grooves 5, the two sides of the outer walls of the two ends of the first pulley rail 2 are extended with fixing plates 51, the fixing plates 51 are provided with fixing holes, and first quick release pins 511 inserted into the first rail fixing grooves 5 and abutting against the side walls of the first pulley rail 2 are rotatably fixed in the fixing holes. Therefore, after the first pulley guide rail 2 is placed on the upper platform of the lifting device 1, the end of the first quick-release pin 511 is only required to penetrate into the fixing hole and the first guide rail fixing groove 5 in sequence, and then the first quick-release pin 511 is rotated, so that the upper end side wall of the first quick-release pin 511 is abutted against the side wall of the first pulley guide rail 2, and the lower end of the first quick-release pin 511 is parallel to the first guide rail fixing groove 5, so that the left and right sides of the first pulley guide rail 2 can be limited.
It should be noted that in this embodiment, the fixing hole on the fixing plate 51 is formed by combining a kidney-shaped rotating hole and a square limiting hole, and the length direction of the square limiting hole is consistent with the extending direction of the first rail fixing groove 5.
Further, in the present embodiment, the first rail fixing groove 5 extends along the length direction of the upper deck of the lifting device 1, and the extending direction of the first rail fixing groove 5 is perpendicular to the length direction of the first pulley rail 2. Therefore, when the first pulley guide rails 2 are installed, the distance between the two first pulley guide rails 2 can be adjusted at will, so that different requirements for loading and unloading heavy objects are met.
In this embodiment, since the first pulley rail 2 is generally relatively short when loading and unloading small-sized heavy objects, the front and rear sides of the upper platform of the lifting device 1 are provided with second rail fixing grooves 6, the extending direction of the second rail fixing grooves 6 is parallel to the length direction of the first pulley rail 2, and the first quick release pin 511 can be installed by matching the second rail fixing grooves 6 with the fixing plate 51.
In one embodiment, as shown in fig. 4, the receiving plate 3 is U-shaped, the receiving plate 3 is rotatably connected to the first pulley rail 2, and when the receiving plate 3 is rotated above the first pulley rail 2, the first pulley rail 2 is located in the receiving plate 3. Therefore, when accomodating first pulley guide rail 2, rotatable board 3 of accepting makes and accepts board 3 and covers in first pulley guide rail 2 top to effectively reduce whole occupation space size, conveniently store and transport.
In one embodiment, as shown in fig. 4-5, two parallel first connecting blocks 41 are disposed at the connection position of the second pulley rail 4 and the first pulley rail 2, a second connecting block 21 disposed between the two first connecting blocks 41 is disposed on the first pulley rail 2, and connecting holes are coaxially disposed on the first connecting block 41 and the second connecting block 21, and a second quick-release pin 211 is disposed in the connecting hole. When the second pulley guide rail 4 is installed, the second quick release pin 211 sequentially passes through the connecting holes between the second connecting block 21 and the first connecting block 41, and then the nut is screwed with the tail end of the second quick release pin 211, so that the second pulley guide rail 4 can be fixed.
The utility model discloses a working process and beneficial effect as follows: referring to fig. 6, firstly, two lifting devices 1 are lifted to the ground from a carriage on a vehicle, then two first pulley guide rails 2 are horizontally arranged on an upper platform of the lifting devices 1, then the two lifting devices 1 are controlled to simultaneously ascend until the bottom surfaces of the first pulley guide rails 2 are flush with a carriage bottom plate and a bearing plate 3 is lapped on the carriage bottom plate, then a transfer trolley for loading the assault boat is manually pushed onto the lifting devices 1, wheels of the transfer trolley are placed in the first pulley guide rails 2 through the bearing plate 3, the assault boat can be transferred onto the lifting devices 1, finally the two lifting devices 1 are controlled to simultaneously descend, when a second pulley guide rail 4 is connected with the ground, the assault boat is smoothly slid to the ground along the second pulley guide rail 4 by manually pushing the transfer trolley for loading the assault boat, and unloading of the assault boat is completed, and the step of loading the assault boat is the reverse of unloading.
To sum up, adopt above-mentioned assembled loading and unloading platform can accomplish the loading and unloading of assault boat fast, and this assembled loading and unloading platform easy dismounting does benefit to the transportation.
The above description is only the preferred embodiment of the present invention, and is not intended to limit the present invention, any modification, equivalent replacement, or improvement made within the design concept of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. The utility model provides a goods fast assembly formula loading platform which characterized in that: including two elevating gear (1) that set up relatively, two can dismantle between elevating gear (1) and be provided with two first pulley guide rail (2) that are parallel to each other, the one end of first pulley guide rail (2) is connected with and is used for accepting board (3) on the carriage bottom plate of overlap joint, the other end of first pulley guide rail (2) articulates has second pulley guide rail (4) that are used for linking up with ground.
2. A cargo quick-assembly loading dock according to claim 1, wherein: the lifting device (1) is a scissor lift.
3. A cargo quick-assembly loading dock according to claim 1 or 2, wherein: the utility model discloses a quick-release pulley guide rail, including elevating gear (1), the upper platform left and right sides of elevating gear (1) is provided with first guide rail fixed slot (5), the both ends outer wall both sides of first pulley guide rail (2) have all extended fixed plate (51), the fixed orifices has been seted up on fixed plate (51), the fixed orifices rotates to be fixed with first quick detach round pin (511) of pegging graft to first guide rail fixed slot (5) and offseting with first pulley guide rail (2) lateral wall.
4. A cargo quick-assembly loading dock according to claim 3, wherein: the first guide rail fixing groove (5) extends along the length direction of an upper platform of the lifting device (1), and the extending direction of the first guide rail fixing groove (5) is perpendicular to the length direction of the first pulley guide rail (2).
5. A cargo quick-assembly loading dock according to claim 3, wherein: and second guide rail fixing grooves (6) are formed in the front side and the rear side of an upper platform of the lifting device (1), and the extending direction of the second guide rail fixing grooves (6) is parallel to the length direction of the first pulley guide rail (2).
6. A cargo quick-assembly loading dock according to claim 1, wherein: the bearing plate (3) is of a U-shaped structure, the bearing plate (3) is rotatably connected with the first pulley guide rail (2), and when the bearing plate (3) rotates to the position above the first pulley guide rail (2), the first pulley guide rail (2) is located in the bearing plate (3).
7. A cargo quick-assembly loading dock according to claim 6, wherein: the connecting part of the second pulley guide rail (4) and the first pulley guide rail (2) is provided with two first connecting blocks (41) which are parallel to each other, the first pulley guide rail (2) is provided with a second connecting block (21) which is positioned between the two first connecting blocks (41), the first connecting block (41) and the second connecting block (21) are coaxially provided with connecting holes, and second quick-release pins (211) are arranged in the connecting holes.
CN202121701762.6U 2021-07-26 2021-07-26 Cargo fast assembly formula loading platform Active CN215047173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121701762.6U CN215047173U (en) 2021-07-26 2021-07-26 Cargo fast assembly formula loading platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121701762.6U CN215047173U (en) 2021-07-26 2021-07-26 Cargo fast assembly formula loading platform

Publications (1)

Publication Number Publication Date
CN215047173U true CN215047173U (en) 2021-12-07

Family

ID=79219566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121701762.6U Active CN215047173U (en) 2021-07-26 2021-07-26 Cargo fast assembly formula loading platform

Country Status (1)

Country Link
CN (1) CN215047173U (en)

Similar Documents

Publication Publication Date Title
CN112339607A (en) Quick battery replacement system of electric commercial vehicle
FI120190B (en) Cargo handling system
CA2791616C (en) Truck-mounted crane
CN103538811A (en) Self-unloading-type container
CN112319302A (en) Electric commercial vehicle battery replacement system
CN204823331U (en) Harbour handling machine
CN115744741A (en) Transport fork truck capable of loading multiple goods
CN215047173U (en) Cargo fast assembly formula loading platform
CN112277722A (en) High-efficient station that trades of electronic commercial car
CN110950112B (en) Loading and unloading device for goods
CN219216298U (en) Auxiliary container loading device for energy storage container
CN212637277U (en) Prefabricated component transport vechicle
CN213948199U (en) Quick battery replacement system of electric commercial vehicle
CN216233046U (en) Loading and unloading system of unmanned aerial vehicle disconnect-type cargo hold, unmanned aerial vehicle and transfer car (buggy)
CN212923017U (en) Battery conveying system and battery replacing station and container thereof
CN214652166U (en) Cargo handling and transporting platform
CN114955846A (en) Gantry frame type carrier capable of being moved universally
CN220412835U (en) Quick assembly type lifting platform for loading and unloading emergency assault boat
CN2695285Y (en) Loading unloading vehicle
CN112297812A (en) Electric commercial vehicle and battery replacing trolley matched with same
CN112356735A (en) Box type battery replacement station of electric commercial vehicle
CN213230669U (en) Loading and unloading anti-roll device for railway delivery
CN214420251U (en) Mobile battery replacing equipment
CN213948200U (en) High-efficient system of trading of electronic commercial car
CN213948202U (en) Electric commercial vehicle battery replacement system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant