CN214940269U - High steep rock matter side slope soil removal hanging net afforestation slope protection structure - Google Patents

High steep rock matter side slope soil removal hanging net afforestation slope protection structure Download PDF

Info

Publication number
CN214940269U
CN214940269U CN202121600366.4U CN202121600366U CN214940269U CN 214940269 U CN214940269 U CN 214940269U CN 202121600366 U CN202121600366 U CN 202121600366U CN 214940269 U CN214940269 U CN 214940269U
Authority
CN
China
Prior art keywords
slope
rope
protection
protection network
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121600366.4U
Other languages
Chinese (zh)
Inventor
陈德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pengcheng Construction Engineering Co ltd
Original Assignee
Shenzhen Pengcheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Pengcheng Construction Engineering Co ltd filed Critical Shenzhen Pengcheng Construction Engineering Co ltd
Priority to CN202121600366.4U priority Critical patent/CN214940269U/en
Application granted granted Critical
Publication of CN214940269U publication Critical patent/CN214940269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a high steep rock matter side slope soil is removed from a land and is hung net afforestation bank protection structure, including fixed rope, guide pile, protection network and the slope body, the top and the bottom of the slope body evenly are provided with the guide pile, fixed rope is all installed to the lateral wall of guide pile, install the protection network between the fixed rope, the inside of protection network is provided with stable structure, and fixes a position the inside intermediate position department of area and evenly be provided with the hole body, the inside of the hole body all is provided with the triangle stake, the both sides of protection network one end all are provided with connection structure, the bottom of the slope body is provided with protective structure. The utility model discloses a be provided with firm structure, this protection network installation protection when corresponding soil, can carry out a reinforcement to the protection network through being provided with triangular pile, location area and the hole body, make between its and the soil be connected more firm, realized this slope protection structure installation more firm to make this slope protection structure's result of use better.

Description

High steep rock matter side slope soil removal hanging net afforestation slope protection structure
Technical Field
The utility model relates to a afforestation slope protection technical field specifically is a high steep rock matter side slope soil removal hangs net afforestation slope protection structure.
Background
With the continuous development of society, the soil of China also changes constantly, and some high and steep rocks can produce naked phenomenon, and people can install the metal mesh on the surface of this soil in order to protect soil, bury soil on the metal mesh after to and spill the seed again for the plant root that the seed was planted twines the dictyosome, thereby protects this slope.
The device in the market is various, can satisfy people's user demand basically, but still has certain problem, and wherein the installation of protection network is firm inadequately, easily influences the result of use in later stage.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high steep rock matter side slope soil removal hanging net afforestation slope protection structure to the installation that proposes the protection network among the solution above-mentioned background is firm problem inadequately.
The utility model provides a high steep rock slope soil removal hanging net greening slope protection structure, which adopts the following technical scheme;
the utility model provides a high steep rock matter side slope soil is hung net afforestation slope protection structure, includes fixed rope, guide pile, protection network and the slope body, the top and the bottom of the slope body evenly are provided with the guide pile, fixed rope is all installed to the lateral wall of guide pile, install the protection network between the fixed rope, the inside of protection network is provided with stable structure, stable structure includes triangular pile, location area and the hole body, the location area is installed in the inside of protection network, and the inside intermediate position department of location area evenly is provided with the hole body, the inside of the hole body all is provided with triangular pile, the both sides of protection network one end all are provided with connection structure, the bottom of the slope body is provided with protective structure.
Optionally, the connecting structure comprises a first connecting rope, a second connecting rope and connecting blocks, the connecting blocks are uniformly installed at the edges of the two sides of the protective net, the first connecting rope is installed on the connecting block on one side of the protective net, and the second connecting rope is installed on the connecting block on the other side of the protective net.
Optionally, the first connecting rope and the second connecting rope are both provided with a plurality of, the first connecting rope and the second connecting rope of the plurality of are in one-to-one correspondence, the first connecting rope and the second connecting rope in one-to-one correspondence are convenient for people to carry out firm and convenient connection on the protective net, and the use is more convenient.
Optionally, protective structure includes set rope, iron wire and fender net, the set rope is installed in the lateral wall of spud, the iron wire has been run through to the inside of set rope, install between the set rope and keep off the net.
Optionally, the cover rope is provided with three groups, and the cover rope adopts the rubber material to make, and the cover rope adopts the rubber material to be convenient for quick cover at the lateral wall of spud pile, and it is also very convenient to dismantle.
Optionally, the triangular piles are provided with a plurality of clamping structures, the clamping structures enable the structures to limit the protective net more stably.
Optionally, the location area is provided with two sets ofly, and the location area is the fork form distribution in the inside of protection network, and the distribution of fork form is better to the firm effect of protection network.
Optionally, the hole body is provided with a plurality of, a plurality of the hole body is equidistant distribution in the inside of location area.
In summary, the utility model has at least one of the following advantages;
by arranging the stable structure, when the protective net is installed and protected on corresponding soil, the protective net can be reinforced by arranging the triangular piles, the positioning belts and the hole bodies, so that the protective net is more stably connected with the soil, the stability of the slope protection structure is realized, and the using effect of the slope protection structure is better;
by arranging the protection structure, the protection structure is protected at the bottom end of the slope body through the blocking net, when some stones in the slope body slide off, the stones in the slope body are not easy to fall on the flat ground under the shielding of the protection structure, and the blocking of the stones in the slope body is realized, so that the protection performance of the slope protection structure is improved;
through being provided with connection structure, when a plurality of slope protection structure used, through the setting that rope was connected to first connection rope and second, can bind the protection network of difference together, realized the concatenation to this slope protection structure, the result of use is better, has improved the convenience of this slope protection structure concatenation.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic view of the enlarged structure of a part a in fig. 1 according to the present invention;
fig. 4 is a front view structure diagram of the protection structure of the present invention.
In the figure: 1. fixing a rope; 2. positioning the pile; 3. a protective net; 4. a connecting structure; 401. a first connection; 402. a second connecting rope; 403. connecting blocks; 5. a protective structure; 501. sleeving a rope; 502. iron wires; 503. blocking the net; 6. a stable structure; 601. triangular piles; 602. a positioning belt; 603. a porous body; 7. a slope body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The present invention will be described in further detail with reference to the accompanying fig. 1-4.
The utility model discloses a high steep rock side slope soil hanging net greening slope protection structure, refer to fig. 1, including fixing rope 1, guide pile 2, protection net 3 and slope body 7, the top and bottom of slope body 7 are evenly provided with guide pile 2, the design of guide pile 2 can fix the position of protection net 3, the outer side wall of guide pile 2 is all provided with fixing rope 1, install protection net 3 between fixing rope 1, the probability of landslide appearing when using of slope body 7 is reduced through the design of fixing rope 1 and protection net 3, the interior of protection net 3 is provided with stabilizing structure 6, stabilizing structure 6 includes triangular pile 601, positioning belt 602 and hole body 603, positioning belt 602 is installed in the interior of protection net 3, and the middle position of the interior of positioning belt 602 is evenly provided with hole body 603, the interior of hole body 603 is all provided with triangular pile 601, in this embodiment, triangular pile 601 is nailed into the interior of positioning belt 602 in proper order, the position of the positioning belt 602 is fixed, the positioning belt 602 reinforces the installation and use of the protective net 3, the two sides of one end of the protective net 3 are both provided with the connecting structures 4, and the bottom end of the slope body 7 is provided with the protective structure 5.
Triangular pile 601 is provided with a plurality of, constitute the block structure between a plurality of triangular pile 601 and the hole body 603, location area 602 is provided with two sets ofly, and location area 602 is the forked distribution in the inside of protection network 3, hole body 603 is provided with a plurality of, a plurality of hole body 603 is equidistant distribution in the inside of location area 602, in this embodiment, the location area 602 of cross distribution is under triangular pile 601's cooperation, make the installation of protection network 3 more firm, difficult production phenomenon such as not hard up, make the root of green planting more firm twine together with soil.
Referring to fig. 1, in this embodiment, after the protection net 3 is installed, the triangular piles 601 are sequentially nailed into the positioning belts 602 through the hole bodies 603, so as to limit and fix the positioning belts 602, and thus the installation and use of the protection net 3 are reinforced through the positioning belts 602, so that the protection net 3 is not easy to fall off in the use process, and the use effect is better.
Connection structure 4 includes first connecting rope 401, second connecting rope 402 and connecting block 403, and connecting block 403 evenly installs in the edge of protection network 3 both sides, and first connecting rope 401 is all installed to connecting block 403 on protection network 3 one side, and second connecting rope 402 is all installed to connecting block 403 on protection network 3 opposite side.
Referring to fig. 1, in this embodiment, when installing a plurality of protection networks 3 and using, can connect adjacent protection network 3, bind together the first connecting rope 401 of protection network 3 one side and the second connecting rope 402 of protection network 3 opposite side during the connection to the completion is to the concatenation between adjacent protection network 3, makes the bank protection effect of follow-up protection network 3 better.
First connecting rope 401 and second connecting rope 402 all are provided with a plurality of, and the rope 402 one-to-one is connected to its first connecting rope 401 of a plurality of and second, and in this embodiment, the corresponding design of rope 402 is connected to first connecting rope 401 and second, has made things convenient for to bind between the protection network 3.
Protective structure 5 includes set rope 501, iron wire 502 and fender net 503, and set rope 501 is installed in the lateral wall of spud 2, and the inside of set rope 501 runs through there is iron wire 502, installs between the set rope 501 and keeps off net 503, and in this embodiment, keeps off net 503 and has strengthened the protection to slope body 7, is difficult for causing the stone to drop away on the slope body 7.
The set rope 501 is provided with three sets, and the set rope 501 is made of rubber, so that the possibility that the set rope 501 slides down when in use is avoided in the embodiment.
Referring to fig. 1 and 4, in this embodiment, the outer sidewall of the positioning pile 2 is sleeved with a corresponding sleeve rope 501, and the iron wire 502 and the blocking net 503 connected by the sleeve rope 501 form a protection at the bottom end of the slope body 7, so that the falling stones or soil blocks in the slope body 7 can be blocked by the blocking net 503, and are not easy to slip down to cause danger, and the like, so that the protection performance of the slope protection structure is greatly increased.
The utility model discloses an implement principle for do:
firstly, the positioning piles 2 are nailed at proper positions at the top end and the bottom end of the slope body 7, then the protective net 3 is installed through the fixing ropes 1 to be protected on the surface of the slope body 7, then the triangular piles 601 are nailed into the positioning belt 602 through the hole bodies 603 in sequence to limit and fix the positioning belt 602, and the positioning belt 602 reinforces the installation and use of the protective net 3.
When a plurality of protective nets 3 are installed, the adjacent protective nets 3 can be connected, and when the protective nets are connected, the first connecting ropes 401 on one side of each protective net 3 and the second connecting ropes 402 on the other side of each protective net 3 are bound together, so that the adjacent protective nets 3 are spliced together for use.
At last fill soil on the protection network 3 that consolidates to plant green planting, make the root winding of green planting carry out the bank protection on the protection network 3, the in-process that protection network 3 used simultaneously, iron wire 502 then protects in the bottom of the slope body 7, and the stone or the soil piece that drop in the slope body 7 can be blocked by keeping off net 503 protection, and difficult landing downwards produces danger etc. finally accomplishes the work of this high steep rock matter side slope soil dressing hanging net afforestation slope protection structure.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (8)

1. The utility model provides a high steep rock matter side slope soil removal hanging net afforestation slope protection structure, includes fixed rope (1), spud (2), protection network (3) and the slope body (7), its characterized in that: the top and the bottom of the slope body (7) evenly are provided with spud (2), fixed rope (1) are all installed to the lateral wall of spud (2), install protection network (3) between fixed rope (1), the inside of protection network (3) is provided with stable structure (6), stable structure (6) are including triangle stake (601), location area (602) and hole body (603), install in the inside of protection network (3) location area (602), and the inside intermediate position department of location area (602) evenly is provided with hole body (603), the inside of hole body (603) all is provided with triangle stake (601), the both sides of protection network (3) one end all are provided with connection structure (4), the bottom of the slope body (7) is provided with protective structure (5).
2. The high cliff matter side slope soil removal hanging net greening slope protection structure of claim 1, characterized in that: connection structure (4) include first connecting rope (401), second connecting rope (402) and connecting block (403), connecting block (403) evenly installed in the edge of protection network (3) both sides, first connecting rope (401) are all installed to connecting block (403) on protection network (3) one side, second connecting rope (402) are all installed to connecting block (403) on protection network (3) opposite side.
3. The high steep rocky slope soil-removal hanging net greening slope protection structure according to claim 2, characterized in that: the first connecting rope (401) and the second connecting rope (402) are provided with a plurality of first connecting ropes (401) and second connecting ropes (402) which are in one-to-one correspondence.
4. The high cliff matter side slope soil removal hanging net greening slope protection structure of claim 1, characterized in that: protective structure (5) are including set rope (501), iron wire (502) and keep off net (503), the lateral wall in spud (2) is installed in set rope (501), iron wire (502) have been run through to the inside of set rope (501), it keeps off net (503) to install between set rope (501).
5. The high cliff matter side slope soil removal hanging net afforestation bank protection structure of claim 4, characterized in that: the three sets of the loop ropes (501) are arranged, and the loop ropes (501) are made of rubber materials.
6. The high cliff matter side slope soil removal hanging net greening slope protection structure of claim 1, characterized in that: the triangular piles (601) are provided with a plurality of triangular piles, and a clamping structure is formed between the triangular piles (601) and the hole body (603).
7. The high cliff matter side slope soil removal hanging net greening slope protection structure of claim 1, characterized in that: the positioning belts (602) are arranged in two groups, and the positioning belts (602) are distributed in the protective net (3) in a cross manner.
8. The high cliff matter side slope soil removal hanging net greening slope protection structure of claim 1, characterized in that: the hole body (603) is provided with a plurality of, and a plurality of hole body (603) are the equidistant distribution in the inside of location area (602).
CN202121600366.4U 2021-07-14 2021-07-14 High steep rock matter side slope soil removal hanging net afforestation slope protection structure Active CN214940269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121600366.4U CN214940269U (en) 2021-07-14 2021-07-14 High steep rock matter side slope soil removal hanging net afforestation slope protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121600366.4U CN214940269U (en) 2021-07-14 2021-07-14 High steep rock matter side slope soil removal hanging net afforestation slope protection structure

Publications (1)

Publication Number Publication Date
CN214940269U true CN214940269U (en) 2021-11-30

Family

ID=79070581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121600366.4U Active CN214940269U (en) 2021-07-14 2021-07-14 High steep rock matter side slope soil removal hanging net afforestation slope protection structure

Country Status (1)

Country Link
CN (1) CN214940269U (en)

Similar Documents

Publication Publication Date Title
CN205116187U (en) Rocky slope's revegetation structure
CN110593281A (en) High-steep rock slope ecological protection system and construction method thereof
CN205369274U (en) Civil engineering structure of complete domatic afforestation worker method in rock matter abrupt slope
CN105544567B (en) A kind of civil engineering structure of the full slope greening engineering method of steep rocky slope
CN110557997B (en) Construction method of slope ecological restoration system
CN214940269U (en) High steep rock matter side slope soil removal hanging net afforestation slope protection structure
CN106545021B (en) Integration support pocket earthing and root fill ecological bank protecting method
CN211849496U (en) High steep rock slope ecological protection system
CN117868179A (en) Scaling ladder type ecological bag re-greening system suitable for re-greening of high steep rock slope
CN211621621U (en) Plant biological bag protection device for high and steep rocky slope
CN105248385A (en) Ecological catching method for small-sized mountain stream fishes
CN104264697B (en) A kind of high steep rock side-slope greening safeguard structure
CN201821698U (en) Plant-climbing rack for ecological rehabilitation
CN1807772A (en) Greening construction structure using single-layered, multilayered nonwoven fabric to protect slope groundmass
CN211020554U (en) Ecological experimental apparatus for mudflat shellfish
CN210712877U (en) Basalt fiber slope protection green plant bag and slope protection structure
CN105155560A (en) Protecting structure and protecting method used for greening high-steep rock slope
CN104186235A (en) Planting device and method enabling submerged plants to be harvested conveniently
KR100994740B1 (en) Vegetation net pad constructing on inclined plane or waterside and the method thereof
CN205444205U (en) Wall -hanging afforestation groove
CN216948354U (en) Ecological protection structure for steep rock slope
JP3880673B2 (en) Greening equipment and greening method for cut slope
CN216515654U (en) Protective net for mine restoration
CN205000347U (en) A protective structure that is used for high steep rock matter slope planting
CN218911459U (en) Lattice beam type slope V-shaped groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant