CN214893212U - Bridge engineering bridge surveying device - Google Patents

Bridge engineering bridge surveying device Download PDF

Info

Publication number
CN214893212U
CN214893212U CN202120577010.7U CN202120577010U CN214893212U CN 214893212 U CN214893212 U CN 214893212U CN 202120577010 U CN202120577010 U CN 202120577010U CN 214893212 U CN214893212 U CN 214893212U
Authority
CN
China
Prior art keywords
groups
surveying
bridge
supporting
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120577010.7U
Other languages
Chinese (zh)
Inventor
贾荣昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Municipal Design Institute
Original Assignee
Chongqing Municipal Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Municipal Design Institute filed Critical Chongqing Municipal Design Institute
Priority to CN202120577010.7U priority Critical patent/CN214893212U/en
Application granted granted Critical
Publication of CN214893212U publication Critical patent/CN214893212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The utility model belongs to the technical field of bridge engineering, in particular to a bridge engineering bridge surveying device, which comprises surveying equipment, a fixed part, a bracket component and a movable component; the support component comprises a plurality of groups of support rods which are uniformly distributed in the circumferential direction of the fixing part; one end of the supporting rod is rotatably connected with the fixing part; the moving assembly comprises a plurality of groups of moving parts; each group of moving parts comprises two groups of supporting plates and two groups of universal wheels, the two groups of supporting plates are rotatably connected to two sides of the supporting rod, and the universal wheels are rotatably connected to one ends of the supporting plates; the supporting plate is provided with a threaded through hole, the threaded through hole is internally threaded with a fixing screw, and the supporting rod is provided with a connecting threaded hole; the connecting thread through holes are provided with two groups, and the two groups of connecting thread through holes are respectively positioned at the upper side and the lower side of the joint. Above-mentioned device can solve current survey equipment and need the manual work to carry intensity of labour great, influences survey efficiency, the problem of the use of people of not being convenient for.

Description

Bridge engineering bridge surveying device
Technical Field
The utility model belongs to the technical field of bridge engineering, especially, relate to a bridge engineering bridge surveys device.
Background
Surveying is one of the important work methods of engineering surveying, and surveying refers to the general term of surveying, exploration and measurement, and is carried out on-site survey and measurement before construction, and when a bridge is built, engineering surveying is required to be used for site selection and design of the bridge, so that the bridge is combined with the geology of the bridge in structure and design, and the stability of the bridge is achieved. The survey work is an indispensable step for building the bridge, and the traditional bridge survey needs various tools or equipment to carry out on-site survey measurement, is inconvenient to carry and increases the workload of bridge survey personnel.
For solving above-mentioned technical problem, chinese patent that publication number is CN208937031U discloses a bridge engineering bridge surveying equipment, including surveying case, rotary platform, support and camera, survey the case and be cylindric box, and survey case welded fastening at rotary platform's top surface, rotary platform's bottom surface is equipped with the support, the lower extreme of support is equipped with the toper post, the outer wall middle part position of surveying case is equipped with laser range finder, laser range finder's upper end position is equipped with the observation hole, the outer wall lower extreme position of surveying case is equipped with the handle, the top central point of surveying case puts and is equipped with the GPS locator, the position of GPS locator left end is equipped with the spirit level, the rigidity of GPS locator right-hand member is equipped with the camera. This bridge engineering bridge surveys equipment, convenient to use has fine stability, surveys the device through the multiple that is equipped with, and the survey personnel of being convenient for survey work.
Above-mentioned survey equipment through setting up multiple survey device, conveniently surveys personnel and carry, but above-mentioned survey equipment needs the manual work to carry intensity of labour great, influences survey efficiency, the people's of not being convenient for use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge engineering bridge surveys device to it needs the manual work to carry intensity of labour great to solve current survey equipment, influences survey efficiency, the problem of the people's of not being convenient for use.
In order to achieve the above purpose, the technical scheme of the utility model is that: the bridge engineering bridge surveying device comprises surveying equipment, a fixing part for fixing the surveying equipment, a bracket component for supporting the sensing equipment and a moving component for moving the surveying equipment; the support component comprises a plurality of groups of support rods, and the support rods are uniformly distributed in the circumferential direction of the fixing part; one end of the supporting rod is rotatably connected with the fixing part, and the other end of the supporting rod is in a conical shape; the moving assembly comprises a plurality of groups of moving parts, and the plurality of groups of moving parts correspond to the plurality of groups of supporting rods one to one; each group of moving parts comprises two groups of supporting plates and two groups of universal wheels, one sides of the two groups of supporting plates are respectively and rotatably connected to the two sides of the supporting rod, and the universal wheels are rotatably connected to one ends of the supporting plates far away from the connecting part of the supporting rods and the supporting plates; the supporting plate is provided with a threaded through hole, a fixing screw rod is connected to the threaded through hole in an internal thread mode, the supporting rod is provided with a connecting threaded hole capable of being opposite to the threaded through hole, and the fixing screw rod can penetrate through the threaded through hole and is located in the connecting threaded hole; two groups of connecting thread through holes are arranged, and the two groups of connecting thread through holes are respectively positioned on the upper side and the lower side of the connecting part; two connecting thread through holes are arranged in each group, and the two connecting thread through holes are respectively opposite to the thread through holes in the two groups of supporting plates; the distance from the universal wheel to the joint is greater than the distance from the conical tip of the supporting rod to the joint.
Further, every group all be equipped with link structure between bracing piece and the fixed part, link structure includes first connecting rod and second connecting rod, the one end and the bracing piece of first connecting rod rotate to be connected, the other end of first connecting rod with the one end of second connecting rod rotates to be connected, the other end of second connecting rod with the fixed part rotates to be connected.
Further, the fixed part includes rotary platform and investigation case, investigation case rotates to be connected rotary platform's upside.
Further, survey equipment includes distancer, GPS locator, spirit level and camera, the spirit level is located survey the inside of case, be equipped with the observation hole that is used for observing the spirit level state on the survey case, one side of surveying the case is located to the distancer, GPS locator, camera are fixed on surveying the case.
Further, a handle is arranged on the survey box.
Further, the distance measuring instrument adopts a laser distance measuring instrument or an infrared distance measuring instrument.
The working principle of the technical scheme is as follows: when the survey device is required to be moved to a destination, the movable assembly is rotated, so that the universal wheels are positioned at the lower parts of the supporting rods, the supporting rods and the supporting plates are fixed by using the fixing screw rods, all the supporting rods are folded and adjusted to be in a vertical state, and the survey device is pushed to move. When the surveying device moves to a destination, the moving assembly is rotated, the supporting plates and the supporting rods are fixed by using the fixing screw rods, the moving assembly is positioned at the upper part of the conical tip of the supporting rods, all the supporting rods are opened to proper positions at the moment, whether the level meter is horizontal or not is observed through the observation hole, and the horizontal state of the level meter can be independently adjusted by adjusting the inclined state of each supporting rod.
The beneficial effects of this technical scheme lie in: compared with the prior art that the device is carried by people, the device reduces the labor intensity of carrying, can quickly move to a destination and is convenient for people to use. And one end of the support rod is set to be in a conical shape, so that the support rod can be stably placed on a position to be measured. The handle can conveniently rotate the survey case. The support rods can be independently adjusted, so that the horizontal state of the level instrument is guaranteed. Designing a GPS locator which can be used for recording the position of a survey point. Sixth, the camera can capture images of the survey site.
Drawings
Fig. 1 is a schematic structural diagram of the bridge engineering bridge surveying device of the present invention during surveying;
fig. 2 is the structure schematic diagram of the utility model discloses bridge engineering bridge surveys device when removing.
Detailed Description
The following is further detailed by way of specific embodiments:
reference numerals in the drawings of the specification include: surveying case 1, rotary platform 2, bracing piece 3, backup pad 4, universal wheel 5, clamping screw 6, pivot 7, first connecting rod 8, second connecting rod 9, distancer 10, observation hole 11, camera 12, GPS locator 13, handle 14.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment is basically as shown in the attached figures 1-2: the bridge engineering bridge surveying device comprises surveying equipment, a fixing part for fixing the surveying equipment, a bracket component for supporting the sensing equipment and a moving component for moving the surveying equipment; the bracket component comprises three groups of supporting rods 3, and the three groups of supporting rods 3 are uniformly distributed in the circumferential direction of the fixing part; the upper end of the support rod 3 is rotatably connected with the fixed part, and the lower end of the support rod 3 is set to be conical; the moving assembly comprises a plurality of three groups of moving parts, and the three groups of moving parts correspond to the three groups of supporting rods 3 one by one; each group of moving parts comprises two groups of supporting plates 4 and two groups of universal wheels 5, one sides of the two groups of supporting plates 4 are respectively and rotatably connected to the two sides of the supporting rod 3 through rotating shafts 7, and the universal wheels 5 are rotatably connected to one ends of the supporting plates 4 far away from the connecting part of the supporting rod 3 and the supporting plates 4; a threaded through hole is formed in the supporting plate 4, a fixing screw 6 is connected to the threaded through hole in a threaded manner, a connecting threaded hole capable of being opposite to the threaded through hole is formed in the supporting rod 3, and the fixing screw 6 can penetrate through the threaded through hole and is located in the connecting threaded hole; the two groups of connecting thread through holes are respectively positioned at the upper side and the lower side of the joint; two connecting thread through holes are arranged in each group, and the two connecting thread through holes are respectively opposite to the thread through holes in the two groups of supporting plates 4; the distance from the universal wheel 5 to the joint is larger than the distance from the conical tip of the supporting rod 3 to the joint.
All be equipped with link structure between every group bracing piece 3 and the fixed part, link structure includes first connecting rod 8 and second connecting rod 9, and the one end and the bracing piece 3 of first connecting rod 8 rotate to be connected, and the other end of first connecting rod 8 rotates with the one end of second connecting rod 9 to be connected, and the other end and the fixed part of second connecting rod 9 rotate to be connected.
The fixed part includes rotary platform 2 and surveys case 1, surveys case 1 and rotates the upside of connecting at rotary platform 2. The surveying equipment comprises a distance meter 10, a GPS (global positioning system) positioner 13, a level meter and a camera 12, wherein the level meter is positioned inside a surveying box 1, the side wall of the surveying box 1 is provided with an observation hole 11 for observing the state of the level meter, the distance meter 10 is arranged on one side of the surveying box 1, and the distance meter 10 adopts a laser distance meter 10 or an infrared distance meter 10; GPS locator 13, camera 12 are fixed on surveying case 1, and the lateral wall of surveying case 1 is equipped with handle 14.
The specific implementation process is as follows:
when the surveying device needs to be moved to a destination, the moving assembly is rotated, so that the universal wheels 5 are positioned at the lower parts of the supporting rods 3, the supporting rods 3 and the supporting plates 4 are fixed by using the fixing screw rods 6, all the supporting rods 3 are folded and adjusted to be in a vertical state, and the surveying device can be pushed to move. When the surveying apparatus is moved to a destination, the moving assembly is rotated to fix the support plate 4 and the support rods 3 using the fixing screws 6, the moving assembly is positioned at the upper portion of the conical tip of the support rods 3 at this time, all the support rods 3 are opened to appropriate positions at this time, whether the spirit level is horizontal is observed through the observation holes 11, and the horizontal state of the spirit level can be individually adjusted by adjusting the inclination state of each support rod 3.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only for the embodiments of the present invention, and the common general knowledge of the known specific structures and characteristics in the schemes is not described herein too much, and those skilled in the art will know all the common technical knowledge in the technical field of the present invention before the application date or the priority date, can know all the prior art in this field, and have the ability to apply the conventional experimental means before this date, and those skilled in the art can combine their own ability to perfect and implement the schemes, and some typical known structures or known methods should not become obstacles for those skilled in the art to implement the present application. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.

Claims (6)

1. Bridge engineering bridge surveys device, its characterized in that: comprises a surveying device, a fixing part for fixing the surveying device, a bracket assembly for supporting a sensing device, and a moving assembly for moving the surveying device; the support component comprises a plurality of groups of support rods (3), and the support rods (3) are uniformly distributed in the circumferential direction of the fixing part; one end of the supporting rod (3) is rotatably connected with the fixing part, and the other end of the supporting rod (3) is in a conical shape; the moving assembly comprises a plurality of groups of moving parts, and the plurality of groups of moving parts correspond to the plurality of groups of supporting rods (3) one by one; each group of moving parts comprises two groups of supporting plates (4) and two groups of universal wheels (5), one sides of the two groups of supporting plates (4) are respectively and rotatably connected to the two sides of the supporting rod (3), and the universal wheels (5) are rotatably connected to one ends of the supporting plates (4) far away from the connecting part of the supporting rod (3) and the supporting plates (4); a threaded through hole is formed in the supporting plate (4), a fixing screw rod (6) is connected to the threaded through hole in an internal thread mode, a connecting threaded hole capable of being opposite to the threaded through hole is formed in the supporting rod (3), and the fixing screw rod (6) can penetrate through the threaded through hole and is located in the connecting threaded hole; two groups of connecting thread through holes are arranged, and the two groups of connecting thread through holes are respectively positioned on the upper side and the lower side of the connecting part; two connecting thread through holes are arranged in each group, and the two connecting thread through holes are respectively opposite to the thread through holes in the two groups of supporting plates (4); the distance from the universal wheel (5) to the joint is greater than the distance from the conical tip of the supporting rod (3) to the joint.
2. The bridge construction bridge surveying arrangement of claim 1, wherein: every group all be equipped with connecting rod structure between bracing piece (3) and the fixed part, connecting rod structure includes first connecting rod (8) and second connecting rod (9), the one end and bracing piece (3) of first connecting rod (8) rotate to be connected, the other end of first connecting rod (8) with the one end of second connecting rod (9) rotates to be connected, the other end of second connecting rod (9) with the fixed part rotates to be connected.
3. The bridge construction bridge surveying arrangement of claim 1, wherein: the fixed part comprises a rotary platform (2) and a surveying box (1), and the surveying box (1) is rotatably connected to the upper side of the rotary platform (2).
4. The bridge construction bridge surveying arrangement of claim 3, wherein: surveying equipment includes distancer (10), GPS locator (13), spirit level and camera (12), the spirit level is located survey the inside of case (1), be equipped with observation hole (11) that are used for observing the spirit level state on surveying case (1), one side of surveying case (1) is located in distancer (10), GPS locator (13), camera (12) are fixed on surveying case (1).
5. The bridge construction bridge surveying arrangement of claim 4, wherein: a handle (14) is arranged on the surveying box (1).
6. The bridge construction bridge surveying arrangement of claim 4, wherein: the distance measuring instrument (10) adopts a laser distance measuring instrument (10) or an infrared distance measuring instrument (10).
CN202120577010.7U 2021-03-22 2021-03-22 Bridge engineering bridge surveying device Expired - Fee Related CN214893212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120577010.7U CN214893212U (en) 2021-03-22 2021-03-22 Bridge engineering bridge surveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120577010.7U CN214893212U (en) 2021-03-22 2021-03-22 Bridge engineering bridge surveying device

Publications (1)

Publication Number Publication Date
CN214893212U true CN214893212U (en) 2021-11-26

Family

ID=79037579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120577010.7U Expired - Fee Related CN214893212U (en) 2021-03-22 2021-03-22 Bridge engineering bridge surveying device

Country Status (1)

Country Link
CN (1) CN214893212U (en)

Similar Documents

Publication Publication Date Title
CN208872221U (en) Folding stake diameter testing stand
CN102944228A (en) Adjustable precise lofting device
CN109357592A (en) Artificial digging pile stake diameter and testing apparatus for verticality
CN207991859U (en) A kind of sampler for soil nutrient detection
CN113028211A (en) Surveying and mapping device for land arrangement
CN111396697B (en) Support for civil engineering measuring instrument
CN210441865U (en) Urban road bridge road bed engineering measuring equipment
CN214893212U (en) Bridge engineering bridge surveying device
CN219641711U (en) Exploration equipment for land measurement
CN210638702U (en) Building engineering quality detection device
CN215522752U (en) High stability civil engineering surveying instrument
CN211600029U (en) Handheld distancer support frame is used in national soil space planning
CN215373779U (en) Hydraulic ring geological crack measuring device
CN113104352B (en) Measuring device for civil engineering construction
CN213422198U (en) Novel centering rod
CN214112900U (en) Municipal works topography survey and drawing auxiliary assembly
CN210922618U (en) Equipment for surveying and mapping house property and cadastral
CN210664493U (en) Site survey device that building engineering cost was used
CN207540492U (en) A kind of trigonometric expression obtains the device of the accurate ground anchor point of sparse cloud of traverse measurement
CN206540549U (en) A kind of suspension type land surveying Sopwith staff
CN215572968U (en) Survey measuring device suitable for complicated topography
CN204064326U (en) Portable rotation instrument trays device
CN210800590U (en) Portable measuring instrument
CN218034742U (en) Supporting pile displacement monitoring device
CN208937031U (en) A kind of science of bridge building bridge surveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126