CN210664493U - Site survey device that building engineering cost was used - Google Patents

Site survey device that building engineering cost was used Download PDF

Info

Publication number
CN210664493U
CN210664493U CN201922295080.9U CN201922295080U CN210664493U CN 210664493 U CN210664493 U CN 210664493U CN 201922295080 U CN201922295080 U CN 201922295080U CN 210664493 U CN210664493 U CN 210664493U
Authority
CN
China
Prior art keywords
plate body
shell
fixedly connected
outer side
site survey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922295080.9U
Other languages
Chinese (zh)
Inventor
高培山
李逸航
曲元梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Institute Of Highway Technician
Original Assignee
Shandong Institute Of Highway Technician
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Institute Of Highway Technician filed Critical Shandong Institute Of Highway Technician
Priority to CN201922295080.9U priority Critical patent/CN210664493U/en
Application granted granted Critical
Publication of CN210664493U publication Critical patent/CN210664493U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a site survey device for construction cost, which comprises a first plate body, wherein the upper surface of the first plate body is respectively and rotatably connected with four threaded rods through four bearings, the outer side walls of the four threaded rods are all in threaded connection with a second plate body, the upper surface of the first plate body at the center is fixedly connected with a first shell, the upper surface of the first shell is provided with a second shell, the first shell and the second shell are internally provided with a ball body, and the outer side wall of the ball body is fixedly connected with a damping pad; the utility model discloses a collocation of four threaded rods and spheroid, body of rod isotructure is fixed and is supported to the second plate body for the height in four corners can be adjusted to the second plate body, makes the second plate body reach the level steady, thereby makes the second plate body can be at the supporting survey device body that the building engineering job site of complicacy can be steady, makes the measuring result more accurate, thereby makes the budget more accurate.

Description

Site survey device that building engineering cost was used
Technical Field
The utility model relates to a building engineering technical field specifically is a site survey device that building engineering cost was used.
Background
The building engineering is an engineering entity which performs various technical works such as planning, investigation, design, construction and completion, and installation engineering of lines, pipelines and equipment matched with the engineering entity, namely the construction engineering of various houses and buildings, also called construction workload, wherein the investment amount of the engineering entity is required to be improved by using engineering materials, and the construction engineering of the house buildings can be realized by construction activities, wherein the construction engineering of the house buildings comprises factory buildings, theaters, hotels, shops, schools, hospitals, houses and the like, and the new construction, the reconstruction or the expansion of the house buildings is required to be improved by using the engineering materials and can be realized by using the construction activities; the 'auxiliary building facilities' refer to water towers, bicycle sheds, pools and the like which are matched with the house building, and the 'installation of lines, pipelines and equipment' refers to the installation activities of the lines, the pipelines and the equipment, such as electricity, water supply and drainage, heating and ventilation, communication, intellectualization, elevators and the like which are matched with the house building and the auxiliary facilities thereof;
the basic content of the construction engineering survey is engineering survey, hydrogeological survey and engineering geological survey, the survey task is to find natural geological condition data such as landform, stratum soil lithology, geological structure, hydrogeological condition and the like of a construction site of an engineering project, and to make identification and comprehensive evaluation, scientific and reliable basis is provided for site selection, engineering design and construction of the construction project, a surveying device is needed to be used for budget of construction cost on a construction site during construction of the construction project, the problem of poor stability often occurs in the using process of a common surveying device, the measuring result is deviated due to the shaking of the surveying device, the accuracy of the budget is affected, and the construction project is inconvenient to use, and therefore, the site surveying device for the construction project cost is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a site survey device that building engineering cost was used to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a site survey device that building engineering cost was used, includes first plate body, the upper surface of first plate body rotates respectively through four bearings and is connected with four threaded rods, four the equal threaded connection of lateral wall of threaded rod has the second plate body, first plate body is located the first casing of last fixed surface of center department and is connected with, the upper surface of first casing is equipped with the second casing, first casing with the inside of second casing is equipped with the spheroid, spheroidal lateral wall fixedly connected with damping pad, the lateral wall of damping pad sliding connection respectively in first casing with the inside wall of second casing, the spheroidal top fixedly connected with body of rod, the top threaded connection of the body of rod in the lower surface of second plate body.
As further preferable in the present technical solution: the upper surface fixed connection of second plate body has the body, the inside wall of body is equipped with surveys the device body, the body through first fixing bolt with body fixed connection.
As further preferable in the present technical solution: the upper surface of first plate body is equipped with four first cones, four the bottom of first cone all runs through the upper surface of first plate body.
As further preferable in the present technical solution: the two first fixed blocks of bilateral symmetry fixedly connected with of first casing, two second fixed blocks of bilateral symmetry fixedly connected with of second casing, first fixed block with the second fixed block passes through fourth fixing bolt fixed connection.
As further preferable in the present technical solution: the outer side wall of the first plate body is hinged with four supporting rods through four second fixing bolts respectively, one end of each supporting rod is far away from the corresponding second fixing bolt, a third shell is hinged to one end of each second fixing bolt through a third fixing bolt, and the third shell is far away from one side of the third fixing bolt, wherein a second cone is fixedly connected with.
As further preferable in the present technical solution: the outer side wall of the first plate body is symmetrically and fixedly connected with four collets, and the outer side walls of the second cones are respectively clamped in the four collets.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a collocation of four threaded rods and spheroid, body of rod isotructure is fixed and is supported to the second plate body in, makes the height in four corners can be adjusted to the second plate body, makes the second plate body reach the level steady, thereby makes the second plate body can survey the device body at the support that the building engineering job site of complicacy can be steady, can adjust the angle of surveying the device body simultaneously, makes the measuring result more accurate, thereby makes the budget more accurate.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic structural view of a region a in fig. 1 according to the present invention;
fig. 3 is a top view of the present invention.
In the figure: 1. a first plate body; 2. a first cone; 3. a first housing; 4. a second housing; 5. a damping pad; 6. a sphere; 7. a rod body; 8. a second plate body; 9. a bearing; 10. a threaded rod; 11. a pipe body; 12. a survey device body; 13. a first fixing bolt; 14. a second fixing bolt; 15. a support bar; 16. a third fixing bolt; 17. a third housing; 18. a second cone; 19. sleeving and clamping; 20. a first fixed block; 21. a second fixed block; 22. and a fourth fixing bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a site survey device that building engineering cost was used, including first plate body 1, the upper surface of first plate body 1 rotates respectively through four bearings 9 and is connected with four threaded rods 10, the equal threaded connection of lateral wall of four threaded rods 10 has second plate body 8, first plate body 1 is located the first casing 3 of last fixed surface of center department, the upper surface of first casing 3 is equipped with second casing 4, the inside of first casing 3 and second casing 4 is equipped with spheroid 6, the lateral wall fixedly connected with damping pad 5 of spheroid 6, sliding connection is respectively in the inside wall of first casing 3 and second casing 4 to the lateral wall of damping pad 5, the top fixedly connected with body of rod 7 of spheroid 6, the top threaded connection of the body of rod 7 is in the lower surface of second plate body 8.
In this embodiment, specifically: the upper surface of the second plate body 8 is fixedly connected with a pipe body 11, the inner side wall of the pipe body 11 is provided with a surveying device body 12, and the pipe body 11 is fixedly connected with the pipe body 11 through a first fixing bolt 13; the arrangement of the pipe body 11 and the first fixing bolt 13 enables the survey device body 12 to be fixedly connected with the second plate body 8, and is also convenient to detach.
In this embodiment, specifically: the upper surface of the first plate body 1 is provided with four first cones 2, and the bottom ends of the four first cones 2 penetrate through the upper surface of the first plate body 1; the first cone 2 is arranged to fixedly connect the first plate 1 with the ground.
In this embodiment, specifically: two first fixed blocks 20 are symmetrically and fixedly connected to two sides of the first shell 3, two second fixed blocks 21 are symmetrically and fixedly connected to two sides of the second shell 4, and the first fixed blocks 20 and the second fixed blocks 21 are fixedly connected through fourth fixing bolts 22; the fourth fixing bolt 22 fixedly connects the first fixing block 20 and the second fixing block 21, so that the first housing 3 and the second housing 4 are fixedly connected, and the first housing 3 and the second housing 4 are conveniently detached.
In this embodiment, specifically: the outer side wall of the first plate body 1 is hinged with four support rods 15 through four second fixing bolts 14 respectively, one ends, far away from the second fixing bolts 14, of the support rods 15 are hinged with a third shell 17 through third fixing bolts 16, and one side, far away from the third fixing bolts 16, of the third shell 17 is fixedly connected with a second cone 18; the setting of second fixing bolt 14 can play the effect of support to bracing piece 15, the setting of bracing piece 15 can play the effect of support to third fixing bolt 16, the setting of third fixing bolt 16 can play the effect of support to third casing 17, the setting of third casing 17 can play the effect of support to second cone 18, through the angle of rotation regulation bracing piece 15 and third casing 17, can insert ground with second cone 18, thereby make bracing piece 15 can play fixed and supported effect to first plate body 1.
In this embodiment, specifically: the outer side walls of the first plate body 1 are symmetrically and fixedly connected with four sleeve clamps 19, and the outer side walls of the four second cones 18 are respectively clamped inside the four sleeve clamps 19; the arrangement of the jacket clamp 19 facilitates the collection of the second cone 18, so that the device can be used for collecting the structures such as the jacket clamp 19 and the second cone 18 under the condition of being idle, the workers are prevented from being accidentally injured, and the device is convenient to store part of the structure.
Working principle or structural principle, when in use, the first cone 2 is inserted into the ground, so that the first plate body 1 is fixed with the ground, the second cone 18 is taken down from the inside of the sleeve clamp 19, the second cone 18 can be inserted into the ground by rotating and adjusting the angles of the supporting rod 15 and the third shell 17, so that the supporting rod 15 can play a role of fixing and supporting for the first plate body 1, because the ground on the construction site of the building engineering is uneven, the heights of four corners of the second plate body 8 can be adjusted by rotating the threaded rod 10, so that the upper surface of the second plate body 8 is level and stable, so that the surveying device body 12 can be stably supported by the pipe body 11 and the first fixing bolt 13, the rod body 7 and the ball body 6 are arranged, can rotate along with the angle of the second plate body 8 when the level of the second plate body 8 is adjusted, and can play a role of supporting for the second plate body 8, damping pad 5's setting, can be so that spheroid 6 is after rotating, fix the position of spheroid 6, fourth fixing bolt 22 is in with first fixed block 20 and second fixed block 21 fixed connection, make first casing 3 and second casing 4 fixed connection, be convenient for first casing 3 and second casing 4's split simultaneously, the setting of collet 19, be convenient for collecting of second cone 18, make this device under the idle condition, pack up collet 19, structures such as second cone 18, prevent accidental injury staff, be convenient for accomodate of this device part structure simultaneously.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A site survey device for construction costs, comprising a first plate body (1), characterized in that: the upper surface of the first plate body (1) is respectively and rotatably connected with four threaded rods (10) through four bearings (9), the outer side walls of the four threaded rods (10) are all in threaded connection with a second plate body (8), the upper surface of the first plate body (1) at the center is fixedly connected with a first shell (3), a second shell (4) is arranged on the upper surface of the first shell (3), a ball body (6) is arranged inside the first shell (3) and the second shell (4), the outer side wall of the sphere (6) is fixedly connected with a damping pad (5), the outer side wall of the damping pad (5) is respectively connected with the inner side walls of the first shell (3) and the second shell (4) in a sliding way, the top fixedly connected with body of rod (7) of spheroid (6), the top threaded connection of the body of rod (7) in the lower surface of second plate body (8).
2. A site survey apparatus for construction costs according to claim 1, wherein: the upper surface fixed connection of second plate body (8) has body (11), the inside wall of body (11) is equipped with surveys device body (12), body (11) through first fixing bolt (13) with body (11) fixed connection.
3. A site survey apparatus for construction costs according to claim 1, wherein: the upper surface of the first plate body (1) is provided with four first cones (2), and the bottom ends of the first cones (2) penetrate through the upper surface of the first plate body (1).
4. A site survey apparatus for construction costs according to claim 1, wherein: the two-side-symmetric fixing device is characterized in that two first fixing blocks (20) are fixedly connected to two sides of the first shell (3), two second fixing blocks (21) are fixedly connected to two sides of the second shell (4), and the first fixing blocks (20) and the second fixing blocks (21) are fixedly connected through fourth fixing bolts (22).
5. A site survey apparatus for construction costs according to claim 1, wherein: the outer side wall of the first plate body (1) is hinged with four supporting rods (15) through four second fixing bolts (14), the supporting rods (15) are far away from one ends of the second fixing bolts (14) are hinged with a third shell (17) through third fixing bolts (16), and the third shell (17) is far away from one side of the third fixing bolts (16) and is fixedly connected with a second cone (18).
6. A site survey apparatus for construction costs according to claim 5, wherein: the outer side wall of the first plate body (1) is symmetrically and fixedly connected with four collets (19), and the outer side wall of the second cone body (18) is clamped in the four collets (19) respectively.
CN201922295080.9U 2019-12-19 2019-12-19 Site survey device that building engineering cost was used Expired - Fee Related CN210664493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922295080.9U CN210664493U (en) 2019-12-19 2019-12-19 Site survey device that building engineering cost was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922295080.9U CN210664493U (en) 2019-12-19 2019-12-19 Site survey device that building engineering cost was used

Publications (1)

Publication Number Publication Date
CN210664493U true CN210664493U (en) 2020-06-02

Family

ID=70820473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922295080.9U Expired - Fee Related CN210664493U (en) 2019-12-19 2019-12-19 Site survey device that building engineering cost was used

Country Status (1)

Country Link
CN (1) CN210664493U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878757A (en) * 2020-07-08 2020-11-03 五冶集团上海有限公司 Lighting device for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878757A (en) * 2020-07-08 2020-11-03 五冶集团上海有限公司 Lighting device for construction

Similar Documents

Publication Publication Date Title
CN207145922U (en) Water conservancy management mobile wireless video monitoring apparatus
CN210664493U (en) Site survey device that building engineering cost was used
CN211341907U (en) Civil engineering construction support
CN108799756A (en) A kind of dismountable engineering mapping instrument
CN207215117U (en) A kind of combined type engineering surveying instrument
CN211779774U (en) Supplementary mapping device of mapping engineering
CN211472518U (en) Removable supporting is used in building engineering construction
CN211877037U (en) Measuring instrument for geological engineering surveying and mapping
CN210831214U (en) Tripod for mapping engineering
CN210918300U (en) Building engineering datum line pay-off
CN214306142U (en) Building design user external data mapping device
CN213576579U (en) Measuring device for construction project cost budget
CN212004998U (en) Survey and drawing tripod is with fixed antiskid device that falls
CN216715754U (en) Temporary foot rest for geological survey
CN210291262U (en) Building survey and drawing is with portable rotary type tripod
CN211118351U (en) Mapping instrument positioning device for engineering mapping
CN113108213A (en) Water conservancy and hydropower engineering surveying and mapping device
CN213745665U (en) Site survey device for building engineering
CN217130776U (en) Strutting arrangement is used in engineering survey and drawing convenient to quick leveling
CN219395351U (en) Surveying and mapping device
CN212320713U (en) Bridge engineering bridge surveying equipment
CN209960165U (en) Building engineering measuring equipment based on photoelectric technology
CN217581199U (en) Top beam support for building
CN220727607U (en) Geological survey support prevents structure that inclines
CN211855342U (en) Construction engineering cost on-site surveying instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602

Termination date: 20211219