CN210918300U - Building engineering datum line pay-off - Google Patents

Building engineering datum line pay-off Download PDF

Info

Publication number
CN210918300U
CN210918300U CN201921826739.2U CN201921826739U CN210918300U CN 210918300 U CN210918300 U CN 210918300U CN 201921826739 U CN201921826739 U CN 201921826739U CN 210918300 U CN210918300 U CN 210918300U
Authority
CN
China
Prior art keywords
fixedly connected
datum line
pay
machine
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921826739.2U
Other languages
Chinese (zh)
Inventor
赵燕飞
李宝娜
唐晓峰
班晓晨
宋富贵
张辉栋
赵鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921826739.2U priority Critical patent/CN210918300U/en
Application granted granted Critical
Publication of CN210918300U publication Critical patent/CN210918300U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model discloses a building engineering datum line pay-off relates to building engineering technical field, including the paying out machine, the top swing joint of paying out machine has the take-up pulley, the top fixedly connected with spirit level of paying out machine, the bottom fixedly connected with line box of paying out machine, the bottom fixedly connected with spool of take-up pulley, one side fixedly connected with handle of line box, the bottom fixedly connected with pillar of line box, the bottom fixedly connected with toper piece of pillar. According to the construction engineering datum line pay-off device, the pay-off machine, the level gauge, the datum line, the wire drawing machine, the mark point groove and the infrared emitter are arranged in a matched mode, so that the mark is straight and horizontal, and the problem that the existing pay-off is error is solved; through the cooperation setting of line box, handle, pillar, toper piece and base, can make the suitability of device stronger, it is more convenient to fix, has solved the current inconvenient condition of use.

Description

Building engineering datum line pay-off
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering datum line pay-off.
Background
The building engineering is an engineering entity which performs various technical works and completions such as planning, surveying, designing, constructing, completing and the like for newly building, reconstructing or extending building buildings and affiliated structures and installation engineering of lines, pipelines and equipment matched with the engineering entity. Also refers to the construction of various houses and buildings, also known as the construction workload. The investment amount of the part can be realized only by the construction activities with the need of carrying out the work and the material movement. The construction project of the house building comprises factory buildings, theaters, hotels, shops, schools, hospitals, houses and the like, and the new construction, reconstruction or extension of the house building can be realized only by construction activities with materials required; the 'auxiliary structure facilities' refer to water towers, bicycle sheds, pools and the like which are matched with the house building. The 'installation of lines, pipelines and equipment' refers to the installation activities of the lines, pipelines and equipment such as electricity, water supply and drainage, heating and ventilation, communication, intellectualization and elevators which are matched with the house building and the auxiliary facilities thereof. The paying off of the datum line in the construction process of all the building engineering is an important link, is directly related to the construction accuracy of the whole building, and is a more complex link before construction. Before construction, all reference points of a building are determined by paying off marking, and the conventional paying off modes comprise manual measurement paying off, paying off by a paying off device and the like.
The existing construction engineering datum line pay-off device has the following defects:
1. the paying-off device is held by a hand in the paying-off process, and meanwhile, due to the terrain and external reasons, the paid-off line is not level enough, and an error exists;
2. the device is light in weight, cannot be conveniently fixed in position in the using process and is not convenient enough to use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building engineering datum line pay-off, through the top fixedly connected with spirit level at the paying out machine, the mark groove has been seted up to one side of wire stretcher, one side fixedly connected with infrared emitter of paying out machine, one side fixedly connected with handle of line box, the bottom fixedly connected with pillar of line box, the bottom fixedly connected with toper piece of pillar has solved the problem that proposes among the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a building engineering datum line pay-off, includes the paying out machine, the top swing joint of paying out machine has the take-up pulley, the top fixedly connected with spirit level of paying out machine, the bottom fixedly connected with line box of paying out machine, the bottom fixedly connected with spool of take-up pulley, one side fixedly connected with handle of line box, the bottom fixedly connected with pillar of line box, the bottom fixedly connected with toper piece of pillar, the bottom of pillar is provided with the base, the inside fixedly connected with datum line of line box, the one end fixedly connected with wire stretcher of line box is kept away from to the datum line, the mark groove has been seted up to one side of wire stretcher, one side fixedly connected with infrared emitter of paying out machine.
Optionally, the rotating shaft of the take-up pulley is fixedly connected with the bobbin, and the top of the take-up pulley is fixedly connected with the rotor.
Optionally, the gradienters are liquid gradienters, the number of the gradienters is two, and one side of each gradienter is provided with a marking line.
Optionally, the bobbin is fixedly connected with the reference line, and the bobbin is movably connected with the line box.
Optionally, the outer surface of the pillar is provided with scales, and the pillar is fixedly connected to the middle of the bottom of the wire box.
Optionally, the outer surface of the conical block is provided with threads, and the conical block is matched with a threaded hole formed in the top of the base.
Optionally, the infrared emitter is fixedly connected to the middle of one side of the pay-off machine, and the infrared emitter corresponds to the position of the punctuation slot.
(III) advantageous effects
The utility model provides a building engineering datum line pay-off possesses following beneficial effect:
1. this building engineering datum line pay-off, through the top fixedly connected with spirit level at the paying out machine, can make the device level through observing the spirit level when using, retention device is perpendicular with ground, through the mark groove has been seted up to one side at the wire stretcher, one side fixedly connected with infrared emitter of paying out machine, infrared emitter's position corresponds with the position of mark groove, can straighten the datum line earlier when using, infrared emitter sends the infrared ray, launch to the position of mark groove, and cooperate with the spirit level, observe the orbit of infrared ray, make infrared ray penetrate into the mark groove perpendicularly, make the datum line straighten, reduce the error, through the paying out machine, the spirit level, the datum line, the wire stretcher, the cooperation setting of mark groove and infrared emitter, can make the straightness and level, the condition that current unwrapping wire has the error has been solved.
2. This building engineering datum line pay-off, one side fixedly connected with handle through at the line box, handle fixed connection is at the middle part of line box one side, the groove of gripping has been seted up to the inside of handle, it is more comfortable that can make the hand grip, it is more firm also to take during the controlling means, bottom fixedly connected with pillar through at the line box, the bottom fixedly connected with toper piece of pillar, the bottom of pillar is provided with the base, can make the device no matter peg graft in the ground, still stand on the ground surface through the installation upper base, can both fix more firm, and the surface of pillar is provided with the scale, can make when fixed individual accurate standard, it is more practical, through the line box, handle, the pillar, the cooperation setting of toper piece and base, can make the suitability of device stronger, it is more convenient to fix, the current use condition has been solved.
Drawings
Fig. 1 is a schematic view of a first view structure of the present invention;
fig. 2 is a schematic view of a second perspective structure of the present invention;
fig. 3 is the utility model discloses a sectional structure schematic diagram of paying out machine.
In the figure: 1-paying out machine, 2-take-up pulley, 3-level meter, 4-line box, 5-line spool, 6-handle, 7-support, 8-conical block, 9-base, 10-datum line, 11-wire drawing machine, 12-mark groove and 13-infrared emitter.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a building engineering datum line pay-off, including paying out machine 1, the top swing joint of paying out machine 1 has take-up pulley 2, the top fixed connection spirit level 3 of paying out machine 1, the bottom fixedly connected with line box 4 of paying out machine 1, the bottom fixedly connected with spool 5 of take-up pulley 2, one side fixedly connected with handle 6 of line box 4, the bottom fixedly connected with pillar 7 of line box 4, the bottom fixedly connected with toper piece 8 of pillar 7, the bottom of pillar 7 is provided with base 9, the inside fixedly connected with datum line 10 of line box 4, datum line 10 keeps away from the one end fixedly connected with wire stretcher 11 of line box 4, mark groove 12 has been seted up to one side of wire stretcher 11, one side fixedly connected with infrared emitter 13 of paying out machine 1.
As an optimal technical solution of the utility model: the rotating shaft of the take-up pulley 2 is fixedly connected with the bobbin 5, the top of the take-up pulley 2 is fixedly connected with a rotary head, the rotary head is rotated to enable the take-up pulley 2 to rotate, the bobbin 5 is driven to rotate, the reference line 10 can be conveniently withdrawn, the level gauge 3 is a liquid level gauge, the number of the level gauges 3 is two, one side of the level gauge 3 is provided with a marking line, the liquid level gauge is low in cost and convenient to observe and judge whether the device is horizontal or not accurately, the bobbin 5 is fixedly connected with the reference line 10, the bobbin 5 is movably connected with the wire box 4, the outer surface of the support 7 is provided with scales, the support 7 is fixedly connected to the middle part of the bottom of the wire box 4, the support 7 can be inserted into a foundation to be used as a scale, the upper base 9 can also be installed to stand on the surface of the foundation, the outer surface of the conical block 8 is, or the infrared emitter 13 is in threaded connection with the base 9, the infrared emitter 13 is fixedly connected to the middle of one side of the pay-off machine 1, the position of the infrared emitter 13 corresponds to that of the mark groove 12, and when the infrared emitter is observed, the infrared ray is vertically emitted into the mark groove 12, namely, the two devices horizontally correspond.
When the user uses, through handle 6 pulling wire stretcher 11, spool 5 and take-up pulley 2 rotate, reach standard point position, flare-out datum line 10 observes two spirit levels 3, adjusting device's position makes the device level to fixing device starts infrared emitter 13, and the infrared ray penetrates perpendicularly into mark point groove 12, and the device level.
To sum up, when the building engineering datum line pay-off device is used, the level 3 is fixedly connected to the top of the pay-off machine 1, the device can be leveled by observing the level when the device is used, the holding device is vertical to the ground, the marking point groove 12 is formed in one side of the wire drawing machine 11, the infrared emitter 13 is fixedly connected to one side of the pay-off machine 1, the position of the infrared emitter 13 corresponds to the position of the marking point groove 12, the datum line 10 can be straightened firstly when the device is used, the infrared emitter 13 emits infrared rays to the position of the marking point groove 12, the track of the infrared rays is observed by matching with the level 3, the infrared rays are vertically emitted into the marking point groove, the datum line is straightened, errors are reduced, and the datum line is straightened and leveled by matching the pay-off machine 1, the level 3, the datum line 10, the wire drawing machine 11, the marking point groove 12 and the infrared emitter 13, the problem that the existing pay-off has errors is solved; by fixedly connecting the handle 6 on one side of the wire box 4, fixedly connecting the handle 6 in the middle of one side of the wire box 4 and arranging the holding groove in the handle 6, the hand can be held more comfortably and the holding of the device is more stable, the support 7 is fixedly connected at the bottom of the wire box 4, the conical block 8 is fixedly connected at the bottom of the support 7, the base 9 is arranged at the bottom of the support 7, the device can be stably fixed no matter inserted in a foundation or erected on the surface of the foundation by installing the upper base 9, and the outer surface of the support post 7 is provided with scales, so that the fixing time can be accurate and standard, the utility model is more practical, through the cooperation setting of line box 4, handle 6, pillar 7, toper piece 8 and base 9, can make the suitability of device stronger, it is more convenient to fix, has solved the current inconvenient condition of use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a building engineering datum line pay-off which characterized in that: comprises a paying-off machine (1), the top of the paying-off machine (1) is movably connected with a take-up pulley (2), the top of the paying-off machine (1) is fixedly connected with a level meter (3), the bottom of the paying-off machine (1) is fixedly connected with a wire box (4), the bottom of the take-up pulley (2) is fixedly connected with a spool (5), one side of the wire box (4) is fixedly connected with a handle (6), the bottom of the wire box (4) is fixedly connected with a support post (7), the bottom of the support post (7) is fixedly connected with a conical block (8), a base (9) is arranged at the bottom of the support post (7), a datum line (10) is fixedly connected inside the wire box (4), one end of the datum line (10) far away from the wire box (4) is fixedly connected with a wire stretcher (11), mark point groove (12) have been seted up to one side of wire stretcher (11), one side fixedly connected with infrared emitter (13) of paying out machine (1).
2. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the rotating shaft of the take-up pulley (2) is fixedly connected with the bobbin (5), and the top of the take-up pulley (2) is fixedly connected with a rotating head.
3. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the level (3) is a liquid level, the number of the level (3) is two, and a marking line is arranged on one side of the level (3).
4. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the bobbin (5) is fixedly connected with the datum line (10), and the bobbin (5) is movably connected with the line box (4).
5. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the surface of pillar (7) is provided with the scale, pillar (7) fixed connection is in the middle part of line box (4) bottom.
6. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the outer surface of the conical block (8) is provided with threads, and the conical block (8) is matched with a threaded hole formed in the top of the base (9).
7. The construction engineering datum line pay-off device as claimed in claim 1, wherein: the infrared emitter (13) is fixedly connected to the middle of one side of the pay-off machine (1), and the infrared emitter (13) corresponds to the position of the mark groove (12).
CN201921826739.2U 2019-10-28 2019-10-28 Building engineering datum line pay-off Active CN210918300U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921826739.2U CN210918300U (en) 2019-10-28 2019-10-28 Building engineering datum line pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921826739.2U CN210918300U (en) 2019-10-28 2019-10-28 Building engineering datum line pay-off

Publications (1)

Publication Number Publication Date
CN210918300U true CN210918300U (en) 2020-07-03

Family

ID=71352220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921826739.2U Active CN210918300U (en) 2019-10-28 2019-10-28 Building engineering datum line pay-off

Country Status (1)

Country Link
CN (1) CN210918300U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049442A (en) * 2020-09-11 2020-12-08 湖北汇宜建设工程有限公司 Building construction engineering wall building equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049442A (en) * 2020-09-11 2020-12-08 湖北汇宜建设工程有限公司 Building construction engineering wall building equipment
CN112049442B (en) * 2020-09-11 2022-05-06 广东聚源建设集团有限公司 Building construction engineering wall building equipment

Similar Documents

Publication Publication Date Title
CN210918300U (en) Building engineering datum line pay-off
CN208721078U (en) A kind of fixed holder of hand-held construction account equipment
JPH0333435Y2 (en)
CN214149327U (en) Building engineering is with straightness detection device that hangs down
CN212510123U (en) Construction mapping device
US20050246917A1 (en) Measuring apparatus with tape measure and pendulum for plumbing
CN114526416A (en) Real estate mapping device with assistance-localization real-time structure
CN209725658U (en) A kind of mapping equipment bracket
CN214250988U (en) Marking device for architectural decoration and finishing engineering design
CN214575868U (en) Building engineering wall body equipment of building in room
CN219121403U (en) On-site measurement marker post
CN215491711U (en) Positioning device and measuring system for elevation transfer measurement
CN220187627U (en) Deflection acceptance measurement device for photovoltaic flexible support steel cable
CN211401207U (en) Marker post for building surveying and mapping
CN212007197U (en) Stay wire device for architectural survey
CN220205196U (en) Auxiliary coordinate positioning and measuring device
CN214372457U (en) Construction mapping device
CN220244242U (en) Engineering measurement structure for constructional engineering
CN218787824U (en) Elevation control device for foundation pit slope section
CN217953488U (en) Level measuring device for engineering survey and drawing
CN216645359U (en) Novel prefabricated wallboard installation detects device
CN218881599U (en) Improved formwork support upright rod
CN216049910U (en) Wall body correcting unit in work progress
CN219996025U (en) Multipurpose ruler
CN221095127U (en) Building construction positioning pile convenient to adjust vertically

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant