CN216645359U - Novel prefabricated wallboard installation detects device - Google Patents

Novel prefabricated wallboard installation detects device Download PDF

Info

Publication number
CN216645359U
CN216645359U CN202122857267.0U CN202122857267U CN216645359U CN 216645359 U CN216645359 U CN 216645359U CN 202122857267 U CN202122857267 U CN 202122857267U CN 216645359 U CN216645359 U CN 216645359U
Authority
CN
China
Prior art keywords
rod
installation
plumb line
groove
graduated scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122857267.0U
Other languages
Chinese (zh)
Inventor
张丽新
刘�东
杨磊
张雪宝
梁强
杨朋广
胡正莱
王永生
张兴峰
王春雷
鹿芸
孟玮
李建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202122857267.0U priority Critical patent/CN216645359U/en
Application granted granted Critical
Publication of CN216645359U publication Critical patent/CN216645359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a novel prefabricated wallboard installation detection device, which comprises a guiding rule and a plumb line weight, wherein the plumb line weight is arranged on the guiding rule, and the guiding rule is arranged in a T-shaped structure; the guiding rule comprises a cross rod and a vertical rod, the vertical rod is fixed on the lower surface of the cross rod, one end of the cross rod is erected on a wall, the other end of the cross rod is provided with a groove, the bottom of the groove is provided with an installation rod, two sides of the groove are provided with a plurality of supporting rods, and the supporting rods are perpendicular to the installation rod; a graduated scale mounting rod is arranged at the bottom end of the vertical rod, a graduated scale is arranged on the graduated scale mounting rod, and the graduated scale is perpendicular to the vertical rod; the plumb line weighs down includes plumb line and weighs down, and the line weighs down and installs in the bottom of plumb line, and the upper end of plumb line is walked around the bracing piece and is penetrated in the installation pole and fix inside the installation pole. By adopting the structure, the utility model simplifies the detection work, detects the verticality and the positioning deviation at one time, greatly accelerates the detection speed in the installation process and improves the assembly type construction speed.

Description

Novel prefabricated wallboard installation detects device
Technical Field
The utility model relates to the technical field of building construction, in particular to a novel prefabricated wall panel installation and detection device.
Background
At present, the assembly type building is rapidly developed, the application of the prefabricated wall board is wide, the installation quality requirement is high, the error requirement is small, and the quality of the wall board installation directly influences the next layer of components, so that the whole building quality is influenced. At present, the installation and detection process still depends on the traditional running rule, the feeler gauge and the steel tape measure for detection, multiple tools are needed for matching and using, the process is very complicated, the time consumption is long, the positioning and the verticality cannot be detected simultaneously, the detection process needs to be alternately detected for many times, the time is wasted, and the installation quality is difficult to control. In view of the above, it is necessary to design a new prefabricated wall panel installation detection device.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a novel prefabricated wallboard installation detection device, which solves the problem that a plurality of tools are needed in the existing prefabricated wallboard installation detection process, simplifies detection work, detects perpendicularity and positioning deviation at one time, greatly accelerates the detection speed in the installation process, and improves the assembly type construction speed.
In order to achieve the purpose, the utility model provides a novel prefabricated wallboard installation detection device, which comprises a guiding rule and a plumb line weight, wherein the plumb line weight is arranged on the guiding rule, and the guiding rule is in a T-shaped structure;
the guiding rule comprises a cross rod and a vertical rod, the vertical rod is fixed on the lower surface of the cross rod, one end of the cross rod is erected on a wall, the other end of the cross rod is provided with a groove, the bottom of the groove is provided with an installation rod, a plurality of support rods are arranged on two sides of the groove, and the support rods are perpendicular to the installation rod;
a graduated scale mounting rod is arranged at the bottom end of the upright rod, a graduated scale is arranged on the graduated scale mounting rod, and the graduated scale is perpendicular to the upright rod;
the plumb line weighs down and falls including plumb line and line, the line weighs down and installs the bottom of plumb line, the upper end of plumb line is walked around the bracing piece penetrates in the installation pole and fixes inside the installation pole.
Preferably, the groove is arranged in an inverted U-shaped structure.
Preferably, the length of the cross rod is 470mm, and the length of the cross rod erected on the wall part is smaller than the length of the vertical line part.
Preferably, the length of the vertical rod is 2 m.
Preferably, the graduated scale mounting rod is in threaded connection with the vertical rod.
Preferably, the cross rods on two sides of the groove are provided with mounting holes for mounting the support rods.
Therefore, the novel prefabricated wallboard installation detection device adopting the structure solves the problem that a plurality of tools are needed in the existing prefabricated wallboard installation detection process, simplifies detection work, detects perpendicularity and positioning deviation at one time, greatly accelerates the installation process detection speed, and improves the assembly type construction speed.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of a novel prefabricated wall panel installation detection device according to the present invention;
FIG. 2 is an installation diagram of an embodiment of the installation detection device for a novel prefabricated wall panel according to the present invention;
fig. 3 is a partially enlarged view of an embodiment of the installation detection device for a novel prefabricated wall panel.
Detailed Description
The technical scheme of the utility model is further explained by the attached drawings and the embodiment.
Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this invention belongs. The use of "first," "second," and similar terms in the present application do not denote any order, quantity, or importance, but rather the terms are used to distinguish one element from another. The word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
Examples
Fig. 1 is a schematic structural view of an embodiment of a novel prefabricated wallboard installation and detection device, fig. 2 is a schematic installation view of an embodiment of a novel prefabricated wallboard installation and detection device, and fig. 3 is a partially enlarged view of the embodiment of the novel prefabricated wallboard installation and detection device. As shown in the figure, the utility model provides a novel prefabricated wallboard installation detection device, which comprises a guiding rule 1 and a plumb bob 2, wherein the plumb bob 2 is arranged on the guiding rule 1, and the guiding rule 1 is arranged in a T-shaped structure; the guiding ruler 1 comprises a cross rod 11 and vertical rods 12, the vertical rods 12 are fixed on the lower surfaces of the cross rod 11, one end of the cross rod 11 is erected on the wall 3, a groove 13 is formed in the other end of the cross rod 11, an installation rod 14 is arranged at the bottom of the groove 13, a plurality of support rods 15 are arranged on two sides of the groove 13, and the support rods 15 are perpendicular to the installation rod 14; the bottom of pole setting 12 is provided with scale installation pole 16, is provided with the scale on the scale installation pole 16, and the scale is perpendicular mutually with pole setting 12. The scale mounting rod 16 is in threaded connection with the upright 12. The cross bar 11 at the two sides of the groove 13 is provided with a mounting hole for mounting the support bar 15, and the position of the support bar can be adjusted according to requirements.
The plumb line bob 2 comprises a plumb line 21 and a line bob 22, the line bob 22 is arranged at the bottom end of the plumb line 21, and the upper end of the plumb line 21 bypasses the support rod 15, penetrates into the mounting rod 14 and is fixed inside the mounting rod 14. The groove 13 is arranged in an inverted U-shaped structure. The length of the cross bar 11 is 470mm, and the length of the cross bar 11 erected on the wall part is less than that of the fixed plumb line 21 part. The upright 12 has a length of 2 m.
The wallboard tentatively takes one's place the back, hang novel detection instrument on prefabricated wallboard, the pole setting of guaranteeing the detection instrument pastes tightly with the wallboard, treat that the line weighs down stable back, at first read plumb line and scale deviation value, judge wallboard slope degree, adjust upper portion bearing diagonal according to the deviation value, return to zero the deviation value, then look over the line and weigh down bottom endpoint and control line deviation, read out the line and weigh down the error between scale and the ground 200mm line, rethread constantly adjusts wallboard lower part bearing diagonal and weighs down the line and adjust well with the control line, adjust long bearing diagonal again, make plumb line and scale deviation return to zero once more. By repeating the above steps, the wallboard can be installed in place with constant adjustment. The tool can judge two indexes simultaneously, simplifies the measurement steps and improves the construction efficiency.
Therefore, the novel prefabricated wallboard installation detection device adopting the structure solves the problem that a large number of tools are needed in the existing prefabricated wallboard installation detection process, simplifies detection work, detects perpendicularity and positioning deviation at one time, greatly accelerates the detection speed of the installation process, and improves the assembly type construction speed.
Finally, it should be noted that: the above embodiments are only intended to illustrate the technical solution of the present invention and not to limit the same, and although the present invention is described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that: modifications and equivalents may be made to the disclosed embodiments without departing from the spirit and scope of the present invention.

Claims (6)

1. The utility model provides a novel prefabricated wallboard installation detects device which characterized in that:
the guiding ruler comprises a guiding ruler and a plumb line bob, wherein the plumb line bob is arranged on the guiding ruler, and the guiding ruler is arranged in a T-shaped structure;
the guiding rule comprises a cross rod and a vertical rod, the vertical rod is fixed on the lower surface of the cross rod, one end of the cross rod is erected on a wall, the other end of the cross rod is provided with a groove, the bottom of the groove is provided with an installation rod, a plurality of support rods are arranged on two sides of the groove, and the support rods are perpendicular to the installation rod;
a graduated scale mounting rod is arranged at the bottom end of the upright rod, a graduated scale is arranged on the graduated scale mounting rod, and the graduated scale is perpendicular to the upright rod;
the plumb line weighs down includes plumb line and line weighs down, the line weighs down installs the bottom of plumb line, the upper end of plumb line is walked around the bracing piece penetrates in the installation pole and fixes inside the installation pole.
2. The novel prefabricated wall panel installation detection device of claim 1, wherein: the groove is of an inverted U-shaped structure.
3. The novel prefabricated wall panel installation detection device of claim 2, wherein: the length of the cross rod is 470mm, and the length of the cross rod erected on the wall body part is smaller than the length of the vertical line part.
4. The novel prefabricated wall panel installation detection device of claim 3, wherein: the length of the vertical rod is 2 m.
5. The novel prefabricated wall panel installation detection device of claim 4, wherein: the graduated scale mounting rod is in threaded connection with the vertical rod.
6. The novel prefabricated wall panel installation detection device of claim 5, wherein: and mounting holes for mounting the supporting rods are formed in the cross rods on two sides of the groove.
CN202122857267.0U 2021-11-22 2021-11-22 Novel prefabricated wallboard installation detects device Active CN216645359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122857267.0U CN216645359U (en) 2021-11-22 2021-11-22 Novel prefabricated wallboard installation detects device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122857267.0U CN216645359U (en) 2021-11-22 2021-11-22 Novel prefabricated wallboard installation detects device

Publications (1)

Publication Number Publication Date
CN216645359U true CN216645359U (en) 2022-05-31

Family

ID=81734994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122857267.0U Active CN216645359U (en) 2021-11-22 2021-11-22 Novel prefabricated wallboard installation detects device

Country Status (1)

Country Link
CN (1) CN216645359U (en)

Similar Documents

Publication Publication Date Title
CN113280721B (en) Pile core positioning device and pile core positioning method
CN211178280U (en) Verticality detection device easy and convenient to operate
CN201421330Y (en) Leveling device
CN205957883U (en) Long and narrow space internal wall verticality measuring instrument and measuring device
CN206002038U (en) A kind of wall column formwork vertical gauge
CN213932497U (en) C type wall body straightness detection device that hangs down
CN216645359U (en) Novel prefabricated wallboard installation detects device
CN113310466A (en) Anti-slide pile deviation monitoring device and monitoring method
CN206905686U (en) A kind of sleeve testing apparatus for verticality and measuring for verticality structure
CN214793144U (en) Special gradient measuring device of building engineering
CN212779061U (en) Angle measuring device
CN215261789U (en) Perpendicular detection device is used in road and bridge construction
CN210288505U (en) Pile core positioning device
CN212129261U (en) Perpendicularity tester for pile hole of cast-in-situ bored pile
CN209637163U (en) A kind of out-hung panel keel of assembled architecture
CN206905766U (en) A kind of joint bar testing apparatus for verticality and measuring for verticality structure
CN219798141U (en) Bridge pier column template installation accuracy measuring tool
CN206113928U (en) Special detection instrument of template
CN215217462U (en) Calibration system of profile blast hole
CN219890450U (en) A straightness control appearance that hangs down for concrete guardrail template
CN219887610U (en) Keel mounting tool
CN217845176U (en) Wall body straightness detection device that hangs down
CN217687057U (en) Multifunctional building engineering detects instrument
CN216239831U (en) Vertical measurement and correction device for mounting of assembled cement board
CN215331610U (en) A assistance-localization real-time structure for steelframe is laid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant