CN214879585U - Semi-mechanized construction hoisting point device - Google Patents

Semi-mechanized construction hoisting point device Download PDF

Info

Publication number
CN214879585U
CN214879585U CN202022718254.0U CN202022718254U CN214879585U CN 214879585 U CN214879585 U CN 214879585U CN 202022718254 U CN202022718254 U CN 202022718254U CN 214879585 U CN214879585 U CN 214879585U
Authority
CN
China
Prior art keywords
hoisting point
plates
clamping plates
semi
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022718254.0U
Other languages
Chinese (zh)
Inventor
王忠涛
张锋
王大伟
潘晓宇
解国兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shanghai Steel Structure Technology Co Ltd
Original Assignee
MCC Shanghai Steel Structure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shanghai Steel Structure Technology Co Ltd filed Critical MCC Shanghai Steel Structure Technology Co Ltd
Priority to CN202022718254.0U priority Critical patent/CN214879585U/en
Application granted granted Critical
Publication of CN214879585U publication Critical patent/CN214879585U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a semi-mechanized construction hoisting point device, which comprises two clamping plates, a steel plate, two fixed plates, a stand column and an auxiliary hoisting point; the two clamping plates and the two fixing plates are U-shaped plates, the two vertical rods of the clamping plates are different in length, the two clamping plates and the two fixing plates are symmetrically welded on the two sides of the steel plate respectively, and the clamping plates and the fixing plates are connected through bolts; the stand is located steel sheet upper portion, and the supplementary hoisting point of stand top welding. The utility model discloses utilize current girder steel to set up the hoisting point device, provide the supplementary hoisting point that is used for installing the steel member, the steel member upper portion that specially adapted needs the installation does not have the condition of supplementary hoisting point. The semi-mechanized construction hoisting point device is detachable, adjustable, quick, light and flexible to install, can save safety measures, and ensures the quick and efficient installation process.

Description

Semi-mechanized construction hoisting point device
Technical Field
The utility model relates to a hoisting point device of building trade, specific semi-mechanized construction hoisting point device that says so.
Background
Newly-increased in the steel construction work process, when changing, often face the construction operating mode and change, can't use machinery to carry out the problem of steel member installation, the conventional measure stand that adopts the supplementary hoist and mount of welding on the installed steel member or the mode that sets up supplementary hoisting point on superstructure are under construction, and construction process is loaded down with trivial details, will carry out the excision of measure after the construction is accomplished, and the installation difficulty, the installation effectiveness is low, and the process is hard and has the potential safety hazard.
Disclosure of Invention
The utility model aims at overcoming prior art's defect, provide a semi-mechanized construction hoisting point device for the building trade utilizes the H shaped steel roof beam of having installed to set up the hoisting point, adopts devices that carry out the steel member installation such as chain block, hoist engine, solves the problem that can't utilize machinery to carry out the steel member installation, reduces construction cost when improving work efficiency.
In order to solve the technical problem, the utility model discloses a realize like this:
the utility model provides a semi-mechanized construction hoisting point device which characterized in that: the device comprises two clamping plates, a steel plate, two fixing plates, a stand column and an auxiliary hoisting point; the two clamping plates and the two fixing plates are U-shaped plates, the two vertical rods of the clamping plates are different in length, the two clamping plates and the two fixing plates are symmetrically welded on two sides of the steel plate respectively, and the clamping plates and the fixing plates are connected through bolts; the stand is located steel sheet upper portion, and the supplementary hoisting point of stand top welding.
The utility model has the advantages that: 1. the integral structure is convenient to process, and the specification and the size of the upright column and the auxiliary hoisting point are selected according to the weight of the hoisted object during manufacturing;
2. the method has the advantages that the disassembly and the assembly are convenient, the recycling is realized, the construction efficiency is improved, the construction safety is ensured, the auxiliary installation measures or hoisting points need to be welded temporarily when the traditional soil method is used for installation, the measures are disassembled after the construction is finished, the construction is complicated, and the high-altitude installation danger is large;
3. the integral structure is light, the operation is simple, the disassembly and the assembly are easy, the structure and the integrity of the original H-shaped steel beam are not damaged, the development requirements of the country, enterprises and public institutions are met, and the method can be widely applied to the installation of steel members by utilizing a soil method.
Drawings
The invention will be described in further detail with reference to the following drawings and embodiments:
fig. 1 is a schematic plan view of the present application.
Detailed Description
As shown in fig. 1: a semi-mechanized construction hoisting point device comprises two clamping plates 1, a steel plate 2, two fixing plates 3, a stand column 4 and an auxiliary hoisting point 5; the two clamping plates and the two fixing plates are U-shaped plates, the two vertical rods of the clamping plates are different in length, the two clamping plates and the two fixing plates are symmetrically welded on two sides of the steel plate respectively, and the clamping plates and the fixing plates are connected through bolts; the stand is located steel sheet upper portion, and the supplementary hoisting point of stand top welding.
The implementation method comprises the following steps:
step 1: the two clamping plates 1 are welded with the steel plate 2, the upright post 4 is welded on the steel plate, the auxiliary hoisting point 5 is welded at the top of the upright post 4, and the clamping plates 1, the steel plate 2, the upright post 4 and the auxiliary hoisting point 5 are welded into a whole;
step 2: when in use, the whole welded by the clamping plate 1, the steel plate 2, the upright post 4 and the auxiliary hoisting point 5 is clamped on the flange of the H-shaped steel beam through the clamping plate 1, then the two fixing plates 3 are clamped on the flange of the H-shaped steel beam, and the clamping plate 1 and the fixing plates 3 are connected and fixed by bolts;
and step 3: when the device is used, bolt holes for fixing the clamping plate 1 and the fixing plate 3 are selected according to the width of a flange of the H-shaped steel beam, when the width of the flange is large, the bolt hole at the outermost side is selected, when the width of the flange is small, the bolt hole at the innermost side is selected, and two bolts are adopted for fixing to ensure that the whole device can be used for clamping the H-shaped steel beam;
and 4, step 4: and (3) installing a lower steel member by the aid of the auxiliary hoisting points 5, removing the connecting bolts of the clamping plates 1 and the fixing plates 3 after the installation is finished, moving the semi-mechanized construction hoisting point device to the next installation position, and repeating the step 2 and the step 3.

Claims (1)

1. The utility model provides a semi-mechanized construction hoisting point device which characterized in that: the device comprises two clamping plates, a steel plate, two fixing plates, a stand column and an auxiliary hoisting point; the two clamping plates and the two fixing plates are U-shaped plates, the two vertical rods of the clamping plates are different in length, the two clamping plates and the two fixing plates are symmetrically welded on two sides of the steel plate respectively, the two clamping plates are clamped on the flange of the H-shaped steel beam, the two fixing plates are clamped on the flange of the H-shaped steel beam, and the clamping plates are connected with the fixing plates through bolts; the stand is located steel sheet upper portion, and the supplementary hoisting point of stand top welding.
CN202022718254.0U 2020-11-23 2020-11-23 Semi-mechanized construction hoisting point device Active CN214879585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022718254.0U CN214879585U (en) 2020-11-23 2020-11-23 Semi-mechanized construction hoisting point device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022718254.0U CN214879585U (en) 2020-11-23 2020-11-23 Semi-mechanized construction hoisting point device

Publications (1)

Publication Number Publication Date
CN214879585U true CN214879585U (en) 2021-11-26

Family

ID=78950833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022718254.0U Active CN214879585U (en) 2020-11-23 2020-11-23 Semi-mechanized construction hoisting point device

Country Status (1)

Country Link
CN (1) CN214879585U (en)

Similar Documents

Publication Publication Date Title
CN114776047B (en) Steel beam installation and fixation device and implementation method
CN214879585U (en) Semi-mechanized construction hoisting point device
CN213531407U (en) Welding fixture device for hoisting segments of steel plate combined beam bridge
CN217175863U (en) Quick ann tears lifeline support device open
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN214362897U (en) Reusable girder lattice system bridge girder installation and adjustment platform structure
CN211420889U (en) Temporary limiting device for linear adjustment of PC track beam
CN110905220B (en) Reinforced concrete structure buckling-restrained energy-dissipation brace installation construction method
CN210420898U (en) Novel No. 0 block support of steel box girder
CN114411699A (en) Auxiliary device for steel pipe pile construction and construction method
CN113564289A (en) Installation method of large bulk boiler water-cooled wall
CN209891088U (en) Bailey beam traction device
CN214364898U (en) Reusable ocean platform tower and splicing module thereof
CN214993124U (en) Lifting mechanism of through tied arch bridge
CN216190446U (en) Lifting structure of brake plate of travelling beam
CN219604652U (en) Combined keel suspended ceiling structure
CN215925687U (en) Steel case roof beam butt joint levelling device
CN220868875U (en) Temporary support secondary beam installation device for floor carrier plate
CN220486439U (en) Temporary pile clamping structure of fork pile
CN218990189U (en) Force transfer beam structure
CN220828055U (en) BRB recoverable convenient installation device
CN215210561U (en) High-pier temporary steel tie beam bolt connecting device
CN220431975U (en) Super-high adhesion structure of construction elevator
CN217078449U (en) Transition pier material transportation platform for extra-large cable bridge
CN218931529U (en) Lifting device for column top steel beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant