CN219604652U - Combined keel suspended ceiling structure - Google Patents

Combined keel suspended ceiling structure Download PDF

Info

Publication number
CN219604652U
CN219604652U CN202321322999.2U CN202321322999U CN219604652U CN 219604652 U CN219604652 U CN 219604652U CN 202321322999 U CN202321322999 U CN 202321322999U CN 219604652 U CN219604652 U CN 219604652U
Authority
CN
China
Prior art keywords
main
connecting piece
connecting plate
piece
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321322999.2U
Other languages
Chinese (zh)
Inventor
方建萍
翁晗冰
邵亚锋
丁辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Jian'an Industrial Co ltd
Original Assignee
Shaanxi Jian'an Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Jian'an Industrial Co ltd filed Critical Shaanxi Jian'an Industrial Co ltd
Priority to CN202321322999.2U priority Critical patent/CN219604652U/en
Application granted granted Critical
Publication of CN219604652U publication Critical patent/CN219604652U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the field of a keel suspended ceiling structure, in particular to a combined keel suspended ceiling structure, which comprises a main keel and a main hanging piece, wherein a first connecting piece is arranged at the middle position of the main keel, first connecting plates are arranged at the two ends of the first connecting piece, a second connecting piece is arranged at the rear end part of the first connecting plate, a third connecting piece is arranged at the front end part of the first connecting plate, fourth connecting pieces are arranged at the two sides of the main keel, second connecting plates are arranged at the two sides of the fourth connecting pieces, a fifth connecting piece is arranged at the rear end part of the second connecting plate, a sixth connecting piece is arranged at the front end part of the second connecting plate, the main hanging piece is arranged at the two sides of the second connecting plate, and a hanging rod is arranged at the top of the main hanging piece; the utility model can carry out splicing support, prevent the main joist from falling off, improve the stability and the use safety of the main joist, has simple and convenient installation process and stable effect after installation, and is convenient for on-site assembly and disassembly.

Description

Combined keel suspended ceiling structure
Technical Field
The utility model relates to the field of a keel suspended ceiling structure, in particular to a combined keel suspended ceiling structure.
Background
In Chinese patent CN202123064259.7, the utility model discloses a green environment-friendly decoration combined keel ceiling structure, which comprises a plurality of secondary keels, wherein second bolt holes are formed in the secondary keels, the tops of the secondary keels are fixedly connected with a main keel through second bolts, the outer sides of the main keels are fixedly connected with keel fixing devices, third bolts are arranged between the keel fixing devices and the main keels, positioning rods are arranged in the keel fixing devices, hanging rods are fixedly connected to the tops of the positioning rods, and clamping grooves are formed in the two of the main keels; this green decorates fitment combination fossil fragments furred ceiling structure only need press all control levers when through demolishing can find out whole device from the jib, need violently demolish when having avoided dismantling, can not damage fossil fragments, still can not lead to the gypsum board of furred ceiling to damage because of demolishing, and the gypsum dust splashes everywhere, very resources are saved to and environmental protection.
When the existing keel suspended ceiling structure is lifted, the suspended ceiling is easy to damage in a large area, the follow-up repairing process is troublesome, and the operation is complex and the use is inconvenient.
Therefore, a combined keel ceiling structure is provided for the above problems.
Disclosure of Invention
In order to make up the defects in the prior art, the problems that the suspended ceiling is easy to damage a large area when being hoisted, the follow-up repairing process is troublesome, and the operation is complex and inconvenient to use when the suspended ceiling is dismounted are solved.
The technical scheme adopted for solving the technical problems is as follows: the utility model discloses a combined keel suspended ceiling structure, which comprises a main keel and a main hanging piece, wherein a first connecting piece is arranged at the middle position of the main keel, first connecting plates are arranged at the two ends of the first connecting piece, a second connecting piece is arranged at the rear end part of the first connecting piece, a third connecting piece is arranged at the front end part of the first connecting plate, fourth connecting pieces are arranged at the two sides of the main keel, second connecting plates are arranged at the two sides of the fourth connecting pieces, a fifth connecting piece is arranged at the rear end part of the second connecting plate, a sixth connecting piece is arranged at the front end part of the second connecting plate, the main hanging piece is arranged at the two sides of the second connecting plate, a hanging rod is arranged at the top of the main hanging piece, and a positioning nut is fixed on the outer wall of the main hanging piece.
Preferably, the inner sides of the fifth connecting piece and the sixth connecting piece are respectively provided with a secondary keel, and the outer wall of the secondary keel is provided with a secondary connecting plate.
Preferably, the main joist is in clamping connection with the first connecting piece, and the first connecting piece is in welding connection with the first connecting plate.
Preferably, the fourth connecting piece is connected with the main keel in a clamping way, and the fourth connecting piece is connected with the second connecting plate in a welding way.
Preferably, the main hanging piece is in clamping connection with the secondary keel, and the main hanging piece is in threaded connection with the positioning nut.
Preferably, the secondary keel is welded with the secondary connecting plate, and the secondary keel is perpendicular to the secondary connecting plate.
The utility model has the advantages that:
1. when decoration and fitment is carried out, the main joist is spliced and installed with the secondary joist and is connected and fixed through the first connecting piece, the second connecting piece and the third connecting piece are fixed through the first connecting plate, so that the main joist and the secondary joist can be primarily fixed through splicing, the connecting pieces are all C-shaped, splicing and supporting can be carried out, the main joist is prevented from falling off, the stability and the use safety of the main joist are improved, the two sides of the main joist are clamped through the fourth connecting piece, the fifth connecting piece and the sixth connecting piece, and meanwhile, the two sides of the main joist are fixed through the second connecting plate, so that the installation process is simple and convenient, the effect after the installation is stable, the on-site assembly and the disassembly are convenient, the construction efficiency and the quality are greatly improved, the main joist can not be damaged through violent dismantling during the disassembly, and the secondary recycling is realized;
2. can hoist and mount the secondary joist through main hanger and jib, set nut is fixed main hanger and secondary joist, and the furred ceiling of being convenient for installs, can not damage the fossil fragments during the hoist and mount, still can not lead to the gypsum board of furred ceiling to damage because of demolishing.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained from these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a schematic perspective view of the whole front view of the present utility model;
FIG. 2 is a schematic perspective view of the whole side view of the present utility model;
FIG. 3 is a schematic perspective view of the present utility model in a top view;
fig. 4 is a schematic perspective view of a main hanger of the present utility model.
In the figure: 1. a main keel; 2. a first connector; 3. a first connection plate; 4. a second connector; 5. a third connecting member; 6. a second connecting plate; 7. a fourth connecting member; 8. a fifth connecting member; 9. a sixth connecting member; 10. a main hanging piece; 11. a boom; 12. positioning a nut; 13. a secondary keel; 14. and (5) a secondary connecting plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1 to 4, a combined keel ceiling structure includes a main keel 1 and a main hanging member 10, wherein a first connecting member 2 is installed at a middle position of the main keel 1, two ends of the first connecting member 2 are both provided with first connecting plates 3, a rear end of the first connecting plate 3 is provided with a second connecting member 4, a front end of the first connecting plate 3 is provided with a third connecting member 5, two sides of the main keel 1 are both provided with fourth connecting members 7, two sides of the fourth connecting member 7 are provided with second connecting plates 6, a rear end of the second connecting plate 6 is provided with a fifth connecting member 8, a front end of the second connecting plate 6 is provided with a sixth connecting member 9, the main hanging member 10 is installed at two sides of the second connecting plate 6, a top of the main hanging member 10 is provided with a hanging rod 11, and an outer wall of the main hanging member 10 is fixedly provided with a positioning nut 12.
The main joist 1 is connected with the first connecting piece 2 through the clamping, and the first connecting piece 2 is connected with the first connecting piece 3 through the welding, and the main joist 1 is connected and fixed with the third connecting piece 5 through the first connecting piece 2 and the second connecting piece 4 when being spliced and installed with the secondary joist 13, and because the first connecting piece 2, the second connecting piece 4 and the third connecting piece 5 are fixed through the first connecting piece 3, the main joist 1 and the secondary joist 13 can be primarily fixed through the splicing, and the connecting pieces are all in the shape of the C, so that the main joist 1 is prevented from falling off, and the stability and the use safety of the main joist 1 are improved.
The fourth connecting piece 7 is connected with the main joist 1 through the clamping, and the fourth connecting piece 7 is welded with the second connecting plate 6, and the main joist 1 both sides are clamped through the fourth connecting piece 7, the fifth connecting piece 8 and the sixth connecting piece 9, and simultaneously are fixed through the installation of the second connecting plate 6, so that the two sides of the main joist 1 can be fixed, the installation process is simple and convenient, the effect after the installation is stable, the on-site assembly and the disassembly are convenient, the construction efficiency and the quality can be greatly improved, the violent disassembly is not needed during the disassembly, the keels are not damaged, and the secondary recycling is realized.
The main hanger 10 is connected with the secondary joist 13 in a clamping manner, the main hanger 10 is connected with the positioning nut 12 in a threaded manner, the secondary joist 13 can be hoisted through the main hanger 10 and the suspender 11, the positioning nut 12 is used for fixing the main hanger 10 and the secondary joist 13, the suspended ceiling is convenient to install, the joist cannot be damaged during hoisting, and the gypsum board of the suspended ceiling cannot be damaged due to dismantling.
Examples
Referring to fig. 1 to 3, in a combined keel ceiling structure, the inner sides of the fifth connecting piece 8 and the sixth connecting piece 9 are respectively provided with a secondary keel 13, and a secondary connecting plate 14 is installed on the outer wall of the secondary keel 13.
The secondary joist 13 is welded with the secondary connecting plate 14, and the secondary joist 13 is perpendicular to the secondary connecting plate 14, and the secondary joist 13 and the secondary connecting plate 14 are welded after being installed in other procedures, so that the connection stability of the main joist 1 and the secondary joist 13 can be improved again.
Working principle: firstly, when the main joist 1 is spliced and installed with the secondary joist 13 during decoration and fitment, the first connecting piece 2, the second connecting piece 4 and the third connecting piece 5 are connected and fixed, as the first connecting piece 2, the second connecting piece 4 and the third connecting piece 5 are fixed through the first connecting plate 3, the main joist 1 and the secondary joist 13 can be primarily fixed through splicing, and the connecting pieces are all in a shape of a C, so that splicing and supporting can be carried out, the main joist 1 is prevented from falling off, the stability and the use safety of the main joist 1 are improved, the two sides of the main joist 1 are clamped through the fourth connecting piece 7, the fifth connecting piece 8 and the sixth connecting piece 9, and the two sides of the main joist 1 are fixed through the second connecting plate 6, so that the installation process is simple and convenient, the effect after installation is stable, the on-site assembly and disassembly are convenient, the construction efficiency and the quality can be greatly improved, the construction efficiency and the quality can be simultaneously recovered and recycled for the secondary joist can not be damaged and reused;
secondly, can hoist and mount secondary joist 13 through main hanger 10 and jib 11, positioning nut 12 is fixed main hanger 10 and secondary joist 13, and the furred ceiling of being convenient for installs, can not damage the fossil fragments during the hoist and mount, still can not damage the gypsum board that leads to the furred ceiling because of demolishing, carries out welded setting with secondary joist 13 and secondary connection board 14 after other process installation are accomplished, can improve the connection stability of main joist 1 and secondary joist 13 again.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.

Claims (6)

1. A combination fossil fragments furred ceiling structure, its characterized in that: including main joist (1) and main hanger (10), first connecting piece (2) are installed to the intermediate position of main joist (1), and first connecting plate (3) are all installed at the both ends of first connecting piece (2), second connecting piece (4) are installed to the rear end portion of first connecting plate (3), and third connecting piece (5) are installed to the front end portion of first connecting plate (3), fourth connecting piece (7) are all installed to the both sides of main joist (1), and second connecting plate (6) are installed to the both sides of fourth connecting piece (7), fifth connecting piece (8) are installed to the rear end portion of second connecting plate (6), and sixth connecting piece (9) are installed to the front end portion of second connecting plate (6), main hanger (10) are installed in the both sides of second connecting plate (6), and the top of main hanger (10) is provided with jib (11) to the outer wall of main hanger (10) is fixed with positioning nut (12).
2. The composite joist suspended ceiling structure of claim 1, wherein: the inner sides of the fifth connecting piece (8) and the sixth connecting piece (9) are respectively provided with a secondary keel (13), and a secondary connecting plate (14) is arranged on the outer wall of the secondary keel (13).
3. The composite joist suspended ceiling structure of claim 1, wherein: the main joist (1) is in clamping connection with the first connecting piece (2), and the first connecting piece (2) is in welding connection with the first connecting plate (3).
4. The composite joist suspended ceiling structure of claim 1, wherein: the fourth connecting piece (7) is in clamping connection with the main keel (1), and the fourth connecting piece (7) is in welding connection with the second connecting plate (6).
5. The composite joist suspended ceiling structure of claim 1, wherein: the main hanging piece (10) is connected with the secondary keel (13) in a clamping mode, and the main hanging piece (10) is connected with the positioning nut (12) in a threaded mode.
6. The composite joist suspended ceiling structure of claim 2, wherein: the secondary keel (13) is in welded connection with the secondary connecting plate (14), and the secondary keel (13) and the secondary connecting plate (14) are arranged in a mutually perpendicular mode.
CN202321322999.2U 2023-05-29 2023-05-29 Combined keel suspended ceiling structure Active CN219604652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321322999.2U CN219604652U (en) 2023-05-29 2023-05-29 Combined keel suspended ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321322999.2U CN219604652U (en) 2023-05-29 2023-05-29 Combined keel suspended ceiling structure

Publications (1)

Publication Number Publication Date
CN219604652U true CN219604652U (en) 2023-08-29

Family

ID=87756406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321322999.2U Active CN219604652U (en) 2023-05-29 2023-05-29 Combined keel suspended ceiling structure

Country Status (1)

Country Link
CN (1) CN219604652U (en)

Similar Documents

Publication Publication Date Title
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN105275203A (en) Telescopic beam, adjustable mold base system made by using same and mold base construction method
CN204737609U (en) European style hoist girder connection structure
CN219604652U (en) Combined keel suspended ceiling structure
CN213062904U (en) Structure is assembled to big template of aluminium membrane
CN215166467U (en) Be suitable for under steel construction of segmentation promotion construction to hang piping lane
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN214329869U (en) Bracket device for truss support of silo wall
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
CN203188612U (en) Beam frame type building template system
CN111217274A (en) A hang in midair hoist that is used for assembled buckling restrained steel plate wall quick, high-efficient assembly
CN220889139U (en) Indoor suspended ceiling construction system of building
CN220166688U (en) Cantilever lifting die support for deck bridge deck slab
CN111140023A (en) Vertical connection construction guide alignment clamping device for assembled building steel concrete combined modules
CN221856316U (en) Life line cantilever bracket based on long-house purlin steel structure construction
CN110950254A (en) Quick mounting and dismounting type tower crane attachment operation platform and manufacturing method thereof
CN218453916U (en) Tower crane attaches wall connecting piece
CN214879585U (en) Semi-mechanized construction hoisting point device
CN221627259U (en) Box girder splicing structure
CN212613030U (en) Variable steel frame for super high-rise building construction
CN216512414U (en) Template hoisting device
CN215797933U (en) Water-cooled wall tube bank hoisting device
CN218950808U (en) Be used for prefabricated T roof beam template to install and remove hoist
CN218643527U (en) Steel structure staggered installation device
CN218581174U (en) Pipeline plugging hanging die capable of being quickly installed and disassembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant