CN214298862U - Hanging basket for truck crane - Google Patents

Hanging basket for truck crane Download PDF

Info

Publication number
CN214298862U
CN214298862U CN202023056636.8U CN202023056636U CN214298862U CN 214298862 U CN214298862 U CN 214298862U CN 202023056636 U CN202023056636 U CN 202023056636U CN 214298862 U CN214298862 U CN 214298862U
Authority
CN
China
Prior art keywords
bottom plate
bracing piece
truck crane
gondola
annular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023056636.8U
Other languages
Chinese (zh)
Inventor
户瑞莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qixing Shengda Installation Engineering Co ltd
Original Assignee
Beijing Qixing Shengda Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qixing Shengda Installation Engineering Co ltd filed Critical Beijing Qixing Shengda Installation Engineering Co ltd
Priority to CN202023056636.8U priority Critical patent/CN214298862U/en
Application granted granted Critical
Publication of CN214298862U publication Critical patent/CN214298862U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model relates to a hanging flower basket for truck crane relates to the field of truck crane technique, including bottom plate, many mutual parallel arrangement's bracing piece and a plurality of mutual parallel arrangement's annular frame, the bottom plate level sets up, and the bracing piece is perpendicular with the bottom plate, and all detachable mounting in the bottom plate of many bracing pieces, and annular frame is parallel with the bottom plate, and a plurality of annular frames all set up directly over the bottom plate, and a plurality of annular frames lay from top to bottom in proper order, all are provided with fixed knot structure between annular frame and the many bracing pieces. This application has the advantage that can make things convenient for the staff to the hanging flower basket transportation.

Description

Hanging basket for truck crane
Technical Field
The application relates to the field of truck crane technology, in particular to a hanging basket for a truck crane.
Background
In the process of installing or overhauling the generator in wind, a truck crane, which is also called as an automobile crane, is often used, and is a crane arranged on an automobile chassis or a special automobile chassis, and a driving cab and a hoisting operation room are separately arranged. Compared with a tower crane, the crane has the advantages of good maneuverability and rapid transfer, so that the truck crane is widely applied to the installation and maintenance processes of the wind driven generator.
During installation or maintenance of the wind power generator, a truck crane is often used to transport workers to a designated position for work. The front end of the boom of a truck crane is generally provided with a basket used as a temporary working platform for workers.
The hanging basket in the related art is generally of a welded frame structure, and all structures on the hanging basket are welded, so that the hanging basket is quite inconvenient to transport.
SUMMERY OF THE UTILITY MODEL
In order to improve the inconvenient problem of hanging flower basket transportation among the correlation technique, this application provides a hanging flower basket for truck crane.
The application provides a hanging flower basket for truck crane adopts following technical scheme:
the utility model provides a hanging flower basket for autocrane, includes bottom plate, many mutual parallel arrangement's bracing piece and a plurality of mutual parallel arrangement's annular frame, and the bottom plate level sets up, and the bracing piece is perpendicular with the bottom plate, and many equal demountable installation of bracing piece in bottom plate, and annular frame is parallel with the bottom plate, and a plurality of annular frames all set up directly over the bottom plate, and a plurality of annular frames lay from top to bottom in proper order, all are provided with fixed knot structure between annular frame and the many bracing pieces.
Through adopting above-mentioned technical scheme, the bracing piece can be dismantled in the bottom plate, and annular frame can be dismantled in the bracing piece for the hanging flower basket is when being transported, and the work can be according to each module transportation of classifying to each subassembly on the hanging flower basket, thereby makes the transportation of hanging flower basket more convenient, and the staff can also choose for use the bracing piece of different length as required simultaneously and change the height of hanging flower basket, makes the hanging flower basket satisfy and uses under different operating modes.
Optionally, the bottom rigid coupling of bracing piece has the overlap joint board, and the overlap joint board overlap joint in the upper surface of bottom plate, and through wearing to establish a plurality of bolt fastening between overlap joint board and the bottom plate.
Through adopting above-mentioned technical scheme, the bracing piece is fixed in on the bottom plate through the overlap joint board.
Optionally, a plurality of grooves are formed in the bottom plate, mounting blocks matched with the grooves are fixedly connected to the bottom end of the supporting rod, and the mounting blocks are inserted into the grooves.
Through adopting above-mentioned technical scheme, the installation piece has increased the relation of connection between bracing piece and the bottom plate, and then more stable when making the bracing piece install on the bottom plate.
Optionally, the cross section of the supporting rod is circular, the fixing structure comprises external threads arranged on the supporting rod, and clamping nuts are in threaded connection with the supporting rod above each annular frame and the supporting rod below each annular frame.
Through adopting above-mentioned technical scheme, the clamp nut of ring frame top and the support nut of ring frame below can press from both sides tightly fixedly the ring frame.
Optionally, a plurality of through holes are formed in the supporting rods, the through holes correspond to the supporting rods one to one, and the supporting rods penetrate through the through holes.
Through adopting above-mentioned technical scheme, make annular frame install more stable when on the bracing piece.
Optionally, the diameter of the through hole is larger than the diameter of the support rod.
By adopting the technical scheme, the interference of the external threads on the supporting rod to the installation of the annular frame is reduced, so that the annular frame is more convenient to install on the supporting rod.
Optionally, the inner circumferential surface of the through hole is fixedly connected with a plurality of panels arranged along the length direction of the supporting rod, the panels are arranged around the axis of the through hole at equal intervals, the outer circumferential surface of the supporting rod is provided with a plurality of caulking grooves arranged along the length direction of the supporting rod, the caulking grooves are arranged around the axis of the supporting rod at equal intervals, the panels on the supporting rod in the through hole correspond to the caulking grooves in the through hole one to one, and the panels are connected in the caulking grooves in a sliding manner.
Through adopting above-mentioned technical scheme, when the cooperation of a plurality of panels and a plurality of caulking grooves made the ring frame install on the bracing piece, a plurality of panels can form the support to the ring frame for more stable when the ring frame was installed on the bracing piece.
Optionally, the cross sections of the groove and the mounting block are both rectangular.
Through adopting above-mentioned technical scheme, the staff can have the function of a location to the mounted state of bracing piece under the effect of installation piece when installing the bracing piece on the bottom plate, makes the staff install the bracing piece with annular frame in the later stage when, makes things convenient for the staff to make the alignment of panel and caulking groove more, and then makes things convenient for the installation of later stage staff to annular frame.
Optionally, a fixing component convenient for hooking the upper hook safety rope is further arranged on the hanging basket.
Through adopting above-mentioned technical scheme, fixed subassembly can make things convenient for staff hook double hook safety rope.
Optionally, fixed subassembly includes the fixed frame parallel with the bottom plate, set up a plurality of constant head tanks with the bracing piece adaptation on the lower surface of fixed frame, a plurality of bracing pieces respectively with a plurality of constant head tank one-to-ones, the top of bracing piece is worn to establish in the constant head tank, and the upper surface of fixed frame wears to be equipped with the construction bolt who fixes fixed frame and bracing piece together, the rigid coupling has many pegs on the fixed frame, many pegs encircle to lay on fixed frame.
Through adopting above-mentioned technical scheme, when the staff worked in the hanging flower basket, can be based on the operating position of self with on one's body the double hook safety rope hook hang on the peg, simultaneously because fixed frame makes because the existence of constant head tank, made things convenient for the staff to be used for wearing to establish mounting bolt's mounting hole alignment on the screw hole that is used for wearing to establish mounting bolt on with the bracing piece and the fixed frame, still increased the relation of being connected between bracing piece and the fixed frame simultaneously for more stable when fixed frame was installed on the bracing piece.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the detachable structure is arranged between the bottom plate and the plurality of supporting rods, and the detachable structure is arranged between the supporting rods and the annular frame, so that the hanging basket is more convenient for workers to transport, and meanwhile, the workers can select the supporting rods with proper lengths as required, so that the hanging basket is suitable for more working conditions;
2. through set up fixed subassembly on the hanging flower basket for the staff can make things convenient for hook double hook safety rope more when work in the hanging flower basket, thereby makes staff safer when work in the hanging flower basket.
Drawings
Figure 1 is the appearance structure sketch map of hanging flower basket in this application embodiment.
FIG. 2 is a schematic view showing a connection structure between the support rod and the bottom plate in the embodiment of the present application.
Fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
Fig. 4 is a schematic view showing a connection structure between the fixing frame and the supporting rod in the embodiment of the present application.
Fig. 5 is a partially enlarged schematic view of a portion B in fig. 4.
Description of reference numerals: 1. a base plate; 11. a groove; 12. adding a groove; 2. a support bar; 21. mounting blocks; 22. a lap plate; 221. fixing the bolt; 23. clamping the nut; 24. caulking grooves; 3. an annular frame; 31. a through hole; 311. a panel; 4. a fixing assembly; 41. a fixing frame; 411. installing a bolt; 412. mounting grooves; 4121. a hanging rod; 413. and (6) positioning a groove.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses hanging flower basket for truck crane. The hanging basket is arranged on a hanging arm of a crane, and referring to fig. 1, the hanging basket comprises a rectangular bottom plate 1, four supporting rods 2 with circular cross sections and a plurality of rectangular annular frames 3; the bottom plate 1 is horizontally arranged, and an additional installation groove 12 used for increasing the space in the hanging basket is formed in the upper surface of the bottom plate 1.
Referring to fig. 2 and 3, four corner positions of the upper surface of the bottom plate 1 are all provided with grooves 11 for mounting the support rods 2, the cross sections of the grooves 11 are rectangular, the four support rods 2 are respectively in one-to-one correspondence with the four grooves 11, the bottom ends of the support rods 2 are fixedly connected with mounting blocks 21 matched with the grooves 11, the mounting blocks 21 are embedded in the grooves 11, the outer peripheral surfaces of the bottom ends of the support rods 2 are fixedly connected with annular lapping plates 22, when the mounting blocks 21 are embedded in the grooves 11, the lapping plates 22 are erected on the upper surface of the bottom plate 1, and an overlapping area between the fixing plate and the bottom plate 1 is fixed by penetrating a plurality of bolts;
the equal level of a plurality of annular frames 3 sets up, a plurality of annular frames 3 are laid along the length direction of bracing piece 2 at equal intervals, and through-hole 31 has all been seted up to four edges of every annular frame 3, four through-holes 31 on the same annular frame 3 respectively with four bracing pieces 2 one-to-ones, bracing piece 2 passes through-hole 31 on the annular frame 3, equal threaded connection has clamp nut 23 on the bracing piece 2 of annular frame 3 top and below, clamp nut 23 of annular frame 3 top and below forms to press from both sides tightly fixedly to annular frame 3.
When the hanging flower basket is in the transportation, the staff dismantles the clamping nut 23 on the bracing piece 2 above the annular frame 3 at first, dismantle annular frame 3 from bracing piece 2 again, later dismantle the clamping nut 23 on the bracing piece 2 below the annular frame 3 again, analogize in proper order and dismantle a plurality of annular frames 3 on the bracing piece 2 after, dismantle the bolt between lapping plate 22 and bottom plate 1 again, later dismantle bracing piece 2 from bottom plate 1, so just realized bottom plate 1, the categorised transportation of many bracing pieces 2 and a plurality of annular frame 3, thereby make the hanging flower basket more convenient at the in-process of transportation.
When the height of the hanging basket needs to be changed, workers can change the supporting rods 2 with different lengths and the annular frames 3 with different numbers.
The inner circumferential surface of the through hole 31 is fixedly connected with four embedded plates 311 arranged along the length direction of the supporting rod 2, a plurality of embedded plates 311 are arranged at equal intervals along the axial direction of the through hole 31, the outer circumferential surface of the supporting rod 2 is provided with a plurality of embedded grooves 24 arranged along the length direction of the supporting rod 2, the plurality of embedded grooves 24 are respectively in one-to-one correspondence with the plurality of embedded plates 311, and the top ends of the embedded grooves 24 extend to the upper surface of the supporting rod 2; the plurality of panels 311 are respectively embedded in the plurality of embedding grooves 24, and the ring frame 3 is more stable under the supporting action of the plurality of panels 311. While the grooves 11 of the bottom plate 1 are formed in a rectangular shape and the plurality of panels 311 and the insertion grooves 24 in the through-holes 31 are uniformly distributed along the axis of the support bar 2, it is easier for a worker to align the panels 311 in the through-holes 31 with the insertion grooves 24 in the support bar 2 when mounting the ring frame 3 on the support bar 2.
Referring to fig. 1, when a worker works in a hanging basket, in order to ensure safety, a double-hook safety rope is arranged on the worker, so that the worker can fix the double-hook safety rope on the hanging basket conveniently; particularly, be provided with fixed subassembly 4 on the hanging flower basket, fixed subassembly 4 includes the fixed frame 41 with bottom plate 1 parallel arrangement, and the size and the shape of fixed frame 41 all are the same with annular frame 3, and fixed frame 41 sets up the upper surface at many spinal branchs vaulting pole 2, and is fixed together through wearing to establish a plurality of construction bolts 411 between fixed frame 41 and the bracing piece 2.
The inner circumferential surface of the fixing frame 41 is formed with a plurality of mounting grooves 412, the plurality of mounting grooves 412 are circumferentially arranged on the fixing frame 41, and a hanging rod 4121 is fixedly connected to the inner wall of the mounting grooves 412. During the working process of the worker in the hanging basket, the double-hook safety rope worn on the body can be hooked on the hanging rod 4121 in the groove 11 according to the working position.
Referring to fig. 4 and 5, a plurality of positioning grooves 413 adapted to the support rods 2 are formed in four corner positions of the lower surface of the fixing frame 41, the top ends of the support rods 2 are respectively inserted into the positioning grooves 413, and the positioning grooves 413 are used for aligning threaded holes for penetrating the mounting bolts 411 in the support rods 2 with mounting holes for penetrating the mounting bolts 411 in the fixing frame 41 for the convenience of workers.
The implementation principle of the hanging basket for the truck crane disclosed by the embodiment of the application is as follows: when assembling the hanging basket, firstly, the worker selects the support rods 2 with proper length and the annular frames 3 with proper quantity according to the requirement, then inserts the mounting blocks 21 at the bottom ends of the plurality of support rods 2 into the grooves 11 on the upper surface of the bottom plate 1 in sequence, and then fixes the lapping plate 22 and the bottom plate 1 together by using the fixing bolts 221; after many spinal branchs vaulting pole 2 have been installed, the staff firstly twists a plurality of clamping nut 23 at many spinal branchs vaulting pole 2 top spin, installs annular frame 3 on many spinal branchs vaulting pole 2 again, then twists clamping nut 23 at many spinal branchs vaulting pole 2 once more, makes two clamping nut 23 press from both sides annular frame 3 tight fixedly simultaneously, analogizes in proper order to install a plurality of annular frames 3 on spinal branch vaulting pole 2 after, the staff with fixed frame 41 install with many spinal branchs vaulting pole 2 top position department can.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. A hanging basket for a truck crane is characterized in that: including bottom plate (1), many mutual parallel arrangement's bracing piece (2) and a plurality of mutual parallel arrangement's annular frame (3), bottom plate (1) level sets up, bracing piece (2) are perpendicular with bottom plate (1), and all detachable mounting in bottom plate (1) of many bracing pieces (2), annular frame (3) are parallel with bottom plate (1), a plurality of annular frame (3) all set up directly over bottom plate (1), and a plurality of annular frame (3) lay from top to bottom in proper order, all be provided with fixed knot between annular frame (3) and many bracing pieces (2).
2. A gondola for a truck crane according to claim 1, characterized in that: the bottom rigid coupling of bracing piece (2) has overlap joint board (22), and overlap joint board (22) overlap joint in the upper surface of bottom plate (1), and fixed through wearing to establish a plurality of bolts between overlap joint board (22) and bottom plate (1).
3. A gondola for a truck crane according to claim 2, characterized in that: a plurality of grooves (11) are formed in the bottom plate (1), mounting blocks (21) matched with the grooves (11) are fixedly connected to the bottom end of the supporting rod (2), and the mounting blocks (21) are inserted into the grooves (11).
4. A gondola for a truck crane according to claim 3, characterized in that: the cross section of bracing piece (2) sets up to circular, fixed knot constructs including offering the external screw thread on bracing piece (2), on bracing piece (2) of every annular frame (3) top and on bracing piece (2) of every annular frame (3) below equal threaded connection have clamp nut (23).
5. A gondola for a truck crane according to claim 4, characterized in that: a plurality of through holes (31) are formed in the supporting rod (2), the through holes (31) are in one-to-one correspondence with the supporting rods (2), and the supporting rods (2) penetrate through the through holes (31).
6. A gondola for a truck crane according to claim 5, characterized in that: the diameter of the through hole (31) is larger than that of the support rod (2).
7. A gondola for a truck crane according to claim 6, characterized in that: the inner peripheral surface of the through hole (31) is fixedly connected with a plurality of panels (311) arranged along the length direction of the supporting rod (2), the panels (311) are arranged around the axis of the through hole (31) at equal intervals, a plurality of caulking grooves (24) arranged along the length direction of the supporting rod (2) are formed in the outer peripheral surface of the supporting rod (2), the caulking grooves (24) are arranged around the axis of the supporting rod (2) at equal intervals, and the panels (311) on the supporting rod (2) in the through hole (31) are in one-to-one correspondence with the caulking grooves (24) in the through hole (31).
8. A gondola for a truck crane according to claim 7, characterized in that: the cross sections of the groove (11) and the mounting block (21) are rectangular.
9. A gondola for a truck crane according to claim 1, characterized in that: the hanging basket is also provided with a fixing component (4).
10. A gondola for a truck crane according to claim 9, characterized in that: fixed subassembly (4) include fixed frame (41) parallel with bottom plate (1), set up on the lower surface of fixed frame (41) a plurality of constant head tank (413) with bracing piece (2) adaptation, a plurality of bracing pieces (2) respectively with a plurality of constant head tank (413) one-to-one, the top of bracing piece (2) is worn to establish in constant head tank (413), and the upper surface of fixed frame (41) is worn to be equipped with and is fixed mounting bolt (411) together fixed with fixed frame (41) and bracing piece (2), the rigid coupling is equipped with many peg (4121) on fixed frame (41), many peg (4121) encircle to lay on fixed frame (41).
CN202023056636.8U 2020-12-16 2020-12-16 Hanging basket for truck crane Active CN214298862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023056636.8U CN214298862U (en) 2020-12-16 2020-12-16 Hanging basket for truck crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023056636.8U CN214298862U (en) 2020-12-16 2020-12-16 Hanging basket for truck crane

Publications (1)

Publication Number Publication Date
CN214298862U true CN214298862U (en) 2021-09-28

Family

ID=77858444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023056636.8U Active CN214298862U (en) 2020-12-16 2020-12-16 Hanging basket for truck crane

Country Status (1)

Country Link
CN (1) CN214298862U (en)

Similar Documents

Publication Publication Date Title
CN201598820U (en) Single point suspension external hanging bracket
CN115492399B (en) Construction method for installing and adjusting hanging steel structure from bottom to top
CN208899886U (en) Cantilever frame platform
CN204899274U (en) Prefabricated concrete structure goes along with sb. to guard him frame outward
CN201703776U (en) Inverted lifting device of storage tank
CN214298862U (en) Hanging basket for truck crane
CN103821336B (en) A kind of fixed high-altitude long-span construction operation platform of rope and construction method thereof
CN212956944U (en) Special fixing device for hoisting pipe truss structure system equipment
CN215160351U (en) Lifting device for assembled enamel tank
CN210340091U (en) Column main reinforcement hoisting tool of concrete cast-in-place steel rib column
CN211422500U (en) A ladder that continues for steel pipe pole is climbed
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN210622440U (en) Traction wire structure for emergency repair of medium-low voltage distribution network
CN111719689A (en) Special fixing device for hoisting pipe truss structure system equipment
CN107335952A (en) A kind of steel plate splicing weld seam bottom surface ceramic substrate lifting device and its operating method
CN211004288U (en) Crawler crane shed assembly
CN214653198U (en) Tower crane attachment device
CN111271068A (en) Movable reaction frame for shield launching
CN219911031U (en) Mixed tower assembling platform of wind generating set
CN205502730U (en) A can dismantle railing for marine wind power
CN213805382U (en) A assembled stock for steel reinforcement cage construction hoist and mount
CN217076777U (en) Tower crane attachment system for frame structure
CN213174845U (en) Temporary assembling device for roof curved surface # -shaped combined steel truss beam construction
CN219182898U (en) Simulated green plant suspension hoisting structure