CN111719689A - Special fixing device for hoisting pipe truss structure system equipment - Google Patents
Special fixing device for hoisting pipe truss structure system equipment Download PDFInfo
- Publication number
- CN111719689A CN111719689A CN202010578109.9A CN202010578109A CN111719689A CN 111719689 A CN111719689 A CN 111719689A CN 202010578109 A CN202010578109 A CN 202010578109A CN 111719689 A CN111719689 A CN 111719689A
- Authority
- CN
- China
- Prior art keywords
- fixing device
- pipe truss
- system equipment
- hoisting
- special fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000010276 construction Methods 0.000 abstract description 24
- 230000002349 favourable effect Effects 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 8
- 230000006378 damage Effects 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 6
- 210000005069 ears Anatomy 0.000 description 3
- 101100460844 Mus musculus Nr2f6 gene Proteins 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007779 soft material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a special fixing device for hoisting of pipe truss structure system equipment, which comprises a fixing device detachably arranged on a pipe truss, a plurality of connecting rods arranged below the fixing device and a supporting platform connected with the free ends of the connecting rods and used for supporting hoisted articles. The invention has the beneficial effects that: this scheme makes fixing device demountable installation on the pipe truss, can install according to the construction needs, dismantle, after position construction is accomplished once, can shift fixing device to next construction position, improve fixing device's reuse rate, be favorable to reducing construction cost, reduce building rubbish's production, owing to adopted the detachable structure, fixing device can not cause destruction to the pipe truss, avoid the later stage to restore, make fixing device's installation also more convenient, be favorable to improving the efficiency of construction, shorten construction cycle.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a special fixing device for hoisting of pipe truss structure system equipment.
Background
Because the pipe truss structure is light in weight and good in bending resistance, the pipe truss structure is widely used in roof structures and overhead trestle structures and is generally higher in position. During construction, partial equipment or materials need to be hoisted to the high altitude, a support structure is usually installed on a pipe truss so as to bear the equipment or the materials, the support structure installed on the pipe truss has the problems of high construction difficulty, low construction efficiency and the like, the support structure is usually required to be welded on the pipe truss in order to ensure the connection strength, certain damage can be caused to the pipe truss structure, and the repairing work is additionally increased. After the construction at this position is accomplished, need shift equipment or material, the supporting structure need not reuse, need take off the supporting structure with the supporting structure to install new supporting structure, the supporting structure reuse rate who takes off is low, can lead to the material extravagant, installs new support and also can bring extra cost.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide the special fixing device for hoisting the pipe truss structure system equipment, which is used for reducing the construction cost and improving the construction efficiency.
The invention is realized by the following technical scheme: the utility model provides a special fixing device of pipe truss structure system equipment hoist and mount, is including dismantling fixed knot who sets up on the pipe truss, a plurality of setting connecting rod in the fixed knot constructs the below and being connected and be used for supporting the supporting platform who hoists article with the connecting rod free end.
Furthermore, in order to better realize the invention, the fixing structure comprises a plurality of hoops and fastening screws for locking the hoops, and the number of the hoops is the same as that of the connecting rods.
Further, in order to better realize the invention, the inner surface of the hoop is provided with a rubber cushion layer.
Further, in order to better realize the invention, the bottom of the fixed structure is provided with an internal threaded pipe, and one end of the connecting rod is provided with an external thread connected with the threaded pipe.
Further, in order to better realize the invention, the other end of the connecting rod is provided with an external thread.
Furthermore, in order to better realize the invention, the supporting platform adopts angle steel or channel steel.
Furthermore, in order to better realize the invention, the connecting rod is provided with an inclined strut connected with the supporting platform.
Further, in order to better realize the invention, the upper surface of the supporting platform is provided with anti-skid patterns or anti-skid cushion layers.
Further, in order to better realize the invention, the anti-skid cushion layer adopts a rubber cushion layer with anti-skid patterns.
The beneficial effect that this scheme obtained is:
this scheme makes fixed knot construct demountable installation on the pipe truss, can install according to the construction needs, dismantle, after position construction is accomplished once, can shift fixed knot structure to next construction position, improve fixed knot structure's reuse rate, be favorable to reducing construction cost, reduce building rubbish's production, owing to adopted the detachable structure, fixed knot structure can not cause destruction to the pipe truss, avoid the later stage to restore, make fixed knot structure's installation also more convenient, be favorable to improving the efficiency of construction, shorten construction cycle.
Drawings
FIG. 1 is a schematic view of a fixing device;
FIG. 2 is a left side view of FIG. 1;
the method comprises the following steps of 1-pipe truss, 2-hoop, 3-connecting rod, 4-supporting platform, 5-hoisting article and 6-internal thread pipe.
Detailed Description
The present invention will be described in further detail with reference to examples, but the embodiments of the present invention are not limited thereto.
Example 1:
as shown in fig. 1 and fig. 2, in this embodiment, a fixing device special for hoisting a pipe truss structure system device includes a fixing structure detachably disposed on a pipe truss 1, a plurality of connecting rods 3 disposed below the fixing structure, and a supporting platform 4 connected to free ends of the connecting rods 3 and used for supporting a hoisted article 5.
Utilize fixed knot to construct as installation basis erection joint pole 3, utilize connecting rod 3 to connect supporting platform 4, utilize supporting platform 4 as the platform of placing hoist and mount article 5, according to the length of hoist and mount article 5, can be along a plurality of fixing device of length direction installation of hoist and mount article 5 to in support hoist and mount article 5 from many places, thereby improve the stability of hoist and mount article 5.
In this embodiment, the fixing structure is detachably connected to the pipe truss 1, and the fixing structure can be connected to the pipe truss 1 or detached as necessary to facilitate transfer of the fixing device.
This scheme avoids adopting welded mode to be connected fixed knot to construct with pipe truss 1, can avoid welding to cause destruction to pipe truss 1, after this department position construction is accomplished, can conveniently take off the fixed knot structure and shift, avoids causing the damage to the fixed knot structure for fixed knot structure can reuse many times, avoids appearing the extravagant phenomenon of material.
Example 2:
on the basis of the above embodiment, in this embodiment, the fixing structure includes a plurality of anchor ears 2 and fastening screws for locking the anchor ears, and the number of the anchor ears 2 is the same as that of the connecting rods 3.
Adopt staple bolt 2 to be connected with pipe truss 1 when convenient, during fastening screw locking staple bolt 2, staple bolt 2 exerts the packing force to pipe truss 1 to make staple bolt 2 can press from both sides tight pipe truss 1, avoid staple bolt 2 and pipe truss 1 relative movement or rotation, be favorable to improving staple bolt 2's stability, thereby improve supporting platform 4's stability, avoid supporting platform 4 to drive hoist and mount article 5 and rock and have safe risk.
Example 3:
on the basis of the above embodiment, in this embodiment, the inner surface of the hoop 2 is provided with a rubber cushion layer. Utilize the rubber cushion can increase the frictional force between staple bolt 2 and the pipe truss 1 to prevent staple bolt 2 and pipe truss 1 relative movement or rotation, the rubber cushion is soft materials, also can reduce or avoid damaging the anticorrosive coating on the pipe truss 1.
The rubber cushion layer can be compressed, so that the fastening screws apply larger pretightening force to the anchor ear 2, the connection strength of the anchor ear 2 and the pipe truss 1 is increased, the stability of the supporting platform 4 is further improved, and the supporting platform 4 and the hoisting article 5 are prevented from shaking to guarantee construction safety.
Example 4:
on the basis of the above embodiment, in this embodiment, the bottom of the fixing structure is provided with an internal threaded pipe 6, and one end of the connecting rod 3 is provided with an external thread connected with the threaded pipe 6. With this make connecting rod 3 and internal thread pipe 6 can be through threaded connection, be convenient for connecting rod 3 and internal thread pipe 6 are connected or are dismantled to make things convenient for fixing device's installation, dismantlement or transfer.
The height position of the connecting rod 3 can be adjusted by screwing in or out the connecting rod 3, so that the position precision of the supporting platform 4 is adjusted, and the inclination of the supporting platform 4 is avoided.
In this embodiment, the other end of the connecting rod 3 is provided with an external thread. Supporting platform 4 on be provided with the through-hole that is used for connecting rod 3 to pass, after connecting rod 3 passed supporting platform 4, at the free end installation lock nut of connecting rod 3, utilize lock nut to carry on spacingly, support supporting platform 4, the external screw thread of connecting rod 3 on you dare to adorn each lock nut of the coming year so that press from both sides tight supporting platform 4, reciprocate supporting platform 4 and carry on spacingly, be favorable to improving supporting platform 4's stability.
In this embodiment, supporting platform 4 adopt angle steel or channel-section steel to this has advantages such as convenient for material collection, construction convenience, and angle steel or channel-section steel itself have certain intensity and rigidity, when bearing pressure, can avoid self to take place bending deformation, thereby guarantee construction safety.
Example 5:
on the basis of the above embodiment, in this embodiment, the connecting rod 3 is provided with an inclined strut connected with the supporting platform 4. Utilize the bracing to make connecting rod 3 be connected with supporting platform 4, can improve connecting rod 3 and supporting platform 4's joint strength to take place relative rotation between connecting rod 3 and the supporting platform 4, be favorable to improving supporting platform 4's stability.
Example 6:
on the basis of the above embodiments, in this embodiment, the upper surface of the supporting platform 4 is provided with anti-skid patterns or anti-skid cushion layers. The friction force between the hoisted article 5 and the supporting platform 4 can be increased by utilizing the anti-slip patterns or the anti-slip cushion layer, so that the hoisted article 5 is prevented from falling off, and the construction safety is guaranteed.
In this embodiment, the anti-slip mat layer is a rubber mat layer with anti-slip patterns. Thereby avoiding the lifting object 5 from being scratched.
In this embodiment, under the condition that uses a plurality of fixing device, make can dismantle between two adjacent supporting platform 4 and connect a plurality of angle steel or channel-section steel to this makes adjacent supporting platform 4 interconnect, is favorable to improving supporting platform 4's stability and bearing capacity, thereby improves the stability of hoist and mount article 5, ensures construction safety.
In this embodiment, other undescribed contents are the same as those in the above embodiment, and thus are not described again.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and all simple modifications and equivalent variations of the above embodiments according to the technical spirit of the present invention are included in the scope of the present invention.
Claims (9)
1. The utility model provides a special fixing device of pipe truss structure system equipment hoist and mount which characterized in that: the device comprises a fixed structure detachably arranged on a pipe truss (1), a plurality of connecting rods (3) arranged below the fixed structure and a supporting platform (4) connected with the free ends of the connecting rods (3) and used for supporting hoisted articles (5).
2. The special fixing device for hoisting of the pipe truss structural system equipment according to claim 1, wherein: the fixing structure comprises a plurality of hoops (2) and fastening screws for locking the hoops, and the quantity of the hoops (2) is the same as that of the connecting rods (3).
3. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in claim 2, wherein: the inner surface of the hoop (2) is provided with a rubber cushion layer.
4. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in any one of claims 1, 2 and 3, wherein: the bottom of the fixed structure is provided with an internal threaded pipe (6), and one end of the connecting rod (3) is provided with an external thread connected with the threaded pipe (6).
5. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in claim 4, wherein: the other end of the connecting rod (3) is provided with an external thread.
6. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in any one of claims 1, 2, 3 and 5, wherein: the supporting platform (4) is made of angle steel or channel steel.
7. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in claim 6, wherein: the connecting rod (3) is provided with an inclined strut connected with the supporting platform (4).
8. The special fixing device for hoisting the pipe truss structural system equipment according to any one of claims 1, 2, 3, 5 and 7, wherein: the upper surface of the supporting platform (4) is provided with anti-skid patterns or an anti-skid cushion layer.
9. The special fixing device for hoisting of the pipe truss structural system equipment as claimed in claim 8, wherein: the anti-slip cushion layer adopts a rubber cushion layer with anti-slip patterns.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010578109.9A CN111719689A (en) | 2020-06-23 | 2020-06-23 | Special fixing device for hoisting pipe truss structure system equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010578109.9A CN111719689A (en) | 2020-06-23 | 2020-06-23 | Special fixing device for hoisting pipe truss structure system equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111719689A true CN111719689A (en) | 2020-09-29 |
Family
ID=72568249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010578109.9A Pending CN111719689A (en) | 2020-06-23 | 2020-06-23 | Special fixing device for hoisting pipe truss structure system equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111719689A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112727148A (en) * | 2020-12-23 | 2021-04-30 | 上海建工集团股份有限公司 | Method for integrally removing vertical smoke exhaust air pipe on outer side of building structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205604557U (en) * | 2016-05-04 | 2016-09-28 | 深圳市宝鹰建设集团股份有限公司 | Staple bolt connection structure that spatial grid structure furred ceiling and conversion layer are connected |
CN206496150U (en) * | 2017-01-10 | 2017-09-15 | 山东飞越钢结构工程有限公司 | A kind of hoisting structure of the light steel Assembled floor with floorboard |
US20180340333A1 (en) * | 2016-03-13 | 2018-11-29 | Yvette Seifert Hirth | Hanging three dimensional grid system for lighting, data, and power |
CN109441008A (en) * | 2018-09-27 | 2019-03-08 | 上海市建筑装饰工程集团有限公司 | Big area roof truss anchor ear system |
CN110056114A (en) * | 2019-04-30 | 2019-07-26 | 中建八局第二建设有限公司 | A kind of large span aluminum ceiling structure and its construction method |
CN212956944U (en) * | 2020-06-23 | 2021-04-13 | 中国五冶集团有限公司 | Special fixing device for hoisting pipe truss structure system equipment |
-
2020
- 2020-06-23 CN CN202010578109.9A patent/CN111719689A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180340333A1 (en) * | 2016-03-13 | 2018-11-29 | Yvette Seifert Hirth | Hanging three dimensional grid system for lighting, data, and power |
CN205604557U (en) * | 2016-05-04 | 2016-09-28 | 深圳市宝鹰建设集团股份有限公司 | Staple bolt connection structure that spatial grid structure furred ceiling and conversion layer are connected |
CN206496150U (en) * | 2017-01-10 | 2017-09-15 | 山东飞越钢结构工程有限公司 | A kind of hoisting structure of the light steel Assembled floor with floorboard |
CN109441008A (en) * | 2018-09-27 | 2019-03-08 | 上海市建筑装饰工程集团有限公司 | Big area roof truss anchor ear system |
CN110056114A (en) * | 2019-04-30 | 2019-07-26 | 中建八局第二建设有限公司 | A kind of large span aluminum ceiling structure and its construction method |
CN212956944U (en) * | 2020-06-23 | 2021-04-13 | 中国五冶集团有限公司 | Special fixing device for hoisting pipe truss structure system equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112727148A (en) * | 2020-12-23 | 2021-04-30 | 上海建工集团股份有限公司 | Method for integrally removing vertical smoke exhaust air pipe on outer side of building structure |
CN112727148B (en) * | 2020-12-23 | 2022-09-27 | 上海建工集团股份有限公司 | Method for integrally removing vertical smoke exhaust air pipe on outer side of building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN112938774B (en) | Integral hoisting system and hoisting method for assembly type component | |
CN108862045B (en) | Special-shaped steel truss girder rod piece turning device and method for turning over rod piece | |
CN104234200B (en) | A kind of suspen-shell structure rope leverage is by ring lifting installation method | |
CN103061506A (en) | Construction method of steel structure dome | |
CN101892736B (en) | High altitude moving hanging basket construction method | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN111042540A (en) | Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss | |
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN207268073U (en) | Novel flexible formwork bearing frame | |
CN115492399B (en) | Construction method for installing and adjusting hanging steel structure from bottom to top | |
CN104018656A (en) | Scaffold construction method for prefabricated outer wall | |
CN212956944U (en) | Special fixing device for hoisting pipe truss structure system equipment | |
CN111218987A (en) | Bearing type net rack construction method | |
CN111719689A (en) | Special fixing device for hoisting pipe truss structure system equipment | |
CN201818043U (en) | Top-lifting type internal supporting device for concrete construction | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN111058538B (en) | Large-span portal reticulated shell tower support construction method | |
CN2251595Y (en) | Building construction external hanging rack | |
CN107816209A (en) | The large-scale Roof Truss construction technology of installation is lifted across outer both sides | |
CN216512520U (en) | Lifting system suitable for small space | |
CN217812491U (en) | Assembled installation device | |
CN115583584A (en) | Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method | |
CN205935720U (en) | Steel truss frame that slides | |
CN221500365U (en) | Steel construction flip-chip hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |