CN213979841U - High pier column operation platform - Google Patents

High pier column operation platform Download PDF

Info

Publication number
CN213979841U
CN213979841U CN202022731550.4U CN202022731550U CN213979841U CN 213979841 U CN213979841 U CN 213979841U CN 202022731550 U CN202022731550 U CN 202022731550U CN 213979841 U CN213979841 U CN 213979841U
Authority
CN
China
Prior art keywords
operation platform
pier stud
ladder
high pier
platform according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022731550.4U
Other languages
Chinese (zh)
Inventor
周锋
杨剑锃
颜学文
李成
邹文才
孙天一
邵俊逸
夏爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Communications Construction Group Co Ltd
Priority to CN202022731550.4U priority Critical patent/CN213979841U/en
Application granted granted Critical
Publication of CN213979841U publication Critical patent/CN213979841U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a high pier stud operation platform, which comprises an operation platform assembled around a pier stud; the operation platform comprises two ladder cages with the same structure, and the two ladder cages are symmetrically arranged on two sides of the pier stud; the other two sides of the pier stud are provided with guardrails, and the operation platform further comprises an anti-falling safety net bound from top to bottom; the utility model has simple structure, can be repeatedly used for a plurality of times, is convenient to install and dismantle, and provides guarantee for the safety protection of the high-altitude operation personnel; the problems mentioned in the background art are effectively solved: the safety of operators cannot be guaranteed due to the great potential safety hazard during the high-altitude operation, and the working efficiency is greatly reduced.

Description

High pier column operation platform
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to high pier stud operation platform.
Background
The pier column is used for bearing the lower part of an upper structure and bearing a heavy object, and the height of the pier column is correspondingly changed according to the difference of the height of the upper structure.
When high pier stud operation is carried out, the necessary working procedure is to carry out on-site reinforcement, high-altitude operation is required, great potential safety hazards exist during high-altitude operation, the safety of operating personnel cannot be guaranteed, and the working efficiency is greatly reduced.
In view of the above technical problems, improvements are needed.
SUMMERY OF THE UTILITY MODEL
High pier stud operation belongs to high altitude construction, and high altitude construction is because factors such as the environment is comparatively complicated become the heavy disaster area of production accident, to the problem that exists now, the utility model provides a high pier stud operation platform when having solved current high pier stud operation, when needing to carry out reinforcement, the major potential safety hazard that operation platform exists, operation personnel's safety can't be ensured, greatly reduced work efficiency's problem.
In order to achieve the above purpose, the utility model adopts the technical scheme that: a high pier stud operation platform comprises an operation platform assembled around a pier stud; the operation platform comprises two ladder cages with the same structure, and the two ladder cages are arranged on two sides of the pier stud; the guardrail is installed to the other both sides of pier stud, and operation platform still has the safety net of preventing weighing down including from top to bottom the ligature.
As an optimized scheme of the utility model, the guardrail sets firmly on the steel sheet, and the steel sheet passes through the bolt fastening on the ladder cage.
As an optimized proposal of the utility model, the ladder cage is arranged corresponding to the guard bar.
As an optimal scheme of the utility model, install stair between ladder cage and the work platform.
As an optimized proposal of the utility model, the two ladder cages are symmetrically arranged at the two sides of the pier stud.
As an optimal scheme of the utility model, two ladder cages pass through expansion bolts to be fixed on the table face that holds of pier stud.
As an optimized scheme of the utility model, placed the steel springboard on the base of guardrail, the steel springboard tiling is and laminate on the base of guardrail.
As an optimized proposal of the utility model, a template is arranged between the steel springboard and the pier stud, and the template is assembled on the pier stud.
As an optimized scheme of the utility model, the bolt is provided with four, and four bolt equidistance are laid.
As an optimized proposal of the utility model, the anti-falling safety net is bound on the rail of the guardrail.
The utility model has the advantages that: the utility model has simple structure, can be repeatedly used for a plurality of times, is convenient to install and dismantle, and provides guarantee for the safety protection of the high-altitude operation personnel; the problems mentioned in the background art are effectively solved: the safety of operators cannot be guaranteed due to the great potential safety hazard during the high-altitude operation, and the working efficiency is greatly reduced.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a left side view of the present invention.
Fig. 3 is a schematic structural diagram of the present invention.
Fig. 4 is a partial enlarged view of the direction a of the present invention.
Reference numbers in the figures: pier stud 1, template 2, ladder cage 3, guardrail 4, steel springboard 5, steel sheet 6, bolt 7, prevent weighing down safety net 8, stair 9.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Example (b):
as shown in fig. 1 to 4, the high pier column operation platform provided in this embodiment includes an operation platform assembled around a pier column 1; the operation platform comprises two ladder cages 3 with the same structure, and the two ladder cages 3 are symmetrically arranged on two sides of the pier stud 1; the two ladder cages 3 are fixed on the top of the bearing platform surface of the pier stud 1 through expansion bolts.
Wherein, it is required to be noted that: the two ladder cages 3 with the same structure are mainly used for installing the operation platform, and meanwhile, a stair 9 is arranged between the ladder cages 3 and the operation platform; the stair 9 is arranged to provide an additional safe climbing channel, and the effect of supporting the operation platform is achieved.
The other two sides of the pier stud 1 are provided with guardrails 4, and the ladder cage 3 is arranged corresponding to the guardrails 4; the operation platform also comprises an anti-falling safety net 8 bound from top to bottom; the guard bar 4 is fixedly arranged on a steel plate 6, and the steel plate 6 is fixed on the ladder cage 3 through a bolt 7; four bolts 7 are arranged, and the four bolts 7 are arranged at equal intervals; the strength of the connecting structure of the steel plate 6 and the ladder cage 3 is improved, and the use safety is further ensured.
A steel springboard 5 is placed on a base of the guardrail 4, a template 2 is arranged between the steel springboard 5 and the pier stud 1, and the template 2 is assembled on the pier stud 1; the steel springboard 5 is tiled and attached to the base of the guardrail 4; namely, an approximate frame of the operation platform is formed, and the anti-falling safety net 8 is bound on the railings of the guardrails 4; the utility model has simple structure, can be repeatedly used for a plurality of times, is convenient to install and dismantle, and provides guarantee for the safety protection of the high-altitude operation personnel; the problems mentioned in the background art are effectively solved: the safety of operators cannot be guaranteed due to the great potential safety hazard during the high-altitude operation, and the working efficiency is greatly reduced.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention; thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Although the reference numerals in the figures are used more here: pier stud 1, template 2, ladder cage 3, guardrail 4, steel springboard 5, steel sheet 6, bolt 7, prevent weighing down safety net 8, stair 9, etc., but do not exclude the possibility of using other terms. These terms are used merely to more conveniently describe and explain the nature of the present invention and should not be interpreted as imposing any additional limitations that are contrary to the spirit of the present invention.

Claims (10)

1. The utility model provides a high pier stud operation platform which characterized in that: comprises an operation platform assembled around a pier stud (1); the operation platform comprises two ladder cages (3) with the same structure, and the two ladder cages (3) are arranged at two sides of the pier stud (1); guardrail (4) are installed to the other both sides of pier stud (1), and operation platform still including from top to bottom the ligature have prevent weighing down safety net (8).
2. The high pier column operation platform according to claim 1, wherein the guardrail (4) is fixedly arranged on a steel plate (6), and the steel plate (6) is fixed on the ladder cage (3) through bolts (7).
3. A high pier stud work platform according to claim 2, characterised in that the ladder cage (3) is arranged in correspondence with the railing (4).
4. A high pier operation platform according to claim 3, wherein a staircase (9) is installed between the ladder cage (3) and the operation platform.
5. A high pier stud work platform according to claim 4, wherein the two ladder cages (3) are symmetrically arranged on both sides of the pier stud (1).
6. A high pier stud work platform according to claim 5, characterised in that the two ladder cages (3) are fixed on top of the bearing platform of the pier stud (1) by means of expansion bolts.
7. The high pier column operation platform according to claim 6, wherein a steel springboard (5) is placed on the base of the guardrail (4), and the steel springboard (5) is tiled and attached to the base of the guardrail (4).
8. The high pier column operation platform according to claim 7, wherein a template (2) is arranged between the steel springboard (5) and the pier column (1), and the template (2) is assembled on the pier column (1).
9. A high pier stud work platform according to claim 2, characterized in that there are four bolts (7), and four bolts (7) are arranged equidistantly.
10. The high pier column operation platform according to claim 1, wherein the anti-falling safety net (8) is bound on a rail of the guardrail (4).
CN202022731550.4U 2020-11-23 2020-11-23 High pier column operation platform Active CN213979841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022731550.4U CN213979841U (en) 2020-11-23 2020-11-23 High pier column operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022731550.4U CN213979841U (en) 2020-11-23 2020-11-23 High pier column operation platform

Publications (1)

Publication Number Publication Date
CN213979841U true CN213979841U (en) 2021-08-17

Family

ID=77266606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022731550.4U Active CN213979841U (en) 2020-11-23 2020-11-23 High pier column operation platform

Country Status (1)

Country Link
CN (1) CN213979841U (en)

Similar Documents

Publication Publication Date Title
CN213626590U (en) Movable safety protection platform for roof net rack system
CN213979841U (en) High pier column operation platform
CN112267661B (en) Climbing frame convenient to adjust for construction industry
CN214034706U (en) Tower crane pedestrian safety passage used on attached lifting scaffold
CN210564332U (en) Movable safety steel cat ladder
CN213742434U (en) Railing unit and template combination
CN214575532U (en) Lifting type steel platform arranged at corridor lighting well position
CN211998568U (en) Standard knot and tower crane
CN209398349U (en) A kind of mobile maintenance platform of ascending stair formula
CN220768783U (en) Anti-skid hand stand with locking function
CN207092517U (en) A kind of climbing frame protection net mounting structure
CN220621173U (en) Face limit protection device of assembled building
CN221321909U (en) Externally-hung manned passage of assembled shear wall
CN216766720U (en) Safety protection device for power transmission and transformation engineering construction
CN221027036U (en) Bridge structure of safety door in sedan-chair
CN213626583U (en) Frame is climbed in construction application
CN217652666U (en) Movable type step combined device for ascending operation
CN221645586U (en) Bridge support pad stone operation protector
CN214575550U (en) Full-steel climbing frame with good protection effect
CN216240384U (en) Operation platform assembly with ladder stand suitable for steel structure high altitude installation
CN218787131U (en) Anti-falling structure for steel I-shaped upper frame and hydraulic support
CN217461399U (en) Climbing frame for building construction
CN213625166U (en) Pier stud bridge fixedly connected by high-strength bolts
CN214302800U (en) Special protection platform for tower crane wall-attached rod
CN218176735U (en) Arc building structure face limit protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant