CN213626583U - Frame is climbed in construction application - Google Patents
Frame is climbed in construction application Download PDFInfo
- Publication number
- CN213626583U CN213626583U CN202022042592.7U CN202022042592U CN213626583U CN 213626583 U CN213626583 U CN 213626583U CN 202022042592 U CN202022042592 U CN 202022042592U CN 213626583 U CN213626583 U CN 213626583U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- fixing
- frame
- base
- groups
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a frame is climbed in construction application, including first fixed plate, a plurality of groups of pulleys of lower extreme fixedly connected with of first fixed plate, the lower extreme of first fixed plate is provided with the base, the upper end of base is provided with first slide rail, first slide rail and pulley sliding connection, the front of first fixed plate is provided with first slider, the back of base is provided with the second slide rail, second slide rail and first slider sliding connection, the equal fixedly connected with second fixing base in both ends around the base, the first mount of the equal fixedly connected with in both ends of base, it is two sets of the equal fixedly connected with second mount in the back of first mount, it is two sets of the first fixing base of three groups of back fixedly connected with of second mount. The utility model discloses in, can avoid climbing the frame slope and fixed insecure and the accident that causes, improve the security of climbing the frame, be worth promoting.
Description
Technical Field
The utility model relates to a climb the frame field, especially relate to a frame is climbed in construction application.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, the scaffold is not limited by the height of a building, and manpower and materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The existing climbing frame has certain defects in fixing and preventing toppling, certain danger is brought to the person, the existing climbing frame is not flexible enough, and the climbing frame can only move up and down in a fixed place, so that certain trouble is brought to workers.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a building construction application climbing frame.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a climbing frame for building construction application comprises a first fixing plate, wherein a plurality of groups of pulleys are fixedly connected to the lower end of the first fixing plate, a base is arranged at the lower end of the first fixing plate, a first slide rail is arranged at the upper end of the base and is in sliding connection with the pulleys, a first slide block is arranged on the front surface of the first fixing plate, a second slide rail is arranged on the back surface of the base and is in sliding connection with the first slide block, second fixing seats are fixedly connected to the front end and the rear end of the base, first fixing frames are fixedly connected to the two ends of the base, second fixing frames are fixedly connected to the back surfaces of the two groups of first fixing frames, three groups of first fixing frames are fixedly connected to the back surfaces of the two groups of second fixing frames, two groups of first fixing frames are respectively arranged at the upper end and the lower end of the six groups of first fixing frames, eight groups of guide rails are, eight group's of upper end fixedly connected with pole settings of first fixed plate, the pole setting is provided with a plurality of groups scaffold board in vertical direction, the upper end of scaffold board is provided with stair, the positive fixedly connected with rail guard of stair, one side fixedly connected with horizontal pole of first mount, the back of horizontal pole is provided with the third slide rail, the positive fixedly connected with extension board of scaffold board, the positive fixedly connected with second slider of extension board, second slider and third slide rail sliding connection, the back of scaffold board is provided with the third fixing base, the front end of third fixing base is provided with the second mounting.
As a further description of the above technical solution:
the lower extreme fixedly connected with A-frame of scaffold board, A-frame is located between two sets of guide rails.
As a further description of the above technical solution:
one side of the upright rod is fixedly connected with a protective screen plate, and the protective screen plate is positioned at the upper end of the scaffold board.
As a further description of the above technical solution:
the first fixing seats are positioned at the upper ends of the cross rods, and the four groups of guide rails are positioned between the two groups of first fixing frames.
As a further description of the above technical solution:
six groups the pole setting all is located between two sets of guide rails, first fixing base is located the upper end of third fixing base.
As a further description of the above technical solution:
the third fixing seat is arranged in an L shape, and the scaffold board is positioned between the two groups of guide rails.
The utility model discloses following beneficial effect has: through the first fixing base and the third fixing base that set up, can give and climb the dual fixed effect of frame, through the horizontal pole that sets up, can prevent to climb the frame and fall down because of the slope, can avoid climbing the frame slope and fix the accident that insecure caused, improve the security of climbing the frame, be worth promoting.
The utility model discloses following beneficial effect has: through the third slide rail and the first slide rail that set up, can carry out the regulation of left right direction to climbing the frame in the effect of external force, avoid causing because of the location error and climbing the buildding again of frame, can adjust the position of climbing the frame to improve the mobility of climbing the frame, be worth promoting.
Drawings
Fig. 1 is a front cross-sectional view of a climbing frame for building construction;
fig. 2 is a side view of a climbing frame for building construction according to the present invention;
fig. 3 is the utility model provides a building construction application climbs the enlargements of A in the frame picture 1.
Illustration of the drawings:
1. a first fixing plate; 2. a first slide rail; 3. a scaffold board; 4. a first slider; 5. a base; 6. a second slide rail; 7. a first fixing frame; 8. a first fixed seat; 9. a first fixing member; 10. a second slide rail; 11. a staircase; 12. erecting a rod; 13. a protective mesh plate; 14. a second slider; 15. a cross bar; 16. a guide rail; 17. a second fixing frame; 18. an extension plate; 19. a second fixing member; 20. a triangular bracket; 21. a pulley; 22. a second fixed seat; 23. protecting the fence; 24. and a third fixed seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a climbing frame for building construction application comprises a first fixing plate 1, wherein a plurality of groups of pulleys 21 are fixedly connected to the lower end of the first fixing plate 1, a base 5 is arranged at the lower end of the first fixing plate 1, a first slide rail 2 is arranged at the upper end of the base 5, the first slide rail 2 is connected with the pulleys 21 in a sliding manner and can facilitate the movement of the climbing frame, a first slide block 4 is arranged on the front side of the first fixing plate 1, a second slide rail 6 is arranged on the back side of the base 5, the second slide rail 6 is connected with the first slide block 4 in a sliding manner and can limit the movement of the whole climbing frame, second fixing seats 22 are fixedly connected to the front end and the rear end of the base 5, first fixing frames 7 are fixedly connected to the two ends of the base 5, second fixing frames 17 are fixedly connected to the back sides of the two groups of first fixing frames 7, three groups of first fixing frames 8 are fixedly connected to the back sides of the two groups of second, the climbing frame can be fixed for the second time, eight groups of guide rails 16 are fixedly connected to the upper end of a first fixing plate 1, eight groups of vertical rods 12 are fixedly connected to the upper end of the first fixing plate 1, a plurality of groups of scaffold plates 3 are arranged on the vertical rods 12 in the vertical direction, a stair 11 is arranged at the upper end of each scaffold plate 3, the working of workers is facilitated, a protective guard 23 is fixedly connected to the front side of each stair 11, the workers are prevented from falling off, a cross rod 15 is fixedly connected to one side of a first fixing frame 7, a third slide rail 10 is arranged on the back side of the cross rod 15, an extension plate 18 is fixedly connected to the front side of each scaffold plate 3, a second slide block 14 is fixedly connected to the front side of each extension plate 18, the second slide block 14 is slidably connected with the third slide rail 10, the movement of the climbing frame can be limited, the climbing frame is prevented from being damaged due to inclination, a third fixing, can fix climbing the frame.
Lower extreme fixedly connected with A-frame 20 of scaffold board 3, A-frame 20 is located between two sets of guide rails 16, increase the support capacity of device, pole setting 12 one side fixedly connected with protection otter board 13, prevent that the workman from falling, protection otter board 13 is located the upper end of scaffold board 3, first fixing base 8 is located the upper end of horizontal pole 15, four sets of guide rails 16 are located between two sets of first mounts 7, six sets of pole setting 12 all are located between two sets of guide rails 16, first fixing base 8 is located the upper end of third fixing base 24, third fixing base 24 is the setting of L shape, the device of being convenient for is fixed, scaffold board 3 is located between two sets of guide rails 16, make things convenient for workman's foot and work.
The working principle is as follows: fix wall and third fixing base 24 through second mounting 19, can carry out first heavy fixed to climbing the frame, it is fixed to climbing the frame to carry out the secondary through first mounting 9 and first fixing base 8, first slider 4 and 6 sliding connection of second slide rail simultaneously, second slider 14 and third slide rail 10 sliding connection, can restrict the front end of climbing the frame, prevent the slope of climbing the frame, make at workman location error, can loosen second mounting 19, use external force to promote the left and right sides of climbing the frame, make pulley 21 slide in first slide rail 2, can be quick carry out the secondary location, first mounting 9 can prevent that the climbing frame from falling simultaneously.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a frame is climbed in construction application, includes first fixed plate (1), its characterized in that: the lower end of the first fixing plate (1) is fixedly connected with a plurality of groups of pulleys (21), the lower end of the first fixing plate (1) is provided with a base (5), the upper end of the base (5) is provided with a first slide rail (2), the first slide rail (2) is in sliding connection with the pulleys (21), the front side of the first fixing plate (1) is provided with a first slide block (4), the back side of the base (5) is provided with a second slide rail (6), the second slide rail (6) is in sliding connection with the first slide block (4), the front end and the back end of the base (5) are both fixedly connected with second fixing seats (22), the two ends of the base (5) are both fixedly connected with first fixing frames (7), the back sides of the two groups of first fixing frames (7) are both fixedly connected with second fixing frames (17), and the back sides of the two groups of second fixing frames (17) are both fixedly connected with three groups of, six sets of upper and lower ends of the first fixing seat (8) are respectively provided with two sets of first fixing parts (9), the upper end of the first fixing plate (1) is fixedly connected with eight sets of guide rails (16), the upper end of the first fixing plate (1) is fixedly connected with eight sets of upright rods (12), the upright rods (12) are provided with a plurality of sets of scaffold boards (3) in the vertical direction, the upper end of each scaffold board (3) is provided with a stair (11), the front surface of each stair (11) is fixedly connected with a guard rail (23), one side of the first fixing frame (7) is fixedly connected with a cross rod (15), the back surface of each cross rod (15) is provided with a third slide rail (10), the front surface of each scaffold board (3) is fixedly connected with an extension board (18), the front surface of each extension board (18) is fixedly connected with a second slide block (14), and the second slide blocks (14) are slidably connected with the third, the back of the scaffold board (3) is provided with a third fixing seat (24), and the front end of the third fixing seat (24) is provided with a second fixing piece (19).
2. The climbing frame for building construction according to claim 1, wherein: the lower extreme fixedly connected with A-frame (20) of scaffold board (3), A-frame (20) are located between two sets of guide rails (16).
3. The climbing frame for building construction according to claim 1, wherein: one side of the upright rod (12) is fixedly connected with a protective screen plate (13), and the protective screen plate (13) is positioned at the upper end of the scaffold board (3).
4. The climbing frame for building construction according to claim 1, wherein: the first fixed seat (8) is positioned at the upper end of the cross rod (15), and the four groups of guide rails (16) are positioned between the two groups of first fixed frames (7).
5. The climbing frame for building construction according to claim 1, wherein: six sets of pole setting (12) all are located between two sets of guide rail (16), first fixing base (8) are located the upper end of third fixing base (24).
6. The climbing frame for building construction according to claim 1, wherein: the third fixing seat (24) is arranged in an L shape, and the scaffold board (3) is positioned between the two groups of guide rails (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022042592.7U CN213626583U (en) | 2020-09-17 | 2020-09-17 | Frame is climbed in construction application |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022042592.7U CN213626583U (en) | 2020-09-17 | 2020-09-17 | Frame is climbed in construction application |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213626583U true CN213626583U (en) | 2021-07-06 |
Family
ID=76649588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022042592.7U Active CN213626583U (en) | 2020-09-17 | 2020-09-17 | Frame is climbed in construction application |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213626583U (en) |
-
2020
- 2020-09-17 CN CN202022042592.7U patent/CN213626583U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207847057U (en) | Integrated lifting scaffold attachment system for irregular building | |
CN213626583U (en) | Frame is climbed in construction application | |
CN111350337A (en) | Bearing frame for building construction | |
CN215254436U (en) | Scaffold with adjustable height | |
CN214885295U (en) | High scaffold supports protective structure for construction | |
CN209874424U (en) | Building assembled safety scaffold | |
CN220504494U (en) | Construction guardrail assembly of building climbing frame | |
CN214575550U (en) | Full-steel climbing frame with good protection effect | |
CN218028901U (en) | Stable attached type climbing frame | |
CN218493566U (en) | Platform for pipe column construction | |
CN219528532U (en) | Simple crawling ladder for steel structure building construction | |
CN214531893U (en) | Creeping formwork mechanism adopting lifting type operating platform | |
CN216740631U (en) | Climbing frame sliding platform device | |
CN217782775U (en) | Scaffold for civil engineering construction | |
CN218562982U (en) | Climbing frame protection device | |
CN221073414U (en) | Scaffold frame is built with room convenient to dismouting | |
CN214885693U (en) | Safety vertical net of chemical fiber rope for construction site | |
CN216766730U (en) | Aluminum-plastic composite climbing frame walkway plate | |
CN219327290U (en) | Face limit operation platform | |
CN212295547U (en) | Steel construction assembled operation platform | |
CN220621173U (en) | Face limit protection device of assembled building | |
CN216076254U (en) | Split type wall-attached falling protector | |
CN212836622U (en) | Connecting structure for climbing frame protective screen frame and vertical rod | |
CN216840482U (en) | Multifunctional construction scaffold | |
CN221778955U (en) | Detachable climbing device for installing net rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |