CN217461399U - Climbing frame for building construction - Google Patents

Climbing frame for building construction Download PDF

Info

Publication number
CN217461399U
CN217461399U CN202220730524.6U CN202220730524U CN217461399U CN 217461399 U CN217461399 U CN 217461399U CN 202220730524 U CN202220730524 U CN 202220730524U CN 217461399 U CN217461399 U CN 217461399U
Authority
CN
China
Prior art keywords
plate
pedal
rod section
frame
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220730524.6U
Other languages
Chinese (zh)
Inventor
邵剑宇
马芳叶
王宇
王浩錡
钱锐
张春然
秦路瑶
史志阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202220730524.6U priority Critical patent/CN217461399U/en
Application granted granted Critical
Publication of CN217461399U publication Critical patent/CN217461399U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of the construction, concretely relates to construction is with climbing frame. The climbing frame for building construction comprises a wall-attached support, a lifting frame, a climbing frame movably assembled in the lifting frame, an anti-falling block arranged in the lifting frame, an L-shaped anti-falling rod which is arranged on the climbing frame and can move horizontally, and a filling plate which is arranged on the climbing frame and can move horizontally; the anti-falling block is provided with an outward-protruding jacking cambered surface, the L-shaped anti-falling rod comprises a vertical rod section and a horizontal rod section, the horizontal rod section is sleeved with a reset spring, the end part of the horizontal rod section is provided with an outward-protruding extruded cambered surface matched with the jacking cambered surface, and the horizontal rod section can be pushed to move in the left and right directions when the jacking cambered surface extrudes the extruded cambered surface; the filling plate is used for filling gaps between the crawling frame and the corresponding floors. The utility model can fill the gap between the climbing frame and the corresponding floor, and avoid falling objects; the whole anti-falling structure is simple, and the safety of constructors in use of the climbing frame for building construction is effectively ensured.

Description

Climbing frame for building construction
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to construction is with climbing frame.
Background
The climbing frame, also called lifting frame, can be divided into several main types such as hydraulic type, electric type, manual pull type and the like according to the power source, is a novel scaffold system developed in recent years, and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building, and this system makes the scaffold technique completely improved: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting processes (the scaffold is used till the construction is finished after one-time assembly), is not limited by the height of a building, greatly saves manpower and materials, has greater improvement on the traditional scaffold in a safety angle, and has great development advantages in high-rise buildings.
When the existing climbing frame is used, a certain gap is still reserved between the climbing frame and a building, and when workers construct on the climbing frame, the risk that personnel or tools fall from the gap easily occurs; and the existing climbing frame is provided with the anti-falling structure, but the anti-falling structure is too complex.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a climbing frame for construction to it is comparatively complicated to solve the climbing frame anti-falling structure among the prior art, still has the technical problem of high altitude risk of falling.
In order to achieve the above object, the utility model adopts the following technical scheme:
a climbing frame for building construction, comprising:
the wall attaching supports are arranged in a plurality of pairs at intervals in the vertical direction, and two wall attaching supports in each pair are used for being fixed on the outer sides of the corresponding layers of shear walls;
the lifting frame comprises a base used for being fixed on the ground, four guide fixing columns welded on the base and distributed in a rectangular shape, a top seat welded on the tops of the four guide fixing columns and a reinforcing oblique column welded between the two corresponding guide fixing columns, the horizontal sections of the guide fixing columns are in a U shape and comprise side plates, and an outer guide plate and an inner guide plate which are connected to the front side and the rear side of each side plate, the width of the outer guide plate in the left-right direction is larger than that of the inner guide plate in the left-right direction, a lifting channel extending in the up-down direction is defined by the four guide fixing columns, and the two guide fixing columns arranged close to the shear wall are connected with corresponding wall attaching supports;
the anti-falling blocks are arranged in the U-shaped grooves of the guide fixing columns and are arranged at intervals in the vertical direction, and the end faces, far away from the side plates, of the anti-falling blocks are convex jacking arc faces;
the crawling frame is movably assembled in the lifting channel along the up-down direction and is in limit fit with each outer guide plate in the front-back direction, the crawling frame comprises a pedal bottom plate for workers to stand, a filling plate for filling gaps between the crawling frame and the corresponding shear wall floors is movably assembled in the pedal bottom plate along the left-right direction, and two fixing rings which are arranged at intervals along the horizontal direction are arranged at the bottom of the pedal bottom plate corresponding to the positions of the guide fixing columns;
the L-shaped anti-falling rod is in one-to-one correspondence with the guide fixing columns and comprises a vertical rod section and a horizontal rod section, the vertical rod section is assembled on the pedal base plate in a moving mode along the left-right direction, the top of the vertical rod section extends out of the upper portion of the pedal base plate, the horizontal rod section penetrates through the two fixing rings, a reset spring is sleeved on the portion, located between the two fixing rings, of the horizontal rod section, the reset spring is used for driving the horizontal rod section to extend into a U-shaped groove of the guide fixing columns, the end portion of the horizontal rod section is provided with a protruding arc-shaped surface matched with the jacking arc-shaped surface in a protruding mode, and the horizontal rod section can be pushed to move in the left-right direction when the jacking arc-shaped surface is extruded.
Furthermore, the pedal bottom plate is provided with adjusting long holes which are arranged at intervals along the front-back direction and extend along the left-right direction, the end part of the filling plate is connected with an L-shaped adjusting rod, and the L-shaped adjusting rod is assembled with the adjusting long holes in a sliding mode.
Furthermore, the top of the filling plate is connected with a limit baffle plate in sliding fit with the adjusting long hole.
Furthermore, attach the wall support and include the pedestal and weld the connecting plate on the pedestal, the pedestal passes through anchor bolt and shear force wall floor fixed, and the connecting plate is connected with the direction fixed column that corresponds, still is connected with the reinforcement floor between connecting plate and the direction fixed column that corresponds.
Further, the creeper includes the pedal roof with pedal bottom plate parallel arrangement from top to bottom, and the pedal roof is equipped with the protection rail all around, is connected with the support column that is the rectangle and distributes between pedal bottom plate and the pedal roof, still is connected with the cat ladder between pedal roof and the pedal bottom plate, and the position that the pedal roof corresponds the cat ladder sets up the mouth of wearing that supplies personnel to pass through.
The beneficial effects of the above technical scheme are: 1. when the climbing frame for building construction moves to the corresponding floor, a worker can operate the L-shaped adjusting rod to push the filling plate to move towards the corresponding shear wall floor until the gap between the climbing frame and the corresponding floor is filled, and at the moment, when the construction personnel perform construction, the personnel and tools are not easy to fall;
2. when the crawling frame crawls upwards, a jacking arc surface on the anti-falling block and a squeezed arc surface on the L-shaped anti-falling rod intermittently touch, so that the L-shaped anti-falling rod is pushed to horizontally move, smooth ascending of the crawling frame is ensured, when the crawling frame crawls to a set position, a horizontal rod section of the L-shaped anti-falling rod extends into a U-shaped groove of the guide fixing column under the action of a reset spring, the L-shaped anti-falling rod is matched with the anti-falling block in the vertical direction, the crawling frame is supported by the anti-falling block, and at the moment, even if a rope driving the crawling frame to ascend is broken, the crawling frame can still be stabilized in a lifting frame, the safety of constructors is ensured, and the anti-falling structure is simple; in the normal descending process of the climbing frame, a constructor can ensure the normal descending of the climbing frame only by pulling the L-shaped anti-falling rod;
3. constructors can carry out construction operation on the pedal bottom plate and the pedal top plate, and the comprehensive construction of the operation surface of the corresponding floor is ensured;
4. whole construction is with climbing stable in structure of frame, and the security is high.
Drawings
FIG. 1 is a front view of the climbing frame for building construction of the present invention;
FIG. 2 is a top view of the climbing frame for building construction, without the climbing frame;
fig. 3 is a schematic structural view of the climbing frame for building construction of the present invention;
fig. 4 is a schematic structural view of the guiding fixing column of the climbing frame for building construction of the utility model;
fig. 5 is the utility model discloses a prevent weighing down piece and L shape in the frame with climbing for construction and prevent weighing down the cooperation sketch map between the pole.
Description of reference numerals: 1-wall-attached support, 2-seat body, 3-connecting plate, 4-reinforcing ribbed plate, 5-lifting frame, 6-base, 7-top seat, 8-guide fixing column, 9-side plate, 10-outer guide plate, 11-inner guide plate, 12-anti-falling block, 13-top pressure cambered surface, 14-pedal bottom plate, 15-ladder stand, 16-pedal top plate, 17-support column, 18-through hole, 19-L-shaped anti-falling rod, 20-fixing ring, 21-reinforcing inclined column, 22-reset spring, 23-L-shaped adjusting rod, 24-filling plate, 25-limit baffle, 26-shear wall floor, 27-winch, 28-anchoring bolt, 29-transmission pulley, 30-lifting pulley and 31-extruded cambered surface.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
The utility model discloses a construction is with concrete embodiment of climbing frame:
as shown in fig. 1 and 2, the climbing frame for building construction comprises a wall-attached support 1, a lifting frame 5, a climbing frame movably assembled in the lifting frame 5, a falling prevention block installed in the lifting frame 5, a lifting assembly installed on the lifting frame for driving the climbing frame to lift, and an L-shaped falling prevention rod 19 installed on the climbing frame.
As shown in fig. 1 and 2, a plurality of pairs of wall-attached supports 1 are arranged at intervals in the vertical direction, and two wall-attached supports 1 in each pair are used for being fixed on the outer side of the corresponding floor 26 of the shear wall. The wall-attached support 1 comprises a support body 2 and a connecting plate 3 welded on the support body 2, wherein the support body 2 is fixed with a shear wall floor 26 through an anchor bolt 28.
The lifting frame 5 comprises a base 6 used for being fixed on the ground, four guide fixing columns 8 welded on the base 6 and distributed in a rectangular shape, a top seat 7 welded at the tops of the four guide fixing columns 8 and a reinforcing inclined column 21 welded between the two corresponding guide fixing columns 8. As shown in fig. 4, the guide fixing column 8 has a U-shaped horizontal cross section, and includes a side plate 9, and an outer guide plate 10 and an inner guide plate 11 connected to the front and rear sides of the side plate 9, and the width of the outer guide plate 10 in the left-right direction is greater than the width of the inner guide plate 11 in the left-right direction. As shown in fig. 2, a lifting channel extending in the vertical direction is defined between the four guiding fixing columns 8, two guiding fixing columns 8 arranged close to the shear wall are connected with the corresponding connecting plates 3 of the wall-attached support 1, and reinforcing rib plates 4 are further connected between the connecting plates 3 and the corresponding guiding fixing columns 8 to ensure firm connection. The base 6 is fixedly provided with a windlass 27, and the top seat 7 is provided with a transmission pulley 29.
As shown in fig. 4, the anti-falling blocks 12 are installed in the U-shaped grooves of the guide fixing columns 8, and a plurality of anti-falling blocks are arranged at intervals in the vertical direction, and the end faces, far away from the side plates, of the anti-falling blocks 12 are convex top-pressing arc faces 13.
The creeper is assembled in the lifting channel and is in limit fit with each outer guide plate 10 in the front-rear direction, and as shown in fig. 3, the creeper comprises a pedal base plate 14 on which workers stand, a pedal top plate 16 arranged in parallel up and down with the pedal base plate 14, four support columns 17 connected between the pedal base plate 14 and the pedal top plate 16 and distributed in a rectangular shape, a ladder stand 15 connected between the pedal top plate 16 and the pedal base plate 14, and a protective fence (not shown) connected around the pedal top plate 16. The pedal top plate 16 is provided with a through hole 18 corresponding to the ladder stand 15 for people to pass through.
The pedal bottom plate 16 is provided with two adjusting long holes which are arranged in parallel at intervals along the front-back direction and extend along the left-right direction, the pedal bottom plate 16 is also provided with a mounting groove, a filling plate 24 is mounted in the mounting groove, and the mounting groove 24 is communicated with the adjusting long holes. All slide in every regulation slotted hole and be equipped with an L shape adjusting lever 23, two L shape adjusting levers 23 are connected with infill panel 24, through pulling L shape adjusting panel 23, can drive infill panel 24 and remove about to will climb the clearance fill between frame and the corresponding shear wall floor 26. The top of the filling plate 24 is connected with a limit baffle 25 which is matched with the adjusting long hole in a sliding way, and the L-shaped adjusting rod 23 cannot move at most to the position of the limit baffle 25. The pedal top plate 15 is provided with a lifting pulley 30, and a steel wire rope on the winch 27 is connected with the lifting pulley 30 by bypassing the transmission pulley 29. Constructors can carry out construction operation on the pedal bottom plate 14 and the pedal top plate 16, and complete construction of the operation surface of the corresponding floor is guaranteed.
The position department that corresponds each guide fixing post 8 on the pedal bottom plate 16 is equipped with along controlling the anti-falling slot hole that the direction extends, and the position that corresponds each guide fixing post 8 in the bottom of pedal bottom plate 16 all is equipped with along the solid fixed ring 20 of horizontal direction interval arrangement. The L-shaped anti-falling rods 19 correspond to the guide fixing columns 8 one by one and comprise vertical rod sections and horizontal rod sections, the vertical rod sections are assembled with the anti-falling long holes in a sliding mode, and the tops of the vertical rod sections extend out of the upper portion of the pedal bottom plate 16; the horizontal rod section penetrates through the two fixing rings 20, a reset spring 22 is sleeved on the part, located between the two fixing rings 20, of the horizontal rod section, the reset spring 22 is used for driving the horizontal rod section to extend into the U-shaped groove of the guide fixing column 8, as shown in fig. 5, the end portion of the horizontal rod section is provided with a convex extruded cambered surface 31 matched with the jacking cambered surface 13, and the horizontal rod section can be pushed to move in the left-right direction when the jacking cambered surface 13 extrudes the extruded cambered surface 31.
The utility model discloses a building construction is with climbing frame when removing to corresponding floor, the workable L shape of workman adjusts the pole to promote the infill panel and remove towards the shear force wall floor that corresponds, fill up until will climbing the clearance between frame and the corresponding floor, when constructor constructed this moment, difficult emergence personnel and instrument fall. The crawling frame is in an upward crawling process, the jacking cambered surface on the anti-falling block can be intermittently touched with the extruded cambered surface on the L-shaped anti-falling rod, so that the L-shaped anti-falling rod is pushed to horizontally move, smooth ascending of the crawling frame is guaranteed, when the crawling frame crawls to a set position, the horizontal rod section of the L-shaped anti-falling rod extends into the U-shaped groove of the guide fixing column under the action of the reset spring, the L-shaped anti-falling rod is matched with the anti-falling block in the up-down direction to support the crawling frame through the anti-falling block, at the moment, even if a rope driving the crawling frame to ascend is broken, the crawling frame can still be stabilized in the lifting frame, the safety of constructors is guaranteed, the anti-falling structure is simple, and in the normal descending process of the crawling frame, the constructors can guarantee normal descending of the crawling frame only by pulling the L-falling rod.
The above-described embodiments of the present invention do not limit the scope of the present invention. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (5)

1. The utility model provides a construction is with climbing frame which characterized in that includes:
the wall attaching supports are arranged in a plurality of pairs at intervals in the vertical direction, and two wall attaching supports in each pair are used for being fixed on the outer sides of the corresponding layers of shear walls;
the lifting frame comprises a base used for being fixed on the ground, four guide fixing columns welded on the base and distributed in a rectangular shape, a top seat welded on the tops of the four guide fixing columns and a reinforcing oblique column welded between the two corresponding guide fixing columns, the horizontal sections of the guide fixing columns are in a U shape and comprise side plates, and an outer guide plate and an inner guide plate which are connected to the front side and the rear side of each side plate, the width of the outer guide plate in the left-right direction is larger than that of the inner guide plate in the left-right direction, a lifting channel extending in the up-down direction is defined by the four guide fixing columns, and the two guide fixing columns arranged close to the shear wall are connected with corresponding wall attaching supports;
the anti-falling blocks are arranged in the U-shaped grooves of the guide fixing columns and are arranged at intervals in the vertical direction, and the end faces, far away from the side plates, of the anti-falling blocks are convex jacking arc faces;
the crawling frame is movably assembled in the lifting channel along the up-down direction and is in limit fit with each outer guide plate in the front-back direction, the crawling frame comprises a pedal bottom plate for workers to stand, a filling plate for filling gaps between the crawling frame and the corresponding shear wall floors is movably assembled in the pedal bottom plate along the left-right direction, and two fixing rings which are arranged at intervals along the horizontal direction are arranged at the bottom of the pedal bottom plate corresponding to the positions of the guide fixing columns;
the L-shaped anti-falling rod is in one-to-one correspondence with the guide fixing columns and comprises a vertical rod section and a horizontal rod section, the vertical rod section is assembled on the pedal base plate in a moving mode along the left-right direction, the top of the vertical rod section extends out of the upper portion of the pedal base plate, the horizontal rod section penetrates through the two fixing rings, a reset spring is sleeved on the portion, located between the two fixing rings, of the horizontal rod section, the reset spring is used for driving the horizontal rod section to extend into a U-shaped groove of the guide fixing columns, the end portion of the horizontal rod section is provided with a protruding arc-shaped surface matched with the jacking arc-shaped surface in a protruding mode, and the horizontal rod section can be pushed to move in the left-right direction when the jacking arc-shaped surface is extruded.
2. The climbing frame for building construction according to claim 1, wherein the foot pedal base plate is provided with adjustment long holes arranged at intervals in the front-rear direction and extending in the left-right direction, and the end of the filling plate is connected with an L-shaped adjustment rod which is slidably fitted with the adjustment long holes.
3. The climbing frame for building construction according to claim 2, wherein a limit baffle slidably fitted with the adjustment long hole is connected to the top of the filling plate.
4. The climbing frame for building construction according to any one of claims 1 to 3, wherein the wall-attached support comprises a base body and a connecting plate welded on the base body, the base body is fixed with the floor of the shear wall through an anchor bolt, the connecting plate is connected with the corresponding guide fixing column, and a reinforcing rib plate is further connected between the connecting plate and the corresponding guide fixing column.
5. The climbing frame for building construction according to any one of claims 1 to 3, wherein the climbing frame comprises a pedal top plate arranged in parallel with a pedal bottom plate up and down, protective fences are arranged around the pedal top plate, support columns are connected between the pedal bottom plate and the pedal top plate in rectangular distribution, a ladder stand is further connected between the pedal top plate and the pedal bottom plate, and a through hole for personnel to pass through is formed in the position, corresponding to the ladder stand, of the pedal top plate.
CN202220730524.6U 2022-03-31 2022-03-31 Climbing frame for building construction Active CN217461399U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220730524.6U CN217461399U (en) 2022-03-31 2022-03-31 Climbing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220730524.6U CN217461399U (en) 2022-03-31 2022-03-31 Climbing frame for building construction

Publications (1)

Publication Number Publication Date
CN217461399U true CN217461399U (en) 2022-09-20

Family

ID=83266967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220730524.6U Active CN217461399U (en) 2022-03-31 2022-03-31 Climbing frame for building construction

Country Status (1)

Country Link
CN (1) CN217461399U (en)

Similar Documents

Publication Publication Date Title
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN217461399U (en) Climbing frame for building construction
CN214658685U (en) Combined anti-skidding climbing frame for constructional engineering
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN211622509U (en) Scaffold for industrial and civil buildings
CN201762977U (en) Continuous guide seat-type adhesion lifting scaffold
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN105776092A (en) Stretching type basket device and construction method thereof
CN213837664U (en) Separated type climbing frame
CN202689489U (en) Frame column construction operation frame
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN214364873U (en) Lifting and hanging device of climbing frame for building
CN206110636U (en) Burst formula hydraulic lifting climbs frame
CN214034706U (en) Tower crane pedestrian safety passage used on attached lifting scaffold
CN212507304U (en) Self-climbing device for mounting prefabricated capping beam
CN210342628U (en) Protective frame
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN218117177U (en) Climb guide rail type protector for frame
CN219710932U (en) Movable hanging basket device
CN219451444U (en) Building climbing frame
CN212246132U (en) Construction is with platform of ascending a height
CN216765611U (en) Movable cable-stayed bridge creeping formwork construction reinforcement binding platform
CN219604843U (en) Scaffold convenient to go up piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant