CN213897164U - Concrete precast segment assembly spraying concrete reinforcing soil tank - Google Patents

Concrete precast segment assembly spraying concrete reinforcing soil tank Download PDF

Info

Publication number
CN213897164U
CN213897164U CN202021987697.3U CN202021987697U CN213897164U CN 213897164 U CN213897164 U CN 213897164U CN 202021987697 U CN202021987697 U CN 202021987697U CN 213897164 U CN213897164 U CN 213897164U
Authority
CN
China
Prior art keywords
concrete
concrete precast
precast slab
utility
sprayed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021987697.3U
Other languages
Chinese (zh)
Inventor
李晓峰
董国明
郑思光
潘伟
姜淼
刘建兵
栗业
郑雅坤
刘思辰
苏明伟
陈艳杰
吴昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Original Assignee
Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources filed Critical Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Priority to CN202021987697.3U priority Critical patent/CN213897164U/en
Application granted granted Critical
Publication of CN213897164U publication Critical patent/CN213897164U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to a concrete precast segment is assembled and is spouted concrete and consolidate soil box mainly is applicable to high abrupt slope ecological restoration management such as mine, quarry, belongs to the environmental protection technology field. The technical proposal of the utility model is as follows: the mountain rock 5 is punched, and the punching depth is 25 cm; one side of the fixed rib 3 is embedded in the concrete precast slab 1, and the other side is fixed at the punching position; the concrete precast slabs 1 are closely arranged, concrete walls 4 are sprayed on the outer sides and between gaps, and the total thickness of the sprayed concrete walls 4 is 10 cm; and nutrient planting soil 2 is arranged between the concrete precast slab 1 and the mountain rock 5. The utility model discloses by a wide margin reduction ecological remediation's cost, simple and easy rapid construction, it is fast to take effect, has not only controlled further destruction of ecological environment, and geological disasters have also obtained effectual improvement simultaneously.

Description

Concrete precast segment assembly spraying concrete reinforcing soil tank
Technical Field
The utility model relates to a concrete precast segment is assembled and is spouted concrete and consolidate soil box mainly is applicable to high abrupt slope ecological restoration management such as mine, quarry, belongs to the environmental protection technology field.
Background
In recent decades, along with irregular mining of mineral resources and quarries, mountain bodies are exposed, vegetation is damaged, water and soil loss and dust are caused, and potential safety hazards such as geological disasters exist. The national and local governments at all levels pay high attention to the ecological restoration of mines, and the common traditional treatment method of high and steep slopes formed by mining in the ecological restoration treatment of mines is slope cutting, slope surface cutting and trimming are completed in a step mode from top to bottom, and then greening of platforms and slope surfaces is performed. The construction method is influenced by the non-standard mining of mines, has certain construction difficulty and large construction engineering quantity, can further destroy the ecological environment, and is difficult for greening plants planted at the toe of the slope to completely cover the slope.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the technical problem who exists among the well-known technology and provide a concrete precast segment assembles and spouts concrete reinforcement soil groove, solve mine and quarry ecological recovery crow's abrupt slope construction difficulty technical problem to reduce ecological environment's further destruction, simple and easy rapid construction, it is fast to take effect, also carries out effectual processing to geological disasters hidden danger simultaneously.
The utility model discloses a solve the technical scheme that technical problem that exists among the well-known technique took and be:
a concrete precast segment assembling concrete spraying reinforced soil tank comprises a concrete precast segment, nutrient planting soil, fixing ribs, a concrete wall and mountain rocks, wherein the mountain rocks are punched with the punching depth of 25 cm; one side of the fixed rib is embedded in the concrete precast slab, and the other side of the fixed rib is fixed at the punching position; the concrete precast slabs are closely arranged, concrete walls are sprayed on the outer sides and between the gaps, and the total thickness of the sprayed concrete walls is 10 cm; nutrient planting soil is arranged between the concrete precast slab and the mountain rock; the concrete precast slab is formed by prefabricating C20 concrete, the height is 500cm, the section is a rectangle with the length of 20cm and the width of 10cm, fixing ribs are pre-embedded inside, and the pre-embedded length is 25 cm; the fixed rib is a twisted steel bar with the length of 45cm and the diameter of 16 cm.
The utility model has the advantages that: greatly reduces the cost of ecological restoration, is simple and rapid in construction, takes effect quickly, controls the further damage of the ecological environment, and effectively controls the geological disasters.
Drawings
FIG. 1 is a schematic structural diagram of a concrete precast segment assembled concrete spraying reinforced soil trough side surface.
FIG. 2 is a top view of a concrete precast slab assembled concrete spraying reinforced soil tank.
In the figure: the concrete prefabricated section 1, the nutrition planting soil 2, the fixed rib 3, the concrete wall 4, the mountain rock 5.
Detailed Description
The invention will be further described by way of example with reference to the accompanying drawings.
A concrete precast segment assembling concrete spraying reinforced soil tank comprises a concrete precast segment 1, nutrient planting soil 2, fixing ribs 3, a concrete wall 4 and mountain rock 5, wherein the mountain rock 5 is punched with the punching depth of 25 cm; one side of the fixed rib 3 is embedded in the concrete precast slab 1, and the other side of the fixed rib is fixed at a punching position; the concrete precast slabs 1 are closely arranged, concrete walls 4 are sprayed on the outer sides and between gaps, and the total thickness of the sprayed concrete walls 4 is 10 cm; nutrient planting soil 2 is arranged between the concrete precast slab 1 and the mountain rock 5; the concrete precast slab 1 is formed by prefabricating C20 concrete, is 500cm in height, has a rectangular section with the length of 20cm and the width of 10cm, and is internally pre-embedded with a fixing rib 3 with the pre-embedded length of 25 cm; the fixed rib 3 is a twisted steel bar with the length of 45cm and the diameter of 16 cm.
The utility model discloses an installation method does:
1. firstly, danger elimination operation is carried out on a high and steep slope, and unstable rocks are removed.
2. Vertically punching holes with the interval of 20cm outside the periphery of the mountain rock 5, wherein the punched holes have the diameter of 20mm and the depth of 25cm, removing scraps by using a fine brush after the punching is finished, inserting a fixing rib after the hole cleaning is finished, and pouring high-strength cement mortar into the holes for reinforcement.
3. And (5) carrying out concrete spraying construction to form a sprayed concrete wall 4, wherein the thickness of the sprayed concrete wall 4 is 10 cm.
4. And removing the rebounded sprayed concrete material, and planting the plants.

Claims (1)

1. The utility model provides a concrete precast segment is assembled and is spouted concrete and consolidate soil box which characterized in that: the concrete planting device comprises a concrete prefabricated sheet (1), nutrient planting soil (2), fixing ribs (3), a concrete wall (4) and mountain rocks (5), wherein the mountain rocks (5) are punched with the punching depth of 25 cm; one side of the fixed rib (3) is embedded in the concrete precast slab (1) and the other side is fixed at the punching position; the concrete prefabricated pieces (1) are closely arranged, concrete walls (4) are sprayed on the outer sides and between gaps, and the total thickness of the sprayed concrete walls (4) is 10 cm; nutrient planting soil (2) is arranged between the concrete precast slab (1) and the mountain rock (5); the concrete precast slab (1) is formed by prefabricating C20 concrete, the height is 500cm, the section is a rectangle with the length of 20cm and the width of 10cm, fixing ribs (3) are embedded in the concrete precast slab, and the embedded length is 25 cm; the fixed rib (3) is a twisted steel bar with the length of 45cm and the diameter of 16 cm.
CN202021987697.3U 2020-09-12 2020-09-12 Concrete precast segment assembly spraying concrete reinforcing soil tank Active CN213897164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021987697.3U CN213897164U (en) 2020-09-12 2020-09-12 Concrete precast segment assembly spraying concrete reinforcing soil tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021987697.3U CN213897164U (en) 2020-09-12 2020-09-12 Concrete precast segment assembly spraying concrete reinforcing soil tank

Publications (1)

Publication Number Publication Date
CN213897164U true CN213897164U (en) 2021-08-06

Family

ID=77109456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021987697.3U Active CN213897164U (en) 2020-09-12 2020-09-12 Concrete precast segment assembly spraying concrete reinforcing soil tank

Country Status (1)

Country Link
CN (1) CN213897164U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482620A (en) * 2021-08-10 2021-10-08 中煤浙江生态环境发展有限公司 Pit slope repairing and backfilling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482620A (en) * 2021-08-10 2021-10-08 中煤浙江生态环境发展有限公司 Pit slope repairing and backfilling method
CN113482620B (en) * 2021-08-10 2024-02-13 中煤浙江生态环境发展有限公司 Pit slope restoration backfill method

Similar Documents

Publication Publication Date Title
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN110409359B (en) Segmented construction method for bottom reservoir of inner-drainage open pit
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN213897164U (en) Concrete precast segment assembly spraying concrete reinforcing soil tank
CN105649092A (en) Slope supporting method for crumbly strata
CN211690386U (en) Slope reinforcing device for foundation building engineering
CN215520873U (en) Coal gangue powder overlying strata compaction grouting filling mining system
CN103953053B (en) Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane
CN205530299U (en) Ecological slope protection structure in ion type rare earth mine mountain
CN113669109B (en) Construction method of underground water storage system of strip mine
CN207228156U (en) A kind of underground structure being made of stake and wall
KR101035264B1 (en) The method using soil mixture layers reinforced by fibrillated fibers for the creation of shore protection for vegetation
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
CN204781274U (en) Tunnel portal faces upward on limit sloping catch water drain structure
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
KR101525942B1 (en) Method for slope reinforcement construction using the ground improvement product
CN210917225U (en) Ecological bank protection of echelonment
CN210695124U (en) A toughened glass anchor structure for mine greening
RU2074924C1 (en) Method for construction of combination drainage
CN204715502U (en) To ride well system
SU1273560A1 (en) Method of preventing inflow of water into stoping faces
KR102036985B1 (en) Recovery method of waste mine
CN209798773U (en) Assembled soil nail wall supporting device for building
CN107476328A (en) A kind of prefabricated pier foundation construction of driving into type
CN106120649B (en) A kind of sill may roadbed bank protection fast reinforcing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant