CN213837911U - Material processing shed for building construction - Google Patents

Material processing shed for building construction Download PDF

Info

Publication number
CN213837911U
CN213837911U CN202022614822.2U CN202022614822U CN213837911U CN 213837911 U CN213837911 U CN 213837911U CN 202022614822 U CN202022614822 U CN 202022614822U CN 213837911 U CN213837911 U CN 213837911U
Authority
CN
China
Prior art keywords
fixedly connected
ladder body
triangle mount
material processing
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022614822.2U
Other languages
Chinese (zh)
Inventor
陈旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd, China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN202022614822.2U priority Critical patent/CN213837911U/en
Application granted granted Critical
Publication of CN213837911U publication Critical patent/CN213837911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of processing canopy production and processing, especially, be a material processing canopy for construction, including the triangle mount, the middle part joint of the right side bottom of triangle mount has the draw-in groove, the bottom fixedly connected with of draw-in groove goes up the ladder body, sliding guide has been seted up to the both sides of going up the ladder body, the inside sliding connection of sliding guide has the sliding block, the bottom fixedly connected with of sliding block is down the ladder body, go up the ladder body and trample the horizontal pole with equal fixedly connected with down between the ladder body, the bottom fixedly connected with fixed axle of going up the ladder body, the outside of fixed axle is rotated and is connected with the layer board, threaded hole has been seted up at the top of draw-in groove, threaded hole links there is fixing bolt, support post is installed through the bolt in the bottom of triangle mount. The utility model discloses a set up draw-in groove, fixing bolt, sliding guide, sliding block, fixed axle, lower ladder body and layer board and cooperate, solved the problem of transport ladder waste time when maintaining to processing canopy.

Description

Material processing shed for building construction
Technical Field
The utility model relates to a processing canopy production and processing technical field specifically is a material processing canopy for construction.
Background
With the continuous improvement of the current building construction management level, the national development strategy about enhancing energy conservation and emission reduction is followed, a resource energy-saving society and an environment-friendly society are built, safety protection devices are standardized, an assembly type and a tool type are effective ways for realizing sustainable development of the building industry, a temporary processing shed on a construction site is more and more emphasized by people as an indispensable safety protection facility in the construction process of a multi-storey and high-rise building, and the processing shed used in the construction process is a simple processing shed basically built by materials such as steel pipes and angle irons for the convenience of recycling.
The prior material processing shed has the following problems: when using, because job site debris are more, do not shelter from the thing, make the ceiling at top blown away easily, the workman need additionally carry the ladder to climb up the top of processing canopy and repair, can waste a large amount of time and manpower and materials when carrying the ladder.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a material processing canopy for construction has solved the problem of carrying ladder waste time when maintaining to processing canopy.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a material processing canopy for construction, includes the triangle mount, the middle part joint of the right side bottom of triangle mount has the draw-in groove, the bottom fixedly connected with of draw-in groove goes up the ladder body, sliding guide has been seted up to the both sides of going up the ladder body, the inside sliding connection of sliding guide has the sliding block, the bottom fixedly connected with of sliding block is the ladder body down, go up the ladder body and trample the horizontal pole with equal fixedly connected with down between the ladder body, the bottom fixedly connected with fixed axle of going up the ladder body, the outside of fixed axle is rotated and is connected with the layer board, the screw hole has been seted up at the top of draw-in groove, screw hole internal thread even has fixing bolt, the support post is installed through the bolt in the bottom of triangle mount.
As the utility model discloses a preferred technical scheme, the fixed orifices has been seted up to the bottom both sides of triangle mount, fixed horizontal pole has been cup jointed between the fixed orifices.
As a preferred technical scheme of the utility model, the fixed ear of bottom fixedly connected with on the both sides inclined plane of triangle mount, the top fixedly connected with worker's type groove of triangle mount, install the flashing board through the bolt between worker's type groove and the fixed ear, the both sides of flashing board are passed through rivet fixed connection on the both sides inclined plane of triangle mount, the top in worker's type groove is passed through the rain-proof edge in bolt fixedly connected with top.
As a preferred technical scheme of the utility model, the bottom of triangle mount and the both sides of support post all are provided with the bracing piece, the both ends fixedly connected with fixed plate of bracing piece, the fixed plate is installed in the bottom of triangle mount and the both sides of support post through the bolt respectively.
As a preferred technical scheme of the utility model, the bottom fixedly connected with fixed baseplate of support post, fixedly connected with strengthening rib between the junction of fixed baseplate and support post.
As a preferred technical scheme of the utility model, fixedly connected with head tree between the middle part of triangle mount, fixedly connected with support column between the hypotenuse of triangle mount and the base structure live.
(III) advantageous effects
Compared with the prior art, the utility model provides a material processing canopy for construction possesses following beneficial effect:
this material processing canopy for construction, through going up the ladder body, trample horizontal pole, draw-in groove, fixing bolt, sliding guide, sliding block, fixed axle, down the ladder body and layer board cooperate, when using, accomodate the ladder body and down the ladder body through sliding guide and fold, save space, when using the ladder expand simultaneously, maintain the top of processing canopy, improve maintenance efficiency, reduce the manpower and materials of carrying the ladder, reduce the cost of labor, improve economic benefits.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is a bottom view of the structure of the present invention;
fig. 3 is an internal structure view of the upper ladder body and the lower ladder body of the present invention.
In the figure: 1. a flashing board; 2. a triangular fixing frame; 3. a tool-shaped groove; 4. going up the ladder body; 5. a support pillar; 6. fixing the substrate; 7. reinforcing ribs; 8. fixing the ear; 9. a top rain-proof edge; 10. a main upright post; 11. a fixing plate; 12. fixing the cross bar; 13. a support bar; 14. treading the cross bar; 15. supporting the upright post; 16. a card slot; 17. fixing the bolt; 18. a sliding guide rail; 19. a slider; 20. a fixed shaft; 21. descending the ladder body; 22. and (7) a supporting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a material processing canopy for construction, including triangle mount 2, the middle part joint of the right side bottom of triangle mount 2 has draw-in groove 16, ladder body 4 on the bottom fixedly connected with of draw-in groove 16, sliding guide 18 has been seted up to the both sides of going up ladder body 4, sliding guide 18 inside sliding connection has sliding block 19, ladder body 21 under sliding block 19's bottom fixedly connected with, go up ladder body 4 and trample horizontal pole 14 with equal fixedly connected with down between the ladder body 21, the bottom fixedly connected with fixed axle 20 of going up ladder body 4, the outside of fixed axle 20 is rotated and is connected with layer board 22, threaded hole is seted up at the top of draw-in groove 16, threaded hole internal thread even has fixing bolt 17, support post 15 is installed through the bolt in the bottom of triangle mount 2.
In the embodiment, the upper ladder body 4 and the lower ladder body 21 are accommodated through the sliding guide rail 18, the bottom of the lower ladder body 21 is supported through the rotating supporting plate 22, the upper ladder body 4 and the lower ladder body 21 are folded, the space occupancy rate of the ladder is reduced, and the ladder is unfolded during use.
Specifically, two sides of the bottom of the triangular fixing frame 2 are provided with fixing holes, and a fixing cross rod 12 is sleeved between the fixing holes.
In this embodiment, through the fixed action between fixed horizontal pole 12 and the triangle mount 2, the person of facilitating the use enlarges the size of processing canopy according to the demand, conveniently improves the stability between the triangle mount 2 simultaneously.
Specifically, the bottom fixedly connected with stationary ear 8 on the both sides inclined plane of triangle mount 2, the worker's type groove 3 of the top fixedly connected with of triangle mount 2 installs flashing board 1 through the bolt between worker's type groove 3 and the stationary ear 8, and the both sides of flashing board 1 are passed through rivet fixed connection and are on the both sides inclined plane of triangle mount 2, and the top in worker's type groove 3 is passed through the rain-proof edge 9 in bolt fixedly connected with top.
In this embodiment, prevent through the rain-proof edge 9 in top that the top gap of flashing board 1 from leaking water, avoid processing the interior material of canopy and become damp.
Specifically, the bottom of the triangular fixing frame 2 and the two sides of the supporting upright post 15 are both provided with supporting rods 13, two ends of each supporting rod 13 are fixedly connected with fixing plates 11, and the fixing plates 11 are respectively installed at the bottom of the triangular fixing frame 2 and the two sides of the supporting upright post 15 through bolts.
In this embodiment, improve the stability of triangle mount 2 through bracing piece 13, prevent that the ceiling from taking place to empty, avoid the potential safety hazard.
Specifically, the bottom of the support column 15 is fixedly connected with a fixed substrate 6, and a reinforcing rib 7 is fixedly connected between the connection part of the fixed substrate 6 and the support column 15.
In this embodiment, support column 15 is conveniently fixed to subaerial through fixed baseplate 6, improves the intensity of junction through strengthening rib 7 simultaneously, prevents fixed baseplate 6 distortion.
Specifically, a main upright post 10 is fixedly connected between the middle parts of the triangular fixing frames 2, and a supporting column 5 is fixedly connected between the bevel edge and the bottom edge structure of the triangular fixing frame 2.
In this embodiment, the strength of the triangular fixing frame 2 is improved through the supporting columns 5 and the main upright columns 10, and the triangular fixing frame 2 is prevented from deforming.
The utility model discloses a theory of operation and use flow: when using, earlier with triangle mount 2 through the top of bolt fastening to support post 15, again with the strengthening rib 7 of support post 15 bottom fixed to the assigned position, insert fixed horizontal pole 12 in the both sides fixed orifices of triangle mount 2 again, insert flashing 1 between worker's type groove 3 and fixed ear 8 again, place the top rain-proof along 9 at the top of worker's type groove 3, through the bolt with flashing 1 and the rain-proof along 9 fixed mounting in top, fix the both sides of flashing 1 to the inclined plane of triangle mount 2 through the rivet, with draw-in groove 16 joint in the bottom of triangle mount 2, rotatory fixing bolt 17 is fixed with draw-in groove 16, when using the ladder, it is rotatory with layer board 22, make down the ladder body 21 from the gliding expansion in the sliding guide 18 of the last ladder body 4.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a material processing canopy for construction, includes triangle mount (2), its characterized in that: the middle part of the right bottom of the triangular fixed frame (2) is clamped with a clamping groove (16), the bottom of the clamping groove (16) is fixedly connected with an upper ladder body (4), two sides of the upper ladder body (4) are provided with sliding guide rails (18), a sliding block (19) is connected in the sliding guide rail (18) in a sliding way, the bottom of the sliding block (19) is fixedly connected with a lower ladder body (21), a treading cross bar (14) is fixedly connected between the upper ladder body (4) and the lower ladder body (21), a fixed shaft (20) is fixedly connected to the bottom of the upper ladder body (4), a supporting plate (22) is rotatably connected to the outer part of the fixed shaft (20), the top of the clamping groove (16) is provided with a threaded hole, the threaded hole is internally threaded with a fixing bolt (17), and a supporting upright post (15) is arranged at the bottom of the triangular fixing frame (2) through a bolt.
2. The material processing shed for building construction according to claim 1, wherein: fixing holes are formed in two sides of the bottom of the triangular fixing frame (2), and a fixing cross rod (12) is sleeved between the fixing holes.
3. The material processing shed for building construction according to claim 1, wherein: the rain-proof edge (9) of bolt fixedly connected with top of triangle mount (3) is passed through to the both sides of triangle mount (2), install between worker's type groove (3) and fixed ear (8) through the bolt in the top fixedly connected with worker's type groove (3), rain-proof edge in both sides of triangle mount (2).
4. The material processing shed for building construction according to claim 1, wherein: the bottom of triangle mount (2) and the both sides of support post (15) all are provided with bracing piece (13), the both ends fixedly connected with fixed plate (11) of bracing piece (13), fixed plate (11) are installed in the bottom of triangle mount (2) and the both sides of support post (15) through the bolt respectively.
5. The material processing shed for building construction according to claim 1, wherein: the bottom fixedly connected with PMKD (6) of support post (15), fixedly connected with strengthening rib (7) between the junction of PMKD (6) and support post (15).
6. The material processing shed for building construction according to claim 1, wherein: the triangular fixing frame is characterized in that a main upright post (10) is fixedly connected between the middle parts of the triangular fixing frames (2), and a supporting column (5) is fixedly connected between the bevel edge of each triangular fixing frame (2) and the bottom edge structure.
CN202022614822.2U 2020-11-12 2020-11-12 Material processing shed for building construction Active CN213837911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022614822.2U CN213837911U (en) 2020-11-12 2020-11-12 Material processing shed for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022614822.2U CN213837911U (en) 2020-11-12 2020-11-12 Material processing shed for building construction

Publications (1)

Publication Number Publication Date
CN213837911U true CN213837911U (en) 2021-07-30

Family

ID=77015603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022614822.2U Active CN213837911U (en) 2020-11-12 2020-11-12 Material processing shed for building construction

Country Status (1)

Country Link
CN (1) CN213837911U (en)

Similar Documents

Publication Publication Date Title
CN204703500U (en) Assembled architecture construction novel support system
CN213837911U (en) Material processing shed for building construction
CN203783170U (en) Detachable protective shed
CN210195199U (en) Assembled climbing frame for building
CN111350337A (en) Bearing frame for building construction
CN206251043U (en) A kind of weather proof photovoltaic robot parking stall
CN209704028U (en) A kind of assembled architecture standardization protection system
CN210598087U (en) Decoration hanging flower basket for building
CN213654429U (en) Safety device for construction
CN201474192U (en) Water flanged board joint structure
CN206712713U (en) A kind of photovoltaic support structure being easy in the installation of tile roof
CN112127698A (en) Folding canopy for building construction
CN206722540U (en) A kind of wind-proof construction enclosing
CN220978975U (en) Reinforcing steel bar machining shed with auxiliary supporting mechanism
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN214659135U (en) Energy-concerving and environment-protective type is oblique positive canopy for construction
CN215670944U (en) A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction
CN217054303U (en) A building templates for building engineering's be convenient for aggregate erection
CN217232902U (en) Interim storehouse in building site
CN213597499U (en) Novel stupefied template of no back of body
CN215564751U (en) Light steel house for building
CN212562404U (en) Overhanging scaffold
CN212613600U (en) Scaffold for building engineering
CN209353648U (en) A kind of combined moving scaffold
CN212866561U (en) Assembled light gauge steel furred ceiling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant