CN204703500U - Assembled architecture construction novel support system - Google Patents

Assembled architecture construction novel support system Download PDF

Info

Publication number
CN204703500U
CN204703500U CN201520359650.5U CN201520359650U CN204703500U CN 204703500 U CN204703500 U CN 204703500U CN 201520359650 U CN201520359650 U CN 201520359650U CN 204703500 U CN204703500 U CN 204703500U
Authority
CN
China
Prior art keywords
support
backup plate
outer tube
assembled architecture
interior pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520359650.5U
Other languages
Chinese (zh)
Inventor
孙金桥
Original Assignee
孙金桥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孙金桥 filed Critical 孙金桥
Priority to CN201520359650.5U priority Critical patent/CN204703500U/en
Application granted granted Critical
Publication of CN204703500U publication Critical patent/CN204703500U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to assembled architecture construction novel support system, it is characterized in that, comprise keel, joist and bracing or strutting arrangement, the bottom welding of described joist has a standpipe, this standpipe is arranged on bracing or strutting arrangement, described keel are positioned at the top of joist, and are linked together by bindiny mechanism and joist.The utility model has the advantages that: supporting & stablizing, ensure that the safety of site operation.Not by the restriction of concave plane, can fine adjustment be realized, install simple, material saving.

Description

Assembled architecture construction novel support system
Technical field
The utility model relates to a kind of assembled architecture construction novel support system, belongs to building field.
Background technology
Industrialization of construction industry is for the mode of production with element precast production, fabricated construction, feature is turned to design safety degree, component component, mechanization of building operation, management information, can the whole industrial chain such as Integration Design, production, construction, realize the novel building mode of production of sustainable development of building products energy-saving and environmental protection, Life cycle value maximization.Being that builing industry is progressively transitioned into the overall process of the large industrial mode of production based on modern technologies from dispersion, the backward handicraft mode of production, is the change of the builing industry mode of production.
Substance and the developing direction of industrialization of construction industry can be summarized as " Four Modernizations ": one is design safety degree, and this is the prerequisite of industrialization of construction industry.Require that design safety degree combines with variation, component and fitting design will accomplish seriation, generalization on standardized basis; Two is component components.Adopt fabricated construction, go out various component and fitting in plant produced in advance and transport to building site and assemble; Concrete component and fitting carries out prefabrication, site prefabrication and tool-type steel form is cast-in-place combines, and the specialization in production of development component and fitting, commercialization, improve prefabrication and assembly construction degree systematically.In constructional materials, the new material that develop actively is economic and practical, payes attention to gathering materials on the spot, utilizes industrial waste, energy conservation, reduces expense; Three is mechanizations of building operation.This is the core of industrialization of construction industry, namely carries out mechanization, semi-mechanization and improved tool and combines, improve construction mechanization level systematically; Four is IT application in management.This refers to use the information-based means such as computer, and from design, be fabricated into job site installation, overall process carries out scientific organization and administration, and this is the important guarantee of industrialization of construction industry.
For a long time, the labor productivity raising speed of builing industry is slow, compare with the external same industry with other industry, most enterprises construction technology is relatively backward, and scientific and technological content is low, and efficiency of construction is poor, labour intensity is large, workmanship and security incident remain high, and workmanship common fault is of common occurrence, and construction cost constantly increases.In the process of urbanization and urban modernization, in today of engineering construction climax, constructional enterprises must from the angle improving construction efficiency, labourer's working strength of speeding up the work, reduce, General Promotion construction technology level is made an effort, as early as possible close to and catch up with external advanced construction technology level.Realize the modernization of builing industry, industrialized road must be walked, rely on scientific and technological advances, realize the modernization of builing industry with design safety degree, component component, mechanization of building operation, IT application in management.
Summary of the invention
For overcoming the defect of prior art, the utility model provides a kind of assembled architecture construction novel support system.The technical solution of the utility model is: a kind of assembled architecture construction novel support system, comprise keel, joist and bracing or strutting arrangement, the bottom welding of described joist has a standpipe, this standpipe is arranged on bracing or strutting arrangement, described keel are positioned at the top of joist, and are linked together by bindiny mechanism and joist.
Described bindiny mechanism is: the bottom of described keel is provided with T-slot, and bolt is inserted in this T-slot, and the head of described bolt is spacing by T-slot, and screw rod is provided with locking nut through after joist.
Described bracing or strutting arrangement comprises support and lower support, and described upper support leans against in described lower support, and is fixed by fixture.
Described upper support comprises outer tube and interior pipe, the lower end of described interior pipe is arranged on the inside of outer tube upper end, pipe is provided with several interior pipe locating hole in described, described outer tube is provided with the outer tube corresponding with interior pipe locating hole and locates elongated hole, outer tube, through outer tube location elongated hole and interior pipe locating hole, is connected with interior pipe by described alignment pin; At the link of described outer tube and interior pipe, described outer tube is provided with external screw thread, and described external screw thread is provided with adjusting nut, and described adjusting nut is fastening by alignment pin, in described standpipe inserts in pipe.
Described lower support is by upper backup plate, lower backup plate, oblique column, horizon bar and support bar composition, described is upper, lower backup plate by while have V-type groove rectangular slab composition, described is upper, the V-type groove of lower backup plate in the same way, and coaxially place, on described backup plate other three limit on be connected to support bar, composition A-frame, horizon bar is equipped with between other three limit of described lower backup plate and corresponding support bar, an oblique column is connected with the bottom of upper backup plate at a described wherein horizon bar, on described oblique column, cover has a fixture, described fixture and upper, described upper support surrounds by the V-type groove of lower backup plate.
Described fixture is a barb, and one end of described barb is enclosed within described oblique column, and described upper support surrounds by the described V-type groove triggering end and upper and lower backup plate.
A described wherein support bar is fixedly connected with upper backup plate, and is fixedly connected with lower backup plate by horizon bar; Other two support bar is flexibly connected with upper support bar, and is flexibly connected with lower backup plate by horizon bar.
Base plate and top board is respectively equipped with in the upper end of the lower end of described outer tube and interior pipe.
Described base plate is identical with top board, and structure is: entire body is in square, and corner is provided with chamfering, and four sides are provided with deep-slotted chip breaker, is provided with a macropore, is respectively equipped with aperture in the inner side of described chamfering at center,
Described keel entirety is in I shape, and comprise the bracket on top and the support of bottom, bracket and support are linked together by junction plate, and described bracket, support and junction plate are one-body molded; The capable groove of described T is opened on support, and the length direction along support is arranged.
The utility model has the advantages that:
1. supporting & stablizing, ensure that the safety of site operation.
2. joist, keel are easy to processing, and product quality is more easy to get control, and presentation quality is good, good endurance.
3. the saving of circulation material total amount can reach more than 80%.
4. job site is directly installed, and not only convenient but also quick, the agent structure duration can save more than 30%.
5. be conducive to environmental protection, alleviate noise pollution, site operation is more civilized.
6. arbitrarily can split by designing requirement, flexibility is large, and applicability is strong.
Accompanying drawing explanation
Fig. 1 is agent structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of the utility model top board (base plate);
Fig. 3 is the enlarged drawing at P place in Fig. 1;
Fig. 4 is the top view of joist in Fig. 1;
Fig. 5 is the lateral view of Fig. 4;
Fig. 6 is the structural representation of lower support in Fig. 1.
Detailed description of the invention
See Fig. 1 to Fig. 6, the utility model relates to a kind of assembled architecture construction novel support system, comprise keel 6, joist 7 and bracing or strutting arrangement, the bottom welding of described joist 7 has a standpipe 72, this standpipe 72 is arranged on bracing or strutting arrangement, described keel 6 are positioned at the top of joist 7, and are linked together by bindiny mechanism and joist 7.
Described bindiny mechanism is: the bottom of described keel 6 is provided with T-slot 64, and bolt 8 is inserted in this T-slot 64, and the head of described bolt 8 is spacing by T-slot 64, and screw rod is through the nut or the wing nut that are provided with locking nut 9(routine after joist).
Described keel 6 entirety is in I shape, and comprise the bracket 61 on top and the support 62 of bottom, bracket 61 and support 62 are linked together by junction plate 63, and described bracket 61, support 62 and junction plate 63 are one-body molded; Described T-slot 64 is opened on support 62, and the length direction along support 62 is arranged; Brace 64 is filled with in bracket 61.
The end of described joist 7 can be provided with U-lag 71(or through hole), screw rod is through this U-lag 71, during concrete installation, by the top of keel laid at joist, bolt is inserted in T-slot in the horizontal direction, simultaneously screw rod is through after U-lag, is provided with locking nut, realizes the fixing of keel and joist.
Described bracing or strutting arrangement comprises support 1 and lower support 2, and described upper support 1 leans against in described lower support 2, and is fixed by fixture 3.Described fixture 3 is a barb, one end of described barb is enclosed within described oblique column 25, described upper support 1 surrounds by the described V-type groove triggering end and upper and lower backup plate 23 and 24, by barb along oblique vertical rod rotation with move up and down, thus by fastening for upper support 1.
Described upper support 1 comprises outer tube 5 and interior pipe 4, the lower end of described interior pipe 4 is arranged on the inside of outer tube 5 upper end, pipe 4 is provided with several interior pipe locating hole 12 in described, described outer tube 5 is provided with the outer tube corresponding with interior pipe locating hole 12 and locates elongated hole 17, described alignment pin 14 is through outer tube location elongated hole 17 and interior pipe locating hole 12, be connected with interior pipe 4 by outer tube 5, alignment pin 14 is hollow hook, effectively can place the rotation of outer tube 5 and interior pipe 4.At the link of described outer tube 5 and interior pipe 4, described outer tube 5 is provided with external screw thread 13, and described external screw thread 13 is provided with adjusting nut 15, described adjusting nut 15 by fine setting, thus by fastening for alignment pin 14.Described adjusting nut 15 is provided with and regulates handle 16, can realize the up-down adjustment of adjusting nut 15 more easily.Described standpipe 72 inserts in interior pipe 4.
Described lower support 2 is by upper backup plate 23, lower backup plate 24, oblique column 25, horizon bar 22 and support bar 21 one-tenth, described is upper, lower backup plate 23 and 24 by while have V-type groove rectangular slab composition, described is upper, the V-type groove of lower backup plate 23 and 24 in the same way, and coaxially place, be spaced a distance, on described backup plate 23 other three limit on be connected to support bar 211, 212 and 213, composition A-frame, other three limit and the corresponding support bar 211 of described lower backup plate 24, horizon bar 22 is equipped with between 212 and 23, be respectively 221, 222 and 223, an oblique column 25 is connected with the bottom of upper backup plate 23 at described horizon bar 223, on described oblique column 25, cover has a fixture 3, described fixture 3 and upper, described upper support 1 surrounds by the V-type groove of lower backup plate 23 and 24.
Described support bar 213 is fixedly connected with upper backup plate 23, and is fixedly connected with lower backup plate 24 by horizon bar 223; Other two support bar 211 and 212 is flexibly connected with upper backup plate 23, and is flexibly connected with lower backup plate 24 by horizon bar 221 and 222.As by screw, support bar 211 is connected with lower backup plate 24 with 222 with upper backup plate 23, horizon bar 221 with 212, thus the rotation of two support bars 211 and 212 can be realized, fold, in the process of transport, can space be reduced.
Base plate 18 and top board 11 is respectively equipped with in the lower end of described outer tube 5 and the upper end of interior pipe 4.Be respectively equipped with base plate 18 and top board 11 in the lower end of described outer tube 5 and the upper end of interior pipe 4, described base plate 18 is identical with top board 11, and main body is in square, its corner is provided with chamfering, four sides are provided with deep-slotted chip breaker, are provided with a macropore at center, are respectively equipped with aperture in the inner side of described chamfering.
Leave a macropore 181 in the middle of base plate 18, can be used for placing adjustable base as increasing outer tube 5, four angles place leaves on four apertures, 182, four sides and is provided with deep-slotted chip breaker 183, and outer tube 5 is fixed on ground to improve stability by available iron nail or bolt;
Leave a macropore 111 in the middle of top board 11 to can be used for placing U-shaped adjustable jack for increasing interior pipe 4; also can place early-dismantling device to realize form removal in advance or place supporting member playing firm beam action; top board four angles place leaves four apertures 112; interior pipe 4 is fixed on wooden frame, to improve stability by available iron nail.Four sides are provided with deep-slotted chip breaker 113, for placing steel tubes, can limit steel pipe.Described outer tube 5 and interior pipe 4 are made by steel.
Described support bar 21 is made by steel.Described keel adopt aluminium alloys to be made.
Using method of the present utility model is as follows: during use, interior pipe 4 is upwards pulled out until alignment pin 14 is inserting in outer tube location elongated hole 14 and interior pipe locating hole 12 by desired height, and finely tune desired height with adjusting nut 15, top board 11 immediate roof is on other Form beam such as wood I-beam or i iron, and base plate 18 is placed on foundation ground.Open lower support 2 upper support 1 is vertically placed on upper backup plate 23 and lower backup plate 24, and barb 3 is hooked on outer tube 5 downward urgent fixing with hammer.The utility model has certain adjustable extent, with satisfied difference by the needs of support structure height.The adjustability of this scope is mainly located by the outer tube of pipe locating hole 12 and outer tube 5 in interior pipe 4 that the difference of the relative position of elongated hole realizes: interior pipe 4 and outer tube 5 are adjusted to desired height, then alignment pin 14 is inserted pipe locating hole 12 in outer tube location elongated hole 17 and correspondence, again by regulating handle 16 to rotate adjusting nut 15, until alignment pin is fastening, this completes the installation of the bracing members of certain height.If U-shaped adjustable jack can be placed in the macropore 111 of top board 11 during insufficient height or place adjustable base in the macropore 181 of base plate 18 also to place formwork system for increasing simultaneously.
During dismounting, only need rotate and regulate handle 16 to be unclamped by alignment pin 14, make adjusting nut 15 and alignment pin 14 leave gap, then alignment pin 14 is extracted, make outer tube 5 and interior pipe 4 separately, as more fastening, can with hammer.Dismantling the time standby hammer barb 3 of lower support 2, it is made to loosen, by upper support 1 and lower support 2 separately.Structure is simple, and easy accessibility, can realize quick turnover, thus reduce construction cost; In addition, this member profile is relatively regular, can reduce occupying construction plant, transport also more for convenience, is considered the utilization rate of material, is designed with different specifications and models to meet different load bearing requirements, structure met the demands and does not waste material, guaranteeing its safe and practical economy.

Claims (10)

1. an assembled architecture construction novel support system, is characterized in that, comprise keel, joist and bracing or strutting arrangement, the bottom welding of described joist has a standpipe, this standpipe is arranged on bracing or strutting arrangement, and described keel are positioned at the top of joist, and are linked together by bindiny mechanism and joist.
2. assembled architecture construction novel support system according to claim 1, it is characterized in that, described bindiny mechanism is: the bottom of described keel is provided with T-slot, and bolt is inserted in this T-slot, the head of described bolt is spacing by T-slot, and screw rod is provided with locking nut through after joist.
3. assembled architecture construction novel support system according to claim 1, it is characterized in that, described bracing or strutting arrangement comprises support and lower support, and described upper support leans against in described lower support, and is fixed by fixture.
4. assembled architecture construction novel support system according to claim 3, it is characterized in that: described upper support comprises outer tube and interior pipe, the lower end of described interior pipe is arranged on the inside of outer tube upper end, pipe is provided with several interior pipe locating hole in described, described outer tube is provided with the outer tube corresponding with interior pipe locating hole and locates elongated hole, outer tube, through outer tube location elongated hole and interior pipe locating hole, is connected with interior pipe by described alignment pin; At the link of described outer tube and interior pipe, described outer tube is provided with external screw thread, and described external screw thread is provided with adjusting nut, and described adjusting nut is fastening by alignment pin, in described standpipe inserts in pipe.
5. assembled architecture construction novel support system according to claim 3, it is characterized in that: described lower support is by upper backup plate, lower backup plate, oblique column, horizon bar and support bar composition, described is upper, lower backup plate by while have V-type groove rectangular slab composition, described is upper, the V-type groove of lower backup plate in the same way, and coaxially place, on described backup plate other three limit on be connected to support bar, composition A-frame, horizon bar is equipped with between other three limit of described lower backup plate and corresponding support bar, an oblique column is connected with the bottom of upper backup plate at a described wherein horizon bar, on described oblique column, cover has a fixture, described fixture and upper, described upper support surrounds by the V-type groove of lower backup plate.
6. assembled architecture construction novel support system according to claim 5, it is characterized in that: described fixture is a barb, one end of described barb is enclosed within described oblique column, and described upper support surrounds by the V-type groove triggering end and upper and lower backup plate.
7. assembled architecture construction novel support system according to claim 5, is characterized in that: a described wherein support bar is fixedly connected with upper backup plate, and is fixedly connected with lower backup plate by horizon bar; Other two support bar is flexibly connected with upper support bar, and is flexibly connected with lower backup plate by horizon bar.
8. assembled architecture construction novel support system according to claim 4, is characterized in that: be respectively equipped with base plate and top board in the upper end of the lower end of described outer tube and interior pipe.
9. assembled architecture construction novel support system according to claim 8, it is characterized in that: described base plate is identical with top board, structure is: entire body is in square, corner is provided with chamfering, four sides are provided with deep-slotted chip breaker, be provided with a macropore at center, be respectively equipped with aperture in the inner side of described chamfering.
10. a kind of assembled architecture construction novel support system according to claim 2, it is characterized in that: described keel entirety is in I shape, comprise the bracket on top and the support of bottom, bracket and support are linked together by junction plate, and described bracket, support and junction plate are one-body molded; Described T-slot is opened on support, and the length direction along support is arranged.
CN201520359650.5U 2015-05-29 2015-05-29 Assembled architecture construction novel support system Expired - Fee Related CN204703500U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520359650.5U CN204703500U (en) 2015-05-29 2015-05-29 Assembled architecture construction novel support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520359650.5U CN204703500U (en) 2015-05-29 2015-05-29 Assembled architecture construction novel support system

Publications (1)

Publication Number Publication Date
CN204703500U true CN204703500U (en) 2015-10-14

Family

ID=54283126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520359650.5U Expired - Fee Related CN204703500U (en) 2015-05-29 2015-05-29 Assembled architecture construction novel support system

Country Status (1)

Country Link
CN (1) CN204703500U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703404A (en) * 2016-12-30 2017-05-24 云南建投第十建设有限公司 Timber formwork early-dismantling formwork support system and construction method thereof
CN106996081A (en) * 2017-06-02 2017-08-01 中铁建大桥工程局集团第四工程有限公司 A kind of adjustable for height jacking support
CN110630037A (en) * 2019-08-28 2019-12-31 四川建筑职业技术学院 Hydraulic system of novel flat plate type structure template vertical supporting column system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703404A (en) * 2016-12-30 2017-05-24 云南建投第十建设有限公司 Timber formwork early-dismantling formwork support system and construction method thereof
CN106996081A (en) * 2017-06-02 2017-08-01 中铁建大桥工程局集团第四工程有限公司 A kind of adjustable for height jacking support
CN110630037A (en) * 2019-08-28 2019-12-31 四川建筑职业技术学院 Hydraulic system of novel flat plate type structure template vertical supporting column system

Similar Documents

Publication Publication Date Title
CN204703500U (en) Assembled architecture construction novel support system
CN202347843U (en) Building construction beam frame
CN202441052U (en) Column mould system
CN111364757A (en) Supporting structure of steel bar truss floor bearing plate
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
CN201474291U (en) Modular assembly construction template device
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN212534174U (en) Raft foundation steel bar supporting tool
CN204934670U (en) A kind of electric drill auxiliary stand
CN202755649U (en) Rebar mold-supporting frame of cantilever slab
CN211762335U (en) Assembled prefabricated component right angle board seam formwork structure that props up soon
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN201943501U (en) Steel-wood door frame
CN2672205Y (en) Adjustable building formwork base structure
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN203145040U (en) Prefabricated slab iron tower foundation convenient to disassemble and transport
CN203531380U (en) Size-adjustable formwork system with local supports arranged bellow beam and no support arranged below plate
CN110777673A (en) Adjustable support frame for cast-in-place beam template
CN203867063U (en) Assembled-type room beam structure
CN206053402U (en) Assembled architecture overlaps plate bracing frame
CN201649632U (en) Adjusting and positing frame of variable-section square column template
CN201202276Y (en) Beam side panels fixture
CN203188612U (en) Beam frame type building template system
CN201460205U (en) Wide-span reinforced concrete combined beam flange cantilever support
CN203238952U (en) Integral installation device for stair tread formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

Termination date: 20170529

CF01 Termination of patent right due to non-payment of annual fee