CN209353648U - A kind of combined moving scaffold - Google Patents

A kind of combined moving scaffold Download PDF

Info

Publication number
CN209353648U
CN209353648U CN201821765336.7U CN201821765336U CN209353648U CN 209353648 U CN209353648 U CN 209353648U CN 201821765336 U CN201821765336 U CN 201821765336U CN 209353648 U CN209353648 U CN 209353648U
Authority
CN
China
Prior art keywords
scaffold
brace
upright bar
fixed
lower brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821765336.7U
Other languages
Chinese (zh)
Inventor
王启培
高雄
王道新
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201821765336.7U priority Critical patent/CN209353648U/en
Application granted granted Critical
Publication of CN209353648U publication Critical patent/CN209353648U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of combined moving scaffold, further includes knighthead including the scaffold being made of vertical operation upright bar, and the top of the knighthead is fixed at the golden section point on operation upright bar top, and ground is fixed in bottom end;The knighthead includes upper brace and lower brace, the upper brace can be socketed on the inside of lower brace, adjusting bolt is provided in the top sidewall of the lower brace, the upper brace of the fixed locking of outer wall for adjusting bolt and passing through lower brace, connecting rod is hinged in the middle part of the lower brace, the other end of the connecting rod is fixed in same operation upright bar.The utility model can provide the scaffold of high construction operation safer protection, improve working efficiency.

Description

A kind of combined moving scaffold
Technical field
The utility model relates to construction field of tool, and in particular to a kind of combined moving scaffold.
Background technique
It is well known that jenny scaffold is widely used in construction, indoor fine fitment construction field, it is especially public to build Indoor high-altitude operation construction is built, generally requires to set up the combined moving scaffold more than more than a step high (1.8m), is used for defect Repairing, ceiling construction, coating application, curtain wall construction etc., the stability of combined moving scaffold building are directly related to work of ascending a height The safety of industry construction.
It is existing when carrying out 1.9m ~ 3.7m high construction operation at indoor and outdoor, especially outdoor ground injustice for construction personnel The dismounting of scaffold in technology is inconvenient, and multi agent cooperation is needed to be completed and shifted.
Summary of the invention
Goal of the invention: the utility model aim is in view of the deficiencies of the prior art, to provide a kind of combined moving scaffold; The assembly and disassembly of scaffold described in the utility model are completed by 1 people, and are moved easily, are transported, and then greatly improve and apply The construction efficiency of worker person.
Technical solution: a kind of combined moving scaffold described in the utility model, including what is be made of vertical operation upright bar Scaffold further includes knighthead, and the top of the knighthead is fixed at the golden section point on operation upright bar top, bottom Ground is fixed at end;The knighthead includes upper brace and lower brace, and the upper brace can be socketed on the inside of lower brace, institute It states and is provided with adjusting bolt in the top sidewall of lower brace, the fixed locking of outer wall that the adjusting bolt passes through lower brace is upper oblique Bar is hinged with connecting rod in the middle part of the lower brace, and the other end of the connecting rod is fixed in same operation upright bar.
In order to keep scaffold easy to remove, the bottom of the operation upright bar is equipped with castor.
Further preferably technical solution is the utility model, and operating platform, the behaviour are arranged inside the scaffold It include scaffold board and skirting board as platform, the scaffold board is horizontally disposed, and the section in conjunction with the skirting board is L-type structure.
Preferably, the protection height of the operating platform on the scaffold board is 120cm.
Preferably, the left and right ends setting of the skirting board bends downward the folded plate of 10cm, offers spiral shell on the folded plate Keyhole, the skirting board are fixed as one with operation upright bar by passing through the bolt of bolt hole.
The utility model has the advantages that (1) the utility model, by the way that knighthead is arranged in 4 operation upright bars of scaffold, support is oblique Bar can further reinforce the utility model, make it is suitable at the injustice of ground, the upper brace of knighthead and lower brace The position that fixed upper brace is adjusted by adjusting bolt, realizes the controllability of knighthead length, is applicable to The scaffold of different size;The utility model provides safer, more firm for 1.9m at outdoor ground injustice ~ 3.7m high construction operation Gu, more stable scaffold;(2) connecting rod, connecting rod, knighthead are set on the lower brace of the knighthead of the utility model The firm shape of triangle is formed with operation upright bar, more makes scaffold firm;The assembly and disassembly of the utility model are easy, by 1 People can be completed, and be moved easily the transport with the present apparatus, and then can be improved the construction efficiency of worker.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of scaffold described in the utility model;
Fig. 2 is the structural schematic diagram of knighthead described in the utility model;
Fig. 3 is the main view of skirting board described in the utility model;
Fig. 4 is the top view of skirting board described in the utility model.
In figure, 1- operating platform;11- operates upright bar;2- scaffold board;3- skirting board;31- fixing bolt;4- knighthead; The upper brace of 41-;Brace under 42-;43- connecting rod;44- adjusts bolt;5- castor.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model It is not limited to the embodiment.
Embodiment: a kind of combined moving scaffold is also wrapped including the scaffold 1 being made of 4 vertical operation upright bars 11 4 knightheads 4 are included, the top of knighthead 4 is fixed at the golden section point (0.618) on operation 11 top of upright bar, bottom Ground is fixed at end;2 it is found that knighthead 4 includes upper brace 41 and lower brace 42 with reference to the accompanying drawings, and upper brace 41 is socketed on oblique The inside of bar 42, the top-side of lower brace 42, which is provided with, adjusts bolt 44, adjusts the outer surface that bolt 44 passes through lower brace 42 Fixed to lock upper brace 41, the middle part of lower brace 42 is hinged with connecting rod 43, and the other end of connecting rod 43 is fixed on same operation In upright bar 11, the vertical height of connecting rod 43 is 1.3m, and tie point is all made of the turret head screw rod of M12 × 50 and fixes, and support is oblique Bar uses two sections of isometric coating steel pipes, and it is diameter * with a thickness of 25*2mm, lower brace 41 that the steel pipe of upper brace, which uses sectional dimension, Steel pipe using diameter * with a thickness of 30*2mm, upper brace 41 can be inserted into lower brace 42, and with two turret head spiral shells of M12 × 50 It is fixed that bar adjusts bolt 44;
In order to keep scaffold 1 easy to remove, the bottom of each operation upright bar 11 is respectively equipped with castor 5, and the diameter of castor 5 is 10cm, the castor 5 that wheel face width is 1.5 cun can carry out 360 ° of rotation, and castor 5 and operation upright bar 11 are using to slotting anchoring, anchor Gu length is 10cm, blending bolt is fixed.
Further preferably technical solution is the utility model, and operating platform, operating platform packet are arranged inside scaffold 1 Scaffold board 2 and skirting board 3 are included, scaffold board 2 is set to horizontal position, and the section combined with skirting board 3 is L-type structure, scaffold board 2 On operating platform protection height be 120cm;3 and 4 it is found that skirting board 3 uses width for 200mm with reference to the accompanying drawings, and thickness is 1mm's The left and right ends setting of galvanized iron sheet, skirting board 3 bends downward the folded plate of 10cm, offers bolt hole on folded plate, skirting board 3 with Operation upright bar 11 is fixed as one by passing through the fixing bolt 31 of bolt hole.
The utility model carries out on-site assembly according to actual use position, first assembles jenny scaffold 1, sets on scaffold 1 4 operation upright bars 11 are set, and castor 5 is installed respectively in the bottom end of operation upright bar 11;Then support is oblique in installation operation upright bar 11 Bar 4 is to guarantee the stabilization of scaffold 1;The scaffold board and skirting board finally installed the operating platform.
It such as needs to shift construction area, will first can be connect with operation upright bar 11 in the connecting rod 43 on knighthead 4 Bolt is dismantled, and directly can arrive specified region by movable supporting frame 1.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (5)

1. a kind of combined moving scaffold, including the scaffold being made of vertical operation upright bar, it is characterised in that: further include branch Brace is supportted, the top of the knighthead is fixed in operation upright bar, and ground is fixed in bottom end;The knighthead includes upper Brace and lower brace, the upper brace can be socketed on the inside of lower brace, be provided with adjusting in the top sidewall of the lower brace Bolt, it is described to adjust outer wall fixed locking upper brace of the bolt across lower brace, it is hinged with connecting rod in the middle part of the lower brace, The other end of the connecting rod is fixed in same operation upright bar.
2. a kind of combined moving scaffold according to claim 1, it is characterised in that: the bottom of the operation upright bar is equipped with Castor.
3. a kind of combined moving scaffold according to claim 1, it is characterised in that: setting operation inside the scaffold Platform, the operating platform include scaffold board and skirting board, and the scaffold board is horizontally disposed, the section in conjunction with the skirting board For L-type structure.
4. a kind of combined moving scaffold according to claim 3, it is characterised in that: the operating platform on the scaffold board Protection height be 120cm.
5. a kind of combined moving scaffold according to claim 4, it is characterised in that: the left and right ends of the skirting board are set The folded plate for bending downward 10cm is set, bolt hole is offered on the folded plate, the skirting board and operation upright bar are by passing through bolt The bolt in hole is fixed as one.
CN201821765336.7U 2018-10-30 2018-10-30 A kind of combined moving scaffold Active CN209353648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821765336.7U CN209353648U (en) 2018-10-30 2018-10-30 A kind of combined moving scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821765336.7U CN209353648U (en) 2018-10-30 2018-10-30 A kind of combined moving scaffold

Publications (1)

Publication Number Publication Date
CN209353648U true CN209353648U (en) 2019-09-06

Family

ID=67782203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821765336.7U Active CN209353648U (en) 2018-10-30 2018-10-30 A kind of combined moving scaffold

Country Status (1)

Country Link
CN (1) CN209353648U (en)

Similar Documents

Publication Publication Date Title
CN105298148A (en) Installing machine for light partition wallboard
CN207944694U (en) Anti-dumping inclined architectural engineering scaffold
CN107060098A (en) A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN107013051A (en) A kind of prefabricated house
CN209353648U (en) A kind of combined moving scaffold
CN206530078U (en) A kind of support meanss
CN209990179U (en) Construction safety protection support frame
CN209429487U (en) A kind of scaffold of architectural engineering
CN212002185U (en) Construction equipment is increased to landing leg behind hanging flower basket
CN86203954U (en) Wall bearing self-lifting scaffold
CN214658788U (en) Retractable's concrete floor formwork structure
CN211143684U (en) A remove scaffold frame for building engineering
CN209413302U (en) Movable side wall form support system with operation platform
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN207526085U (en) A kind of attachment type raise scaffold structure
CN220226918U (en) Assembled shield plugging trolley
CN219118688U (en) Construction frame for construction of building engineering high place
CN112538960A (en) Make things convenient for dismouting and firm scaffold frame
CN219973823U (en) Construction scaffold erecting system
CN206873987U (en) A kind of prefabricated house
CN218175600U (en) Suspension frame for welding arch rib segments
CN210798239U (en) Truss removes operation platform
CN210918169U (en) Outer frame in lighting well

Legal Events

Date Code Title Description
GR01 Patent grant