CN219118688U - Construction frame for construction of building engineering high place - Google Patents
Construction frame for construction of building engineering high place Download PDFInfo
- Publication number
- CN219118688U CN219118688U CN202221576585.8U CN202221576585U CN219118688U CN 219118688 U CN219118688 U CN 219118688U CN 202221576585 U CN202221576585 U CN 202221576585U CN 219118688 U CN219118688 U CN 219118688U
- Authority
- CN
- China
- Prior art keywords
- construction
- base
- support
- building engineering
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 64
- 238000009434 installation Methods 0.000 claims description 7
- 239000003381 stabilizer Substances 0.000 claims description 2
- 230000009194 climbing Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 206010063385 Intellectualisation Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a construction frame for construction of a building engineering high place, which comprises a base and an operation platform, wherein the base is vertically and fixedly provided with brackets, the brackets are fixedly provided with four brackets, the operation platform is fixedly supported by the brackets and horizontally installed, the operation platform is vertically and fixedly provided with a rail, the rail is fixedly installed at the corners around the operation platform, the rail is provided with a cross rod, the cross rods are adjustably installed by fixing sleeves, side brackets are crossly installed between the brackets, the side brackets are fixedly arranged on the brackets by fixing nails, and the bottom of the base is fixedly provided with supporting legs. The utility model solves the problem that the traditional climbing operation platform needs to be assembled on site when in use, saves a large amount of assembly time, has higher flexibility, can move at will, can adjust the height of the cross rod without adjusting at will according to the height of a user, and has wider application range and stronger practicability.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a construction frame for high-rise construction of constructional engineering.
Background
The building engineering is the engineering entity for planning, surveying, designing and constructing, completing and installing the building and its matched line, pipeline and equipment. But also the construction engineering of various houses and buildings, which is also called building workload. This part of investment must be made by the construction activity. The building engineering of the house building comprises factory buildings, theatres, hotels, shops, schools, hospitals, houses and the like, and the building, reconstruction or expansion of the building can be realized through construction activities; the term "auxiliary structure facilities" refers to water towers, bicycle sheds, water tanks and the like which are matched with the house building. The installation of the lines, the pipelines and the equipment refers to the installation activities of the lines, the pipelines and the equipment, such as electricity, water supply and drainage, heating and ventilation, communication, intellectualization, elevators and the like, which are matched with the house building and the auxiliary facilities thereof.
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. The site of construction is referred to as a "building site" or "job site," also known as a worksite. On the worksite, the work platform is required to be used for high-altitude operation, however, most of traditional work platforms are scaffolds built on site, the disassembly and assembly are time-consuming and labor-consuming, a large range of installation is required, the cost is high, the flexibility is poor, and the use requirement is difficult to meet.
Based on the construction frame, the utility model designs a construction frame for high-rise construction of the building engineering so as to solve the problems.
Disclosure of Invention
The utility model aims to provide a construction frame for construction at a high place of a building engineering, which aims to solve the problems that the traditional operation platform proposed in the background technology is mostly a scaffold built on site, the disassembly and the assembly are time-consuming and labor-consuming, the assembly is required to be installed in a large range at one time, the cost is high, the flexibility is poor, and the use requirement is difficult to meet.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a scaffold for construction of building engineering eminence, includes base and work platform, perpendicular fixed mounting has the support on the base, support fixed mounting has four, work platform passes through support fixed support and horizontal installation, perpendicular fixed mounting has the rail on the work platform, rail fixed mounting is in work platform corner all around, install the horizontal pole on the rail, the horizontal pole passes through the adjustable installation of fixed cover, cross mounting has the side support between the support, the side support passes through the staple to be fixed on the support, base bottom fixed mounting has the stabilizer blade.
As a further scheme of the utility model, limit holes are formed in the fence at equal intervals, and limit adjusting bolts matched with the limit holes are arranged on the fixing sleeve.
As a further scheme of the utility model, one side of the working platform is provided with a ladder frame, and the ladder frame is movably arranged on the cross rod through a sliding sleeve.
As a further scheme of the utility model, the cross rod is provided with a storage box, and the storage box is slidably arranged on the cross rod.
As a further scheme of the utility model, the support leg comprises a mounting sleeve fixedly welded with the base, an adjusting seat is arranged in the mounting sleeve, and external threads are integrally formed on the adjusting seat.
According to the utility model, the universal wheel is arranged on the bottom bolt of the base, and the braking device for preventing the base from moving is arranged on the universal wheel.
Compared with the prior art, the utility model has the beneficial effects that:
the construction frame for construction engineering high-rise construction solves the problem that a traditional climbing operation platform needs to be assembled on site when in use, saves a large amount of assembly time, has higher flexibility, can be moved randomly, can adjust the height of the cross rod without being adjusted randomly according to the height of a user, and has wider application range and higher practicability.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic view of the overall structure of a construction frame for high-rise construction of a construction project according to the present utility model;
FIG. 2 is a partial schematic view of a construction frame for high-rise construction of a construction project according to the present utility model;
fig. 3 is a schematic view of a leg of a construction frame for high-rise construction of a construction project according to the present utility model.
In the drawings, the list of components represented by the various numbers is as follows:
1. a base; 2. a bracket; 3. an operation platform; 4. a fence; 5. a support leg; 6. a cross bar; 7. a fixed sleeve; 8. limit adjusting bolt; 9. a storage box; 10. a side strut; 11. fixing nails; 12. a ladder frame; 13. a sliding sleeve; 14. a universal wheel; 15. a limiting hole; 16. a mounting sleeve; 17. an adjusting seat; 18. and (5) external threads.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms of "top", "bottom", "one side", "the other side", "front", "rear", "middle portion", "inner", "top", "bottom", etc., are directions or positional relationships based on the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
As shown in fig. 1 to 3, the present utility model provides a construction frame for high-rise construction of constructional engineering, in which,
FIG. 1 is a schematic view of the overall structure of a construction frame for high-rise construction of a construction project according to the present utility model; FIG. 2 is a partial schematic view of a construction frame for high-rise construction of a construction project according to the present utility model; FIG. 3 is a schematic view of the legs of a construction frame for high-rise construction of a construction project according to the present utility model;
from fig. 1 to 3, in practical application, a construction frame for construction of high-altitude construction of constructional engineering comprises a base 1 and an operation platform 3, wherein four supports 2 are fixedly arranged on the base 1, the operation platform 3 is fixedly supported and horizontally arranged through the supports 2, a fence 4 is fixedly arranged on the operation platform 3, the fence 4 is fixedly arranged at corners around the operation platform 3, cross bars 6 are arranged on the fence 4, the cross bars 6 are adjustably arranged through fixing sleeves 7, side supports 10 are arranged between the supports 2 in a crossed mode, the side supports 10 are fixed on the supports 2 through fixing nails 11, and supporting feet 5 are fixedly arranged at the bottom of the base 1.
Limiting holes 15 are formed in the rail 4 at equal intervals, and limiting adjusting bolts 8 matched with the limiting holes 15 are arranged on the fixing sleeve 7. A ladder frame 12 is arranged on one side of the working platform 3, and the ladder frame 12 is movably arranged on the cross bar 6 through a sliding sleeve 13. The cross bar 6 is provided with a storage box 9, and the storage box 9 is slidably mounted on the cross bar 6. The support leg 5 comprises a mounting sleeve 16 fixedly welded with the base 1, an adjusting seat 17 is arranged in the mounting sleeve 16, and external threads 18 are integrally formed on the adjusting seat 17. The universal wheel 14 is mounted on the bottom bolt of the base 1, and a braking device for preventing the base 1 from moving is mounted on the universal wheel 14.
The construction frame for construction engineering high-rise construction solves the problem that a traditional climbing operation platform needs to be assembled on site when in use, saves a large amount of assembly time, has higher flexibility, can be moved randomly, can adjust the height of the cross rod without being adjusted randomly according to the height of a user, and has wider application range and higher practicability.
The preferred embodiments of the utility model disclosed above are intended only to assist in the explanation of the utility model. The preferred embodiments are not exhaustive or to limit the utility model to the precise form disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, to thereby enable others skilled in the art to best understand and utilize the utility model. The utility model is limited only by the claims and the full scope and equivalents thereof.
Claims (6)
1. The utility model provides a scaffold for construction of building engineering eminence, includes base (1) and work platform (3), its characterized in that: the utility model discloses a support, including base (1) and work platform, perpendicular fixed mounting has support (2) on base (1), support (2) fixed mounting has four, work platform (3) are passed through support (2) fixed support and horizontal installation, perpendicular fixed mounting has rail (4) on work platform (3), rail (4) fixed mounting is in work platform (3) corner all around, install horizontal pole (6) on rail (4), horizontal pole (6) are through fixed cover (7) adjustable installation, cross mounting has side stand (10) between support (2), side stand (10) are fixed through staple (11) on support (2), base (1) bottom fixed mounting has stabilizer blade (5).
2. The construction frame for high-rise construction of building engineering according to claim 1, wherein: limiting holes (15) are formed in the rail (4) at equal intervals, and limiting adjusting bolts (8) matched with the limiting holes (15) are arranged on the fixing sleeve (7).
3. The construction frame for high-rise construction of building engineering according to claim 1, wherein: a ladder frame (12) is arranged on one side of the working platform (3), and the ladder frame (12) is movably arranged on the cross rod (6) through a sliding sleeve (13).
4. The construction frame for high-rise construction of building engineering according to claim 1, wherein: the storage box (9) is arranged on the cross rod (6), and the storage box (9) is slidably mounted on the cross rod (6).
5. The construction frame for high-rise construction of building engineering according to claim 1, wherein: the support leg (5) comprises a mounting sleeve (16) fixedly welded with the base (1), an adjusting seat (17) is arranged in the mounting sleeve (16), and external threads (18) are integrally formed on the adjusting seat (17).
6. The construction frame for high-rise construction of building engineering according to claim 1, wherein: the universal wheel (14) is mounted on the bottom bolt of the base (1), and the brake device for preventing the base (1) from moving is mounted on the universal wheel (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221576585.8U CN219118688U (en) | 2022-06-23 | 2022-06-23 | Construction frame for construction of building engineering high place |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221576585.8U CN219118688U (en) | 2022-06-23 | 2022-06-23 | Construction frame for construction of building engineering high place |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219118688U true CN219118688U (en) | 2023-06-02 |
Family
ID=86524342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221576585.8U Expired - Fee Related CN219118688U (en) | 2022-06-23 | 2022-06-23 | Construction frame for construction of building engineering high place |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219118688U (en) |
-
2022
- 2022-06-23 CN CN202221576585.8U patent/CN219118688U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201334747Y (en) | Main beam with light-steel structure for housing floor slab | |
CN219118688U (en) | Construction frame for construction of building engineering high place | |
CN207176922U (en) | A kind of modular architectural | |
CN212224668U (en) | System is assembled on super large box steel column regularization ground | |
CN101424099B (en) | Light steel structure house with outdoor corridor bottom girder | |
CN86203954U (en) | Wall bearing self-lifting scaffold | |
CN211143684U (en) | A remove scaffold frame for building engineering | |
CN105442873A (en) | Lightweight steel structure awning of gas station | |
CN209353648U (en) | A kind of combined moving scaffold | |
CN219365355U (en) | Combined scaffold for constructional engineering | |
CN210067401U (en) | Positioning and adjusting device for climbing scaffold | |
CN212642061U (en) | Scaffold frame that engineering construction operation was used is built in room | |
CN220395120U (en) | Overhanging type operation platform | |
CN221194376U (en) | Combined type adjustable balcony safety protection plate | |
CN220469346U (en) | Building scaffold component | |
CN210622277U (en) | Hanging flower basket high support fixing device | |
CN115045421B (en) | Outdoor glass curtain wall structure and construction method | |
CN219411757U (en) | Attached lifting scaffold | |
CN221053135U (en) | Overhanging type operation platform for outer wall decoration construction | |
CN213952887U (en) | Scaffold frame for building engineering convenient to carry | |
CN217027984U (en) | Movable overhanging construction platform | |
CN213234201U (en) | Building engineering safety construction platform | |
CN219863916U (en) | Combined building table | |
CN219931752U (en) | Assembled cat ladder | |
CN216986897U (en) | Fixed type climbing frame spraying device for house construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Room 313, No. 1712, North Panyu Avenue, Qiaonan Street, Panyu District, Guangzhou, Guangdong 510000 Patentee after: Guangdong Tianzheng Construction Engineering Co.,Ltd. Address before: 510000 404, No. 2, 1451 North Panyu Avenue, Qiaonan Street, Panyu District, Guangzhou, Guangdong Province Patentee before: Guangdong Runfu Construction Engineering Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230602 |