CN213837659U - Two side baskets of hanging of precast beam template high altitude construction - Google Patents
Two side baskets of hanging of precast beam template high altitude construction Download PDFInfo
- Publication number
- CN213837659U CN213837659U CN202021375091.4U CN202021375091U CN213837659U CN 213837659 U CN213837659 U CN 213837659U CN 202021375091 U CN202021375091 U CN 202021375091U CN 213837659 U CN213837659 U CN 213837659U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- square tube
- socket
- precast beam
- basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a basket is hung to two sides of precast beam template high altitude construction belongs to construction application technical field, and it can replace full hall scaffold frame when the precast beam side form board is under construction at the assembled factory building. The utility model discloses a base, pole setting, horizontal pole, socket joint side pipe, socket joint interior side pipe. The two square pipes are provided with different corresponding through holes according to different sizes of beam sections, and the square pipes provided with the through holes are fixed on the operating platforms on the two sides of the hanging basket on the two sides, so that the corresponding through holes can be selected according to different beam sections and are fixed on the precast beam by using the operating platforms on the two sides of the hanging basket connected by bolts. The utility model discloses can be applicable to the precast beam high altitude construction of different cross-sections, and use this string of basket and need not set up full hall scaffold frame, practice thrift the cost.
Description
Technical Field
The utility model belongs to the application field of construction technology, concretely relates to two sides of precast beam template high altitude construction hang basket.
Background
As the construction industry of various countries is developed more and more. More and more plants adopt an assembly type structure, and a template needs to be erected at the joint of a laminated slab or a truss floor slab and a precast beam to prevent slurry leakage during concrete pouring. The factory building area is large, the floor is high, the cost for building a full scaffold is high, the difficulty is high, and the safety is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
In order to solve the prior art problem, the utility model aims to overcome the not enough of prior art existence, provide a two side baskets of hanging of precast beam template high altitude construction, dismantled and assembled is the high altitude construction device of an adjustable width, can replace full hall scaffold frame, practices thrift the cost. The device system can prefabricate and finish the assembly outside the site, and has simple manufacturing process, effectively improves the working efficiency and shortens the construction period.
In order to achieve the purpose of the invention, the utility model adopts the following technical scheme:
a prefabricated beam template high-altitude operation double-side hanging basket comprises a left side hanging basket and a right side hanging basket, wherein the left side hanging basket and the right side hanging basket are fastened and connected through at least two sets of inserting structure devices, the top end of the left side hanging basket is fixedly connected with a socket outer square tube, the top end of the right side hanging basket is fixedly connected with a socket inner square tube, the socket inner square tube is inserted into the socket outer square tube, bolts are inserted into through aligned through holes preset at inserting positions of the socket square tubes for fastening, a splicing structure combined cross beam is formed, the left side hanging basket and the right side hanging basket are fastened together, and a splicing structure combined cross beam is erected on a prefabricated beam template for fixing, so that a carrying pole type hanging basket is formed; each side hanging basket is provided with at least 4 upright posts which are mainly fixedly connected with four corner positions of the base, first cross rods are arranged above the base and are fixedly connected with adjacent upright posts in sequence to form a crosspiece upright post type connecting structure, and a middle layer reinforcing rib connecting structure of the hanging basket is formed; and the top end of the vertical rod is fixedly connected with the second cross rod, so that the second cross rod and the socket inner square tube or the second cross rod and the socket inner square tube are fixedly connected with the vertical rod to form a top-layer hanging basket upper edge structure, and the left side hanging basket and the right side hanging basket form two-side hanging basket two-side operation platforms.
As the utility model discloses preferred technical scheme, the plug-in connection portion of square pipe outside the socket joint and the socket joint in the socket joint sets up two at least through-holes respectively, through the through-hole construction bolt that the square pipe is different outside the socket joint in the alignment socket joint and the socket joint, hangs basket and right side to the left side and hangs the distance between the basket and adjust, adapts to the different cross-section width size of precast beam template, carries out the installation that the basket was hung to the two sides of high altitude construction.
As the utility model discloses preferred technical scheme, but the square tube inserts the outer side pipe of socket joint and adopts and to unload the structure and carry out fastening connection in the interior side pipe of socket joint, and the fixed connection mode between other parts adopts welding integral type fixed connection structure.
As the utility model discloses preferred technical scheme, two sets of grafting constructional device all hang the socket joint outside pipe of basket and the socket joint inside pipe connection of basket is hung on the right side for the left side.
As the utility model discloses preferred technical scheme, in two sets of grafting constructional device, one of them set is the socket joint square tube of basket is hung with the right side for the left side and is hung the socket joint square tube connection in the basket, and another set is the socket joint square tube of basket is hung with the left side for the right side and is hung the socket joint square tube connection in the basket.
Compared with the prior art, the utility model, have following substantive characteristics and advantage:
1. the utility model discloses the two side baskets of hanging of device precast beam template high altitude construction reasonable in design is effective, and the construction is simple; the construction operation platforms on the two sides are manufactured, the used construction technology can be mainly welding, the prefabrication method is simple, the cost is low, the hanging baskets on the two sides can be manufactured in advance, the work efficiency is improved, and the construction period is shortened;
2. the utility model has the advantages that the socket square tube and the socket inner square tube are provided with a plurality of through holes, different through holes can be selected according to the width of the cross section of different precast beam templates, so the double-side hanging basket is suitable for precast beam templates with different cross sections, and the adaptability is strong;
3. the double-side hanging basket of the device can be used for the construction of prefabricated beam templates of the assembly type factory building, and a full scaffold is not required to be erected, so that the cost is saved;
4. the device technical scheme of the utility model simple structure, convenient to use maintains simply.
Drawings
Fig. 1 is the utility model discloses a two side structural sketch of hanging basket of precast beam template high altitude construction.
Fig. 2 is the embodiment of the present invention provides an installation schematic diagram of a socket structure of a socket square tube.
Detailed Description
The preferred embodiments of the present invention are detailed as follows:
the first embodiment is as follows:
in this embodiment, referring to fig. 1 and 2, a prefabricated beam template overhead operation double-side hanging basket comprises a left side hanging basket and a right side hanging basket, wherein the left side hanging basket and the right side hanging basket are fastened and connected through at least two sets of inserting structure devices, the top end of the left side hanging basket is fixedly connected with a socket outer square tube 5, the top end of the right side hanging basket is fixedly connected with a socket inner square tube 6, the socket inner square tube 6 is inserted into the socket outer square tube 5, bolts are inserted into through alignable through holes 7 preset at inserting positions of the socket square tubes for fastening to form an inserting structure combined cross beam, the left side hanging basket and the right side hanging basket are fastened together, and the inserting structure combined cross beam is erected on a prefabricated beam template 8 for fixing to form a shoulder-pole type double-side hanging basket; each side hanging basket is provided with at least 4 upright posts 4, the upright posts 4 are mainly fixedly connected with four corner positions of the base 1, first cross rods 2 are arranged above the base 1, and each first cross rod 2 is fixedly connected with the adjacent upright post 4 in sequence to form a crosspiece upright post type connecting structure so as to form a middle layer reinforcing rib connecting structure of the hanging basket; and the top end of the vertical rod 4 is fixedly connected with the second cross rod 3, so that the second cross rod 3 and the socket inner square tube 6 or the second cross rod 3 and the socket inner square tube 6 are fixedly connected with the vertical rod 4 to form a top layer hanging basket upper edge structure, and the left side hanging basket and the right side hanging basket form two-side hanging basket two-side operation platforms. The two sides of this embodiment precast beam template high altitude construction hang basket can be applicable to precast beam template high altitude construction, and uses this to hang the basket and need not set up full hall scaffold frame, practices thrift the cost.
Example two
This embodiment is substantially the same as the first embodiment, and is characterized in that:
in this embodiment, the spliced portion of square pipe 6 outside the socket joint and the square pipe 5 outside the socket joint sets up two at least through-holes 7 respectively, through the through-hole 7 construction bolt that the square pipe 6 is managed in the socket joint and the square pipe 5 is different outside the socket joint, hangs basket and right side on the left side and hangs the distance between the basket and adjust, adapts to the different cross-sectional width size of precast beam template 8, carries out the installation of the two sides of high altitude construction string basket. The two-side hanging basket for the high-altitude operation of the precast beam template can select different through holes 7 according to the sections of different precast beam templates, and then the operation platforms on the two sides are fixed on the precast beam template through bolts. The two-side hanging basket for the precast beam template in the high-altitude operation is common in field, can be precast outside the field, is simple in construction technology, and is manufactured on the two operation platforms. Because the socket square tube and the socket inner square tube are provided with the plurality of through holes, different through holes can be selected according to the sections of different precast beam templates, and then the operation platforms at two sides are connected by bolts and fixed on the precast beam templates, so that the precast beam template with the through holes is suitable for precast beam templates without sections. The double-side hanging basket can replace a full scaffold in the construction of prefabricated beam side templates of a factory building, and cost is saved.
EXAMPLE III
This embodiment is substantially the same as the previous embodiment, and is characterized in that:
in this embodiment, the female inner tube 6 is inserted into the female outer tube 5 and fastened by a detachable structure, and the other components are fixedly connected by a welding-integrated fixed connection structure. Welding a vertical rod 4 on a base 1 in advance, and then welding a first cross rod 2 and a second cross rod 3 on the vertical rod 4 to form an operation platform on two sides of the hanging basket on two sides; and a plurality of through holes 7 are formed in the socket outer square tube 5 and the socket inner square tube 6, and the socket square tube 5 and the socket inner square tube 6 which are provided with the through holes are welded on the vertical rods 4 of the two side operation platforms. The used construction technology can mainly be welding, the prefabrication method is simple, the cost is low, the hanging baskets on the two sides can be manufactured in advance, the work efficiency is improved, and the construction period is shortened.
Example four
This embodiment is substantially the same as the previous embodiment, and is characterized in that:
in this embodiment, the two sets of inserting structure devices are connected by the socket outer square tube 5 of the left hanging basket and the socket inner square tube 6 of the right hanging basket. This embodiment adopts square pipe grafting structure, forms grafting structure combination span beam, makes the two sides of precast beam template high altitude construction hang the basket and can be applicable to precast beam high altitude construction, and uses this string basket and need not set up full hall scaffold frame, practices thrift the cost.
EXAMPLE five
This embodiment is substantially the same as the previous embodiment, and is characterized in that:
in this embodiment, in two sets of insertion connection structure devices, one set of the female external square tube 5 for the left hanging basket is connected with the female internal square tube 6 for the right hanging basket, and the other set of the female external square tube 5 for the right hanging basket is connected with the female internal square tube 6 for the left hanging basket. The present embodiment is particularly different from the fourth embodiment, so that another optional or alternative structure of the plug structure of the fourth embodiment meets the diversity of the plug structure combination span beam formed by the plug structure.
The above description is combined with the drawings to explain the embodiment of the present invention, but the present invention is not limited to the above embodiments, and can also be according to the present invention to make various changes in the purpose of creation, all according to the present invention the utility model discloses change, modification, substitution, combination or simplification of doing under the spirit essence and principle of technical scheme the present invention should be equivalent replacement mode, as long as accord with the utility model discloses a utility model aims at, as long as do not deviate from the technical principle and utility model concept, all belong to the protection scope of the present invention.
Claims (5)
1. The utility model provides a two side baskets of hanging of precast beam template high altitude construction which characterized in that: the hanging basket comprises a left hanging basket and a right hanging basket, wherein the left hanging basket and the right hanging basket are fastened and connected through at least two sets of inserting structure devices, the top end of the left hanging basket is fixedly connected with a socket outer square tube (5), the top end of the right hanging basket is fixedly connected with a socket inner square tube (6), the socket inner square tube (6) is inserted into the socket outer square tube (5), bolts are inserted into through holes (7) which are preset in inserting positions of the socket square tubes and can be aligned to fasten the socket outer square tube, an inserting structure combined cross beam is formed, the left hanging basket and the right hanging basket are fastened together, the inserting structure combined cross beam is erected on a precast beam template (8) to be fixed, and a shoulder pole type double-side hanging basket is formed; each side hanging basket is provided with at least 4 upright rods (4), the upright rods (4) are mainly fixedly connected with four corner positions of the base (1), first cross rods (2) are arranged above the base (1), and each first cross rod (2) is sequentially and fixedly connected with the adjacent upright rods (4) to form a crosspiece upright column type connecting structure so as to form a middle layer reinforcing rib connecting structure of the hanging basket; and the top end of the vertical rod (4) is fixedly connected with the second cross rod (3), so that the second cross rod (3) and the socket inner square tube (6) or the second cross rod (3) and the socket inner square tube (6) are fixedly connected with the vertical rod (4), an upper edge structure of the top-layer hanging basket is formed, and the left-side hanging basket and the right-side hanging basket form two-side hanging basket two-side operation platforms.
2. The precast beam formwork aerial work double-side hanging basket according to claim 1, is characterized in that: the socket joint of square pipe (6) outside the socket joint and the socket joint of square pipe (5) set up two at least through-holes (7) respectively in the socket joint, through lining up the socket joint square pipe (6) and the socket joint square pipe (5) different through-hole (7) construction bolt, hang the basket and adjust the distance between the basket on the left side and the right side, adapt to precast beam template (8) different cross-section width size, carry out the installation that the basket was hung to the high altitude construction both sides.
3. The precast beam formwork aerial work double-side hanging basket according to claim 1, is characterized in that: except that the socket inner square tube (6) is inserted into the socket outer square tube (5) and fastened and connected by adopting a detachable structure, the other parts are fixedly connected by adopting a welding integrated fixed connection structure.
4. The precast beam formwork aerial work double-side hanging basket according to claim 1, is characterized in that: the two sets of the inserting structure devices are connected by a socket outer square tube (5) of the left hanging basket and a socket inner square tube (6) of the right hanging basket.
5. The precast beam formwork aerial work double-side hanging basket according to claim 1, is characterized in that: in the two sets of insertion connection structure devices, one set of the insertion outer square tube (5) of the left hanging basket is connected with the insertion inner square tube (6) of the right hanging basket, and the other set of the insertion outer square tube (5) of the right hanging basket is connected with the insertion inner square tube (6) of the left hanging basket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021375091.4U CN213837659U (en) | 2020-07-14 | 2020-07-14 | Two side baskets of hanging of precast beam template high altitude construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021375091.4U CN213837659U (en) | 2020-07-14 | 2020-07-14 | Two side baskets of hanging of precast beam template high altitude construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213837659U true CN213837659U (en) | 2021-07-30 |
Family
ID=76987221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021375091.4U Expired - Fee Related CN213837659U (en) | 2020-07-14 | 2020-07-14 | Two side baskets of hanging of precast beam template high altitude construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213837659U (en) |
-
2020
- 2020-07-14 CN CN202021375091.4U patent/CN213837659U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208430687U (en) | Self-anchored type suspended-cable structure support construction and system | |
WO2019206193A1 (en) | Prefabricated wall panel, connection structure thereof and construction method therefor | |
CN103850363B (en) | Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall | |
CN109372129A (en) | The novel full assembly concrete frame joint of one kind and its construction method | |
CN207846687U (en) | Prefabricated assembled modularization frame node | |
CN107327068B (en) | Steel structure truss string system roof ceiling structure and construction method thereof | |
CN107060098A (en) | A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform | |
CN106801436A (en) | A kind of construction method for overlapping assembled underground pipe gallery | |
CN106013441A (en) | Connecting casing with steel structure | |
CN114809699A (en) | Construction method of assembly type outer facade enclosure system for reconstruction of upper part of super high-rise building | |
CN111058555A (en) | Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof | |
CN108179842A (en) | A kind of assembled steel tube confined concrete models and its production technology | |
CN213837659U (en) | Two side baskets of hanging of precast beam template high altitude construction | |
CN212450188U (en) | Fast-assembling well frame construction | |
CN206128303U (en) | Modularization integrated configuration building system | |
CN216194062U (en) | Temporary support structure | |
CN114033171B (en) | Clamp type triangular support system of cantilever roof panel and construction method thereof | |
CN214034927U (en) | Modularization concatenation shelter | |
CN105507428B (en) | The house and assemble method of pluggable assembling | |
CN114439202A (en) | Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system | |
CN209443577U (en) | A kind of steel structure member | |
CN207633583U (en) | A kind of connection structure of prefabricated post and prefabricated partition wall | |
CN106088398A (en) | A kind of combined wall board | |
CN213869033U (en) | High-altitude edge surrounding structure of assembly type factory building | |
CN214940975U (en) | Beam column node reinforcing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210730 |