CN214034927U CN202022435830.0U CN202022435830U CN214034927U CN 214034927 U CN214034927 U CN 214034927U CN 202022435830 U CN202022435830 U CN 202022435830U CN 214034927 U CN214034927 U CN 214034927U
Authority
CN
China
Prior art keywords
module
wall body
section bar
base
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022435830.0U
Other languages
Chinese (zh)
Inventor
孙宇飞
司新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Sanjune Electronic Technology Co ltd
Original Assignee
Xi'an Sanjune Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Sanjune Electronic Technology Co ltd filed Critical Xi'an Sanjune Electronic Technology Co ltd
Priority to CN202022435830.0U priority Critical patent/CN214034927U/en
Application granted granted Critical
Publication of CN214034927U publication Critical patent/CN214034927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a modularization concatenation shelter, including base module, corner post module, wall body module, door frame module, partition wall module, circle roof beam module, top module, each vertical corner post module of installing in base module upper end four corners, and each vertical wall body module of installing in both sides around the base module upper end, the vertical door frame module of installing in the anterior left side of base module upper end. The utility model discloses simple structure adopts the modular design, can realize dismantling more fast, is convenient for remove, and top module design has the rainwater groove, can prevent that the rainwater from the gap infiltration between the top module, influences the effect of living in, and the pedestal mounting has flexible jib, and the transportation of the base module of being convenient for, and reduced occuping of space, the base module reservation has the cable through wires hole, has avoided outside threading to increase holistic aesthetic property.

Description

Modularization concatenation shelter
Technical Field
The utility model relates to a prefabricated cabin technical field especially relates to a modularization concatenation shelter.
Background
The modularization splicing shelter is mainly applied to a mobile data center, modularization, green energy conservation and automation are trends of future development of the data center, supply is core content of control cost according to needs, the modularization splicing shelter can be allocated according to needs, a module required currently can be preferentially established at the initial stage of data center establishment, other modules can be continuously added if capacity expansion is carried out at the later stage, traditional data center construction is disposable in investment, and flexibility is poor. For example: under the traditional mode, the computer lab utilizes office building space often, often has that the building bearing capacity is not enough, unfavorable factors such as architectural design is unreasonable, and traditional mode period is long in addition, and later stage operation cost is high, the operation maintenance is complicated scheduling problem, to the computer lab construction that increases temporarily, has very big limitation. The flexibility of the modular splicing shelter, the rapid assembly of the modular splicing shelter as a data center shelter can effectively solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a modularization concatenation shelter to solve above-mentioned technical problem.
In order to realize the purpose, the utility model adopts the following technical scheme: the utility model provides a modularization concatenation shelter, includes base module, corner post module, wall body module, door frame module, partition wall module, circle roof beam module, apical module, each vertical angle post module of installing in base module upper end four corners, and each vertical wall body module of installing in both sides around the base module upper end, the anterior left side of base module upper end is vertical installs the door frame module, and each vertical partition wall module of installing in the base module upper end left and right sides, partition wall module upper end, and wall body module upper end horizontal installation have a circle roof beam module, circle roof beam module middle part horizontal installation has a plurality of apical modules.
On the basis of the technical scheme, the base module comprises a main beam, a connecting piece, a telescopic hanging rod, a ground copper bar, cable threading holes and ventilation holes, wherein a plurality of connecting pieces are vertically arranged in the middle of the main beam, the telescopic hanging rods are respectively arranged on the left side and the right side of the front end and the rear end of the main beam, the ground copper bar is horizontally arranged on the right side of the front end of the main beam, a plurality of rib plates are horizontally arranged between the upper portion and the lower portion of the main beam, a plurality of cable threading holes are formed in the middle of the main beam in a transverse equidistant mode, and the ventilation holes are formed in the rear side of the main beam.
On the basis of the technical scheme, the corner post module comprises a corner post, a corner post extrusion profile, a rectangular profile, a base connection transition piece, a ring beam connection transition piece and a downpipe, wherein the corner post is formed by fixedly connecting a root corner post extrusion profile and the rectangular profile through bolts, the base connection transition piece is installed at the lower end of the corner post, the ring beam connection transition piece is installed at the upper end of the corner post, and the downpipe vertically penetrates through the rectangular profile.
On the basis of the technical scheme, the wall body module and the partition wall module comprise wall body profiles, wall body upper end connecting pieces and wall body lower end connecting pieces, prefabricated holes are reserved in the wall body profiles, the wall body profiles are connected with the corner post modules, the wall body modules and the partition wall modules through the prefabricated holes, a plurality of wall body profiles are vertically fixed on the periphery of the upper end of the base module, the wall body upper end connecting pieces are installed at the upper ends of the wall body profiles, and the wall body lower end connecting pieces are installed at the lower ends of the wall body profiles.
On the basis of the technical scheme, the door frame module comprises a door frame profile, a base connecting piece and a ring beam connecting piece, wherein the base connecting piece is horizontally arranged at the lower end of the door frame profile, and the ring beam connecting piece is horizontally arranged at the upper end of the door frame profile.
On the basis of the technical scheme, the ring beam module comprises a ring beam profile, transverse diameters, drainage grooves and drainage pipes, a plurality of transverse diameters are welded between the front end and the rear end of the ring beam profile at equal intervals in the longitudinal direction, the drainage grooves are formed in the upper end of the ring beam profile, the drainage pipes are vertically installed at the four corners of the lower end of the ring beam profile, and a plurality of prefabricated holes are formed in the four ends of the ring beam profile.
On the basis of the technical scheme, the top module comprises an integral frame and a top plate module, the upper end of the ring beam profile is connected with the integral frame through bolts, and the upper end of the integral frame is horizontally provided with the top plate modules.
Compared with the prior art, the utility model has the advantages of it is following: the utility model discloses simple structure adopts the modular design, can realize dismantling more fast, is convenient for remove, and top module design has the rainwater groove, can prevent that the rainwater from the gap infiltration between the top module, influences the effect of living in, and the pedestal mounting has flexible jib, and the transportation of the base module of being convenient for, and reduced occuping of space, the base module reservation has the cable through wires hole, has avoided outside threading to increase holistic aesthetic property.
Drawings
Fig. 1 is a schematic view of the appearance structure of the present invention.
Fig. 2 is the schematic view of the appearance structure of the base module of the present invention.
Fig. 3 is a schematic view of the horizontal placement of the corner post module of the present invention.
Fig. 4 is the installation schematic diagram of the wall module structure of the utility model.
Fig. 5 is the installation schematic diagram of the door frame module structure of the present invention.
Fig. 6 is the schematic view of the appearance structure of the ring beam module of the present invention.
Fig. 7 is a schematic view of the ring beam module according to the present invention.
Fig. 8 is a schematic structural view of the upper end of the loop top module of the present invention.
Fig. 9 is a partially enlarged cross-sectional view of the top module of the present invention.
In the figure: 1. the base module, 2, the corner post module, 3, the wall body module, 4, the door frame module, 5, the partition wall module, 6, the ring beam module, 7, the roof module, 101, the girder, 102, the connecting piece, 103, the flexible jib, 104, the ground copper bar, 105, the cable through wires hole, 106, the ventilation hole, 201, the corner post, 202, the corner post extruded section bar, 203, the rectangle section bar, 204, the base transition connecting piece, 205, the ring beam transition connecting piece, 206, the downpipe, 301, the wall body section bar, 302, the wall body upper end connecting piece, 303, the wall body lower end connecting piece, 401, the door frame section bar, 402 base connecting piece, 403 ring beam connecting piece, 601, the ring beam section bar, 602, the transverse diameter, 603, the drainage channel, 604, the drain pipe, 701, the whole frame, 702, the roof module.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1-9, a modularization concatenation shelter, includes base module 1, corner post module 2, wall body module 3, door frame module 4, partition wall module 5, ring beam module 6, top module 7, each vertical corner post module 2 of installing in base module 1 upper end four corners, and each vertical wall body module 3 of installing in both sides around base module 1 upper end, the anterior left side of base module 1 upper end is vertical installs door frame module 4, and each vertical partition wall module 5 of installing in the base module 1 upper end left and right sides, partition wall module 5 upper end, and wall body module 3 upper end horizontal installation has ring beam module 6, ring beam module 6 middle part horizontal installation has a plurality of top modules 7.
Base module 1 includes girder 101, connecting piece 102, flexible jib 103, ground copper bar 104, cable through wires hole 105, ventilation hole 106, girder 101 middle part vertical installation has a plurality of connecting pieces 102, flexible jib 103 is respectively installed to the both ends left and right sides around the girder 101, girder 101 front end right side horizontal installation has ground copper bar 104, and horizontal installation has a plurality of gusset between the girder 101 upper and lower two, the horizontal equidistance in girder middle part is opened has a plurality of cable through wires holes 105, and the girder 101 rear side is opened there is ventilation hole 106.
The corner post module 2 comprises a corner post 201, a corner post extruded section bar 202, a rectangular section bar 203, a base connecting transition piece 204, a ring beam connecting transition piece 205 and a downpipe 206, wherein the corner post 201 is formed by connecting and fixing 2 corner post extruded section bars 202 and the rectangular section bar 203 together through bolts, the base connecting transition piece 204 is installed at the lower end of the corner post 201, the ring beam connecting transition piece 205 is installed at the upper end of the corner post 201, and the downpipe 206 vertically penetrates through the rectangular section bar 203.
Wall body module 3 and partition wall module 5 include wall body section bar 301, wall body upper end connecting piece 302, wall body lower extreme connecting piece 303, wall body section bar 301 leaves prefabricated hole, and wall body section bar 301 is connected with corner post module 2, wall body module 3 and partition wall module 5 through prefabricated hole, 1 upper end of base module is vertical all around to be fixed with a plurality of wall body section bars 301, wall body upper end connecting piece 302 is installed to wall body section bar 301 upper end, and wall body lower extreme connecting piece 303 is installed to wall body section bar 301 lower extreme.
The door frame module 4 comprises a door frame section 401, a base connecting piece 402 and a ring beam connecting piece 403, wherein the base connecting piece 402 is horizontally installed at the lower end of the door frame section 401, and the ring beam connecting piece 403 is horizontally installed at the upper end of the door frame section 401.
Circle roof beam module 6 includes circle roof beam section bar 601, violently footpath 602, water drainage tank 603, drain pipe 604, it has a plurality of violently footpaths 602 to weld between the circle roof beam section bar 601 front and back both ends vertical equidistance, and opens on circle roof beam section bar 601 has water drainage tank 603, each vertical drain pipe 604 of installing in circle roof beam section bar 601 lower extreme four corners, and four ends of circle roof beam section bar 601 are opened there are a plurality of prefabricated holes.
The top module 7 comprises an integral frame 701 and a top plate module 702, the integral frame 701 is installed at the upper end of the ring beam profile 601 in a bolt connection mode, and the top plate modules 702 are horizontally installed at the upper end of the integral frame 701.
The utility model discloses a theory of operation: the base module 1 is placed on a plane, the corner post modules 2 are vertically installed at four corners of the upper end of the base module 1 through prefabricated bolt holes, then the wall body module 3, the door frame module 4 and the partition wall module 5 are installed according to the layout required by the modularized splicing shelter, and because the positioning pins are designed in the wall body module 3, the door frame module 4 and the partition wall module 5, the positioning pins only need to be inserted into the positioning holes during installation, the connection of the residual bolts can be rapidly carried out, the installation is finished, after the installation of the wall body for one circle is finished, the installation of the ring beam module 6 is carried out, the connection of the ring beam with the corner post module 2, the wall body module 3, the door frame module 4 and the partition wall module 5 is finished only by the bolts through the prefabricated bolt holes, the top module 7 is integrally hoisted on the ring beam module after the installation of the ring beam module 6 is finished, and positioning through a positioning pin of the top module 7, and after the positioning pin is aligned in place, completing bolt fastening of the top module 7 and the ring beam module 6.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.

Claims (7)

1. The utility model provides a modularization concatenation shelter, includes base module (1), corner post module (2), wall body module (3), door frame module (4), partition wall module (5), collar tie beam module (6), top module (7), its characterized in that: base module (1) upper end four corners is vertical respectively to be installed cornered post module (2), and each vertical wall body module (3) of installing in both sides around base module (1) upper end, the vertical door frame module (4) of installing in the anterior left side in base module (1) upper end, and each vertical partition wall module (5) of installing in the base module (1) upper end left and right sides, partition wall module (5) upper end, and wall body module (3) upper end horizontal installation have circle roof beam module (6), circle roof beam module (6) middle part horizontal installation has a plurality of roof modules (7).
2. A modular splice shelter as claimed in claim 1 wherein: base module (1) includes girder (101), connecting piece (102), flexible jib (103), ground copper bar (104), cable through wires hole (105), ventilation hole (106), girder (101) middle part is vertical installs a plurality of connecting pieces (102), flexible jib (103) are respectively installed to the both ends left and right sides around girder (101), girder (101) front end right side horizontal installation has ground copper bar (104), and horizontal installation has a plurality of gusset between girder (101) upper and lower two, the horizontal equidistance in girder middle part is opened there are a plurality of cable through wires holes (105), and girder (101) rear side has ventilation hole (106).
3. A modular splice shelter as claimed in claim 1 wherein: the corner post module (2) comprises corner posts (201), corner post extruded profiles (202), rectangular profiles (203), base connection transition pieces (204), ring beam connection transition pieces (205) and water falling pipes (206), the corner posts (201) are formed by fixing the corner post extruded profiles (202) and the rectangular profiles (203) together through bolts, the base connection transition pieces (204) are installed at the lower ends of the corner posts (201), the ring beam connection transition pieces (205) are installed at the upper ends of the corner posts (201), and the water falling pipes (206) are vertically penetrated in the rectangular profiles (203).
4. A modular splice shelter as claimed in claim 1 wherein: wall body module (3) and partition wall module (5) are including wall body section bar (301), wall body upper end connecting piece (302), wall body lower extreme connecting piece (303), prefabricated hole has been left in wall body section bar (301), and wall body section bar (301) are connected with corner post module (2), wall body module (3) and partition wall module (5) through prefabricated hole, base module (1) upper end is vertical all around to be fixed with a plurality of wall body section bars (301), wall body upper end connecting piece (302) is installed to wall body section bar (301) upper end, and wall body lower extreme connecting piece (303) are installed to wall body section bar (301) lower extreme.
5. A modular splice shelter as claimed in claim 1 wherein: the door frame module (4) comprises a door frame section bar (401), a base connecting piece (402) and a ring beam connecting piece (403), wherein the base connecting piece (402) is horizontally installed at the lower end of the door frame section bar (401), and the ring beam connecting piece (403) is horizontally installed at the upper end of the door frame section bar (401).
6. A modular splice shelter as claimed in claim 1 wherein: circle beam module (6) are including circle beam section bar (601), violently footpath (602), water drainage tank (603), drain pipe (604), vertical equidistance welding has a plurality of violently footpaths (602) between both ends around circle beam section bar (601), and opens on circle beam section bar (601) has water drainage tank (603), each vertical drain pipe (604) of installing in circle beam section bar (601) lower extreme four corners, and circle beam section bar (601) four-end is opened has a plurality of prefabricated holes.
7. The modular splice shelter of claim 6, wherein: the top module (7) comprises an integral frame (701) and a top plate module (702), the upper end of the ring beam profile (601) is connected with the integral frame (701) through bolts, and the upper end of the integral frame (701) is horizontally provided with the top plate modules (702).
CN202022435830.0U 2020-10-28 2020-10-28 Modularization concatenation shelter Active CN214034927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022435830.0U CN214034927U (en) 2020-10-28 2020-10-28 Modularization concatenation shelter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022435830.0U CN214034927U (en) 2020-10-28 2020-10-28 Modularization concatenation shelter

Publications (1)

Publication Number Publication Date
CN214034927U true CN214034927U (en) 2021-08-24

Family

ID=77355801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022435830.0U Active CN214034927U (en) 2020-10-28 2020-10-28 Modularization concatenation shelter

Country Status (1)

Country Link
CN (1) CN214034927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114430149A (en) * 2021-11-29 2022-05-03 华信咨询设计研究院有限公司 Adjustable cable support for square bin of data center mechanism and construction method of adjustable cable support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114430149A (en) * 2021-11-29 2022-05-03 华信咨询设计研究院有限公司 Adjustable cable support for square bin of data center mechanism and construction method of adjustable cable support
CN114430149B (en) * 2021-11-29 2023-08-11 华信咨询设计研究院有限公司 Adjustable cable support for square cabin of data center mechanism and construction method of adjustable cable support

Similar Documents

Publication Publication Date Title
CN205444446U (en) Assembled industrialization steel construction house
CN103967133B (en) Rectangular steel-tube concrete column and H profile steel beam bolted and welded connection node
CN214034927U (en) Modularization concatenation shelter
CN106013441A (en) Connecting casing with steel structure
CN205954965U (en) Novel node of light -duty floor of steel skeleton
CN107165274A (en) A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems
CN105064759A (en) GFRP (glass fiber reinforced plastic) tubed reinforced concrete combination multi-circuit transmission pole
CN212866010U (en) Prefabricated assembly type case becomes basis
CN206128303U (en) Modularization integrated configuration building system
CN206859404U (en) A kind of connecting node applied to modularization steel building
CN201486057U (en) Node mechanism for self-water drainage flashing edge-closing plate
CN217537582U (en) Steel construction consolidates roof device for architectural design
CN216811161U (en) Modular structure of airport terminal corridor
CN207175138U (en) Outdoor installation elevator
CN214579282U (en) Building electromechanical pipeline module frame
CN211849569U (en) Reinforced concrete prefabricated assembled box becomes basis
CN212002259U (en) Prefabricated balcony aluminum mould structure
CN210421426U (en) Reinforcing steel bar processing workshop
CN213837659U (en) Two side baskets of hanging of precast beam template high altitude construction
CN219196252U (en) Full-modularized elevator additionally installed structure
CN220897492U (en) Integral assembly type pig farm
CN211816894U (en) High-prefabrication-rate assembly type integrated house
CN218912194U (en) Portable safe operation platform for elevator shaft of high-rise building
CN211313140U (en) Combined rapid assembling ladder step structure for assembly type building
CN212716019U (en) Elevator shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant