CN212002259U - Prefabricated balcony aluminum mould structure - Google Patents
Prefabricated balcony aluminum mould structure Download PDFInfo
- Publication number
- CN212002259U CN212002259U CN202020227438.4U CN202020227438U CN212002259U CN 212002259 U CN212002259 U CN 212002259U CN 202020227438 U CN202020227438 U CN 202020227438U CN 212002259 U CN212002259 U CN 212002259U
- Authority
- CN
- China
- Prior art keywords
- prefabricated balcony
- template
- cast
- place
- roof beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 49
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 49
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 239000004411 aluminium Substances 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 4
- 230000010354 integration Effects 0.000 abstract description 3
- AZDRQVAHHNSJOQ-UHFFFAOYSA-N alumane Chemical group [AlH3] AZDRQVAHHNSJOQ-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a prefabricated balcony aluminum mould structure, including the prefabricated balcony back beam template that is used for supporting cast-in-place roof beam template of cast-in-place roof beam and is used for supporting prefabricated balcony back beam, cast-in-place roof beam template is the same with prefabricated balcony back beam template structure, all sets up the roof beam side form board in cast-in-place roof beam or prefabricated balcony back beam both sides including setting up at the roof beam die block board and the symmetry of cast-in-place roof beam or prefabricated balcony back beam bottom, roof beam die block board bottom supports fixedly through scalable steel-pipe column, fixedly connected with right angle template between roof beam die block board and the roof beam side form board. The utility model discloses the problem of considering comprehensively that the aluminium mould is prefabricated balcony support system and stop device concurrently, effectual realization support and spacing integration, prefabricated balcony produces the translation when avoiding concreting, support the system and set up the engineering volume big, the aluminium mould material takes place with the circumstances such as many, has improved the work efficiency, has practiced thrift the cost.
Description
Technical Field
The utility model relates to a prefabricated balcony aluminum mould structure belongs to building subject construction technical field.
Background
With the implementation of the management method and the incentive mechanism of the fabricated building, the fabricated buildings in various regions are prosperous, the prefabricated balconies are also used as the fabricated building parts in large quantity, but the conventional prefabricated balconies are still limited to a mode of adopting a combination form of a steel pipe frame and an aluminum mould or a full aluminum mould platform, the double effects of the aluminum mould keel supporting platform serving as a prefabricated balcony supporting system and a limiting device are not comprehensively considered, and the problems of insufficient horizontal direction constraint between the prefabricated balconies and the supporting system, large aluminum mould consumption and the like are caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated balcony aluminum mould structure to solve conventional prefabricated balcony and not comprehensively consider the problem that the aluminum mould is prefabricated balcony support system and stop device simultaneously, prefabricated balcony produces the translation when avoiding concreting, support the system and sets up the condition emergence that the engineering volume is big, the aluminum mould material is many.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a prefabricated balcony aluminum mould structure comprises a cast-in-place beam template for supporting a cast-in-place beam and a prefabricated balcony inverted beam template for supporting a prefabricated balcony inverted beam, wherein the cast-in-place beam template and the prefabricated balcony inverted beam template are the same in structure and respectively comprise a beam bottom template arranged at the bottom of the cast-in-place beam or the prefabricated balcony inverted beam and beam side templates symmetrically arranged at two sides of the cast-in-place beam or the prefabricated balcony inverted beam, the bottom of the beam bottom template is supported and fixed through a telescopic steel pipe column, a right-angle template is fixedly connected between the beam bottom template and the beam side templates, internal corner templates are respectively arranged at a corner between the cast-in-place beam and a cast-in-place floor, a corner between the cast-in-place beam and a prefabricated balcony floor and a corner between the prefabricated balcony inverted beam and the prefabricated balcony floor, a steel pipe-shaped aluminum mould keel is arranged at the bottom of the prefabricated balcony floor in a shape like a Chinese character, the internal corner template is fixedly connected with the aluminum mould keel in the shape like the Chinese character feng or the floor template, and the cast-in-place beam template and the prefabricated balcony reversed beam template are connected into a whole through the aluminum mould keel in the shape like the Chinese character feng.
Furthermore, beam side templates on two sides of the cast-in-place beam are connected and fixed through split bolts.
Furthermore, an inner corner template is arranged at the junction of the prefabricated balcony reversed beam and the cast-in-place beam, and the end parts of the two beam side templates which are vertically arranged are connected and fixed through the inner corner template.
Furthermore, an outer corner template is arranged at the position of the junction of the prefabricated balcony inverted beam, and the end parts of two adjacent vertically arranged beam bottom templates are connected and fixed through the outer corner template.
Furthermore, the 'feng' shaped aluminum mould keel is assembled by four single aluminum mould keels.
Furthermore, all the templates are fixedly connected through short pins.
Since the technical scheme is used, the utility model discloses an advantage has below: the utility model discloses the problem of considering comprehensively that the aluminium mould is prefabricated balcony support system and stop device concurrently, effectual realization support and spacing integration, prefabricated balcony produces the translation when avoiding concreting, support the system and set up the engineering volume big, the aluminium mould material takes place with the circumstances such as many, has improved the work efficiency, has practiced thrift the cost.
Drawings
Fig. 1 is a front view of a schematic structural view of the present invention;
fig. 2 is a sectional view of the structure diagram of the present invention;
FIG. 3 is a perspective view of a "Feng" shaped aluminum form keel;
fig. 4 is a bottom view of the "feng" shaped aluminum form keel.
Description of reference numerals: 1-cast-in-place beam, 2-prefabricated balcony reversed beam, 3-rich aluminum mould keel, 4-telescopic steel pipe column, 5-beam side template, 6-beam bottom template, 7-internal corner template, 8-right angle template, 9-split bolt, 10-floor template, 11-internal corner template, 12-external corner template and 13-short pin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1 to 4, a prefabricated balcony aluminum mold structure comprises a cast-in-place beam mold plate for supporting a cast-in-place beam 1 and a prefabricated balcony inverted beam mold plate for supporting a prefabricated balcony inverted beam 2, wherein the cast-in-place beam mold plate and the prefabricated balcony inverted beam mold plate have the same structure and respectively comprise a beam bottom mold plate 6 arranged at the bottom of the cast-in-place beam 1 or the prefabricated balcony inverted beam 2 and beam side mold plates 5 symmetrically arranged at two sides of the cast-in-place beam 1 or the prefabricated balcony inverted beam 2, the bottom of the beam bottom mold plate 6 is supported and fixed by a telescopic steel pipe column 4, a right-angle mold plate 8 is fixedly connected between the beam bottom mold plate 6 and the beam side mold plates 5, a female mold plate 7 is arranged at a corner between the cast-in-place beam 1 and a cast-in-place floor, a corner between the cast-in-place beam 1 and a prefabricated balcony floor and a corner between the prefabricated balcony inverted beam 2 and a prefabricated balcony floor, and, the 'feng' shaped aluminum mould keel 3 is supported and fixed through the telescopic steel pipe column 4, the internal corner template 7 is fixedly connected with the 'feng' shaped aluminum mould keel 3 or the floor template 10, and the cast-in-place beam template and the prefabricated balcony reversed beam template are connected into a whole through the 'feng' shaped aluminum mould keel 3. And beam side templates 5 on two sides of the cast-in-situ beam 1 are fixedly connected through split bolts 9. An inner corner template 11 is arranged at the junction of the prefabricated balcony reversed beam 2 and the cast-in-place beam 1, and the end parts of two beam side templates 5 which are vertically arranged adjacently are connected and fixed through the inner corner template 11; an outer corner template 12 is arranged at the position of the junction of the prefabricated balcony inverted beam 2, and the end parts of two adjacent vertically arranged beam bottom templates 6 are connected and fixed through the outer corner template 12. The 'feng' shaped aluminum mould keel 3 is assembled by four single aluminum mould keels. The templates are fixedly connected through short pins 13.
When the prefabricated balcony aluminum mould structure is adopted for prefabricated balcony construction, the following steps can be adopted:
firstly, beam bottom templates 6 are laid at the bottoms of a cast-in-place beam 1 and a prefabricated balcony reversed beam 2, the end parts of two adjacent vertically arranged beam bottom templates 6 are connected and fixed through outer corner templates 12, the bottom of the beam bottom template 6 is supported and fixed through a telescopic steel pipe column 4, and the beam bottom templates 6 are bolted and fixed through short pins 13;
step two, beam side templates 5 are installed on two sides of a cast-in-place beam 1 and a prefabricated balcony reversed beam 2, the end parts of the two adjacent vertically arranged beam side templates 5 are connected and fixed through an inner corner template 11, the beam side templates 5 are bolted through short pins 13, the beam side templates 5 on two sides of the cast-in-place beam 1 are connected and fixed through split bolts 9, after the beam side templates 5 are installed, a 'Feng' shaped aluminum mold keel 3 is laid on the outer side of the cast-in-place beam 1, and the 'Feng' shaped aluminum mold keel 3 is supported and fixed through a telescopic steel pipe column 4;
thirdly, arranging inside corner templates 7 at corners between the cast-in-place beam 1 and the cast-in-place floor, between the cast-in-place beam 1 and the prefabricated balcony floor and between the prefabricated balcony counter beam 2 and the prefabricated balcony floor, and then connecting and fixing the inside corner templates 7 with the 'feng' -shaped aluminum mold keel 3 and the floor template 10, so that the cast-in-place beam template and the prefabricated balcony counter beam template are connected into a whole through the 'feng' -shaped aluminum mold keel 3;
step four, hoisting the prefabricated balcony to the ' feng ' shaped aluminum mould keel 3 and the prefabricated balcony reversed beam template by adopting a lifting appliance, then pouring the cast-in-place beam 1 and the cast-in-place floor, and after the cast-in-place part reaches the maintenance age, dismantling the cast-in-place beam template, the prefabricated balcony reversed beam template and the ' feng ' shaped aluminum mould keel 3 according to the principle of ' firstly erecting and then dismantling;
and step five, repeating the step one to the step four until the prefabricated balcony is constructed to the (N + 3) th layer, and then removing the telescopic steel pipe columns 4 on the nth layer.
To sum up, the utility model discloses synthesize and consider the problem that the aluminium mould was prefabricated balcony support system and stop device concurrently, effectual realization is supported and spacing integration, and prefabricated balcony produces the translation when avoiding concreting, support the system and set up the engineering volume big, the aluminium mould material takes place with the circumstances such as many, has improved the work efficiency, has practiced thrift the cost.
Claims (6)
1. The utility model provides a prefabricated balcony aluminum mould structure, is including being used for supporting cast-in-place roof beam template of cast-in-place roof beam (1) and being used for supporting the prefabricated balcony anti-roof beam template of roof beam (2), its characterized in that: the cast-in-place beam template and the prefabricated balcony reversed beam template have the same structure and respectively comprise a beam bottom template (6) arranged at the bottom of the cast-in-place beam (1) or the prefabricated balcony reversed beam (2) and beam side templates (5) symmetrically arranged at two sides of the cast-in-place beam (1) or the prefabricated balcony reversed beam (2), the bottom of the beam bottom template (6) is supported and fixed through a telescopic steel pipe column (4), a right-angle template (8) is fixedly connected between the beam bottom template (6) and the beam side templates (5), internal corner templates (7) are respectively arranged at corners between the cast-in-place beam (1) and the cast-in-place floor, the cast-in-place beam (1) and the prefabricated balcony floor and the prefabricated balcony reversed beam (2) and the prefabricated balcony floor, a 'Feng' shaped aluminum mold keel (3) is arranged at the bottom of the prefabricated balcony floor, the 'Feng' shaped aluminum mold keel (3) is supported and fixed through the telescopic steel pipe column (4) as well, the internal corner template (7) is fixedly connected with the aluminum mould keel (3) shaped like the Chinese character feng or the floor template (10), and the cast-in-place beam template and the prefabricated balcony reversed beam template are connected into a whole through the aluminum mould keel (3) shaped like the Chinese character feng.
2. The prefabricated balcony aluminum mold structure of claim 1, wherein: the beam side templates (5) on two sides of the cast-in-place beam (1) are fixedly connected through split bolts (9).
3. The prefabricated balcony aluminum mold structure of claim 1, wherein: an inner corner template (11) is arranged at the position of the prefabricated balcony reversed beam (2) and the cast-in-place beam (1), and the end parts of two adjacent beam side templates (5) which are vertically arranged are connected and fixed through the inner corner template (11).
4. The prefabricated balcony aluminum mold structure of claim 1, wherein: outer corner templates (12) are arranged at the positions of the prefabricated balcony inverted beams (2) in the transfer mode, and the end parts of the two beam bottom templates (6) which are vertically arranged in the adjacent mode are fixedly connected through the outer corner templates (12).
5. The prefabricated balcony aluminum mold structure of claim 1, wherein: the aluminum die keel (3) is formed by assembling four single aluminum die keels.
6. The prefabricated balcony aluminum mold structure of claim 1, wherein: the templates are fixedly connected through short pins (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020227438.4U CN212002259U (en) | 2020-02-28 | 2020-02-28 | Prefabricated balcony aluminum mould structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020227438.4U CN212002259U (en) | 2020-02-28 | 2020-02-28 | Prefabricated balcony aluminum mould structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212002259U true CN212002259U (en) | 2020-11-24 |
Family
ID=73423806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020227438.4U Expired - Fee Related CN212002259U (en) | 2020-02-28 | 2020-02-28 | Prefabricated balcony aluminum mould structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212002259U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111173270A (en) * | 2020-02-28 | 2020-05-19 | 中国建筑第四工程局有限公司 | Prefabricated balcony aluminum mold structure and construction method |
-
2020
- 2020-02-28 CN CN202020227438.4U patent/CN212002259U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111173270A (en) * | 2020-02-28 | 2020-05-19 | 中国建筑第四工程局有限公司 | Prefabricated balcony aluminum mold structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704672B (en) | Installation construction method for large all-steel formwork at internal corner of shear wall | |
CN101063319B (en) | Node component used for connecting steel tube concrete column with building roof beam | |
CN214575640U (en) | U-shaped synchronous construction formwork system for vertical and horizontal structures of cast concrete | |
CN111173270A (en) | Prefabricated balcony aluminum mold structure and construction method | |
CN212002259U (en) | Prefabricated balcony aluminum mould structure | |
CN103362307A (en) | Construction method for modularizing insulation wall boards and pouring integrated house building | |
CN112814383A (en) | Construction method of double-layer roof curtain wall structure | |
CN208964324U (en) | A kind of full module-assembled elevator shaft | |
CN218264577U (en) | Assembly type building structure | |
CN206570922U (en) | Assembled integral armored concrete grid type framework | |
CN216690347U (en) | Bidirectional shaping steel formwork device for shear wall at deformation joint | |
CN216276132U (en) | Low multilayer assembled light steel light concrete structural system | |
CN215926719U (en) | Reinforcing structure of aluminum alloy template reverse ridge hanging die | |
CN212897158U (en) | Assembled multi-ribbed composite horizontal warehouse and horizontal warehouse wall | |
CN211547355U (en) | Formwork support for construction of Y-shaped pier column bent cap | |
CN111424917A (en) | Prefabricated assembly type integrated ground and process method | |
CN212388900U (en) | Prefabricated assembled integrated ground | |
CN113338614A (en) | Adjustable template structure for column caps of beamless floor | |
CN205224366U (en) | Novel compound incubation floor plate | |
CN221053165U (en) | Post-cast strip conversion template for building | |
CN215291408U (en) | Compound building aluminum mould and wheel buckle frame combined template supporting structure | |
CN221855999U (en) | Assembled sloping roof gutter retaining wall module | |
CN215594885U (en) | Template and main part are installation connection structure in coordination | |
CN210217136U (en) | Formwork support | |
CN221761628U (en) | Can have enough to meet need interim fender that encloses of reinforced concrete combination formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201124 |