CN210421426U CN201920803734.1U CN201920803734U CN210421426U CN 210421426 U CN210421426 U CN 210421426U CN 201920803734 U CN201920803734 U CN 201920803734U CN 210421426 U CN210421426 U CN 210421426U
Authority
CN
China
Prior art keywords
bar processing
trusses
contraband
processing workshop
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920803734.1U
Other languages
Chinese (zh)
Inventor
田庆喜
张貌
王明磊
王旋
田庆忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Nuanshu Industrial Co ltd
Original Assignee
Zhengzhou Nuanshu Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Nuanshu Industrial Co ltd filed Critical Zhengzhou Nuanshu Industrial Co ltd
Priority to CN201920803734.1U priority Critical patent/CN210421426U/en
Application granted granted Critical
Publication of CN210421426U publication Critical patent/CN210421426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A steel bar processing workshop aims to solve the technical problem that the existing steel bar processing workshop is low in repeated utilization rate. The device comprises an assembling module; the assembling module comprises a side stand frame, a ceiling assembly and a bottom substrate, wherein two ends of the side stand frame are detachably connected with the ceiling assembly and the bottom substrate respectively to form the assembling module with openings at the front side and the rear side; in the front-rear direction, a plurality of the assembling modules are sequentially connected to form the steel bar processing workshop, and the assembling modules are detachably connected together. It can be reused; through the equipment module of assembling, its length can extend as required.

Description

Reinforcing steel bar processing workshop
Technical Field
The utility model relates to an assembly type structure technical field, concretely relates to reinforcing bar workshop.
Background
The reinforcing steel bars are mostly used in the building industry, are slender articles and have large weight. At the building site, most reinforcing bar processing environment is open-air environment, because is close to the construction environment, and the security is relatively poor. When an indoor processing environment such as a processing workshop is adopted, the processing workshop building needs to be dismantled after the project is completed, and the material is wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a reinforcing bar processing vehicle to solve the technical problem that current reinforcing bar processing vehicle reuse rate is low.
In order to solve the technical problem, the utility model adopts the following technical scheme:
designing a steel bar processing workshop, which comprises an assembling module; the assembling module comprises a side stand frame, a ceiling assembly and a bottom substrate, wherein two ends of the side stand frame are detachably connected with the ceiling assembly and the bottom substrate respectively to form the assembling module with openings at the front side and the rear side; in the front-rear direction, a plurality of the assembling modules are sequentially connected to form the steel bar processing workshop, and the assembling modules are detachably connected together.
Preferably, the roof board assembly comprises a mouth-shaped truss girder, and the mouth-shaped truss girder is connected with the side vertical frame in a plugging mode.
Furthermore, the mouth-shaped truss girder comprises two Contraband-shaped trusses and an extended truss with a ridgepurlin, and the extended truss with the ridgepurlin is detachably connected with the Contraband-shaped trusses on two sides; the splicing part of the Contraband-shaped truss and the side vertical frame is also provided with an anti-drop pin.
Still further, a first fixing part and a second fixing part are fixedly arranged at the end of the Contraband-shaped truss, a third fixing part and a fourth fixing part are fixedly arranged at the end of the extension truss with the ridge purlin, and the first fixing part is detachably connected with the third fixing part; the roof assembly further comprises two diagonal draw bars, two ends of each diagonal draw bar are hinged and connected with the second fixing portion and the fourth fixing portion respectively, and the two diagonal draw bars form an X shape, so that the extension truss with the ridge purlin and the Contraband-shaped trusses on two sides form a shear resistant structure.
Still further, an eave drainage groove parallel to the ridge purlin of the extension truss with the ridge purlin is arranged on the Contraband-shaped truss, the roof assembly further comprises a rain shielding tile plate and a secondary beam, two ends of the secondary beam are detachably connected with the eave drainage groove and the ridge purlin respectively, the rain shielding tile plate is detachably connected to the roof assembly to form a roof of the reinforcing steel bar processing workshop, and an eave edge of the roof is connected with the eave drainage groove, so that rainwater flowing down from the roof can flow into the eave drainage groove.
Preferably, the both ends of eaves water drainage tank have public grafting structure, female grafting structure respectively to make in adjacent two sets of modules of assembling, the eaves water drainage tank of one of them group of module of assembling can be connected with the eaves water drainage tank grafting of another group of module of assembling, and form drainage channel.
Compared with the prior art, the beneficial effects of the utility model are that: can be repeatedly used; through the equipment module of assembling, its length can extend as required.
Drawings
Fig. 1 is the utility model relates to a stereogram between reinforcing bar processing vehicle.
Fig. 2 is the utility model relates to a three-dimensional view of assembling module between reinforcing bar processing vehicle.
Fig. 3 is a front view of fig. 2.
Fig. 4 is the utility model relates to a stereogram that two of reinforcing bar processing vehicle assemble module and put together.
Fig. 5 is a side view of fig. 4.
In the figure, 1-splicing module, 11-side stand, 12-roof component, 121-Contraband-shaped truss, 122-extended truss with ridge purlin, 123-secondary beam, 13-eave drainage channel, 14-bottom substrate, 141-cable channel, 1411-cable perforation.
Detailed Description
The following embodiments are only intended to illustrate the present invention in detail, and do not limit the scope of the present invention in any way.
Example 1: a reinforcing bar processing workshop, see fig. 1-5, comprising an assembly module 1; the assembly module 1 comprises a side stand 11, a ceiling component 12 and a bottom substrate 14, wherein two ends of the side stand 11 are respectively detachably connected with the ceiling component 12 and the bottom substrate 14 to form the assembly module 1 with openings at the front side and the rear side; in the front and back direction, a plurality of assembling modules 1 are sequentially connected to form a steel bar processing workshop, and the assembling modules 1 are detachably connected together. Specifically, the bottom substrate 14 selects the steel plate, the bottom end of the side stand 11 and the bottom substrate 14 are fixed together through the bolts, and in two adjacent assembly modules 1, the adjacent side stands 11 are connected together through the bolts.
Preferably, the roof assembly 12 includes a "port" truss beam that is spliced to the side stiles. The upright posts of the side upright frames 11 can be hollow steel pipes, and the roof board assembly 12 is inserted on the upright posts of the side upright frames 11.
Further, the 'mouth' shaped truss girder comprises two 'Contraband' shaped trusses 121 and an extended truss 122 with ridgepurlin, and the extended truss 122 with ridgepurlin is detachably connected with the 'Contraband' shaped trusses 121 on two sides through bolts; the joint of the Contraband-shaped truss 121 and the side vertical frame 11 is also provided with a drop-proof pin (not shown).
Still further, a first fixing part and a second fixing part are fixedly arranged at the end of the Contraband-shaped truss 121, a third fixing part and a fourth fixing part are fixedly arranged at the end of the extension truss 122 with the ridge purlin, and the first fixing part and the third fixing part are detachably connected through bolts; the roof board assembly 12 further includes two diagonal members (not shown), two ends of the diagonal members are respectively hinged to the second fixing portion and the fourth fixing portion, and the two diagonal members form an X shape, so that the extension truss 122 with ridge purlin and the Contraband-shaped trusses 121 on two sides form a shear-resistant structure.
Still further, an eave drainage groove 13 parallel to the ridge purlin of the extension truss 122 with the ridge purlin is arranged on the Contraband-shaped truss 121, the roof assembly 12 further comprises a rain shielding tile plate (not shown) and a secondary beam 123, two ends of the secondary beam 123 are detachably connected with the eave drainage groove 13 and the ridge purlin through screws respectively, the rain shielding tile plate is detachably connected to the roof assembly 12 through screws to form a roof of the reinforcing steel bar processing workshop, and the eave edge of the roof is connected with the eave drainage groove 13, so that rainwater flowing down from the roof can flow into the eave drainage groove 13.
Preferably, the two ends of the eave drainage channel 13 are respectively provided with a male plug structure and a female plug structure, so that in two adjacent groups of assembly modules, the eave drainage channel of one group of assembly modules can be in plug connection with the eave drainage channel of the other group of assembly modules, and a drainage channel is formed. In an alternative mode, the eave drainage channel 13 is provided with a membrane-pulling angle, so that a male insertion structure and a female insertion structure can be formed at two ends of the eave drainage channel.
Preferably, a cable slot 141 is further installed on the upper surface of the bottom substrate 14, a rubber slot is adopted as the cable slot 141, and the cable slot 14 and the bottom substrate 14 enclose to form a cable through hole 1411. The wall thickness of the cable groove 141 is 1 cm.
The present invention has been described in detail with reference to the accompanying drawings and embodiments, but those skilled in the art will understand that various specific parameters in the above embodiments can be changed without departing from the spirit of the present invention to form a plurality of specific embodiments, which are the common variation ranges of the present invention and will not be described in detail herein.

Claims (6)

1. A steel bar processing workshop is characterized by comprising an assembling module; the assembling module comprises a side stand frame, a ceiling assembly and a bottom substrate, wherein two ends of the side stand frame are detachably connected with the ceiling assembly and the bottom substrate respectively to form the assembling module with openings at the front side and the rear side; in the front-rear direction, a plurality of the assembling modules are sequentially connected to form the steel bar processing workshop, and the assembling modules are detachably connected together.
2. The rebar processing plant of claim 1, wherein the roof assembly includes a "port" truss beam that is plug-connected to the side stiles.
3. The rebar processing plant of claim 2, wherein the "mouth" truss beams include two "Contraband" trusses and ridged purlin-carrying elongate trusses that are removably connected to the "Contraband" trusses on either side; the splicing part of the Contraband-shaped truss and the side vertical frame is also provided with an anti-drop pin.
4. The reinforcing bar processing workshop as claimed in claim 3, wherein a first fixing part and a second fixing part are fixedly arranged at the ends of the Contraband-shaped trusses, a third fixing part and a fourth fixing part are fixedly arranged at the ends of the extension trusses with ridge purlins, and the first fixing part and the third fixing part are detachably connected; the roof assembly further comprises two diagonal draw bars, two ends of each diagonal draw bar are hinged and connected with the second fixing portion and the fourth fixing portion respectively, and the two diagonal draw bars form an X shape, so that the extension truss with the ridge purlin and the Contraband-shaped trusses on two sides form a shear resistant structure.
5. The reinforcing bar processing workshop as claimed in claim 3, wherein the Contraband-shaped trusses are provided with eave drainage grooves parallel to the ridge purlins of the ridge purlin-equipped extension trusses, the roof assembly further comprises rain shielding tiles and secondary beams, two ends of the secondary beams are detachably connected with the eave drainage grooves and the ridge purlins respectively, the rain shielding tiles are detachably connected with the roof assembly to form the roof of the reinforcing bar processing workshop, and the eaves of the roof are connected with the eave drainage grooves, so that rainwater flowing down from the roof can flow into the eave drainage grooves.
6. A steel bar processing workshop as claimed in claim 5, wherein both ends of the eaves drainage channel are respectively provided with a male plug structure and a female plug structure, so that in two adjacent groups of the assembly modules, the eaves drainage channel of one group of the assembly modules can be in plug connection with the eaves drainage channel of the other group of the assembly modules, and a drainage channel is formed.
CN201920803734.1U 2019-05-30 2019-05-30 Reinforcing steel bar processing workshop Expired - Fee Related CN210421426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920803734.1U CN210421426U (en) 2019-05-30 2019-05-30 Reinforcing steel bar processing workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920803734.1U CN210421426U (en) 2019-05-30 2019-05-30 Reinforcing steel bar processing workshop

Publications (1)

Publication Number Publication Date
CN210421426U true CN210421426U (en) 2020-04-28

Family

ID=70373313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920803734.1U Expired - Fee Related CN210421426U (en) 2019-05-30 2019-05-30 Reinforcing steel bar processing workshop

Country Status (1)

Country Link
CN (1) CN210421426U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982674A (en) * 2021-01-22 2021-06-18 漳州杰盛钢结构工程有限公司 Steel construction factory building integral building system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982674A (en) * 2021-01-22 2021-06-18 漳州杰盛钢结构工程有限公司 Steel construction factory building integral building system

Similar Documents

Publication Publication Date Title
KR100746244B1 (en) Two-way architectural structural system and modular support member
CN110872879B (en) Modular wall
CN110042928B (en) Modularized spliced house and construction method thereof
CN101864847A (en) Assembled type moveable plank house
CN209227776U (en) A kind of three-dimensional building module
CN111075078B (en) Special-shaped transverse locking type double-face panel unit curtain wall system and construction method thereof
CN210421426U (en) Reinforcing steel bar processing workshop
CN215519142U (en) Lap joint assembly type energy-saving building
CN106930571A (en) A kind of assembled stereoscopic structure plant and its construction method
CN203334552U (en) Assembly-type rectangular planar roof
CN208063088U (en) Roofing is without support type roof photovoltaic power station
CN110565682A (en) ring main unit prefabricated foundation module segmentation method and installation connection method thereof
CN215406722U (en) Steel house
CN214220746U (en) Assembled tool room
CN212358796U (en) Combined roof for emergency engineering
CN213837040U (en) Steel structure node connection structure based on BIM technology
CN209817104U (en) House frame connection structure
CN112196260A (en) Assembly type template of foreign-style house outer eave concrete structure and construction method thereof
CN201883725U (en) Split communication base station machine room
CN215054437U (en) Assembled roof suspended beam structure is built in room
CN220790728U (en) Quick assembly disassembly formula camping unit and composite set thereof
CN217840521U (en) Prefabricated assembly type building structure for roof structure
CN213448852U (en) Modular prefabricated house
CN214614580U (en) Steel construction fast assembly formula house frame of full bolted connection
CN219158547U (en) Multilayer assembled energy-saving building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428