CN212450188U - Fast-assembling well frame construction - Google Patents

Fast-assembling well frame construction Download PDF

Info

Publication number
CN212450188U
CN212450188U CN202020882175.0U CN202020882175U CN212450188U CN 212450188 U CN212450188 U CN 212450188U CN 202020882175 U CN202020882175 U CN 202020882175U CN 212450188 U CN212450188 U CN 212450188U
Authority
CN
China
Prior art keywords
butt joint
frame
upright post
connecting rod
butt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020882175.0U
Other languages
Chinese (zh)
Inventor
张凡
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Kuaike Urban Construction Additional Elevator Co ltd
Original Assignee
Fujian Kuaike Urban Construction Additional Elevator Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Kuaike Urban Construction Additional Elevator Co ltd filed Critical Fujian Kuaike Urban Construction Additional Elevator Co ltd
Priority to CN202020882175.0U priority Critical patent/CN212450188U/en
Application granted granted Critical
Publication of CN212450188U publication Critical patent/CN212450188U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a fast-assembling well frame construction, including four sleeve pipes and four tie-beams that enclose and connect and constitute square link in the sleeve pipe week side, the sleeve pipe is divided and is established in the four corners and by the tie-beam grafting, the sleeve pipe cross-section is square and the intraductal equal vertical insertion of cover establishes the butt joint frame assembly, butt joint frame assembly includes the butt joint stand, the butt joint stand leans on all to set up the notch that supplies two tie-beams dislocation to insert on the adjacent lateral wall in square link center, butt joint stand bottom from lower vertical insertion up inserts the metal connecting rod, pass butt joint stand, tie-beam to the butt joint stand top in proper order through the metal connecting rod and wear out, the upper end surface of this metal connecting rod is seted up the screw thread and the spiro union nut is fastened to the butt joint stand upper; the lower end of the butt joint frame assembly is inserted into the frame upright column on the lower layer, and the upper end of the butt joint frame assembly is inserted into the frame upright column on the other layer and is locked for connection, so that the structure is simple, and the installation is convenient.

Description

Fast-assembling well frame construction
Technical Field
The utility model relates to a fast-assembling well frame construction.
Background
The traditional elevator well is mostly of a reinforced concrete structure, is designed together with a building and is constructed synchronously. For villa elevators, elevator shafts with reinforced concrete structures occupy too large area, so that valuable actual use area is wasted, and if the shafts are arranged inside buildings, the indoor home decoration style is seriously influenced; villa elevators do not need a pit and an independent machine room, so that the requirements on civil engineering and the height of a top floor are greatly reduced, however, elevator shafts are indispensable; at present, the construction and installation of the elevator shaft frame adopt a field welding mode, the operation preparation and the steps are complicated, and the welded seam is not attractive. The device adopts a glass well with modular design and integrated structure, and is installed in the special interior of the existing building without destroying the original decoration basically;
at present, villa elevators are installed in the interior of an existing building, large cranes cannot be used on site, and all hoistway components must be capable of being transported into a room from a built door (at least a door opening). Therefore, the shape, size and length of the self-contained hoistway components are limited.
SUMMERY OF THE UTILITY MODEL
In view of the not enough of prior art, the utility model aims to solve the technical problem that a fast-assembling well frame construction is provided, not only rational in infrastructure, simple to operate is swift moreover.
In order to solve the technical problem, the technical scheme of the utility model is that: the fast-assembling shaft way frame structure comprises four sleeves and four connecting beams which are encircled on the peripheral sides of the sleeves to form a square connecting frame, the sleeves are respectively arranged at four corners and are inserted by the connecting beams, the cross sections of the sleeves are square, the sleeves are vertically inserted into the butt joint frame assemblies, the butt joint frame assembly comprises butt joint upright posts, the adjacent side walls of the butt joint upright posts close to the center of the square connecting frame are respectively provided with a notch for the dislocation insertion of the two connecting beams, the bottom of the butt-joint upright post is vertically inserted with a metal connecting rod from bottom to top, the metal connecting rod sequentially passes through the butt-joint upright post and the connecting beam to penetrate out of the top of the butt-joint upright post, the upper end surface of the metal connecting rod is provided with threads and is screwed with a nut to be fastened with the upper surface of the butt joint upright post, the lower end of the metal connecting rod is fixedly connected with a hanging block into a whole, the lower end of the butt joint upright post is provided with an opening and is blocked by a hanging block, and a slit is vertically arranged upwards at one corner of the lower end of the butt joint upright post; the lower end of the butt joint frame assembly is inserted into the frame upright column on the lower layer, and the upper end of the butt joint frame assembly is inserted into the frame upright column on the other layer to be locked and connected.
Furthermore, the vertical blocks are in a quadrangular frustum pyramid shape with a small upper part and a big lower part, and the area of the lower end face of each vertical block is larger than that of the opening of the butt joint upright post.
Furthermore, all the butt joint stand is overlapped with the stainless steel frame and links firmly as an organic whole outward, and the stainless steel frame also offers notch and slit with butt joint stand apposition department, the tie-beam both ends set firmly the grafting piece of height dislocation respectively, and two tie-beams are inserted respectively perpendicularly and are inserted into nevertheless to be the dislocation of the grafting piece of one low height and insert in the different notches to vertically wear to establish by the metal connecting rod.
Furthermore, the notch is arranged at the position close to the upper end of the butt joint upright post, the upper end of the butt joint upright post is higher than the upper end surface of the sleeve, a through hole transversely penetrating through the butt joint upright post is formed in the side edge of the position higher than the sleeve, the through hole is staggered with the metal connecting rod, and a through hole is correspondingly formed in the upper layer of frame upright post and is screwed and locked by a bolt in a penetrating way.
Further, layer frame stand is provided with four and is connected constitution layer frame with a plurality of scarf beams, layer frame front side is installed the aluminum alloy lintel of horizontal extension and the aluminum alloy muntin of longitudinal extension, the equal rigid coupling in aluminum alloy lintel both ends is on layer frame stand, and the equal rigid coupling in aluminum alloy muntin upper end is on the aluminum alloy lintel, and the equal rigid coupling of lower extreme is on the scarf beam.
Compared with the prior art, the utility model discloses following beneficial effect has: the layer frames are connected together through the butt joint frame assembly, namely the tops of the metal connecting rods are locked through nuts, the hanging blocks move upwards in the nut locking process, the bottom of the device expands under the action of the quadrangular frustum pyramid and the thin seam, and then the butt joint frame assembly is fastened, the upper end of the device is fastened with the upright post of the upper layer frame through bolts, and butt joint fastening is completed, namely the butt joint frame assembly is simple and convenient to assemble on the premise of ensuring firm and reliable assembly, the welding steps are prevented from being complicated and the attractiveness is prevented from being influenced, the performance and the attractiveness of the surface layer material of the frame are not damaged, five-sided sightseeing experience is achieved, and the original home decoration;
the invention provides a self-carrying well, which can be used for sightseeing on four sides, has a real panoramic design and can be installed in various buildings such as villas, private residences, duplex buildings and the like; the stair can be arranged in the middle of the stair, close to the wall and indoors and outdoors. Both can have been installed in the middle of the present reservation elevartor shaft of developer or stair, also can be installed by wall position or floor trompil position at any outdoor indoor of family, saved actual area occupied and install convenient.
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic view of a split state according to an embodiment of the present invention;
FIG. 3 is an enlarged view of A in FIG. 2;
fig. 4 is a schematic diagram of the single-side plugging and quick plugging of the connecting beam in the embodiment of the present invention.
In the figure: 1-sleeve, 2-square connecting frame, 3-connecting beam, 4-butt joint frame assembly, 5-butt joint upright post, 6-notch, 7-metal connecting rod, 8-nut, 9-vertical block, 10-fine slit, 11-layer frame upright post, 12-stainless steel frame, 13-splicing block, 14-through hole, 15-bolt, 16-layer frame, 17-aluminum alloy lintel, 18-aluminum alloy middle support and 19-embedded beam.
Detailed Description
In order to make the aforementioned and other features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below.
As shown in fig. 1 to 4, a fast-assembly hoistway frame structure comprises four sleeves 1 and four connecting beams 3 enclosing the periphery of the sleeves to form a square connecting frame 2, the sleeves are respectively arranged at four corners and are inserted by the connecting beams, the cross sections of the sleeves are square, the sleeves are vertically inserted into a butt-joint frame assembly 4, the butt-joint frame assembly comprises a butt-joint upright post 5, the adjacent side walls of the butt-joint upright post near the center of the square connecting frame are respectively provided with a notch 6 for the staggered insertion of the two connecting beams, the bottom of the butt-joint upright post is vertically inserted into a metal connecting rod 7 from bottom to top, the metal connecting rod sequentially penetrates through the butt-joint upright post and the connecting beams to the top of the butt-joint upright post and penetrates out from the top of the butt-joint upright post, the upper surface of the metal connecting rod is provided with threads and is screwed with a nut 8 to be fastened to the upper surface of the, one corner at the lower end of the butt joint upright post is vertically upwards provided with a thin seam 10; the lower end of the butt joint frame assembly is inserted into the lower layer of frame upright post 11, and the upper end of the butt joint frame assembly is inserted into the other layer of frame upright post to be locked and connected.
In the embodiment of the present invention, the hanging block is a square frustum with a small top and a large bottom, and the lower end surface area is larger than the opening area of the docking upright.
The embodiment of the utility model provides an in, the butt joint stand material is the carbon steel, and the proof strength is high and machinability is good, and outer stainless steel frame does not rust in order to guarantee that its outward appearance is intact.
In the embodiment of the utility model, the stainless steel frame 12 is sleeved outside the butt-joint upright posts and fixedly connected into a whole, the stainless steel frame is also provided with a notch and a slit at the same position with the butt-joint upright posts, and the sleeve is provided with a notch for the scarf beam to pass through at the corresponding position; the two ends of the connecting beam are respectively and fixedly provided with inserting blocks 13 with staggered heights, the two connecting beams are respectively and vertically inserted into different notches, but the inserting blocks with one lower height are inserted in a staggered manner, and the two connecting beams are vertically penetrated by metal connecting rods.
The embodiment of the utility model provides an in, the notch is seted up in the nearly upper end department of butt joint stand, and this butt joint stand upper end exceeds sleeve pipe up end, and sets up the through-hole 14 that transversely runs through the butt joint stand at the side of exceeding sleeve pipe department, and this through-hole staggers with the metal connecting rod position, corresponds also to be provided with the through-hole on the upper frame stand and wears to establish spiro union locking by bolt 15.
The embodiment of the utility model provides an in, layer frame stand is provided with four and is connected constitution layer frame 16 with a plurality of scarf beams 19, layer frame front side installs aluminum alloy lintel 17 and the aluminum alloy muntin 18 of longitudinal extension of horizontal extension, the equal rigid coupling in aluminum alloy lintel both ends is on layer frame stand, and the equal rigid coupling in aluminum alloy muntin upper end is on the aluminum alloy lintel, and the equal rigid coupling of lower extreme need not install the scarf beam between two aluminum alloy metal lintels except the bottom on the scarf beam.
The embodiment of the utility model provides a theory of operation: adopt a plurality of layers of well frame to take the building block formula to establish, link together layer frame through butt joint frame assembly, metal connecting rod top passes through the nut locking promptly, at the in-process of nut locking, the piece that hangs down shifts up, because the effect of quadrangular frustum form and slit, the inflation can take place for the device bottom, and then fasten butt joint frame assembly, and the upper end is fastened through bolt and top layer frame stand, accomplish the butt joint fastening, realize the equipment simple and convenient under the firm reliable prerequisite of guaranteeing the assembly promptly, it is loaded down with trivial details and influence pleasing to the eye to avoid the welding step.
The present invention is not limited to the above-described preferred embodiments, and any person can obtain other various types of fast-assembly hoistway frame structures according to the teaching of the present invention. All the equivalent changes and modifications made according to the claims of the present invention shall fall within the scope of the present invention.

Claims (5)

1. Fast-assembling well frame construction, its characterized in that: comprises four sleeves and four connecting beams which are encircled on the periphery of the sleeves to form a square connecting frame, the sleeves are respectively arranged at four corners and are inserted by the connecting beams, the cross sections of the sleeves are square, and the sleeves are vertically inserted into a butt joint frame assembly, the butt joint frame assembly comprises butt joint upright posts, the adjacent side walls of the butt joint upright posts close to the center of the square connecting frame are respectively provided with a notch for the dislocation insertion of the two connecting beams, the bottom of the butt-joint upright post is vertically inserted with a metal connecting rod from bottom to top, the metal connecting rod sequentially passes through the butt-joint upright post and the connecting beam to penetrate out of the top of the butt-joint upright post, the upper end surface of the metal connecting rod is provided with threads and is screwed with a nut to be fastened with the upper surface of the butt joint upright post, the lower end of the metal connecting rod is fixedly connected with a hanging block into a whole, the lower end of the butt joint upright post is provided with an opening and is blocked by a hanging block, and a slit is vertically arranged upwards at one corner of the lower end of the butt joint upright post; the lower end of the butt joint frame assembly is inserted into the frame upright column on the lower layer, and the upper end of the butt joint frame assembly is inserted into the frame upright column on the other layer to be locked and connected.
2. The package hoistway frame structure of claim 1, wherein: the vertical block is in a quadrangular frustum pyramid shape with a small upper part and a big lower part, and the area of the lower end face of the vertical block is larger than that of the opening of the butt joint upright post.
3. The package hoistway frame structure of claim 1, wherein: the stainless steel frame is also provided with a notch and a slit at the same position with the butt joint upright column, the two ends of the connecting beam are respectively and fixedly provided with inserting blocks with staggered heights, the two connecting beams are respectively and vertically inserted into different notches and are inserted by the inserting blocks with one lower height in a staggered manner, and the connecting beams are vertically penetrated by metal connecting rods.
4. The package hoistway frame structure of claim 3, wherein: the notch is arranged at the position close to the upper end of the butt joint upright post, the upper end of the butt joint upright post is higher than the upper end surface of the sleeve, a through hole transversely penetrating through the butt joint upright post is formed in the side edge of the position higher than the sleeve, the through hole is staggered with the metal connecting rod, and a through hole is correspondingly formed in the upper layer frame upright post and is screwed and locked by a bolt in a penetrating mode.
5. The package hoistway frame structure of claim 1, wherein: the layer frame stand is provided with four and is connected constitution layer frame with a plurality of scarf beams, layer frame front side is installed the aluminum alloy lintel of horizontal extension and the aluminum alloy mullion of longitudinal extension, the equal rigid coupling in aluminum alloy lintel both ends is on layer frame stand, and the equal rigid coupling in aluminum alloy mullion upper end is on the aluminum alloy lintel, and the equal rigid coupling of lower extreme is on the scarf beam.
CN202020882175.0U 2020-05-24 2020-05-24 Fast-assembling well frame construction Active CN212450188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020882175.0U CN212450188U (en) 2020-05-24 2020-05-24 Fast-assembling well frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020882175.0U CN212450188U (en) 2020-05-24 2020-05-24 Fast-assembling well frame construction

Publications (1)

Publication Number Publication Date
CN212450188U true CN212450188U (en) 2021-02-02

Family

ID=74500223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020882175.0U Active CN212450188U (en) 2020-05-24 2020-05-24 Fast-assembling well frame construction

Country Status (1)

Country Link
CN (1) CN212450188U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113213308A (en) * 2021-04-23 2021-08-06 佛山长驰电梯部件有限公司 Elevator well frame convenient to equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113213308A (en) * 2021-04-23 2021-08-06 佛山长驰电梯部件有限公司 Elevator well frame convenient to equipment

Similar Documents

Publication Publication Date Title
JP7022688B2 (en) Modular building connector
CN209924120U (en) Assembled light steel frame structure building system
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN111927248B (en) Integrally prefabricated externally hung bay window, connecting node and manufacturing method
CN212450188U (en) Fast-assembling well frame construction
CN111498645A (en) Villa elevator self-provided shaft rapid installation structure and method
CN210396247U (en) Modularization container building connected node
CN102220785A (en) Combined joint, precast box house, and construction method for reinforced concrete structure multistory and high-rise building
CN107558608B (en) Lattice steel frame connecting node and construction method
CN114482348B (en) Cross double-pull-rod steel frame supporting large-span glass curtain wall system
CN109537724A (en) One kind is unilateral to be bolted reinforcing joint for resisting continuous collapse of beam column and its construction method
CN112942898B (en) Modularized integrally assembled building system, building module unit and connecting node
CN201254771Y (en) Wide span non-column curtain wall system
CN213268314U (en) Truss structure and building structure
CN213572930U (en) Self-locking hinged elevator shaft construction platform device
CN211341132U (en) Precast concrete frame structure
CN101343900B (en) Large-span non-upright post curtain wall system
CN108532747A (en) A kind of assembled architecture component
CN215068910U (en) Assembled building teaching aid for teaching
CN211816941U (en) Constructional engineering steel construction support frame
CN213837659U (en) Two side baskets of hanging of precast beam template high altitude construction
CN217027984U (en) Movable overhanging construction platform
CN219732285U (en) Wall column integrated steel structure building
CN215803421U (en) Improved civil building reinforcing device
CN112482561B (en) Wall structure attaches in core section of thick bamboo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant