CN201254771Y - Wide span non-column curtain wall system - Google Patents

Wide span non-column curtain wall system Download PDF

Info

Publication number
CN201254771Y
CN201254771Y CNU2008201102233U CN200820110223U CN201254771Y CN 201254771 Y CN201254771 Y CN 201254771Y CN U2008201102233 U CNU2008201102233 U CN U2008201102233U CN 200820110223 U CN200820110223 U CN 200820110223U CN 201254771 Y CN201254771 Y CN 201254771Y
Authority
CN
China
Prior art keywords
crossbeam
curtain wall
crossbeams
glass
face glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201102233U
Other languages
Chinese (zh)
Inventor
魏东海
陶伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jangho Group Co Ltd
Original Assignee
Beijing Jangho Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jangho Curtain Wall Co Ltd filed Critical Beijing Jangho Curtain Wall Co Ltd
Priority to CNU2008201102233U priority Critical patent/CN201254771Y/en
Application granted granted Critical
Publication of CN201254771Y publication Critical patent/CN201254771Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model provides a large-span non-upright post curtain wall system; an integral structure adopts a mode that a frame supporting glass curtain wall structure and a pull rod glass curtain wall structure are combined. Crossbeams are arranged between every transverse jointing line of a glass panel; one ends of the crossbeams are connected with a crossbeam supporting structure; the other ends are connected with neighboring crossbeams by a core sleeve in an inserting way; and the upper and the lower of the crossbeam supporting structure are respectively connected with an upper top structure and a lower bottom structure. The upper top structure is downwards suspended with a suspender system; under the deadweight effect of glass, the crossbeams always maintain a horizontal state or within a deflection range. The suspender system is penetrated into a pre-opening on the crossbeams at the crossed location with the crossbeams and is provided with a loading adjusting nut at the lower part of the pre-opening; the crossbeams are spanned on the loading adjusting nut. The glass panel is inserted and fixed on the glass mounting notches of the upper crossbeam and the lower crossbeam. The utility model realizes the horizontal penetrating space with large span, and plays the active effect on lighting and visual effects.

Description

Large-span non-upright post curtain wall system
Technical field
The utility model relates to a kind of curtain wall system and support system structure thereof of large-span non-upright post.
Background technology
The lattice of common large-area curtain wall is less, column or some glass spare are all arranged in the vertical, cause column, crossbeam or some glass spare too intensive, thereby block people's sight, can not realize large span, large-area open space, cause the whole permeability of building to reduce.So how to greatest extent the transparency of large-area glass parts is displayed, be the emphasis of glass construction architectural study always.
Summary of the invention
In view of this, the utility model provides a kind of curtain wall system of large-span non-upright post, the whole baffle wall system realizes the large-span non-upright post purpose of connecting by big specification, high-performance beam design, the design of stealthy suspension rod and dry seal technology, can obtain large-area open space.
The utility model is achieved in that the mode that the overall structure of curtain wall system adopts frame supported glass curtain wall structure and pull bar glass curtain wall structure to combine.Curtain wall system comprises the face glass that a piece is stitched together, and leaves splicing seams on vertically between each face glass, forms the crisscross straight line of a lot of between the longitudinal spliced seam of each face glass and each crossbeam.Roof construction on the curtain wall system top has, bottom have following bottom structure.It is characterized in that: between the horizontally-spliced seam in each road of face glass, crossbeam is installed all, crossbeam one end is connected with the crossbeam braced structures, the other end is pegged graft by core retainer plate and adjacent beams, the crossbeam braced structures is positioned at a side of face glass, is connected with following bottom structure respectively with by last roof construction up and down.Begin from last roof construction, be lifted with boom system downwards, boom system is hidden in the longitudinal spliced seam of face glass, the foot of boom system is unsettled, boom system is directly born vertical load, and guarantee that face glass is installed to after the glass installation groove mouth on the crossbeam, under the deadweight effect of glass, crossbeam remains level or is in the amount of deflection scope.Boom system all is being interspersed in the pre-drilled cavity on the crossbeam with the crossbeam intersection, and the load-bearing adjusting nut is contained in the bottom of suspension rod and each crossbeam intersection pre-drilled cavity.By regulating the levelness that the load-bearing adjusting nut is regulated crossbeam.Face glass injects and is fixed in the glass installation groove mouth of lower and upper cross-member.The utility model can be realized a kind of curtain wall construction of large-span non-upright post, can only observe the crossbeam lattice on the horizontal direction, can only observe face glass splicing seams lattice on the vertical direction, be separated with the span of certain distance between the crossbeam braced structures, this span can reach more than tens meters, realized the horizontal open space of large span, on daylighting and visual effect, played a positive role, thereby can satisfy the buildings higher such as airport, sightseeing dining room, stadiums penetrating area requirements.
Description of drawings
Figure 1A is a Facad structure schematic diagram of the present utility model.
Figure 1B is the cross-sectional figure of Figure 1A.
Fig. 1 C is the sectional side elevation of Figure 1A.
Fig. 2 is the schematic diagram that crossbeam is connected with suspension rod.
Fig. 3 is the schematic diagram of face glass in crossbeam glass installation groove mouth.
Among the figure: 1 face glass, 2 boom systems, roof construction on 3,4 times bottom structures, 5 crossbeam braced structuress, 6 crossbeams, 7 glass installation groove mouths, 8 adaptors, 9 core retainer plates, 10 load-bearing adjusting nuts, 11 regulating sleeves.
The specific embodiment
Referring to Fig. 1-Fig. 3, the curtain wall system of large-span non-upright post comprises the face glass 1 that a piece is stitched together, and leaves splicing seams between the face glass 1, and each face glass 1 longitudinal spliced seam and each crossbeam 6 form the crisscross straight line of a lot of.The mode that the overall structure of curtain wall adopts frame supported glass curtain wall structure and pull bar glass curtain wall structure to combine.At the curtain wall system top roof construction 3 on is arranged, following bottom structure 4 is arranged at the bottom.Between the horizontally-spliced seam in each road of face glass 1 crossbeam 6 is installed all, crossbeam 6 one ends are connected by steel adaptor 8 with crossbeam braced structures 5, and the other end is pegged graft by core retainer plate 9 and adjacent beams 6.The core retainer plate inserting mode is one of connected mode the most basic in the Machine Design, and promptly a section connects together crossbeam 6 by overlapping slotting method.Crossbeam braced structures 5 tops are connected with last roof construction 3, and the bottom is connected with following bottom structure 4.Be lifted with boom system 2 downwards from last roof construction 3, the foot of boom system 2 is unsettled, and guarantee that face glass 1 is installed to after the glass installation groove mouth 7 on the crossbeam 6, under the deadweight effect of face glass 1, crossbeam 6 remains level or is in the amount of deflection scope.The topmost of boom system 2 is connected with last roof construction 3 or is connected with the crossbeam 6 at top.Boom system 2 is to be assembled by a section high strength bar and regulating sleeve 11.Load-bearing adjusting nut 10 and locking nut are housed on the suspension rod.The regulating sleeve 11 of boom system 2 occupy between per two crossbeams 6, and regulating sleeve 11 two ends are reverse thread each other, by rotating regulating sleeve 11 neighbouring two suspension rods is fixed.Suspension rod passes the pre-drilled cavity on the crossbeam 6.Load-bearing adjusting nut 10 is installed on the suspension rod with pre-drilled cavity bottom, each crossbeam 6 intersection, and 6 on crossbeam is on load-bearing adjusting nut 10.Can regulate crossbeam 6 levelnesss by regulating load-bearing adjusting nut 10.Load-bearing adjusting nut 10 carries out anticreep by locking nut.Boom system 2 also can above-mentioned connecting rod mode, and adopt steel hinge line system or other alternative systems.The longitudinal spliced seam that face glass is 1 is sealed by adhesive tape, and boom system 2 is hidden in the middle of the longitudinal spliced seam of face glass 1, and boom system 2 then all can't be seen in the indoor and outdoor.Face glass 1 injects and also is fixed in the glass installation groove mouth 7 that lower and upper cross-member 6 reserves, directly the falling on the boom system 2 by load-bearing adjusting nut 10 of face glass 1 from heavy load, and boom system 2 is directly born vertical load.
Because the longspan structure design, the span of its crossbeam can reach more than tens meters, and crossbeam span, geomery and face glass lattice size all can design according to architect's requirement.The whole face glass of curtain wall can be perpendicular to ground, can beveling, or other designs.Therefore the crossbeam braced structures both can be and vertically also can be inclination, form can require to design according to the architect, as the steel work of plane triangle Vierendeel truss, square truss, U-shaped Vierendeel truss or other shapes, also can be concrete structure column or other braced structuress.Last roof construction can be a net shell steel work, also can be other structures etc.

Claims (7)

1, a kind of large-span non-upright post curtain wall system, comprise the face glass that a piece is stitched together, leave splicing seams between each face glass, the longitudinal spliced seam of each face glass and each crossbeam form the crisscross straight line of a lot of, roof construction on the top of curtain wall system has, bottom have following bottom structure; It is characterized in that: between the horizontally-spliced seam in each road of face glass, crossbeam is installed all, crossbeam one end is connected with the crossbeam braced structures, the other end is pegged graft by core retainer plate and adjacent beams, and the crossbeam braced structures is positioned at a side of face glass, and each is by the last roof construction and the support structure of going to the bottom up and down; Begin from last roof construction, be lifted with boom system downwards, boom system is hidden in the longitudinal spliced seam of face glass, the foot of boom system is unsettled, the load-bearing adjusting nut is installed on the suspension rod, cross beam frame makes crossbeam remain level or is in the amount of deflection scope on the load-bearing adjusting nut; Face glass injects and is fixed in the glass installation groove mouth of lower and upper cross-member.
2, curtain wall system according to claim 1 is characterized in that: boom system is to be assembled by a section high strength bar and regulating sleeve.
3, curtain wall system according to claim 1 and 2 is characterized in that: the regulating sleeve of boom system occupy on the position between per two crossbeams.
4, curtain wall system according to claim 1 and 2 is characterized in that: the load-bearing adjusting nut is contained on the suspension rod with each pre-drilled cavity bottom, crossbeam intersection.
5, curtain wall system according to claim 1 is characterized in that: longitudinal spliced seam is sealed by adhesive tape, and boom system is hidden in it.
6, curtain wall system according to claim 1 is characterized in that: boom system adopts the steel hinge line system.
7, according to claim 1,2 or 6 described curtain wall systems, it is characterized in that: the topmost of boom system is connected with last roof construction or is connected with the beam structure at top.
CNU2008201102233U 2008-08-26 2008-08-26 Wide span non-column curtain wall system Expired - Lifetime CN201254771Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201102233U CN201254771Y (en) 2008-08-26 2008-08-26 Wide span non-column curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201102233U CN201254771Y (en) 2008-08-26 2008-08-26 Wide span non-column curtain wall system

Publications (1)

Publication Number Publication Date
CN201254771Y true CN201254771Y (en) 2009-06-10

Family

ID=40738090

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201102233U Expired - Lifetime CN201254771Y (en) 2008-08-26 2008-08-26 Wide span non-column curtain wall system

Country Status (1)

Country Link
CN (1) CN201254771Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343900B (en) * 2008-08-26 2010-06-16 北京江河幕墙股份有限公司 Large-span non-upright post curtain wall system
WO2019196006A1 (en) * 2018-04-10 2019-10-17 侯志峰 Construction method for suspended diamond aluminum veneer sunshade curtain wall of textile enterprise exhibition hall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343900B (en) * 2008-08-26 2010-06-16 北京江河幕墙股份有限公司 Large-span non-upright post curtain wall system
WO2019196006A1 (en) * 2018-04-10 2019-10-17 侯志峰 Construction method for suspended diamond aluminum veneer sunshade curtain wall of textile enterprise exhibition hall

Similar Documents

Publication Publication Date Title
CN209397709U (en) Lightgage steel joist steel frame composite structure
CN103276676B (en) Traffic guidance display screen frame
CN203402792U (en) Pre-assembled elevator with improved connection strength
CN111075078B (en) Special-shaped transverse locking type double-face panel unit curtain wall system and construction method thereof
CN201254771Y (en) Wide span non-column curtain wall system
CN107268422A (en) Across the self-anchored type suspension cable arched girder co-operative system bridge such as one kind
CN101343900B (en) Large-span non-upright post curtain wall system
CN212835882U (en) Y-shaped steel structure upright column dome with two layers of galleries
CN112323978A (en) Corner structure of encorbelmenting and building structure
CN111498645A (en) Villa elevator self-provided shaft rapid installation structure and method
CN111809726A (en) Truss structure and building structure
CN201400966Y (en) Overlength cantilever large truss type rainshed
CN212450188U (en) Fast-assembling well frame construction
CN206360205U (en) large-span concrete truss structure
CN215166940U (en) Self-balancing system glass curtain wall
CN213014697U (en) Corner structure of encorbelmenting and building structure
CN103104057A (en) Full-glass self-balance glass curtain wall
CN213268314U (en) Truss structure and building structure
CN213268588U (en) Light steel roof truss with super-large span
CN209817104U (en) House frame connection structure
CN213572930U (en) Self-locking hinged elevator shaft construction platform device
CN202466898U (en) Holohyaline self-balance glass curtain wall
CN209620622U (en) A kind of promotion platform
CN206503284U (en) A kind of semicircle vertex of a cone combines paulin room with curved surface top
CN109281478B (en) Assembly method of shear wall-concrete truss cantilever type building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JANGHO GROUP CO., LTD.

Free format text: FORMER NAME: BEIJING JIANGHE CURTAIN WALL CO., LTD.

CP03 Change of name, title or address

Address after: 101300 Beijing City, Shunyi District, the north of cattle, No. five street, No. 5

Patentee after: Jiangho Group Company Limited

Address before: 101301 5, five North Street, Shunyi District, Beijing

Patentee before: Beijing Jianghe Curtain Wall Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090610