CN209620622U CN201822090072.6U CN201822090072U CN209620622U CN 209620622 U CN209620622 U CN 209620622U CN 201822090072 U CN201822090072 U CN 201822090072U CN 209620622 U CN209620622 U CN 209620622U
Authority
CN
China
Prior art keywords
truss
steel plate
overarm
isolating pedestal
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822090072.6U
Other languages
Chinese (zh)
Inventor
龙敏健
苗恩新
柏志诚
朱永航
岳云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201822090072.6U priority Critical patent/CN209620622U/en
Application granted granted Critical
Publication of CN209620622U publication Critical patent/CN209620622U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of promotion platform, including supporting steel plate, construction ceiling is equipped with reinforced concrete knoll, and earth anchor steel plate is embedded on reinforced concrete knoll, and supporting steel plate is equipped with shock isolating pedestal, has been located end truss on shock isolating pedestal;The crossbeam of end truss rear end is connect through earth anchor rod with earth anchor steel plate;Two sides are separately installed with hoisting platform at the top of the truss of end;Hoisting platform includes pillar, the column welding of pillar bottom end and end truss front end two sides;Beam welding on rear side of pillar top through brace and end truss rear end;Horizontal overarm is welded on front side of pillar top, level overarm bottom is welded through the bottom of column on front side of support rod and end truss;Level overarm inside in the middle part of the crossbeam at the top of bearing diagonal and end truss through welding.The utility model stability is good, can reduce promotion total weight, reduces and promotes difficulty, and convenient for docking after promotion, the utility model is set up and removes very convenient, is conducive to control construction cost.

Description

A kind of promotion platform
Technical field
It is especially a kind of for promoting the promotion of large span skybridge truss the utility model relates to a kind of promotion platform Platform belongs to technical field of building construction.
Background technique
As economy, the expansion of cultural construction demand and people appreciate building the raising of taste, large-span steel The features such as due to its diversification of forms, handsome in appearance, good economy performance, is increasingly by the favor of designers, longspan structure master Roof structure to be applied to large public buildings such as Aerodrome Construction, conference and exhibition center, stadiums, exhibition center, aerial vestibules In.
The prior art is using the method for setting up temporary support when carrying out the construction of large span skybridge truss.By Longer in vestibule truss length, the locating height of vestibule truss is very high, also needs to rent big machinery and big setting up temporary support The moulding bed of amount, operating expenses are quite high.
Utility model content
The purpose of this utility model is to provide a kind of promotion platforms, especially a kind of for promoting large span skybridge The promotion platform of truss assembles the middle section of large span skybridge truss on ground, can reduce high-altitude work to the greatest extent Industry amount, using skybridge truss both ends end truss as promoted platform foundation structure, stability is good, after promotion be convenient for pair It connects, construction period can be shortened, reduce construction cost.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of promotion platform of the utility model, the supporting steel plate including being embedded in construction ceiling, construction ceiling are equipped with steel Reinforced concrete pier, earth anchor steel plate is embedded on reinforced concrete knoll, and supporting steel plate is equipped with shock isolating pedestal, is located on shock isolating pedestal There is end truss;The crossbeam of end truss rear end is connect through earth anchor rod with earth anchor steel plate;Two sides, which are separately installed with, at the top of the truss of end hangs Assembling platform;Hoisting platform includes pillar, the column welding of pillar bottom end and end truss front end two sides;Through oblique pull on rear side of pillar top The beam welding of bar and end truss rear end;Horizontal overarm is welded on front side of pillar top, the front end of level overarm is equipped with for pacifying The notch of hydraulic cylinder is filled, level overarm bottom is welded through the bottom of column on front side of support rod and end truss;Level overarm inside warp It is welded in the middle part of crossbeam at the top of bearing diagonal and end truss.
In aforementioned promotion platform, the stabilizer blade of the end truss is surrounded by stiffener, and closes and sit through shock isolating pedestal and support It falls on supporting steel plate;Shock isolating pedestal is friction pendulum shock isolating pedestal;Support closes outside and welds through one group of stiffening plate and supporting steel plate It connects;Support closes inside and fixes shock isolating pedestal through one group of snap-gauge.
In aforementioned promotion platform, the shock isolating pedestal includes lower seat and the seat of honour, and lower seat top surface center is equipped with frustum, frustum top Face and seat of honour bottom surface are concave spherical surface;Isolation cushion is equipped between upper and lower two concave spherical surfaces.
In aforementioned promotion platform, the notch of the horizontal overarm front end is equipped with lift cylinder, sets on rear side of lift cylinder There is leading truck;The cable wire of lifting heavy is installed among lift cylinder.
By adopting the above-described technical solution, the utility model is compared with prior art, the promotion platform of the utility model Using the end truss at skybridge truss both ends as the foundation structure for promoting platform, stability is good, convenient for docking after promotion.It is right It does not need to remove assembled end truss after connecing, it is only necessary to remove some additional structures.It sets up and removes and is very convenient.By In the utility model using skybridge truss both ends end truss as promotion platform foundation structure after, in skybridge truss Between part vestibule truss middle section can integrally be promoted by promoting platform, construction operation master after ground is completed Ground is concentrated on, amount of high-altitude operation can be down at least, it is smaller to the construction infection of other professions, and the more than enough work surface of energy is flat Row construction.In addition the end truss at vestibule truss both ends is eliminated, only needs to promote skybridge truss middle part in lifting process Point, reduce promotion total weight, reduces promotion difficulty and be conducive to construct.When removing promotion platform, it is only necessary to which dismounting is being held Increased temporary facility on truss retains the end truss set up, reduces dismounting workload, be conducive to construction cost control System.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the axonometric drawing of the utility model;
Fig. 4 is the structural schematic diagram of friction pendulum shock isolating pedestal.
In the figure, it is marked as 1- construction ceiling, 2- supporting steel plate, 3- reinforced concrete knoll, 4- earth anchor steel plate, 5- shock insulation branch Seat, the end 6- truss, 7- earth anchor rod, 8- pillar, 9- column, 10- brace, the overarm of 11- level, 12- notch, 13- support rod, 14- bearing diagonal, 15- stabilizer blade, 16- stiffener, 17- support box, 18- stiffening plate, 19- snap-gauge, seat under 20-, the seat of honour 21-, 22- cone Platform, 23- concave spherical surface, 24- isolation cushion, 25- lift cylinder, 26- leading truck, 27- cable wire.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
A kind of promotion platform of the utility model, as shown in Figures 1 to 3, the supporting steel plate including being embedded in construction ceiling 1 2, construction ceiling 1 is equipped with reinforced concrete knoll 3, is embedded with earth anchor steel plate 4 on reinforced concrete knoll 3, supporting steel plate 2 be equipped with every Support 5 is shaken, end truss 6 has been located on shock isolating pedestal 5;The crossbeam of end 6 rear end of truss is connect through earth anchor rod 7 with earth anchor steel plate 4; End 6 top two sides of truss are separately installed with hoisting platform;Hoisting platform includes pillar 8,8 bottom end of pillar and end 6 front end two of truss The column 9 of side welds;Beam welding on rear side of 8 top of pillar through brace 10 and end 6 rear end of truss;Weldering on front side of 8 top of pillar It is connected to horizontal overarm 11, the front end of level overarm 11 is equipped with the notch 12 for installing hydraulic cylinder, and 11 bottoms of level overarm are through propping up The bottom of strut 13 and end 6 front side column 9 of truss is welded;Cross of 11 inside of level overarm through 6 top of bearing diagonal 14 and end truss Welding in the middle part of beam.As shown in partial enlarged view in Fig. 3, the stabilizer blade 15 of end truss 6 is surrounded by stiffener 16, and through shock isolating pedestal 5 and support close and 17 be located on supporting steel plate 2;Shock isolating pedestal 5 is friction pendulum shock isolating pedestal;Support closes 17 outsides and adds through one group Strong plate 18 is welded with supporting steel plate 2;It is through one group of snap-gauge 19 that shock isolating pedestal 5 is fixed that support closes 17 insides.As shown in figure 4, shock insulation Support 5 includes lower seat 20 and the seat of honour 21, and lower 20 top surface center of seat is equipped with frustum 22, and 22 top surface of frustum and 21 bottom surface of the seat of honour are recessed Spherical surface 23;Isolation cushion 24 is equipped between upper and lower two concave spherical surfaces 23.After the completion of promoting putting up platform, in 11 front ends of horizontal overarm Lift cylinder 25 is installed, the rear side of lift cylinder 25 installs leading truck 26 on notch 12;Promotion weight is installed among lift cylinder 25 The cable wire 27 of object.27 lower end of cable wire is connect with middle truss to be hoisted, can be promoted.
Embodiment
Below by taking the aerial vestibule of Nanjing ancient cooking vessel positive purchase of property No.2011G38 plot project as an example, the project underground height 13.75m, ground height 63.8m, total height 77.55m.Vestibule truss depth 2.3m, span 39m, assembled absolute altitude -6.1m are promoted Height about 71m.It is 750,000 or so according to prior art estimated charges.Total cost is 340,000 yuan of left side after using the method for this example Construction cost 55% or so is saved on the right side.
The method of this example is that vestibule truss is divided into three sections, including a middle truss and two end truss 6, two end truss 6 as promoted platform base rack can directly in construction ceiling 1 it is assembled in place.When assembled end truss 6, the branch of truss 6 is held 15 bottom of foot should pad shock isolating pedestal 5;Shock isolating pedestal 5 uses friction pendulum shock isolating pedestal, and shock isolating pedestal 5 includes lower seat 20 and upper Seat 21, lower 20 top surface center of seat are equipped with frustum 22, and 22 top surface of frustum and 21 bottom surface of the seat of honour are concave spherical surface 23;Upper and lower two recessed balls Isolation cushion 24 is equipped between face 23.Lifting process can be made more stable by isolation cushion 24.Shock isolating pedestal 5 is to be located at support conjunction In 17, support closes 17 and welds with supporting steel plate 2;Support closes and is welded with stiffening plate 18 between 17 outer rims and supporting steel plate 2, with Increase the intensity that support closes 17.There are gaps between 5 surrounding of shock isolating pedestal and support 17 interior frames of conjunction, in lifting process, are Ensure to hold the stability of truss 6, gap is by one group of snap-gauge 19 by shock isolating pedestal 5 jam-packed.
After holding the assembled position of truss 6, truss 6 will be held by earth anchor rod 7 and be embedded on construction ceiling reinforced concrete knoll 3 Earth anchor steel plate 4 connect, opposite end truss 6 reinforced.Then it is set in the auxiliary that the top installation of 6 liang of the truss surveys in end promotes platform It applies.Auxiliary equipment includes pillar 8, horizontal overarm 11, support rod 13, bearing diagonal 14 and leading truck 26.The effect of pillar 8 is will to mention Peaceful raising certain altitude can dock after being promoted in place in order to middle truss with end truss 6.The lower end and end purlin of pillar 8 It welds 9 upper end of column of 6 front end two sides of frame.The upper end of pillar 8 and the welding of 11 one end of horizontal overarm.Level overarm 11 effect be It is corresponding with the hoisting point position on middle truss that hoist point is forward extended out into certain distance.The horizontal overarm in lifting process in order to prevent 11 is sagging, is equipped with support rod 13,13 one end of support rod and horizontal overarm 11 front bottom ends weldering in 11 overhanging one end of level overarm It connects, 9 lower end of column of 13 other end of support rod and end truss 6 is welded.The horizontal overarm 11 or so in lifting process in order to prevent It swings, is welded with bearing diagonal 14,14 one end of bearing diagonal and horizontal overarm 11 leading insides weldering in 11 overhanging one end of level overarm It connects, is welded in the middle part of the crossbeam of 14 other end of bearing diagonal and end 6 front bottom end of truss.11 overhanging one end of level overarm are equipped with notch 12, lift cylinder 25 is installed on notch 12.Cable wire 27 influences to promote operation in lifting process in order to prevent, in lift cylinder 25 Rear side is to be welded with leading truck 26, can be led too long cable wire 27 by leading truck 26 in the side for not influencing promotion operation. After the device of the utility model promotes middle truss in place, need to dock middle truss with end truss 6.It is taken out when docking The snap-gauge 19 being stuck in 17 interior frame gaps of shock isolating pedestal 5 and support conjunction, makes that truss 6 is held to have certain horizontal freedom degree, with Convenient accurate docking.The effect of the concave spherical surface 23 of 21 bottom surface of 22 top surface of frustum and the seat of honour makes that truss 6 is held to have centainly when being contraposition Angular freedom, to facilitate accurate docking.Middle truss can also be made to have certain extendable room when expanding with heat and contract with cold simultaneously.
The utility model is using the end truss at skybridge truss both ends as the foundation structure for promoting platform, stability It is good, convenient for docking after promotion.It does not need to remove assembled end truss after docking, it is only necessary to remove some additional structures. It sets up and removes and is very convenient.Since the utility model is using the end truss at skybridge truss both ends as the basis for promoting platform After structure, skybridge truss middle section can be after ground be completed, by promoting platform for vestibule truss middle part Divide whole promotion, construction operation is concentrated mainly on ground, can be down to amount of high-altitude operation at least, to the construction infection of other professions It is smaller, and can more than enough work surface parallel construction.In addition the end truss at vestibule truss both ends is eliminated, only needs to mention in lifting process Skybridge truss middle section is risen, promotion total weight is reduced, promotion difficulty is reduced and is conducive to construct.It is put down removing to be promoted When platform, it is only necessary to remove the increased temporary facility on the truss of end, retain the end truss set up, reduce dismounting work Amount, is conducive to construction cost control.

Claims (4)

1. a kind of promotion platform, the supporting steel plate (2) including being embedded in construction ceiling (1), it is characterised in that: construction ceiling (1) It equipped with reinforced concrete knoll (3), is embedded on reinforced concrete knoll (3) earth anchor steel plate (4), supporting steel plate (2) is equipped with shock insulation Support (5) has been located end truss (6) on shock isolating pedestal (5);Hold the crossbeam of truss (6) rear end through earth anchor rod (7) and earth anchor steel Plate (4) connection;Two sides are separately installed with hoisting platform at the top of end truss (6);Hoisting platform includes pillar (8), pillar (8) bottom end It is welded with the column (9) of end truss (6) front end two sides;Through brace (10) and end truss (6) rear end on rear side of pillar (8) top Beam welding;Horizontal overarm (11) is welded on front side of pillar (8) top, the front end of level overarm (11) is equipped with hydraulic for installing The notch (12) of cylinder, level overarm (11) bottom are welded through the bottom of column (9) on front side of support rod (13) and end truss (6);Water Through being welded in the middle part of the crossbeam at the top of bearing diagonal (14) and end truss (6) on the inside of flat overarm (11).
2. promoting platform according to claim 1, it is characterised in that: the stabilizer blade (15) of the end truss (6), which is surrounded by, to be added Strength plate (16), and close (17) through shock isolating pedestal (5) and support and be located on supporting steel plate (2);Shock isolating pedestal (5) is friction pendulum Shock isolating pedestal;Support is closed and is welded on the outside of (17) through one group of stiffening plate (18) and supporting steel plate (2);Support closes on the inside of (17) through one group Snap-gauge (19) is fixed by shock isolating pedestal (5).
3. promoting platform according to claim 1, it is characterised in that: the shock isolating pedestal (5) includes lower seat (20) and the seat of honour (21), lower seat (20) top surface center is equipped with frustum (22), and frustum (22) top surface and the seat of honour (21) bottom surface are concave spherical surface (23);On Isolation cushion (24) are equipped between lower two concave spherical surfaces (23).
4. promoting platform according to claim 1, it is characterised in that: set on the notch (12) of described horizontal overarm (11) front end Have lift cylinder (25), the rear side of lift cylinder (25) is equipped with leading truck (26);Lifting heavy is installed among lift cylinder (25) Cable wire (27).
CN201822090072.6U 2018-12-12 2018-12-12 A kind of promotion platform Expired - Fee Related CN209620622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822090072.6U CN209620622U (en) 2018-12-12 2018-12-12 A kind of promotion platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822090072.6U CN209620622U (en) 2018-12-12 2018-12-12 A kind of promotion platform

Publications (1)

Publication Number Publication Date
CN209620622U true CN209620622U (en) 2019-11-12

Family

ID=68445584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822090072.6U Expired - Fee Related CN209620622U (en) 2018-12-12 2018-12-12 A kind of promotion platform

Country Status (1)

Country Link
CN (1) CN209620622U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707172A (en) * 2018-12-12 2019-05-03 中国建筑第四工程局有限公司 It is a kind of for promoting the promotion platform of large span skybridge truss

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707172A (en) * 2018-12-12 2019-05-03 中国建筑第四工程局有限公司 It is a kind of for promoting the promotion platform of large span skybridge truss

Similar Documents

Publication Publication Date Title
CN108560719A (en) The support installation method of super large span double-layer Bidirectional hanging rope structure
CN104947942A (en) Computer-controlled expansion accumulative lifting method for erecting super-high arch grid structure
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN105332452A (en) Dragline curtain wall support system with steel truss at top and construction method thereof
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN205296869U (en) Spatial grid structure thrustor that slides
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN105332417A (en) Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN201460242U (en) Assembly jig frame with net rack structure
CN114809699A (en) Construction method of assembly type outer facade enclosure system for reconstruction of upper part of super high-rise building
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN105625645A (en) Construction method of suspension type steel-structured lighting skylight
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN209620622U (en) A kind of promotion platform
CN106193284A (en) Large span space falls installation method and the mounting structure of the continuous steel truss of level
CN206503233U (en) Assembled architecture beam-to-column joint structure and steel building
CN103835369B (en) Extensible high-altitude conjoined steel structure
CN105133774A (en) Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method
CN211257756U (en) Progressive overhanging structure aiming at complex outer vertical surface modeling
CN210597630U (en) Net rack integral lifting structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN202899639U (en) Concrete column structure
CN102817617A (en) Novel inhaul cable type shield originating backrest substrate system
CN109707172A (en) It is a kind of for promoting the promotion platform of large span skybridge truss
CN205955156U (en) Elevartor shaft steel platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

Termination date: 20201212