CN213771093U - Be used for pushing up mound top material and carry fortune equipment - Google Patents

Be used for pushing up mound top material and carry fortune equipment Download PDF

Info

Publication number
CN213771093U
CN213771093U CN202022850832.6U CN202022850832U CN213771093U CN 213771093 U CN213771093 U CN 213771093U CN 202022850832 U CN202022850832 U CN 202022850832U CN 213771093 U CN213771093 U CN 213771093U
Authority
CN
China
Prior art keywords
jacking
equipment
support
electric block
carry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022850832.6U
Other languages
Chinese (zh)
Inventor
施向华
游凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hejian Kattor Industrial Co ltd
Original Assignee
Hejian Kattor Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hejian Kattor Industrial Co ltd filed Critical Hejian Kattor Industrial Co ltd
Priority to CN202022850832.6U priority Critical patent/CN213771093U/en
Application granted granted Critical
Publication of CN213771093U publication Critical patent/CN213771093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a carry fortune equipment technical field, specifically be a be used for top of push to push away mound top material to carry fortune equipment, including installing the support at the girder steel front end, be provided with a plurality of on the support and remove the track, be provided with the electric block who is used for vertical promotion material on every removal track, electric block can follow the removal track and remove. The utility model discloses a to carry fortune equipment setting on the girder steel, through electric block's vertical lifting function with the material promotion, electric block is along the vertical walking of removal track simultaneously, realizes the promotion and the transport of material, along with the top pushing operation, carries fortune mound top required equipment and material, and process and time limit for a project are controllable, practice thrift the cost. The problem of steel structure bridge need carry at high mound top push-off in-process, and prior art carries the material cost higher and inefficiency is solved.

Description

Be used for pushing up mound top material and carry fortune equipment
Technical Field
The utility model relates to a carry fortune equipment technical field, specifically be a be used for top of push to push away mound top material to carry fortune equipment.
Background
A pier top material lifting and transporting device for pier top walking type pushing is used for installing devices and lifting and transporting materials of a steel structure bridge in a high pier top pushing process. To this end, we propose a lifting device for pushing the pier top material.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for top to push away mound top material to carry fortune equipment possesses to reduce and carries the fortune cost, improves the advantage of carrying the fortune efficiency, has solved steel construction bridge and has pushed away the in-process at high mound top and need carry the fortune, and prior art carries the problem that the material cost is higher and efficient.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a be used for pushing up mound top material and carry fortune equipment, is including installing the support at the girder steel front end, be provided with a plurality of on the support and remove the track, be provided with the electric block that is used for vertical promotion material on every removal track, electric block can follow the removal track and remove.
Preferably, the bracket is a steel structure welding structural member.
Preferably, the bracket is provided with a connecting piece and is arranged at the front end of the steel beam through the connecting piece.
Preferably, the connecting piece is composed of a connecting batten plate and a high-strength bolt.
Preferably, the number of the moving tracks and the number of the electric hoists are two.
Preferably, the electric hoist drives the wheels to roll on the moving track through the motor.
Preferably, the electric block is controlled to move and lift by a wired controller or a wireless controller.
Compared with the prior art, the beneficial effects of the utility model are as follows:
will carry fortune equipment setting on the girder steel, promote the material through electric block's vertical lifting function, electric block vertically walks along the removal track simultaneously, realizes the promotion and the transport of material, along with the top pushes away the operation, carries fortune mound top required equipment and material, and process and time limit for a project are controllable, practices thrift the cost. The problem of steel structure bridge need carry at high mound top push-off in-process, and prior art carries the material cost higher and inefficiency is solved.
Drawings
FIG. 1 is a vertical layout of the present invention;
FIG. 2 is a three-dimensional view of the present invention;
fig. 3 is a plan view of the present invention;
FIG. 4 is a cross-sectional view of the present invention;
FIG. 5 is a schematic diagram of a first embodiment;
FIG. 6 is a schematic view of step two according to the embodiment;
FIG. 7 is a schematic view of step three of the embodiment;
FIG. 8 is a diagram illustrating a fourth exemplary step.
In the figure: 1. an electric hoist; 2. a moving track; 3. a support; 4. a connecting member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, a device for jacking and transporting a pier top material comprises a support 3 installed at the front end of a steel beam, wherein a plurality of moving rails 2 are arranged on the support 3, an electric hoist 1 for vertically lifting the material is arranged on each moving rail 2, the electric hoist 1 can move along the moving rails 2, and wheels are driven by a motor to roll on the moving rails 2. The number of the moving tracks 2 and the number of the electric hoists 1 are two, and different numbers can be set according to requirements. The electric hoist 1 has longitudinal walking and vertical lifting functions, and is controlled to move and lift by a wired controller or a wireless controller.
The bracket 3 is a steel structure welding structural part. The electric hoist is arranged at the front end of the steel beam, is used for installing the electric hoist 1 and the walking mechanism, and is a main stress structure in the lifting process; as shown in fig. 1-3.
The bracket 3 is provided with a connecting piece 4 and is arranged at the front end of the steel beam through the connecting piece 4. The connecting piece 4 is composed of a connecting batten plate and a high-strength bolt. By being connected with the top of the front end of the steel beam. As shown in fig. 1-3.
The lifting principle and the process are as follows:
the method comprises the following steps: the whole lifting equipment is arranged at the front end of the steel beam through a connecting piece 4, and when the steel beam is pushed to the top of a high pier, the lifting equipment is used as a front fulcrum through a steel cushion block copying pad. As shown in fig. 4.
Step two: the equipment and the materials are lifted to the pier top height through the electric hoist 1. As shown in fig. 5.
Step three: the traveling mechanism of the electric hoist 1 is driven to longitudinally move to the pier top on the moving track 2. As shown in fig. 6.
Step four: and repeating the second step and the third step to finish the lifting and transporting of other materials. As shown in fig. 7.
The utility model discloses a to carry fortune equipment setting on the girder steel, through electric block 4's vertical lifting function with the material promotion, electric block is along moving 2 vertical walks of track simultaneously, realizes the promotion and the transport of material, along with the top pushing operation, carries fortune mound top required equipment and material, and process and time limit for a project are controllable, practice thrift the cost. The problem of steel structure bridge need carry at high mound top push-off in-process, and prior art carries the material cost higher and inefficiency is solved.
When the device is used, before the steel beam is pushed, lifting equipment is installed when the steel beam is assembled, the front end of the steel beam reaches the top of a high pier, the bottom of the steel beam is lifted by a steel cushion block serving as a fulcrum, the electric hoist 1 travels to the foremost end and lifts materials such as a walking jack and the like to the side of a platform by using a steel wire rope of the electric hoist 1, the electric hoist 1 is driven to travel backwards, the equipment and the materials fall onto the pier top platform, the initial state is reached again, the operation is repeated, and equipment material arrangement of each pier top is carried out.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a be used for top of push pier material to carry fortune equipment, is including installing support (3) at the girder steel front end, its characterized in that: the support (3) is provided with a plurality of moving rails (2), each moving rail (2) is provided with an electric block (1) used for vertically lifting materials, and the electric blocks (1) can move along the moving rails (2).
2. The jacking equipment for jacking pier top materials as claimed in claim 1, wherein: the support (3) is a steel structure welding structural part.
3. The jacking equipment for jacking pier top materials as claimed in claim 1, wherein: the support (3) is provided with a connecting piece (4) and is arranged at the front end of the steel beam through the connecting piece (4).
4. The jacking equipment for jacking pier top materials as claimed in claim 3, wherein: the connecting piece (4) is composed of a connecting batten plate and a high-strength bolt.
5. The jacking equipment for jacking pier top materials as claimed in claim 1, wherein: the number of the moving tracks (2) and the number of the electric hoists (1) are both two.
6. The jacking equipment for jacking pier top materials as claimed in claim 1, wherein: the electric hoist (1) drives the wheels to roll on the moving track (2) through the motor to walk.
7. The jacking equipment for jacking pier top materials as claimed in claim 1, wherein: the electric hoist (1) is controlled to move and lift through a wired controller or a wireless controller.
CN202022850832.6U 2020-12-02 2020-12-02 Be used for pushing up mound top material and carry fortune equipment Active CN213771093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022850832.6U CN213771093U (en) 2020-12-02 2020-12-02 Be used for pushing up mound top material and carry fortune equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022850832.6U CN213771093U (en) 2020-12-02 2020-12-02 Be used for pushing up mound top material and carry fortune equipment

Publications (1)

Publication Number Publication Date
CN213771093U true CN213771093U (en) 2021-07-23

Family

ID=76895516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022850832.6U Active CN213771093U (en) 2020-12-02 2020-12-02 Be used for pushing up mound top material and carry fortune equipment

Country Status (1)

Country Link
CN (1) CN213771093U (en)

Similar Documents

Publication Publication Date Title
KR101287455B1 (en) System and method for launching upper structure of bridege
CN110904841B (en) Bridge girder lifting method and system
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN107447681A (en) A kind of precast plate girder erection method
CN202220327U (en) Moving pulley of side web plate of full space support cast-in-place box beam
CN108661328A (en) A kind of shaped steel girder transferring installation method
CN109112963B (en) Bridge hoisting equipment
CN213771093U (en) Be used for pushing up mound top material and carry fortune equipment
CN205526359U (en) Prefab conveyer
JP4551037B2 (en) Large-scale PC slab erection method and apparatus
CN215101589U (en) Prestressing force superimposed sheet overhead hoist
CN217498459U (en) Track beam based on gravity energy storage
CN214245366U (en) Movable operation platform for bridge construction
CN206385867U (en) The type of mobile three-dimensional garage two
CN205418901U (en) Prefab conveyer
CN211711873U (en) Rail mounted is used for hoist and mount traction system of transportation
JP2009196802A (en) Conveying system and conveying method
CN106087756A (en) The erecting device of Wavelike steel webplate and installation method
CN205526362U (en) Prefab travelling bogie
CN205574937U (en) Prefab production conveyor system
CN220563563U (en) Movable cable platform
CN215165630U (en) Device is delivered to six arriss blocks of road slope high efficiency
CN210439083U (en) Maglev track panel transportation and pushing system
CN214497023U (en) Magnetic levitation track panel transporting and laying machine
CN219688244U (en) Efficient attic goods shelves of going up and down goods

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A lifting equipment for pushing pier top materials

Effective date of registration: 20220402

Granted publication date: 20210723

Pledgee: Bank of China Limited Wuhan Qingshan sub branch

Pledgor: HEJIAN KATTOR INDUSTRIAL Co.,Ltd.

Registration number: Y2022420000095

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210723

Pledgee: Bank of China Limited Wuhan Qingshan sub branch

Pledgor: HEJIAN KATTOR INDUSTRIAL Co.,Ltd.

Registration number: Y2022420000095

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A type of material lifting equipment for top pushing piers

Granted publication date: 20210723

Pledgee: Bank of China Limited Wuhan Qingshan sub branch

Pledgor: HEJIAN KATTOR INDUSTRIAL Co.,Ltd.

Registration number: Y2024980013532