CN215165630U - Device is delivered to six arriss blocks of road slope high efficiency - Google Patents
Device is delivered to six arriss blocks of road slope high efficiency Download PDFInfo
- Publication number
- CN215165630U CN215165630U CN202120875021.3U CN202120875021U CN215165630U CN 215165630 U CN215165630 U CN 215165630U CN 202120875021 U CN202120875021 U CN 202120875021U CN 215165630 U CN215165630 U CN 215165630U
- Authority
- CN
- China
- Prior art keywords
- road
- slide rail
- slope
- delivered
- hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a device is delivered to six arriss of road slope piece high efficiency, side slope including fill road and both sides, be provided with mobilizable removal wooden handcart on the fill road, it is fixed with a plurality of parallels and extends to the slide rail of side slope lower part, and is a plurality of to remove wooden handcart one side the slide rail end fixing has the support frame, the both ends lower part of support frame is provided with the removal wheel that supports on the side slope, every be provided with the hopper that can remove on the slide rail, the hopper upper end is connected fixedly through wire rope and the winch of fixing corresponding on removing the wooden handcart, the utility model has the advantages of simple structure, simple operation, the quick ageing efficiency of delivering six arris of brick improves at double, has guaranteed the efficiency of road construction, and fundamentally has stopped the risk that artifical delivery fragment of brick brought simultaneously, and the security improves greatly.
Description
Technical Field
The utility model relates to a road construction field, concretely relates to device is delivered to six arriss of road slope piece high efficiency.
Background
When the road is built, need lay hollow hexagonal piece at the side slope of road both sides and protect, because the longer and slope setting of side slope, in the past when delivering hollow hexagonal piece, the manual work rolls hexagonal piece or personnel from the side road and carries, not only has very big potential safety hazard, delivers the fragment of brick efficiency greatly reduced moreover, influences the efficiency of whole road side slope construction.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem of the existence, the utility model provides a device is delivered to six arriss blocks of road slope high efficiency.
The utility model discloses a realize through following technical scheme:
the utility model provides a device is delivered to six arriss of road slope piece high efficiency, is including the side slope of fill road and both sides, be provided with mobilizable removal wooden handcart on the fill road, it is fixed with a plurality of parallels and extends to the slide rail of side slope lower part, and is a plurality of to remove wooden handcart one side the slide rail end fixing has the support frame, the both ends lower part of support frame is provided with the removal wheel that supports on the side slope, every be provided with the hopper that can remove on the slide rail, the hopper upper end is connected fixedly through wire rope and the winch of fixing to correspond on removing the wooden handcart.
Preferably, a door-shaped fixture block is fixed at the bottom of the hopper, and limiting wheels are arranged at the lower parts of two sides of the door-shaped fixture block.
Preferably, the slide rail is arranged by adopting an I-shaped slide rail, and limiting wheels of door-shaped clamping blocks are placed in grooves on two sides of the I-shaped slide rail.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of being simple in structure and simple in operation, the efficiency improves at double soon after throwing six arris bricks, has guaranteed the efficiency of road construction, and fundamentally has stopped the artifical risk of throwing the fragment of brick and bringing simultaneously, and the security improves greatly.
Drawings
Fig. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a schematic enlarged view of a portion of the structure of FIG. 1;
FIG. 3 is a partial schematic view of the present invention;
in the figure: fill road 1, side slope 2, removal wooden handcart 3, slide rail 4, support frame 5, removal wheel 6, hopper 7, door-shaped fixture block 71, spacing wheel 72, wire rope 8, winch 9.
Detailed Description
The invention will be described in further detail with reference to the following detailed description and accompanying drawings:
as shown in fig. 1, 2, 3, a device is delivered to six arriss of road slope piece high efficiency, side slope 2 including fill road 1 and both sides, be provided with mobilizable removal wooden handcart 3 on the fill road 1, it is fixed with a plurality of parallels and extends to slide rail 4 of side slope 2 lower part to remove wooden handcart 3 one side, and is a plurality of slide rail 4 end fixing has support frame 5, the both ends lower part of support frame 5 is provided with the removal wheel 6 of support on side slope 2, every be provided with hopper 7 that can remove on the slide rail 4, hopper 7 upper end is connected fixedly through wire rope 8 and the winch 9 of fixing to correspond on removing wooden handcart 3.
A door-shaped fixture block 71 is fixed at the bottom of the hopper 7, and limiting wheels 72 are arranged at the lower parts of two sides of the door-shaped fixture block 71.
The slide rail 4 is arranged in an I-shaped slide rail, and the limiting wheels 72 of the door-shaped fixture block 71 are arranged in grooves on two sides of the I-shaped slide rail 4, so that the stability of the hopper 7 can be ensured when the slide rail 4 moves.
The working principle is as follows: when bricks are delivered, the brick transporting truck transports bricks on a filling road 1 to travel to the side of a moving plate car 3, a winch 9 on the moving plate car 3 is started, the winch 9 drives a hopper 7 to move to the upper part of the filling road 1 along a slide rail 4 through a steel wire rope 8, and hexagonal bricks in the brick transporting truck are transported into the hopper 7;
after the transportation is accomplished, start winch 9 and transfer hopper 7 along slide rail 4 to the optional position of side slope 2, put the hexagonal brick in the hopper 7 again and lay on side slope 2, along with the propulsion of the position that the hexagonal piece laid on side slope 2, can promote the removal wheel 6 that removes wooden handcart 3 and support frame 5 simultaneously, thereby drive 4 whole delivery devices of slide rail and move forward to side slope 2 blank areas, make this device have better position adaptability, wholly at the quick efficiency of delivering hexagonal brick rate at the time of like this and improve at double, the efficiency of road construction has been guaranteed, fundamentally has stopped the risk that artifical delivery fragment of brick brought simultaneously, the security improves greatly.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (3)
1. The utility model provides a device is delivered to six arriss of road slope piece high efficiency, includes slope (2) of fill road (1) and both sides, its characterized in that: fill and be provided with mobilizable removal wooden handcart (3) on road (1), it is fixed with a plurality of parallels and extends to slide rail (4) of side slope (2) lower part, a plurality of to remove wooden handcart (3) one side slide rail (4) end fixing has support frame (5), the both ends lower part of support frame (5) is provided with removal wheel (6) of support on side slope (2), every be provided with hopper (7) that can remove on slide rail (4), hopper (7) upper end is passed through wire rope (8) and is connected fixedly with winch (9) of fixing to correspond on removing wooden handcart (3).
2. The device is delivered to road slope hexagonal piece high efficiency of claim 1, characterized in that: a door-shaped fixture block (71) is fixed at the bottom of the hopper (7), and limiting wheels (72) are arranged at the lower parts of two sides of the door-shaped fixture block (71).
3. The device is delivered to road slope hexagonal piece high efficiency of claim 1, characterized in that: the sliding rail (4) is arranged by adopting an I-shaped sliding rail, and limiting wheels (72) of door-shaped clamping blocks (71) are placed in grooves on two sides of the I-shaped sliding rail (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120875021.3U CN215165630U (en) | 2021-04-26 | 2021-04-26 | Device is delivered to six arriss blocks of road slope high efficiency |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120875021.3U CN215165630U (en) | 2021-04-26 | 2021-04-26 | Device is delivered to six arriss blocks of road slope high efficiency |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215165630U true CN215165630U (en) | 2021-12-14 |
Family
ID=79363890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120875021.3U Active CN215165630U (en) | 2021-04-26 | 2021-04-26 | Device is delivered to six arriss blocks of road slope high efficiency |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215165630U (en) |
-
2021
- 2021-04-26 CN CN202120875021.3U patent/CN215165630U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202966320U (en) | Hydraulic traction self-advancing flat car | |
CN202320307U (en) | Gear monorail crane driving device | |
CN201058968Y (en) | Electric track type sliding beam apparatus for erection of railway bridge | |
CN203636961U (en) | Roller raising machine used in concrete component production system | |
CN109667203B (en) | Railway sleeper carrying device | |
CN203996335U (en) | Steel pipe transmission car | |
CN103952954A (en) | Method for replacing subway track plate, subway plate replacing vehicle and plate replacing unit | |
US20130206031A1 (en) | Railway track construction method | |
CN103754246A (en) | Transport cart for steel tubes | |
CN103231986A (en) | Trolley structure for travelling crane | |
CN204280693U (en) | The supporting plate cart transport frame of block machine | |
CN215165630U (en) | Device is delivered to six arriss blocks of road slope high efficiency | |
CN202063155U (en) | Transitional rail changing device for mine empty wagons | |
CN103522932A (en) | Carrier vehicle for vehicles | |
CN209875172U (en) | Tunnel lining trolley | |
CN202180828U (en) | Sliding boot type self-moving device train | |
CN204173814U (en) | One can uprise rubber tired crane | |
CN103523480A (en) | Workshop feeding and loading trolley | |
CN106939536B (en) | A kind of coal mine inclined shaft assembled is laid a railway track construction method | |
US4608928A (en) | Track-bound carriage for an assembled track section | |
CN212404667U (en) | Device is demolishd to track subassembly in shield structure TBM tunnel | |
CN210527657U (en) | Rail transport vehicle for rack rail clamping vehicle | |
CN214648235U (en) | Mine tunnel slide rail motor car | |
CN211850704U (en) | A suspension type moving platform for steel construction installation | |
RU161483U1 (en) | RAILWAY STACKER |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |