CN213710395U - Finished product device of shear force wall hangs mould supporting tool - Google Patents

Finished product device of shear force wall hangs mould supporting tool Download PDF

Info

Publication number
CN213710395U
CN213710395U CN202021832184.5U CN202021832184U CN213710395U CN 213710395 U CN213710395 U CN 213710395U CN 202021832184 U CN202021832184 U CN 202021832184U CN 213710395 U CN213710395 U CN 213710395U
Authority
CN
China
Prior art keywords
rubber cushion
cushion block
supporting
detachable
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021832184.5U
Other languages
Chinese (zh)
Inventor
田长霖
田羽琳
高义民
王立媛
王丽华
李美怡
石郎
由莎莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Sanchuan Construction Group Co ltd
Original Assignee
Dalian Sanchuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Sanchuan Construction Group Co ltd filed Critical Dalian Sanchuan Construction Group Co ltd
Priority to CN202021832184.5U priority Critical patent/CN213710395U/en
Application granted granted Critical
Publication of CN213710395U publication Critical patent/CN213710395U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A finished product device of a shear wall suspended formwork supporting tool relates to the technical field of constructional engineering. Install the bracing steel bar at the mould in-process of hanging, the welding waterstop piece of bracing steel bar middle part, the detachable rubber cushion of support system upper and lower part installation makes things convenient for the support die plate in-process to lay stably. The supporting height is the thickness of a floor slab, the detachable rubber cushion block arranged on the upper part is connected with the supporting steel bar and the upper part to be detached with the screw rod, and the mountain-shaped part penetrate through the detachable screw rod and fall to the top of the upper part to be detached with the rubber cushion block so as to support the formwork hanging pipe. The utility model discloses steerable mould that hangs highly keeps its stability, has still solved the problem that traditional supporting tool easily seeps water simultaneously. The utility model discloses engineering quality and engineering progress can be effectively improved.

Description

Finished product device of shear force wall hangs mould supporting tool
Technical Field
The utility model relates to a building engineering technical field, concretely relates to shear force wall hangs finished product device of mould supporting tool.
Background
During the construction of civil engineering main body, the mould is usually required to be hung. The most obvious place for constructing the suspended formwork and other formworks is that the lower opening is not supported or is fixedly supported in a special mode, lateral loads are generally borne, the stability of the suspended formwork is kept, the levelness and the verticality of a concrete member can meet requirements, but a traditional supporting tool is easy to seep water, and the engineering quality and the construction progress are directly influenced.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a shear force wall hangs finished product device of mould supporting tool can the effective control infiltration problem, cuts off water infiltration route, also improves engineering economic benefits simultaneously, convenient construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a finished product device of shear force wall hangs mould supporting tool which characterized in that: the utility model discloses a detachable rubber cushion block, including the supporting steel bar, the supporting steel bar is connected between survival building ground and floor template or bed course, the supporting steel bar's supporting height is floor thickness, supporting steel bar middle part welding waterstop, upper and lower both ends are connected respectively and can be dismantled rubber cushion block one, can dismantle rubber cushion block two, the top elevation that can dismantle rubber cushion block one is the elevation on survival building ground, can dismantle rubber cushion block two and place on floor template or the bed course, can dismantle the detachable lead screw that rubber cushion block one connected the supporting steel bar and upper portion, mountain type spare and mountain type mu from top to bottom pass in proper order can dismantle the lead screw and fall to the top that can dismantle rubber cushion block one for support connection is in the die hanger pipe at the detachable lead screw top, is connected through the flit.
The length of a single supporting steel bar is 100mm, and the diameter of the single supporting steel bar is 20 mm.
The utility model discloses steerable mould that hangs highly keeps its stability, still solved the problem that traditional supporting tool easily seeps water simultaneously, can effectively improve engineering quality and engineering progress.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
in the figure: 1-shear wall, 2-batten, 3-template, 4-hanging formwork pipe, 5-detachable screw rod, 6-mountain-shaped part, 7-mountain-shaped mu, 8-survival building ground, 9-detachable rubber cushion block I, 10-water stop sheet, 11-supporting steel bar, 12-detachable rubber cushion block II, 13-floor slab template or cushion layer.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments, but the present invention is not limited to the specific embodiments.
Examples
As shown in figure 1, a finished device of a shear wall mold-hanging supporting tool, a single supporting steel bar 11 with the length of 100mm and the diameter of 20mm is connected between a survival building ground 8 and a floor slab template or cushion layer 13, the supporting height of the supporting steel bar 11 is the thickness of a floor slab, a water stop sheet 10 is welded at the middle part of the supporting steel bar 11, a detachable rubber cushion block I9 and a detachable rubber cushion block II 12 are respectively connected at the upper end and the lower end, the top height of the detachable rubber cushion block I9 is the elevation of the survival building ground 8, the detachable rubber cushion block II 12 is placed on the floor slab template or cushion layer 13, the detachable rubber cushion block I9 is connected with the supporting steel bar 11 and a detachable screw rod 5 at the upper part, a mountain-shaped part 6 and a mountain-shaped mu 7 sequentially penetrate through the detachable screw rod 5 from top to bottom to fall to the top of the detachable rubber cushion block I, the hanging formwork pipe 4 is connected with the formwork 3 of the shear wall 1 through the battens 2.
The utility model discloses the use: construction worker installs brace rod 11 in the formwork hanging work progress, on brace rod 11, the detachable rubber cushion block 9 of lower part installation respectively, can dismantle rubber cushion block two 12 and place on floor form or bed course 13, can dismantle rubber cushion block 9 and adjust to the elevation position on survival building ground 8 through the spirit level, can dismantle lead screw 5 and be connected to detachable rubber cushion block one 9, mountain type spare 6, mountain type mu 7 passes and can dismantle lead screw 5 and fall to the top of detachable rubber cushion block one 9, support steel pipe 11 and prop on mountain type spare 6 during the formwork hanging construction, accomplish the formwork hanging construction.

Claims (2)

1. The utility model provides a finished product device of shear force wall hangs mould supporting tool which characterized in that: the supporting steel bars (11) are connected between the survival building ground (8) and the floor slab template or the cushion layer (13), the supporting height of the supporting steel bars (11) is the floor slab thickness, the middle parts of the supporting steel bars (11) are welded with water stop sheets (10), the upper end and the lower end of each supporting steel bar (11) are respectively connected with a detachable rubber cushion block I (9) and a detachable rubber cushion block II (12), the top height of the detachable rubber cushion block I (9) is the elevation of the survival building ground (8), the detachable rubber cushion block II (12) is placed on the floor slab template or the cushion layer (13), the detachable rubber cushion block I (9) is connected with the supporting steel bars (11) and a detachable screw rod (5) on the upper part, a mountain-shaped part (6) and a mountain-shaped hoop (7) sequentially penetrate through the detachable screw rod (5) from top to bottom and fall to the top of the detachable rubber cushion block I (9) for supporting, the hanging formwork pipe (4) is connected with the formwork (3) of the shear wall (1) through the batten (2).
2. The finished device of a shear wall suspended formwork supporting tool according to claim 1, characterized in that: the length of each supporting steel bar (11) is 100mm, and the diameter of each supporting steel bar is 20 mm.
CN202021832184.5U 2020-08-28 2020-08-28 Finished product device of shear force wall hangs mould supporting tool Active CN213710395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021832184.5U CN213710395U (en) 2020-08-28 2020-08-28 Finished product device of shear force wall hangs mould supporting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021832184.5U CN213710395U (en) 2020-08-28 2020-08-28 Finished product device of shear force wall hangs mould supporting tool

Publications (1)

Publication Number Publication Date
CN213710395U true CN213710395U (en) 2021-07-16

Family

ID=76791673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021832184.5U Active CN213710395U (en) 2020-08-28 2020-08-28 Finished product device of shear force wall hangs mould supporting tool

Country Status (1)

Country Link
CN (1) CN213710395U (en)

Similar Documents

Publication Publication Date Title
CN103498425B (en) One completely knocks down multifunctional assembled bearing bracket structure and construction method thereof
CN107327050B (en) Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN211007032U (en) Concrete bay window plastering-free construction structure
CN202882446U (en) Horse stool suspended by steel bars
CN209817430U (en) Template supporting structure of tower crane reserved hole
CN114922360A (en) Device for combining prefabrication and cast-in-place of roof cornice structure and construction method thereof
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN212642115U (en) Clear water concrete indent arc roofing inner side roof beam hangs mould system
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN109235280A (en) The operation platform and construction method of bridge coping
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN219672123U (en) Cantilever frame for cornice board construction
CN213710395U (en) Finished product device of shear force wall hangs mould supporting tool
CN209194347U (en) The operation platform of bridge coping
CN209760872U (en) Diagonal draw bar for supporting-free formwork
CN216664766U (en) Assembled parapet that cornices
CN203603462U (en) Post-cast strip beam plate formwork supporting structure
CN206070809U (en) ALC steam-pressing aero-concretes batten inclines curtain wall structure
CN103290924B (en) Construction technology for building foundation and main structure
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN211923466U (en) Elevator shaft regularization operation platform
CN211447283U (en) Connecting beam of main building and skirt house
CN210370706U (en) Tunnel arch bearing structure
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Floor 19, No. 100 Bohai Street, Pulandian District, Dalian City, Liaoning Province, 116200

Patentee after: Dalian Sanchuan Construction Group Co.,Ltd.

Address before: 116000 Sanchuan building, 100 Bohai street, Nanshan street, Pulandian District, Dalian City, Liaoning Province

Patentee before: DALIAN SANCHUAN CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address