CN109235280A - The operation platform and construction method of bridge coping - Google Patents
The operation platform and construction method of bridge coping Download PDFInfo
- Publication number
- CN109235280A CN109235280A CN201811314574.0A CN201811314574A CN109235280A CN 109235280 A CN109235280 A CN 109235280A CN 201811314574 A CN201811314574 A CN 201811314574A CN 109235280 A CN109235280 A CN 109235280A
- Authority
- CN
- China
- Prior art keywords
- steel
- platform
- beam assembly
- frame
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of operation platform of bridge coping and construction methods, including being set in hoop component and the beam assembly being connected to above hoop component on pier stud, the beam assembly is equipped with the template component for pouring bent cap, the beam assembly two sides are equipped with platform group, the integral construction platform is set up using bridge pier column, it can not be by river place, the limitation of the terrain environments condition such as pier stud height, meet energy conservation, environmental requirement, and platform assembly is equipped in the beam assembly two sides, the operating environment of safety and comfort is provided, reduce construction worker's labor intensity, improve work efficiency, save construction cost, since there are platform assemblies to be easy to control quality and safety with platform assembly, greatly improve the fining degree of construction.
Description
Technical field
The present invention relates to the operation platform of bridge coping and construction methods.
Background technique
Currently, the substructure of reinforced concrete beam bridge is generally made of bent cap, pier stud and pile foundation three parts.Bent cap
It is the supporting member for shelving bridge beam slab, plays ' forming a connecting link ' effect.Bent cap is erected at the upper of pier stud in direction across bridge
Portion is connected with pier stud, the whole load from bridge superstructure is transmitted to pier stud, then pass by pier stud and pile foundation
It is delivered to lithosphere.
The bent cap of bridge is cast-in-place concrete structure part, carries out the concrete casting of bent cap again after the completion of pier stud.Due to
Bent cap has certain altitude apart from ground, is limited by orographic condition, construction personnel cannot directly operation on the ground, need to set up
Operation platform carries out high altitude operation.The erection method of bridge coping operation platform is different, and more conventional method is directly on ground
Steel pipe scaffold support platform is set up, is then poured concrete bent cap in support platform formwork erection.Also some is bored on bridge pier column
Pier stud two sides are run through in hole, and solid steel tube is inserted into hole and makees supporting point, vertically and horizontally truss is shelved in solid steel tube, then on it
Set up support for shuttering;The bent cap of the above various support for shuttering erection method constructions, since construction technology technique tradition falls behind, quality,
Safe difficulty or ease control, is not able to satisfy fining construction and civilized markization, environmental protection management require.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of quality, safety is easy to control, construction fining, energy-saving ring
The operation platform and construction method of the bridge coping of guarantor.
The technical solution of the invention is as follows, provides a kind of operation platform of bridge coping having following structure, including
It is set in hoop component and the beam assembly being connected to above hoop component on pier stud, the beam assembly is equipped with for pouring lid
The template component of beam, the beam assembly two sides are equipped with platform assembly.
Preferably, the platform assembly includes several A-frames being detachably connected with beam assembly, the triangle
Walking plate is connected on bracket, the A-frame free end is removably connected with guardrail.
Preferably, one right-angle side of A-frame is connect with beam assembly, end of another right-angle side far from beam assembly
Equipped with pivot pin, guardrail is combined on the pivot pin.
Preferably, the walking plate is equipped with location hole, and the A-frame is equipped with the company to match with location hole
Fitting.
Preferably, the A-frame is equipped with connecting plate, at least provided with two pivot pins on the connecting plate.
Preferably, the beam assembly is including two I-steels disposed in parallel, between I-steel described in two
It is connected with connection channel steel.
Preferably, between I-steel described in two and it is located at hoop component and is connected with to wearing pull rod.
After using the above structure, the operation platform of bridge coping of the invention has following excellent compared with prior art
Point: setting up the integral construction platform using bridge pier column, can not be by the limit of the terrain environments conditions such as river place, pier stud height
System meets energy-saving and environmental protection requirement, and is equipped with platform assembly in the beam assembly two sides, provides the operating environment of safety and comfort,
Construction worker's labor intensity is reduced, work efficiency is improved, construction cost is saved, since there are platform assemblies to hold with platform assembly
Easily quality and safety are controlled, greatly improve the fining degree of construction.
The technical solution of the invention is as follows, provides a kind of construction method of bridge coping, which is characterized in that including following
Step:
S1, hoop component is installed on pier stud;
Beam assembly is installed on S2, hoop component;
S3, beam assembly two sides mounting platform component are simultaneously tested;
S4, installation template component;
S5, concreting;
S6, demoulding.
Preferably, step S2 specifically: adjustable jacking is set on hoop component, I-steel, institute are installed on jacking
The I-steel stated is arranged in parallel, by wearing after pull rod is positioned I-steel installation connection channel steel.
Preferably, step S3 specifically: it several A-frames of grafting and is bolted on the outside of I-steel, it is described
A-frame on be laid with walking and plate and positioned, A-frame is equipped with connecting plate, on the connecting plate at least provided with
Two pivot pins, install guardrail on pivot pin.
The construction method of bridge coping of the invention: setting up the integral construction platform using bridge pier column, can not be by river
The limitation of the terrain environments conditions such as place, pier stud height meets energy-saving and environmental protection requirement, and is equipped in the beam assembly two sides
Platform assembly provides the operating environment of safety and comfort, reduces construction worker's labor intensity, improves work efficiency, and saving is constructed into
This greatly improves the fining of construction since there are platform assemblies to be easy to control quality and safety with platform assembly
Degree.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the operation platform of bridge coping of the invention.
Fig. 2 is the structural schematic diagram of walking plate of the invention.
Fig. 3 is the structural schematic diagram of I-steel of the invention.
It is as shown in the figure: 1, hoop component;2, beam assembly;21, I-steel;3, platform assembly;31, A-frame;32, row
Limp;33, guardrail.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
It please refers to shown in Fig. 1, Fig. 2 and Fig. 3, the operation platform of bridge coping of the invention, including is set on pier stud and embraces
Hoop component 1 and the beam assembly 2 for being connected to 1 top of hoop component, general pier stud are two, i.e. are equipped at least one on two pier studs
A hoop component 1, two I-steels 21 are arranged in parallel in pier stud two sides along direction across bridge in beam assembly 2, have 4 with hoop component 1
A supporting point, supporting & stablizing are conveniently set up, and the beam assembly 2 is equipped with the template component for pouring bent cap, the beam
2 two sides of component are equipped with platform assembly 3.The integral construction platform is set up using bridge pier column, it can not be by river place, pier stud height
The limitation of equal terrain environments condition meets energy-saving and environmental protection requirement, and is equipped with platform assembly 3 in 2 two sides of beam assembly, mentions
For the operating environment of safety and comfort, construction worker's labor intensity is reduced, improves work efficiency, saves construction cost, due to existing
Platform assembly 3 can be easy to control quality and safety with platform assembly 3, greatly improve the fining degree of construction.
Hoop component 1 includes several semicircle anchor ears, and anchor ear is bent into semicircle loop-drive by general steel plate, in semicircle
Loop-drive both ends are welded into one with triangular leg.8 ~ 10cm of steel plate thickness, height generally take 30 ~ 50cm.The circular arc of semicircle loop-drive is big
Depending on small foundation column diameter.Triangular leg is made of 2 pieces of connecting plates and 4 blocks of triangle liner plates.Connecting plate is welded on semi-circular arc
Both ends are enclosed, bore 4 eyelets on every piece of connecting plate, are used to wear high-strength bolt fastening anchor ear.4 blocks of triangle liner plates respectively with 2 pieces of companies
Fishplate bar is mutually 90 degree of direction vertical weldings, i.e. side is welded on junction steel plate, and the other side is welded on semicircle loop-drive, plays
Increase anchor ear intensity, stiffness.Semicircle loop-drive and triangular leg form 1 single anchor ear component, and 2 single anchor ear components are high
It is anchor ear, high-strength bolt and nut after strength bolt connection: the high-strength bolt of 14mm standard quality, every group of anchor ear 8 can be used
A, junction, which forms a support platform, can be used for being arranged jacking, and jacking can be 2 high 25cm, diameter 20cm, thickness
The circle cylinder barrel of 6cm, it is each up and down to weld 1 piece of the liner plate contact surface as support.Jacking is shelved on the triangular leg above anchor ear,
I-steel plan-position is adjusted, the whole load from I-steel girder is relayed on anchor ear.Hoop component 1 is additionally provided with liner
Pad: being generally pasted on the inside of the semi-circular arc of anchor ear with rubber slab, or the blanket material package made of chemical fibre dimension is wrapped in and embraces
On the semicircle loop-drive of hoop, increase the inner frictional resistance of anchor ear, the mutual extrusion of simultaneous buffering anchor ear and pier stud contact surface does not make pier
Column concrete generates scratch and influences the appearance and inherent quality of column.
Two I-steels 21 can be 2 type I-steel of H500 × 200 in beam assembly 2, and I-steel length is in direction across bridge
According to the design size of bent cap, and beyond each 1.5m in bent cap both ends most outer or so, convenient for setting up the springboard of people's row platform;In work
Steel plate is vertically reinforced for 1 piece at interval of 40-70cm welding in the waist rib two sides of word steel, can vertically add to weld 1 piece at interval of 60cm
Strong steel plate, at the anchor ear stress of column above vertically reinforce the spacing encryption of steel plate within the scope of 2.5m, at interval of 20cm welding 1
Block, to meet its strength and stiffness needs.2 diameter 18mm holes are bored at interval of vertical at 1.2m on I-steel waist rib, to
Bolt anchoring workbench is worn to use.Have on I-steel waist rib simultaneously and laterally drills to wearing pull rod and lateral connection channel steel position
Hole, 4 transverse directions of setting are laterally positioned close to anchor ear forced position, two sides to wearing pull rod to pull rod is worn on 2 I-steel girders
It is symmetrical arranged.By the hole stayed in advance on I-steel, it will be anchored on I-steel girder, be connected with nut to pull rod is worn
Integrally, 4 lateral connection channel steels are set on 2 I-steel girders, and lateral connection channel steel is arranged at I-steel girder both ends
Head and intermediate certain position are fixed lateral connection channel steel and I-steel by the hole stayed in advance on I-steel with bolt
Girder is connected, and forms the stabilising system of main beam structure.
The platform assembly 3 includes several A-frames 31 being detachably connected with beam assembly 2, the A-frame
Walking plate 32 is connected on 31,31 free end of A-frame is removably connected with guardrail 33.The A-frame 31
One right-angle side is connect with beam assembly 2, and another right-angle side is equipped with pivot pin far from the end of beam assembly 2, is combined on the pivot pin
Guardrail 33.A-frame 31 is welded by horizon bar, brace and vertical bar, material L7.5cm × 6mm angle steel.A-frame
31 each length 1.4m are highly slightly less than girder I-steel rib height, can be embedded in I-steel and convenient for operation, by bolt in work
On word steel.The every 2.4m of spacing disposes one.It is to place walking plate 32 that it, which is acted on,.The walking plate 32 is equipped with location hole, institute
The A-frame 31 stated is equipped with the connector to match with location hole.31 one end of A-frame connects with girder I-steel bolt
It connects, the other end welds one block of small steel plate of 7 × 15cm, then the seamless steel pipe of 2 outer diameter 4cm, high 20cm are welded on small steel plate, makees
For the pivot pin of socket joint guardrail 33.Walking plate 32 is made of lattice board, structural steel frame and is welded integral, and shape is rectangle, ruler
Very little is long 2.4m × wide 1m, and lattice board is 3mm steel plate, is welded the formation monolith plate body on structural steel frame.Structural steel frame L5cm
Angle steel is welded, and welds an angle steel at the centre, that is, 1.2m in lengths of frame direction again, rigid with the support for enhancing lattice board laying
Degree.Walking plate is laid on A-frame 31, the job platform for operating and walking as construction personnel.Guardrail 33: by steel framework
Frame, safe mesh sheet, bell-and-spigot pipe composition.The long 2m* high 1m of steel frame size, is welded by 5*5cm square steel tube and is formed.In every spelling steel frame
Between increase be welded same specification vertical steel pipe one, to enhance its rigidity.Surrounding welds 4*4 angle steel on the inside of frame, is used to fixed peace
The whole network piece;Safe mesh sheet is made using 5mm steel wire, is fixed on the angle steel of 33 frame of guardrail.Safe mesh sheet is to prevent from making
The effective safety measures that industry personal height falls;Bell-and-spigot pipe is actually to be replaced with the square steel tube of 33 frame of guardrail, square tube
On the seamless steel pipe being welded in advance on lower mouth alignment tripod, play the role of nonfloating rail 33.
The technical solution of the invention is as follows, provides a kind of construction method of bridge coping, which is characterized in that including following
Step:
S1, hoop component 1 is installed on pier stud;
Adjustable jacking is set on S2, hoop component 1, I-steel 21 is installed on jacking, the I-steel 21 is parallel
Setting, by connecting channel steel to wearing pull rod is positioned I-steel 21 after installation;
S3, several A-frames 31 of 21 outside grafting of I-steel are simultaneously bolted, 31 upper berth of A-frame
If walking plate 32 is simultaneously positioned, A-frame 31 is equipped with connecting plate, at least provided with two pivot pins on the connecting plate,
Guardrail 33 is installed on pivot pin and is tested;
S4, installation template component;
S5, concreting;
S6, demoulding.
It further include being checked and accepted to material installation tissue of marching into the arena before S1.The part of appliance of anchor ear, girder and operating platform by
Factory process molding, transports to building-site and carries out an acceptance inspection, installed after meeting the requirements, and fills hoop component 1 in step s 2,
It need to determine that anchor ear is single or multiple rows of quantity according to bent cap and upper part load-bearing load, adjustment anchor ear position makes its support when installation
Point is located at the column two sides of bridge longitudinal direction, convenient for shelving I-steel 21.
Installation template component specifically includes:
Place the longitudinal and transverse beam of bed die.After operation platform is completed, longitudinal and transverse beam is placed on girder, adjusts beam absolute altitude in length and breadth, as
It is laid with the datum level of bent cap bed die.
Bent cap bed die, bottom end mould are installed.In length and breadth after the completion of beam Pass line adjustment, bent cap bed die and lid can be laid on crossbeam
The oblique end bed die at beam both ends, it is easy to adjust.
Rotary ligating cover beam steel.After completing bed die laying, rotary ligating cover beam steel.Bent cap reinforcing bar can also be bound in advance on the ground
Good, becoming framework of steel reinforcement is integrally lifted, and to complete the binding work of framework of steel reinforcement, is built more quickly.
Bent cap side form, side mould are installed.Framework of steel reinforcement is installed and through after the assay was approved, in the peace for carrying out bent cap side form
Dress wants whether reasonable, framework of steel reinforcement the geometric dimension of detailed inspection cushion block of concrete bar protective layer setting before bent cap side form installation
Whether technical requirements are met, and indices examine qualification to carry out vertical side form again, construction can be made more to refine, Quality Cost is more
It is high.
It is poured bent cap concrete.Template installation terminates to inspect for acceptance again, the pourable concrete in the rear that meets the requirements.It is mixed
One-pass molding is wanted in solidifying soil casting, and requires to construct according to job specfication, technical standard.
Finally carry out demoulding, quality inspection.It is conserved as requested, demoulding can be carried out by reaching regulation striking time, be torn open
Continue after the completion of mould maintenance reach design, code requirement strength criterion until.
The integral construction platform is set up using bridge pier column, it can not be by terrain environments conditions such as river place, pier stud height
Limitation, meet energy-saving and environmental protection requirement, and be equipped with platform assembly 3 in 2 two sides of beam assembly, the work of safety and comfort be provided
Industry environment reduces construction worker's labor intensity, improves work efficiency, construction cost is saved, since there are platform assemblies 3 to put down
Platform component 3 is easy to control quality and safety, greatly improves the fining degree of construction.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of operation platform of bridge coping, which is characterized in that embraced including being set in hoop component on pier stud (1) and being connected to
The beam assembly (2) above component (1) is bound round, the beam assembly (2) is equipped with the template component for pouring bent cap, the beam
Component (2) two sides are equipped with platform assembly (3).
2. the operation platform of bridge coping according to claim 1, which is characterized in that the platform assembly (3) includes
Several A-frames (31) being detachably connected with beam assembly (2) are connected with walking plate (32) on the A-frame (31),
Described A-frame (31) free end is removably connected with guardrail (33).
3. the operation platform of bridge coping according to claim 2, which is characterized in that the A-frame (31) is always
The arm of angle is connect with beam assembly (2), and another right-angle side is equipped with pivot pin far from the end of beam assembly (2), is combined on the pivot pin
Guardrail (33).
4. the operation platform of bridge coping according to claim 2, which is characterized in that the walking plate (32) is equipped with
Location hole, the A-frame (31) are equipped with the connector to match with location hole.
5. the operation platform of bridge coping according to claim 3, which is characterized in that set on the A-frame (31)
There is a connecting plate, at least provided with two pivot pins on the connecting plate.
6. the operation platform of bridge coping according to claim 1, which is characterized in that the beam assembly (2) includes two
A I-steel disposed in parallel (21) is connected with connection channel steel between I-steel (21) described in two.
7. the operation platform of bridge coping according to claim 6, which is characterized in that I-steel (21) described in two
Between and be located at hoop component (1) and be connected with to wearing pull rod.
8. a kind of construction method of bridge coping, which comprises the following steps:
S1, hoop component (1) is installed on pier stud;
Beam assembly (2) are installed on S2, hoop component (1);
S3, beam assembly (2) two sides mounting platform component (3) are simultaneously tested;
S4, installation template component;
S5, concreting;
S6, demoulding.
9. the construction method of bridge coping according to claim 8, which is characterized in that step S2 specifically: hoop component
(1) adjustable jacking is set on, I-steel (21) are installed on jacking, the I-steel (21) is arranged in parallel, passes through
Channel steel is connected to installation after pull rod is positioned I-steel (21) is worn.
10. the construction method of bridge coping according to claim 8, which is characterized in that step S3 specifically: I-steel
(21) outside and is bolted several A-frames (31) of grafting, and walking plate is laid on the A-frame (31)
(32) it and is positioned, A-frame (31) is equipped with connecting plate, at least provided with two pivot pins on the connecting plate, in pivot pin
Upper installation guardrail (33).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811314574.0A CN109235280A (en) | 2018-11-06 | 2018-11-06 | The operation platform and construction method of bridge coping |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811314574.0A CN109235280A (en) | 2018-11-06 | 2018-11-06 | The operation platform and construction method of bridge coping |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109235280A true CN109235280A (en) | 2019-01-18 |
Family
ID=65077280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811314574.0A Pending CN109235280A (en) | 2018-11-06 | 2018-11-06 | The operation platform and construction method of bridge coping |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109235280A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111139744A (en) * | 2019-12-27 | 2020-05-12 | 中冶天工集团有限公司 | Bridge engineering large-section bent cap bottom reinforcement binding formwork erecting process |
CN114541284A (en) * | 2022-02-28 | 2022-05-27 | 浙江交工金筑交通建设有限公司 | Construction method of bracket system for replacing bridge plate type rubber support |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201567532U (en) * | 2009-11-30 | 2010-09-01 | 中冶成工建设有限公司 | Novel supporting structure of lid beam of bridge |
CN202359506U (en) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | Double hoop supporting system for pier column capping beam |
CN203867216U (en) * | 2014-04-02 | 2014-10-08 | 北京六建集团有限责任公司 | Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate |
CN203923913U (en) * | 2014-05-19 | 2014-11-05 | 东风设计研究院有限公司 | The load formula carrier structure of Bridge High-pier bent cap |
CN204039921U (en) * | 2014-05-19 | 2014-12-24 | 赵燕 | A kind of Construction Support without support bent cap |
CN204825660U (en) * | 2015-07-08 | 2015-12-02 | 中铁二十四局集团有限公司 | Bent cap staple bolt device |
CN209194347U (en) * | 2018-11-06 | 2019-08-02 | 浙江省衢州市交通建设集团有限公司 | The operation platform of bridge coping |
-
2018
- 2018-11-06 CN CN201811314574.0A patent/CN109235280A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201567532U (en) * | 2009-11-30 | 2010-09-01 | 中冶成工建设有限公司 | Novel supporting structure of lid beam of bridge |
CN202359506U (en) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | Double hoop supporting system for pier column capping beam |
CN203867216U (en) * | 2014-04-02 | 2014-10-08 | 北京六建集团有限责任公司 | Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate |
CN203923913U (en) * | 2014-05-19 | 2014-11-05 | 东风设计研究院有限公司 | The load formula carrier structure of Bridge High-pier bent cap |
CN204039921U (en) * | 2014-05-19 | 2014-12-24 | 赵燕 | A kind of Construction Support without support bent cap |
CN204825660U (en) * | 2015-07-08 | 2015-12-02 | 中铁二十四局集团有限公司 | Bent cap staple bolt device |
CN209194347U (en) * | 2018-11-06 | 2019-08-02 | 浙江省衢州市交通建设集团有限公司 | The operation platform of bridge coping |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111139744A (en) * | 2019-12-27 | 2020-05-12 | 中冶天工集团有限公司 | Bridge engineering large-section bent cap bottom reinforcement binding formwork erecting process |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
US11885083B2 (en) | 2020-08-07 | 2024-01-30 | Peri Se | Formwork system and method |
CN114541284A (en) * | 2022-02-28 | 2022-05-27 | 浙江交工金筑交通建设有限公司 | Construction method of bracket system for replacing bridge plate type rubber support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
CN105350454B (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN109235280A (en) | The operation platform and construction method of bridge coping | |
CN108005401A (en) | A kind of support and change method of the column of existing frame structure base isolation reinforcement | |
CN103498425A (en) | Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof | |
CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
CN209194347U (en) | The operation platform of bridge coping | |
CN109853365A (en) | A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN103938871B (en) | A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN207092331U (en) | Combined type reinforced truss floor support plate | |
CN106638265B (en) | A kind of steel reinforced concrete beam rigid framed structure arch bridge | |
CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN107142834B (en) | A kind of Through Steel pipe concrete tie-rod arch bridge abutment steel pipe location structure and its construction method | |
CN215482366U (en) | Double-line continuous beam bracket structure | |
CN109555021A (en) | It is a kind of without pre-buried, movable continuous beam 0# block bracket | |
CN102619335A (en) | Construction method of large-height small-sized cast-in-place concrete beam slab | |
CN108951643A (en) | The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN214005382U (en) | Bridge bent cap staple bolt formwork system | |
CN211473320U (en) | Tool type external hanging rack for corridor | |
CN104532758A (en) | Construction support for pre-stress concrete suspension-poured continuous beam number zero segment | |
CN204343174U (en) | A kind of prestress concrete cantilever continuous beam No. zero block construction support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |