CN213653452U - Wharf pile foundation construction equipment - Google Patents

Wharf pile foundation construction equipment Download PDF

Info

Publication number
CN213653452U
CN213653452U CN202022046942.7U CN202022046942U CN213653452U CN 213653452 U CN213653452 U CN 213653452U CN 202022046942 U CN202022046942 U CN 202022046942U CN 213653452 U CN213653452 U CN 213653452U
Authority
CN
China
Prior art keywords
pile foundation
pile
plate
fixed
construction equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022046942.7U
Other languages
Chinese (zh)
Inventor
高静
金梁瑜
刘坚
刘晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Qiantang River Water Conservancy Construction Engineering Co ltd
Original Assignee
Zhejiang Qiantang River Water Conservancy Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Qiantang River Water Conservancy Construction Engineering Co ltd filed Critical Zhejiang Qiantang River Water Conservancy Construction Engineering Co ltd
Priority to CN202022046942.7U priority Critical patent/CN213653452U/en
Application granted granted Critical
Publication of CN213653452U publication Critical patent/CN213653452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of the pier construction and specifically relates to a pier pile foundation construction equipment is related to, it includes the fortune pile car, be provided with the backup pad on the fortune pile car, be fixed with square box in the backup pad, the under shed has been seted up to square box, the pile foundation has been held in the square box, the pile foundation top is provided with pile driving mechanism, pile driving mechanism includes the clamp plate, clamp plate sliding connection is in the box, the clamp plate top sets up the motor, the motor is fixed at the box upper surface, set up the output shaft on the motor, be fixed with the screw thread post on the output shaft, screw thread post and clamp plate threaded connection. This application is provided with pile mechanism on fortune stake car, makes fortune stake car not only can transport the pile foundation, can install the pile foundation in the stake foundation ditch after transporting the appointed place moreover, has saved pile foundation installation time, has promoted pile foundation installation rate.

Description

Wharf pile foundation construction equipment
Technical Field
The application relates to the field of wharf construction, in particular to wharf pile foundation construction equipment.
Background
The wharf refers to a building which is specially used by seasides and rivers for passengers to get on and off and goods to be loaded and unloaded; common in commercial cities with developed land and water traffic; humans use docks as ferry landings for passengers and cargo, and possibly as landmarks to attract visitors and dating collections.
The wharf pile foundation construction equipment in the related art comprises a pile transporting vehicle and a pile driver, wherein the pile foundation is transported to a specified place through the pile transporting vehicle, and the pile foundation is installed in a pile foundation pit through the pile driver.
In view of the above-mentioned related technologies, the inventor believes that there is a defect that the pile foundation installation rate is slow when the pile foundation is installed in the pile foundation pit, the pile foundation in the pile foundation vehicle needs to be unloaded first and then installed in the pile driver.
SUMMERY OF THE UTILITY MODEL
In order to accelerate pile foundation installation rate, this application provides a pier pile foundation construction equipment.
The application provides a pier pile foundation construction equipment adopts following technical scheme:
the utility model provides a pier pile foundation construction equipment, includes the fortune pile car, be provided with the backup pad on the fortune pile car, be fixed with square box in the backup pad, the under shed has been seted up to the box, the pile foundation has been held in the box, the pile foundation top is provided with pile mechanism, pile mechanism includes the clamp plate, clamp plate sliding connection is in the box, the clamp plate top sets up the motor, the motor is fixed at the box upper surface, set up the output shaft on the motor, be fixed with the screw thread post on the output shaft, screw thread post and clamp plate threaded connection.
Through adopting above-mentioned technical scheme, be provided with pile mechanism on fortune stake car, make fortune stake car not only can transport the pile foundation, can transport the appointed place in addition, install the pile foundation in the pile foundation ditch, saved pile foundation installation time, promoted pile foundation installation rate.
Preferably, the upper surface of the box body is provided with an upper opening, the upper cover of the box body is provided with a fixing plate, the side surface of the fixing plate is provided with a first boss, a first bolt penetrates through the upper surface of the first boss, and the first bolt penetrates through the first boss and is fixed on the box body.
Through adopting above-mentioned technical scheme, set up the fixed plate on the box to pass through first bolted connection with fixed plate and box, conveniently take out the interior clamp plate of box, and then make the pile foundation put into the box in the fortune stake car more easily.
Preferably, a second boss is arranged at the bottom of the side face of the motor, a second bolt is arranged on the upper surface of the second boss, and the second bolt penetrates through the second boss and is fixed on the fixing plate.
Through adopting above-mentioned technical scheme, make the motor fix on the fixed plate, drive the clamp plate at the motor and push down pile foundation in-process, the motor can not upwards remove, has promoted the pressure of clamp plate.
Preferably, a protective cover is arranged on the outer side of the motor and fixed on the upper surface of the fixing plate.
By adopting the technical scheme, the motor is protected from being damaged by the external environment, the service life of the motor is prolonged, and the service life of pile foundation construction equipment is longer.
Preferably, the support plate is provided with a door plate at the pile foundation, and the side length of the door plate is larger than the diameter of the pile foundation.
Through adopting above-mentioned technical scheme, after the door plant is opened, the pile foundation can be smoothly fallen from the backup pad bottom surface.
Preferably, a hinge shaft is fixed on the side wall of the supporting plate, and the hinge shaft is rotatably connected with the door plate.
Through adopting above-mentioned technical scheme, make the door plant rotate in the backup pad, make things convenient for the door plant to open, reduced the time of installation pile foundation, promoted the installation rate of pile foundation.
Preferably, the side surface of the supporting plate is provided with an inserting shaft, the side surface of the door plate is provided with an inserting hole, and the inserting shaft can penetrate through the side wall of the supporting plate and be inserted into the inserting hole in the side surface of the door plate.
Through adopting above-mentioned technical scheme, make the pile foundation can fix in the door plant, make things convenient for the fortune pile car to transport the pile foundation.
Preferably, at least two box bodies are arranged on the pile transporting vehicle.
Through adopting above-mentioned technical scheme, increased the quantity that fortune stake car single transported the pile foundation, beaten the installation rate of having quickened the stake.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the pile driving mechanism is arranged on the pile transporting vehicle, so that the pile transporting vehicle not only can transport the pile foundation, but also can install the pile foundation in the pile foundation pit after being transported to a specified place, thereby saving the installation time of the pile foundation and improving the installation rate of the pile foundation;
2. the fixing plate is arranged on the box body and is connected with the box body through the first bolt, so that a pressing plate in the box body can be conveniently taken out, and the pile foundation can be more easily placed into the box body in the pile transporting vehicle;
3. be provided with the safety cover in the motor outside, the protection motor does not receive external environment damage, has promoted the life of motor, and then makes pile foundation construction equipment life longer.
Drawings
Fig. 1 is an overall structural schematic diagram of pile foundation construction equipment according to an embodiment of the present application.
FIG. 2 is a schematic view of the internal structure of the supporting plate, the box body and the protecting cover according to the embodiment of the present invention.
Description of reference numerals: 1. pile transporting vehicle; 2. a support plate; 21. a door panel; 22. hinging a shaft; 23. a plug shaft; 3. a box body; 4. a pile foundation; 5. pressing a plate; 6. a motor; 61. an output shaft; 62. a threaded post; 63. a second boss; 64. a second bolt; 7. a fixing plate; 71. a first boss; 72. a first bolt; 8. a protective cover.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses pier foundation construction equipment. Referring to fig. 1, the quay pile foundation construction equipment includes a pile transporting vehicle 1.
Referring to fig. 1 and 2, a supporting plate 2 is arranged on a pile transporting vehicle 1, two square box bodies 3 are fixed on the upper surface of the supporting plate 2, an upper opening is formed in the upper surface of each box body 3, a fixing plate 7 is arranged on the upper cover of each box body 3, first bosses 71 are arranged on four outer side surfaces of each fixing plate 7, the first bosses 71 and the fixing plates 7 are integrally formed, first bolts 72 penetrate through the upper surfaces of the first bosses 71, and the first bolts 72 penetrate through the first bosses 71 and are fixed on the box bodies 3.
Referring to fig. 1 and 2, be provided with motor 6 on fixed plate 7, four lateral surface bottoms of motor 6 all are provided with second boss 63, second boss 63 and motor 6 shell integrated into one piece, second boss 63 upper surface is provided with second bolt 64, second bolt 64 passes second boss 63 and fixes on fixed plate 7, the motor 6 outside is provided with safety cover 8, safety cover 8 is fixed on fixed plate 7, safety cover 8's setting, protection motor 6 does not receive external environment damage, motor 6's life has been promoted, and then make pile foundation 4 construction equipment life longer.
Referring to fig. 1 and 2, motor 6 bottom surface is connected with output shaft 61, be provided with screw post 62 on the output shaft 61, screw post 62 is seted up threadedly, screw post 62 and output shaft 61 integrated into one piece, threaded connection has clamp plate 5 on the screw post 62, 5 sliding connection of clamp plate is inside 3 boxes, 5 belows of clamp plate are provided with pile foundation 4, 5 butt of clamp plate is at the pile foundation 4 upper surface, the blind hole has been seted up to 4 upper surface intermediate positions of pile foundation, the blind hole diameter is greater than screw post 62 diameter, make things convenient for screw post 62 to take out and install from the blind hole, the setting of above-mentioned scheme, after starting motor 6, screw post 62 rotates along with output shaft 61, and then make clamp plate 5 remove downwards, in impressing pile foundation ditch with pile foundation 4, make the installation of pile foundation 4 more convenient.
Referring to fig. 1 and 2, the door plate 21 is arranged at the pile foundation 4 of the supporting plate 2, the side length of the door plate 21 is larger than the diameter of the pile foundation 4, and after the door plate 21 is opened, the pile foundation 4 can smoothly fall from the bottom surface of the supporting plate 2; a hinged shaft 22 is fixed on the side wall of the supporting plate 2, and one side of the side surface of the door plate 21 is rotatably connected to the hinged shaft 22; the side surface of the supporting plate 2 is provided with an inserting shaft 23, the other side of the side surface of the door plate 21 is provided with an inserting hole, and the inserting shaft 23 can penetrate through the side wall of the supporting plate 2 and be inserted into the inserting hole in the side surface of the door plate 21; above-mentioned scheme's setting, after the jack that grafting axle 23 inserted door plant 21, door plant 21 is fixed in backup pad 2 bottoms, can hold pile foundation 4 in making box 3, takes out the back in the jack of grafting axle 23 follow door plant 21, and door plant 21 is followed backup pad 2 and is gone up down, and pile foundation 4 can fall into in the pile foundation 4 hole.
The implementation principle of the wharf pile foundation construction equipment in the embodiment of the application is as follows: put into box 3 on fortune stake car 1 with pile foundation 4 in and fix fixed plate 7 at 3 upper surfaces of box, fortune stake car 1 transports pile foundation ditch with pile foundation 4 after, open the door plant 21 of 2 bottoms in backup pad, starter motor 6, threaded post 62 rotates along with output shaft 61, and then make clamp plate 5 remove downwards, make pile foundation 4 impress in the pile foundation 4 hole, above-mentioned structure, make fortune stake car 1 not only can transport pile foundation 4, and can transport after the pile foundation ditch, install pile foundation 4 in the pile foundation ditch, pile foundation 4 installation time has been saved, pile foundation 4 installation rate has been promoted.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a pier pile foundation construction equipment which characterized in that: including fortune stake car (1), be provided with backup pad (2) on fortune stake car (1), be fixed with square box (3) on backup pad (2), the under shed has been seted up in box (3), pile foundation (4) have been held in box (3), pile foundation (4) top is provided with pile driving mechanism, pile driving mechanism includes clamp plate (5), clamp plate (5) sliding connection is in box (3), clamp plate (5) top sets up motor (6), motor (6) are fixed at box (3) upper surface, set up output shaft (61) on motor (6), be fixed with screw thread post (62) on output shaft (61), screw thread post (62) and clamp plate (5) threaded connection.
2. The dock pile foundation construction equipment of claim 1, wherein: the improved structure of the water tank is characterized in that an upper opening is formed in the upper surface of the tank body (3), a fixing plate (7) is arranged on the upper cover of the tank body (3), a first boss (71) is arranged on the side face of the fixing plate (7), a first bolt (72) is arranged on the upper surface of the first boss (71) in a penetrating mode, and the first bolt (72) penetrates through the first boss (71) and is fixed on the tank body (3).
3. The dock pile foundation construction equipment of claim 2, wherein: the motor (6) side bottom is provided with second boss (63), second boss (63) upper surface is provided with second bolt (64), second bolt (64) pass second boss (63) and fix on fixed plate (7).
4. The dock pile foundation construction equipment of claim 3, wherein: the motor (6) outside is provided with safety cover (8), safety cover (8) are fixed at fixed plate (7) upper surface.
5. The dock pile foundation construction equipment of claim 1, wherein: the door plate (21) is arranged at the position of the pile foundation (4) of the supporting plate (2), and the side length of the door plate (21) is larger than the diameter of the pile foundation (4).
6. The wharf pile foundation construction equipment of claim 5, wherein: an articulated shaft (22) is fixed on the side wall of the supporting plate (2), and the articulated shaft (22) is rotatably connected with the door plate (21).
7. The wharf pile foundation construction equipment of claim 6, wherein: the side surface of the supporting plate (2) is provided with an inserting shaft (23), the side surface of the door plate (21) is provided with an inserting hole, and the inserting shaft (23) can penetrate through the side wall of the supporting plate (2) and be inserted into the inserting hole in the side surface of the door plate (21).
8. The dock pile foundation construction equipment of claim 1, wherein: the pile transporting vehicle (1) is at least provided with two box bodies (3).
CN202022046942.7U 2020-09-17 2020-09-17 Wharf pile foundation construction equipment Active CN213653452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022046942.7U CN213653452U (en) 2020-09-17 2020-09-17 Wharf pile foundation construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022046942.7U CN213653452U (en) 2020-09-17 2020-09-17 Wharf pile foundation construction equipment

Publications (1)

Publication Number Publication Date
CN213653452U true CN213653452U (en) 2021-07-09

Family

ID=76696643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022046942.7U Active CN213653452U (en) 2020-09-17 2020-09-17 Wharf pile foundation construction equipment

Country Status (1)

Country Link
CN (1) CN213653452U (en)

Similar Documents

Publication Publication Date Title
NL2009763C2 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same.
WO2016009572A1 (en) Method for constructing offshore structure and offshore structure
US4451174A (en) Monopod jackup drilling system
US6082931A (en) Modular maritime dock design
CN109911125A (en) A kind of rolling of offshore wind power foundation steel-pipe pile takes on board method
CN213653452U (en) Wharf pile foundation construction equipment
CN107654339B (en) Seabed sweeping device
CN212047805U (en) Multifunctional environment-friendly engineering ship
CN111676894B (en) Wharf structure suitable for muddy coast
RU186075U1 (en) Mobile modular berth for river and coastal vessels
CN103693168B (en) The water transportation system of marine LNG storage tank
CN219410747U (en) Dock suitable for ship berthing of water surface photovoltaic power station
CN215906730U (en) Automobile connection floating body capable of being independently installed and detached
US11661157B2 (en) Offshore floating island
CN218703740U (en) Fishery boats and ships anchor mooring auxiliary device
GB2114195A (en) Marine railroad
CN214242212U (en) Self-discharging container with horizontal pushing and discharging structure
CN216335453U (en) Marine environmental protection and energy saving's of pier integration steel construction platform of unloading
JP3229239U (en) Modular offshore multifunctional work platform and integrated operation platform
JP2616172B2 (en) Offshore structures for loading waste
SU1754603A1 (en) System for transferring freight over dam
DE102008044513A1 (en) Solar cell arrangement for using solar energy by flexible solar cells for pole less cargo ship and transport ship, is provided with loaded, partially loaded or empty loading area and loading chamber
US9981591B2 (en) System for lifting and launching a boat
NZ540032A (en) Floating dock lift
CN111409779A (en) Multifunctional environment-friendly engineering ship and mooring method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant