CN213509726U - Construction template adjustable support for construction - Google Patents
Construction template adjustable support for construction Download PDFInfo
- Publication number
- CN213509726U CN213509726U CN202021279032.7U CN202021279032U CN213509726U CN 213509726 U CN213509726 U CN 213509726U CN 202021279032 U CN202021279032 U CN 202021279032U CN 213509726 U CN213509726 U CN 213509726U
- Authority
- CN
- China
- Prior art keywords
- post
- support column
- screw thread
- construction
- part support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 230000008093 supporting effect Effects 0.000 claims description 15
- 238000009435 building construction Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 10
- 238000009415 formwork Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 11
- 230000008569 process Effects 0.000 description 6
- 239000004567 concrete Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000010030 laminating Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a construction template adjustable support for construction, including the bottom sprag post, the fixed a plurality of middle part support columns that are provided with in top of bottom sprag post, the upper end threaded connection of middle part support column has the screw thread post, the top support column has been cup jointed to the top outside of screw thread post, the fixed top backup pad that is provided with in upper end of top support column. Through setting up the bottom sprag post, the middle part support column, the threaded rod, the cooperation of top sprag post and top fixed plate is used, current construction is with construction formwork support has been solved, can't adjust the height, and unable convenient installation is dismantled, current support is mostly fastener formula steel pipe structure, processing is simple and convenient, the equipment is nimble, however, the connection quality of fastener formula steel pipe support frame's fastener node is established the influence that speed easily received fastener quality and workman's operation with propping up, cause propping up of template to establish the difficult problem that obtains the assurance of quality and construction period.
Description
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a construction template adjustable support for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and the place of the construction operation is called a building construction site or a construction site.
The cast-in-place concrete structure engineering becomes the leading type of the current concrete engineering, the template engineering is one of the main project branches of the reinforced concrete structure construction, in the cast-in-place concrete structure engineering construction, the construction progress, the construction quality and the construction cost of the engineering construction are directly influenced by the erecting method of the template and the support frame, the safety of constructors and the economic benefit of construction enterprises are directly concerned, the rationalization of the template and the support frame is sought, the cost of the template engineering is reduced, the labor force is saved, and the method is an important way for reducing the cost of the concrete structure engineering.
The formwork support frame is an important component of formwork engineering and is correspondingly developed along with the technical progress of the formwork engineering, at present, support systems of many countries are developed into construction tools with various characteristics to form various series products, and the fastener type steel pipe support frame is popularized and applied from the 60 th century in China, is simple and convenient to process and flexible to assemble, but the connection quality and the erecting speed of fastener nodes of the fastener type steel pipe support frame are easily influenced by the quality of fasteners and the operation of workers, so that the erecting quality and the construction period of a formwork are not easily ensured.
How to effectively improve the efficiency of the manufacture, the installation and the disassembly of the template and the supporting frame and ensure the construction quality of the project is the problem to be solved urgently at present.
SUMMERY OF THE UTILITY MODEL
The problem to prior art exists, the utility model provides a construction template adjustable support for construction possesses and is convenient for highly adjust, and the installation is dismantled comparatively conveniently, can guarantee to support the advantage of intensity, the construction template support for construction has solved current, can't adjust highly, and unable convenient installation dismantlement, connection quality and establishing speed easily receive the influence of fastener quality itself and workman's operation, cause establishing quality and the difficult problem that obtains the assurance of construction period of a project of template.
The utility model discloses a realize like this, including the bottom sprag post, the fixed a plurality of middle part support columns that are provided with in top of bottom sprag post, the upper end threaded connection of middle part support column has the screw thread post, the top support column has been cup jointed to the top outside of screw thread post, the fixed top backup pad that is provided with in upper end of top support column.
As the utility model discloses it is preferred, the fixed bottom sprag board that is provided with of lower extreme of bottom sprag post.
As the utility model discloses it is preferred, bottom sprag post, middle part support column and top sprag post are hollow steel tube structure, the upper end inner wall of bottom sprag post and middle part support column is the screw thread form, and is a plurality of the lower extreme of middle part support column is all fixed and is provided with threaded connection pipe, and is a plurality of threaded connection pipe's outer wall is provided with bottom sprag post and middle part support column inner wall screw thread assorted screw thread, threaded connection pipe's external diameter is the same with the internal diameter of bottom sprag post and middle part support column.
As the utility model discloses it is preferred, the external diameter of screw thread post is the same with the internal diameter of middle part support column and top support column, the external screw thread of screw thread post and the internal thread phase-match of middle part support column, the middle part outer wall threaded connection of screw thread post has first lock nut, the outer wall threaded connection that the top of first lock nut is located the screw thread post has second lock nut.
As the utility model discloses it is preferred, the even welding of central authorities 'department outer wall of top support post has four first fixed blocks, top support plate's lower extreme four corners department is the fixed second fixed block that is provided with all, corresponds all fixedly between first fixed block and the second fixed block being provided with the connecting rod, four the connecting rod is provided with fixing bolt with the junction of first fixed block and second fixed block is all fixed.
As the utility model discloses preferred, closely laminate between top support column and the top support plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the bottom sprag post, the middle part support column, the threaded rod, the cooperation of top sprag post and top fixed plate is used, the construction formwork support for current construction has been solved, can't adjust the height, and unable convenient installation is dismantled, current support is mostly fastener formula steel pipe structure, processing is simple and convenient, the equipment is nimble, however, the connection quality of the fastener node of fastener formula steel pipe support frame is established the speed and is easily received the influence of fastener quality itself and workman's operation with propping up, cause the problem that quality and construction period are difficult for obtaining the assurance to establish of formwork.
2. The utility model discloses a set up the bottom sprag board, can be so that whole support has more plane strong points for whole support supports more steadily, guarantees the not easy slope of bottom sprag post and the middle part support column of lower extreme, can be so that whole support intensity is better.
3. The utility model discloses a set up threaded connection pipe, can be so that carry out threaded connection between middle part support column and the bottom sprag post, guarantee the convenience of support mounting and dismantlement to guaranteed the stable strength of support mounting, and can make the height of support adjust through the middle part support column of installing different quantity.
4. The utility model discloses a set up first lock nut and second lock nut, can be so that behind screw thread post and the middle part support column threaded connection, through revolve first lock nut to middle part support column upper end, can play limiting displacement, guarantee in the support process, the screw thread post has fixed hookup location with the middle part support column, avoid screw thread post or middle part support column to take place to remove and influence the supporting effect, position through fixed second lock nut can make the relative screw thread post of top support column have fixed position, adjust different positions second lock nut and can push up or descend the top support column, can carry out the altitude mixture control to the less range of support.
5. The utility model discloses a set up first fixed block, second fixed block and connecting rod, can be so that top support post and top support plate fixed connection for whole support has better supporting effect, and can make fixedly between top support plate and the whole support through a plurality of connecting rods.
6. The utility model discloses a set up the setting of closely laminating between top support post and the top supporting plate, can be so that the top support post directly plays the effect of supporting the top supporting plate, when dismantling simultaneously, can separate top supporting plate and top support post, more convenient dismantlement and transportation.
Drawings
Fig. 1 is a schematic view of an overall structure provided by an embodiment of the present invention;
fig. 2 is a schematic plan view of the overall structure provided by the embodiment of the present invention;
FIG. 3 is a schematic cross-sectional view of a bottom support plate and bottom support columns provided by an embodiment of the present invention;
fig. 4 is a schematic cross-sectional view of a middle support column according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a threaded post, a first lock nut, and a second lock nut provided in an embodiment of the present invention;
fig. 6 is a schematic cross-sectional view of a top support pillar according to an embodiment of the present invention;
in the figure: 1. a bottom support column; 101. a bottom support plate; 2. a middle support column; 201. a threaded connection pipe; 3. a threaded post; 301. a first lock nut; 302. a second lock nut; 4. a top support column; 401. a first fixed block; 402. fixing the bolt; 5. a connecting rod; 6. a top support plate; 601. and a second fixed block.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 6, the embodiment of the utility model provides a pair of construction template adjustable support for construction, including bottom sprag post 1, the top of bottom sprag post 1 is fixed to be provided with a plurality ofly middle part support column 2, the upper end threaded connection of the middle part support column 2 on top has screw thread post 3, and top support column 4 has been cup jointed to the top outside of screw thread post 3, and top support column 4's the fixed top support plate 6 that is provided with in upper end.
Referring to fig. 1, 2 and 3, a bottom support plate 101 is fixedly provided at the lower end of the bottom support pillar 1.
Adopt above-mentioned scheme: through setting up bottom sprag board 101, can be so that whole support has more plane strong points for whole support supports more steadily, guarantees the difficult slope of bottom sprag post 1 and the middle part support column 2 of lower extreme, can be so that whole support intensity is better.
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, bottom support column 1, middle part support column 2 and top support column 4 are hollow steel tube structure, the upper end inner wall of bottom support column 1 and middle part support column 2 is the screw thread form, the lower extreme of a plurality of middle part support columns 2 is all fixed and is provided with threaded connection pipe 201, the outer wall of a plurality of threaded connection pipe 201 is provided with bottom support column 1 and the 2 inner wall screw thread assorted screw threads of middle part support column, the external diameter of threaded connection pipe 201 is the same with the internal diameter of bottom support column 1 and middle part support column 2.
Adopt above-mentioned scheme: through setting up threaded connection pipe 201, can be so that carry out threaded connection between middle part support column 2 and the bottom sprag post 1, guarantee the convenience of support mounting and dismantlement to guaranteed support mounting's stability, and can make the height of support adjust through the middle part support column 2 of installing different quantity.
Referring to fig. 1, 2 and 5, the outer diameter of the threaded column 3 is the same as the inner diameters of the middle support column 2 and the top support column 4, the outer thread of the threaded column 3 matches the inner thread of the middle support column 2, the middle outer wall of the threaded column 3 is in threaded connection with a first lock nut 301, and the outer wall of the threaded column 3 above the first lock nut 301 is in threaded connection with a second lock nut 302.
Adopt above-mentioned scheme: through setting up first lock nut 301 and second lock nut 302, can be so that behind screw thread post 3 and the 2 threaded connection of middle part support column, through revolve first lock nut 301 to 2 upper ends of middle part support column, can play limiting displacement, guarantee at the support in-process, screw thread post 3 has fixed hookup location with middle part support column 2, avoid screw thread post 3 or middle part support column 2 to take place to remove and influence the supporting effect, position through fixed second lock nut 302 can make 4 relative screw thread posts 3 of top support column have fixed position, adjust different positions second lock nut 302 and can push up or descend top support column 4, can carry out the altitude mixture control to the less range of support.
Referring to fig. 1, 2 and 6, four first fixing blocks 401 are uniformly welded to the outer wall of the center of the top support column 4, a second fixing block 601 is fixedly arranged at four corners of the lower end of the top support plate 6, connecting rods 5 are fixedly arranged between the corresponding first fixing blocks 401 and the corresponding second fixing blocks 601, and fixing bolts 402 are fixedly arranged at the joints of the four connecting rods 5 and the first fixing blocks 401 and the second fixing blocks 601.
Adopt above-mentioned scheme: through setting up first fixed block 401, second fixed block 601 and connecting rod 5, can be so that top support post 4 and top support plate 6 fixed connection for whole support has better supporting effect, and can make between top support plate 6 and the whole support fixed through a plurality of connecting rods 5.
Referring to fig. 1 and 2, the top support column 4 is in close contact with the top support plate 6.
Adopt above-mentioned scheme: closely laminating the setting between through setting up top support post 4 and top support plate 6, can be so that top support post 4 directly plays the effect of supporting top support plate 6, when dismantling simultaneously, can separate top support plate 6 and top support post 4, more convenient dismantlement and transportation.
The utility model discloses a theory of operation:
in use, the bottom support plate 101 and the bottom support columns 1 are first placed at the lower end positions where the formwork is to be supported, the approximate height of the overall rack is then adjusted by installing a different number of central support columns 2, the upper end of the middle support column 2 is screwed with the threaded column 3, then the top support column 4 is sleeved on the upper end of the threaded column 3, a top support plate 6 is placed at the upper end of a top support column 4, a connecting rod 5 is further arranged between a first fixing block 401 and a second fixing block 601 to fix the top support plate 6, finally the top support plate 6 is jacked to the lower end of the template through screwing a threaded column 3, a first locking nut 301 and a second locking nut 302 to complete the support installation, the whole support can be subjected to height adjustment, and the installation and the disassembly are convenient, the strength and the quality of the support can be ensured after the installation, and the installation efficiency of the template support is further improved.
In summary, the following steps: this construction template adjustable support for construction, through setting up bottom sprag post 1, bottom sprag post 101, middle part support column 2, threaded connection pipe 201, threaded column 3, first lock nut 301, second lock nut 302, top sprag post 4, first fixed block 401, fixing bolt 402, connecting rod 5, top sprag post 6 and second fixed block 601's cooperation is used, the construction template support for current construction has been solved, can't adjust highly, and unable convenient installation is dismantled, current support is mostly fastener formula steel pipe structure, processing is simple and convenient, the equipment is nimble, but, the connection quality of fastener formula steel pipe support frame's fastener node is established the influence that speed easily received fastener quality and workman's operation with propping up, cause establishing the difficult problem that obtains the assurance of quality and construction period for a project of template.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a construction template adjustable support for construction, includes bottom sprag post (1), its characterized in that: the fixed a plurality of middle part support columns (2) that are provided with in top of bottom sprag post (1), the upper end threaded connection of middle part support column (2) has screw thread post (3), top sprag post (4) have been cup jointed to the top outside of screw thread post (3), the fixed top backup pad (6) that are provided with in upper end of top sprag post (4).
2. The construction template adjustable bracket for building construction according to claim 1, characterized in that: the lower end of the bottom supporting column (1) is fixedly provided with a bottom supporting plate (101).
3. The construction template adjustable bracket for building construction according to claim 1, characterized in that: bottom sprag post (1), middle part support column (2) and top sprag post (4) are hollow steel tube structure, the upper end inner wall of bottom sprag post (1) and middle part support column (2) is the screw thread form, and is a plurality of the lower extreme of middle part support column (2) is all fixed and is provided with threaded connection pipe (201), and is a plurality of the outer wall of threaded connection pipe (201) is provided with bottom sprag post (1) and middle part support column (2) inner wall screw thread assorted screw thread, the external diameter of threaded connection pipe (201) is the same with the internal diameter of bottom sprag post (1) and middle part support column (2).
4. The construction template adjustable bracket for building construction according to claim 1, characterized in that: the external diameter of screw thread post (3) is the same with the internal diameter of middle part support column (2) and top support column (4), the external screw thread of screw thread post (3) and the internal thread phase-match of middle part support column (2), the middle part outer wall threaded connection of screw thread post (3) has first lock nut (301), the outer wall threaded connection that the top of first lock nut (301) is located screw thread post (3) has second lock nut (302).
5. The construction template adjustable bracket for building construction according to claim 1, characterized in that: the welding of the even welding of central authorities department outer wall of top sprag (4) has four first fixed blocks (401), the lower extreme four corners department of top supporting plate (6) all fixes and is provided with second fixed block (601), corresponds all fix between first fixed block (401) and second fixed block (601) and be provided with connecting rod (5), four connecting rod (5) and the junction of first fixed block (401) and second fixed block (601) are all fixed and are provided with fixing bolt (402).
6. The construction template adjustable bracket for building construction according to claim 1, characterized in that: the top supporting columns (4) are tightly attached to the top supporting plate (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021279032.7U CN213509726U (en) | 2020-07-01 | 2020-07-01 | Construction template adjustable support for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021279032.7U CN213509726U (en) | 2020-07-01 | 2020-07-01 | Construction template adjustable support for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213509726U true CN213509726U (en) | 2021-06-22 |
Family
ID=76433794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021279032.7U Expired - Fee Related CN213509726U (en) | 2020-07-01 | 2020-07-01 | Construction template adjustable support for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213509726U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374245A (en) * | 2021-06-29 | 2021-09-10 | 中冶建工集团有限公司 | Construction method for temporary support of post-cast strip of beam plate |
-
2020
- 2020-07-01 CN CN202021279032.7U patent/CN213509726U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374245A (en) * | 2021-06-29 | 2021-09-10 | 中冶建工集团有限公司 | Construction method for temporary support of post-cast strip of beam plate |
CN113374245B (en) * | 2021-06-29 | 2022-11-25 | 中冶建工集团有限公司 | Construction method for temporary support of post-cast strip of beam plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201763002U (en) | Independent adjustable steel supporting device | |
CN111173249B (en) | Overhanging support system attached to rectangular beam and column | |
CN213509726U (en) | Construction template adjustable support for construction | |
CN109518950B (en) | Support-free tool-based template system applied to assembled cast-in-place section and use method thereof | |
CN215107329U (en) | Support platform for construction of overhanging concrete structure | |
CN214994011U (en) | Municipal construction is with supporting location bed-jig | |
CN209907886U (en) | Adjustable assembled stair construction platform | |
JP2000073561A (en) | Setting method for external strut | |
CN213038845U (en) | Support system | |
CN211775944U (en) | Support arrangement for quicken installation of taking one's place of PC wall body | |
CN210947143U (en) | Steel structure for building | |
CN211037509U (en) | Suspended ceiling mounting structure under steel construction with spherical node | |
CN113931354A (en) | Cantilever scaffold and curtain wall integrated structure and construction method | |
CN103953190B (en) | Hollow round table erecting device and mold method | |
CN203729852U (en) | Assembled building site gate | |
CN220928730U (en) | General supporting system of adjustable concrete overhanging structure | |
CN218758739U (en) | Supporting mechanism for stand column template | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN209760795U (en) | Adjustable dismounting type column formwork reinforcing device | |
CN110847529A (en) | Simple to operate's pin-connected panel railing | |
CN219993083U (en) | Building construction engineering scaffold | |
CN218277995U (en) | Pre-buried component of big-arch shelter skeleton installation | |
CN221664190U (en) | Suitable socket type disc buckle type steel pipe support supporting system | |
CN220814858U (en) | Scaffold frame | |
CN215717242U (en) | Digital template and top support movable frame for civil building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210622 |
|