CN203729852U - Assembly type construction site door - Google Patents

Assembly type construction site door Download PDF

Info

Publication number
CN203729852U
CN203729852U CN201320880714.7U CN201320880714U CN203729852U CN 203729852 U CN203729852 U CN 203729852U CN 201320880714 U CN201320880714 U CN 201320880714U CN 203729852 U CN203729852 U CN 203729852U
Authority
CN
China
Prior art keywords
gate
adopts
building site
door
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320880714.7U
Other languages
Chinese (zh)
Inventor
杨星
周竹坚
张旭志
黄汉武
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201320880714.7U priority Critical patent/CN203729852U/en
Application granted granted Critical
Publication of CN203729852U publication Critical patent/CN203729852U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses an assembly type construction site door comprising two stand columns (1) and a cross beam (2). The bottom of the each stand column (1) is provided with a base plate (3) connected with a bolt on a foundation; and the upper ends of the two stand columns (1) are respectively connected with two ends of the cross beam (2) via connection bolts (4) to form a door-shaped structure. Different from a tradition technological principle, the door stand columns and the cross beam are prefabricated according to a drawing size and then connected via bolts to form an integrity, so revolving use of the assembly type construction door can be facilitated and effects of time, labor reduction and revolution and recovery are achieved.

Description

Gate, assembling building site
Technical field
The utility model relates to a kind of gate, particularly relates to gate, a kind of assembling building site.
Background technology
With regard to the mode of setting up at gate, traditional building site, mainly utilize masonry, masonry mortar etc.First utilize masonry to build two square columns by laying bricks or stones by certain size at the main entrance place in building site, built-in fitting and gate are installed on square column.Gate, tradition building site has disposable, can not have enough to meet the need use.
Utility model content
Technical problem to be solved in the utility model is to provide and a kind ofly can economizes on resources, pacify and tear quick, elegant in appearance, saving of work and time, safe and reliable, the gate, assembling building site that can repeatedly have enough to meet the need open.
In order to solve the problems of the technologies described above, the gate, assembling building site that the utility model provides, comprise two root posts and a crossbeam, the bottom of described column be provided with basis on bolted base plate, the upper end of the column described in two adopts connecting bolt to be connected to form portal structures with the two ends of described crossbeam respectively.
Described column adopts 63 × 4 angle steel vertical rods, 50 × 4 cross bars and 40 × 4 diagonal web members to be welded to connect.
Described crossbeam adopts 60 × 40 quarter bends, 50 × 4 angle steel vertical rods and 40 × 4 diagonal web members to be welded to connect.
Described column 1 adopts the connecting bolt 4 of M14 fixing with described crossbeam 2, and the base plate 3 of described vertical rod 1 adopts M10 bolt to fix with basis.
Adopt the gate, assembling building site of technique scheme, column adopts detachable linkage with basis, sound construction, and stability is strong; And component have interchangeability, disassembling section is simple, convenient, can repeat turnover and use.And in dismounting and installation process, can not cause damage to component, reduce the construction cost of unit in charge of construction.Resolve safely that in building construction process, to mount and dismount labour intensity large, required great effort time-consuming, can not have enough to meet the need the technical problems such as use.
Adopt gate, assembling building site, set up taking shaped steel as material, safe, attractive in appearance, atmosphere, can have enough to meet the need with secondary and use.Truly feasible by facts have proved this method, and aspect cost efficiency, energy conservation, having good effect.
In sum, the utility model is simple to operate, and technical essential is easily grasped.Compared with traditional gate, building site, economize on resources, can have enough to meet the need and secondary uses, save trouble, save time, safe and reliable, drop into lowly, economic benefit is high.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is along I-I line cut-away view in Fig. 1.
Fig. 3 is along II-II line cut-away view in Fig. 1.
Fig. 4 is A place enlarged drawing in Fig. 1.
Fig. 5 is B place enlarged drawing in Fig. 1.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, two root posts 1 all adopt 63 × 4 angle steel vertical rod 4,50 × 4 cross bar 5 and 40 × 4 diagonal web members 6 to be welded to connect, the bottom of column 1 be provided with basis on bolted base plate 3; Crossbeam 2 adopts 60 × 40 quarter bend 7,50 × 4 angle steel vertical rod 8 and 40 × 4 diagonal web members 9 to be welded to connect.The upper end of two root posts 1 adopts the connecting bolt 4 of M14 to be fixedly connected to form portal structures with the two ends of crossbeam 2 respectively, and the base plate 3 of vertical rod 1 adopts M10 bolt to fix with basis.After acceptance(check) to be installed, the outside unification mark that hangs.
According to the principle of mechanical drawing, the Wei Biao unit that represents size is herein all ㎜.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, construction sequence of the present utility model is:
1, arrange and determine escape way position according to construction main flat, carry out land clearing smooth, place adopts and is not less than C20, and the concrete that thickness is not less than 20cm hardens.
2, on-the-spot field survey is determined suitable gate, building site size, draws gate, building site construction drawing, and according to good various materials under drawing, ensures that construction equipment and personnel put in place.
3, contrast drawing carries out setting-out to stone bolt bore position, and snap the line is indicated bore position, first-class bolt.
4,, by the column of the finished product having welded 1,3 and 4 M14 × 300 stone bolt of the base plate of column 1 are connected firmly.
5, the two ends of the crossbeam having welded 2 are connected with the upper end of column 1 by the connecting bolt 4 of M14 respectively, make it to be formed as firmly gate system.
6,, after installing, can use after qualified by inspection.

Claims (4)

1. gate, an assembling building site, it is characterized in that: comprise two root posts (1) and a crossbeam (2), the bottom of described column (1) be provided with basis on bolted base plate (3), the upper end of the column (1) described in two adopts connecting bolts (4) to be connected to form portal structures with the two ends of described crossbeam (2) respectively.
2. gate, assembling according to claim 1 building site, is characterized in that: described column (1) adopts 63 × 4 ㎜ angle steel vertical rods (4), 50 × 4 ㎜ cross bars (5) and 40 × 4 ㎜ diagonal web members (6) to be welded to connect.
3. gate, assembling according to claim 1 and 2 building site, is characterized in that: described crossbeam (2) adopts 60 × 40 ㎜ quarter bends (7), 50 × 4 ㎜ angle steel vertical rods (8) and 40 × 4 ㎜ diagonal web members (9) to be welded to connect.
4. gate, assembling according to claim 1 and 2 building site, it is characterized in that: described column (1) adopts the connecting bolt (4) of M14 fixing with described crossbeam (2), and the base plate (3) of described vertical rod (1) adopts M10 bolt to fix with basis.
CN201320880714.7U 2013-12-30 2013-12-30 Assembly type construction site door Expired - Fee Related CN203729852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320880714.7U CN203729852U (en) 2013-12-30 2013-12-30 Assembly type construction site door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320880714.7U CN203729852U (en) 2013-12-30 2013-12-30 Assembly type construction site door

Publications (1)

Publication Number Publication Date
CN203729852U true CN203729852U (en) 2014-07-23

Family

ID=51199933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320880714.7U Expired - Fee Related CN203729852U (en) 2013-12-30 2013-12-30 Assembly type construction site door

Country Status (1)

Country Link
CN (1) CN203729852U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131775A (en) * 2014-07-24 2014-11-05 武汉市汉阳市政建设集团公司 Steel-structure gate for architectural engineering construction
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131775A (en) * 2014-07-24 2014-11-05 武汉市汉阳市政建设集团公司 Steel-structure gate for architectural engineering construction
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method

Similar Documents

Publication Publication Date Title
CN103243817B (en) A kind of assembled beam-column attachment means
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN110805257B (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN101694110B (en) Connecting structure of beam column nodes and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN210216163U (en) Self-supporting cantilever formwork support system
CN203559628U (en) Shape steel fence with turnover and shaping capacity
CN203729852U (en) Assembly type construction site door
CN106592456A (en) Railway line subsidiary facilities and mounting method thereof
CN202157581U (en) Foundation-pit limb shaping protection device
CN211548015U (en) Prefabricated assembled steel-concrete composite beam
CN210216478U (en) Open caisson construction work platform
CN204139631U (en) The guard rail of building site fast demountable
CN204266373U (en) A kind of assembled integral Steel Space grid box structure room for earthquake region
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN215107329U (en) Support platform for construction of overhanging concrete structure
CN104295146A (en) Compositional structure of angle tower for 110kV line engineering
CN204960324U (en) Suspension type floor formwork support device
CN210421395U (en) Assembled light steel frame
CN202611010U (en) Steel plate and brickwork combination shear wall
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure
CN105422140A (en) Template supporting device for concrete supporting construction of shaft and lane engineering
CN112962822A (en) Double-layer profiled steel sheet-recycled concrete combined shear wall and assembling method thereof
CN201261947Y (en) Assembly type escape way

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140723

Termination date: 20171230

CF01 Termination of patent right due to non-payment of annual fee