CN218277995U - Pre-buried component of big-arch shelter skeleton installation - Google Patents

Pre-buried component of big-arch shelter skeleton installation Download PDF

Info

Publication number
CN218277995U
CN218277995U CN202222552878.9U CN202222552878U CN218277995U CN 218277995 U CN218277995 U CN 218277995U CN 202222552878 U CN202222552878 U CN 202222552878U CN 218277995 U CN218277995 U CN 218277995U
Authority
CN
China
Prior art keywords
erection column
plate
embedded
mounting panel
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222552878.9U
Other languages
Chinese (zh)
Inventor
李国明
赵金旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Yihe Agricultural Technology Co ltd
Original Assignee
Handan Yihe Agricultural Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Yihe Agricultural Technology Co ltd filed Critical Handan Yihe Agricultural Technology Co ltd
Priority to CN202222552878.9U priority Critical patent/CN218277995U/en
Application granted granted Critical
Publication of CN218277995U publication Critical patent/CN218277995U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a pre-buried component of big-arch shelter skeleton installation, including mounting panel, connecting plate, built-in board and pre-buried reinforcing bar, the bottom fixedly connected with multiunit pre-buried reinforcing bar of built-in board, fixedly connected with multiunit erection column on the top surface of built-in board, the multiunit erection column all passes the mounting panel, and mounting panel and erection column fixed connection, lies in mounting panel upper portion region on the erection column and is provided with the screw thread, and the screw thread matches is provided with the nut, corresponds every group erection column on the connecting plate and all is provided with the mounting hole. The utility model relates to a pre-buried component technical field, it has the big-arch shelter skeleton later stage of being convenient for dismantlement, the characteristics of change, can be used to the installation of big-arch shelter skeleton.

Description

Pre-buried component of big-arch shelter skeleton installation
Technical Field
The utility model relates to a pre-buried component technical field, specific pre-buried component of big-arch shelter skeleton installation that says so.
Background
The greenhouse is an agricultural facility, the components of the greenhouse are that bamboo and wood poles, cement poles, light steel pipes or pipes and other materials are used as frameworks, the frameworks are made into upright posts, pull rods, arch poles and pressure rods, plastic films are covered on the frameworks to form an arched material greenhouse, the greenhouse framework is an important part of the greenhouse, and the installation stability of the greenhouse framework is a key for directly determining the service life of the greenhouse. At present, for guaranteeing that greenhouse framework is firm at subaerial installation, generally pour out concrete foundation earlier subaerial to pre-buried built-in fitting in concrete foundation carries out welded fastening with stand or other pipe fittings in the skeleton and built-in fitting again, but this kind of mounting means, when making the later stage dismantle, can only cut built-in fitting and stand or other pipe fittings, just so make greenhouse framework's dismantlement, change inconvenient.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned weak point that exists among the prior art, the utility model aims at providing a pre-buried component convenient to greenhouse skeleton later stage is dismantled, is changed.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: the utility model provides a pre-buried component of big-arch shelter skeleton installation, includes mounting panel, connecting plate, built-in plate and embedded bar, the bottom fixedly connected with multiunit of built-in plate the embedded bar, fixedly connected with multiunit erection column on the top surface of built-in plate, the multiunit the erection column all passes the mounting panel, just the mounting panel with erection column fixed connection, lie in on the erection column the regional screw thread that is provided with in mounting panel upper portion, what the screw thread matches is provided with the nut, correspond every group on the connecting plate the erection column all is provided with the mounting hole.
In the technical scheme, the bottom of the embedded steel bar is provided with a bending area.
In the technical scheme, a plurality of groups of circulation holes are formed in the embedded plate.
In the above technical scheme, fixedly connected with horizontal sand grip of multiunit and vertical sand grip on the top surface of mounting panel, correspond on the bottom surface of connecting plate horizontal sand grip is provided with horizontal recess, corresponds vertical sand grip is provided with vertical recess.
In the technical scheme, the surfaces of the connecting plate and the mounting plate are provided with anticorrosive coatings.
In the above technical scheme, when the mounting post passes through the mounting hole, the transverse convex strip corresponds to the transverse groove, and the longitudinal convex strip corresponds to the longitudinal groove.
The utility model has the advantages that: can bury built-in panel and embedded steel bar in the concrete base station in advance, and the mounting panel is located the external world, can be with stand welded fastening in the greenhouse skeleton connect on the connecting plate, later every group erection column passes the mounting hole of connecting plate, threaded connection multiunit nut on the threaded area of erection column, like this alright be connected stand and pre-buried component, thereby realize the stand subaerial installation, this kind of pre-buried component is different from current, can make stand and pre-buried component dismantle, so that the later stage is to the dismantlement of big-arch shelter, change.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of another embodiment of the present invention;
fig. 3 is a schematic view of the installation structure of the present invention.
In the figure: the concrete foundation comprises 1 mounting plate, 2 connecting plates, 3 embedded plates, 4 embedded steel bars, 5 bending areas, 6 circulation holes, 7 mounting columns, 8 threads, 9 nuts, 10 mounting holes, 11 transverse convex strips, 12 longitudinal convex strips, 13 transverse grooves, 14 longitudinal grooves, 15 concrete foundation bodies and 16 upright columns.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-3, an embedded member for installing a greenhouse framework comprises an installation plate 1, a connection plate 2, an embedded plate 3 and embedded steel bars 4, wherein four groups of embedded steel bars 4 are fixedly welded at the bottom of the embedded plate 3, each group of embedded steel bars 4 is respectively positioned at one corner of the embedded plate 3, and a bending area 5 is arranged at the bottom of each embedded steel bar 4, so that the embedded steel bars 4 are stably connected in a concrete base 15;
fixedly connected with four group of erection columns 7 on the top surface of embedded plate 3, every group of erection column 7 corresponds a set of embedded bar 4, and four group of erection columns 7 all pass mounting panel 1, and the connection position welded fastening of mounting panel 1 and erection column 7, and the region that lies in mounting panel 1 upper portion on the erection column 7 still is provided with screw thread 8, and screw thread 8 matches then is provided with nut 9, corresponds every group of erection column 7 on the connecting plate 2 and all is provided with mounting hole 10.
In this embodiment, fixedly connected with four groups of horizontal sand grips 11 and three groups of vertical sand grips 12 on the top surface of mounting panel 1, it is provided with horizontal recess 13 to correspond horizontal sand grip 11 on the bottom surface of connecting plate 2, it is provided with vertical recess 14 to correspond vertical sand grip 12, and when erection column 7 passed mounting hole 10, horizontal sand grip 11 corresponds horizontal recess 13, vertical sand grip 12 corresponds vertical recess 14, erection column 7 can realize the effect of location like this, and in horizontal sand grip 11 gomphosis to horizontal recess 13, when vertical sand grip 12 gomphosis to in the horizontal recess 13, horizontal sand grip 11, vertical sand grip 12 can form spacing effect, thereby avoid producing the displacement between connecting plate 2 and the mounting panel 1.
In this embodiment, the surface of connecting plate 2 and mounting panel 1 all is provided with the anticorrosive coating, and anticorrosive coating accessible spraying paint constitutes, reduces the corruption of connecting plate 2 and mounting panel 1 through the anticorrosive coating to strengthen its life.
In summary, the present embodiment provides an embedded component, which is mainly used for installing a greenhouse framework, specifically, the embedded plate 3 and the embedded steel bars 4 are embedded in a concrete base in advance, the installation plate 1 is located outside, the upright posts 16 or other pipe fittings in the greenhouse framework are welded and fixed on the connection plate 2, then each group of installation posts 7 passes through the installation holes 10 of the connection plate 2, and the screw threads 8 of the installation posts 7 are connected with at least two groups of nuts 9.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (5)

1. The utility model provides a pre-buried component of big-arch shelter skeleton installation which characterized in that: including mounting panel (1), connecting plate (2), built-in plate (3) and embedded steel (4), the bottom fixedly connected with multiunit of built-in plate (3) embedded steel (4), fixedly connected with multiunit erection column (7), multiunit on the top surface of built-in plate (3) mounting column (7) all pass mounting panel (1), just mounting panel (1) with erection column (7) fixed connection, lie in on erection column (7) mounting panel (1) upper portion region is provided with screw thread (8), screw thread (8) match be provided with nut (9), correspond every group on connecting plate (2) erection column (7) all are provided with mounting hole (10).
2. The embedded member for installing the greenhouse framework as claimed in claim 1, wherein the embedded member comprises: and a bending area (5) is arranged at the bottom of the embedded steel bar (4).
3. The embedded member for installing the greenhouse framework as claimed in claim 1, wherein the embedded member comprises: and a plurality of groups of circulation holes (6) are arranged on the embedded plate (3).
4. The embedded member for installing the greenhouse framework as claimed in claim 1, wherein the embedded member comprises: the top surface of the mounting plate (1) is fixedly connected with a plurality of groups of transverse convex strips (11) and longitudinal convex strips (12), the bottom surface of the connecting plate (2) is provided with transverse grooves (13) corresponding to the transverse convex strips (11), and longitudinal grooves (14) corresponding to the longitudinal convex strips (12);
when the mounting column (7) penetrates through the mounting hole (10), the transverse convex strip (11) corresponds to the transverse groove (13), and the longitudinal convex strip (12) corresponds to the longitudinal groove (14).
5. The embedded member for installing the greenhouse framework as claimed in claim 1, wherein the embedded member comprises: the surfaces of the connecting plate (2) and the mounting plate (1) are provided with anticorrosive coatings.
CN202222552878.9U 2022-09-27 2022-09-27 Pre-buried component of big-arch shelter skeleton installation Active CN218277995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222552878.9U CN218277995U (en) 2022-09-27 2022-09-27 Pre-buried component of big-arch shelter skeleton installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222552878.9U CN218277995U (en) 2022-09-27 2022-09-27 Pre-buried component of big-arch shelter skeleton installation

Publications (1)

Publication Number Publication Date
CN218277995U true CN218277995U (en) 2023-01-13

Family

ID=84805533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222552878.9U Active CN218277995U (en) 2022-09-27 2022-09-27 Pre-buried component of big-arch shelter skeleton installation

Country Status (1)

Country Link
CN (1) CN218277995U (en)

Similar Documents

Publication Publication Date Title
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN105155686A (en) House beam column and profile connection structure and sleeper integration house
CN218277995U (en) Pre-buried component of big-arch shelter skeleton installation
WO2017042856A1 (en) Assembly block
CN212359317U (en) Prefabricated enclosure wall structure with prefabricated light partition plate
CN210767192U (en) Building structure with insertion connection
CN116971597A (en) Independent flower stand column template of house construction project roof and construction method thereof
CN110748001A (en) Steel structure net rack
CN106351429A (en) Heavy support system and construction method thereof
CN108252569B (en) Rapid combined enclosure and construction method
CN217232907U (en) Folding fan-shaped classical landscape corridor frame
CN213509726U (en) Construction template adjustable support for construction
CN205035915U (en) Integrated house of house beam column section bar connection structure and sleeper
CN103981948A (en) Movable and dismountable mobile house
CN210395626U (en) Skeleton device for building with steel structure
CN207110676U (en) The prefabricated enclosure wall of integral type
CN104948004A (en) Revolving wall for on-site safety management
CN210264071U (en) Movable PC component production workshop
CN215926859U (en) A consolidate stand structure for building structure design
CN218292414U (en) Welding-free assembled UHPC curtain wall unit body
CN217205838U (en) Assembled fender of building site
CN216042250U (en) Decorative panel of prefabricated staircase
CN220539212U (en) Independent pergola post template of engineering roofing is built in room
CN220336447U (en) Balcony guardrail combined type template
CN217269323U (en) Combined enclosure wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant