CN213477623U - Concatenation formula ultra high performance concrete form - Google Patents
Concatenation formula ultra high performance concrete form Download PDFInfo
- Publication number
- CN213477623U CN213477623U CN202021742417.2U CN202021742417U CN213477623U CN 213477623 U CN213477623 U CN 213477623U CN 202021742417 U CN202021742417 U CN 202021742417U CN 213477623 U CN213477623 U CN 213477623U
- Authority
- CN
- China
- Prior art keywords
- concrete
- high performance
- concrete form
- ultra
- performance concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to the technical field of building appliances, in particular to a splicing type ultra-high performance concrete template, which comprises a concrete template body, wherein one end of the concrete template body is provided with a fixed groove, the other end of the concrete template body is provided with an installation buckle, a reinforcing block is provided with a mounting groove, the mounting groove is provided with a top post, the top post is provided with a connecting end, the concrete template body is formed by pouring ultra-high performance concrete, the utility model can splice a plurality of concrete template bodies through the fixed groove and the installation buckle to form a cavity, then the ultra-high performance concrete is injected into the cavity of the spliced concrete template body, the utility model is formed by pouring the ultra-high performance concrete, after the ultra-high performance concrete is injected, the concrete template body and the injected ultra-high performance concrete are integrated, need not to dismantle the concrete form body, and the utility model discloses convenient transportation preparation, the effectual work efficiency who pours that has improved.
Description
Technical Field
The utility model belongs to the technical field of the building apparatus technique and specifically relates to indicate a concatenation formula ultra high performance concrete form.
Background
The concrete template refers to a whole set of construction system of a template and a supporting template formed by newly poured concrete. Along with the development of modern building trade, building structure is more and more various, and is more and more to concrete placement's requirement, and current concrete form generally adopts large-scale template to splice, and the transportation is inconvenient, and current concrete form concatenation process is complicated, and the installation is inconvenient with the dismantlement, and current concrete form need install earlier at the in-process of pouring in addition, later dismantles, uses inconveniently.
SUMMERY OF THE UTILITY MODEL
The utility model discloses problem to prior art provides a concatenation formula ultra high performance concrete form.
In order to solve the technical problem, the utility model discloses a following technical scheme:
the utility model provides a pair of concatenation formula ultra high performance concrete form, including the concrete form body, concrete form body one end is provided with the fixed slot, the other end of concrete form body is provided with the installation and detains, the installation is detained including fixing base, rotating part and locking portion, fixed mounting in on the concrete form body, the rotating part is rotatable install in on the fixing base, locking portion install in on the rotating part, the inside boss that is provided with of concrete form body, set up the mounting groove on the boss, the fore-set is installed to the mounting groove, be provided with the link on the fore-set, the concrete form body adopts ultra high performance concrete placement to form.
Preferably, splice plates are arranged on two sides of the concrete formwork body, and the fixing grooves and the mounting buckles are mounted on the splice plates.
Preferably, the fixing groove and the mounting buckle are provided in plurality.
Preferably, the bottom of the concrete formwork body is provided with a boss, and the outer part of the concrete formwork body is obliquely arranged.
Preferably, the top pillar is made of a metal material.
Preferably, the locking portion is provided with a handle.
Preferably, an extension plate is disposed at an upper portion of the concrete form body.
The utility model has the advantages that:
the utility model provides a splicing type ultra-high performance concrete template, which comprises a concrete template body, wherein one end of the concrete template body is provided with a fixed groove, the other end of the concrete template body is provided with an installation buckle, the installation buckle comprises a fixed seat, a rotating part and a locking part, the fixed seat is arranged on the concrete template body, the rotating part can be rotatably arranged on the fixed seat, the locking part is arranged on the rotating part, the inner part of the concrete template body is provided with a reinforcing block, the reinforcing block is provided with a mounting groove, the mounting groove is provided with a top post, the top post is provided with a connecting end, the concrete template body is formed by pouring ultra-high performance concrete, the utility model can splice a plurality of concrete template bodies through the fixed groove and the installation buckle to form a cavity, then the ultra-high performance concrete is injected into the cavity of the spliced concrete template body, the utility model discloses an ultra high performance concrete placement forms, and after pouring into ultra high performance concrete, the concrete form body becomes whole with the ultra high performance concrete that pours into, need not to dismantle the concrete form body, and the utility model discloses the preparation is transported to the convenience, the effectual work efficiency of pouring that has improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the concrete form body of the present invention.
Fig. 3 is an enlarged view of fig. 1 at a.
The reference numerals are respectively;
the concrete formwork comprises a concrete formwork body, a fixing groove, a fixing buckle, a fixing seat, a rotating part, a locking part, a reinforcing block, a splicing plate, a boss, a mounting groove, a top column, a connecting end, a handle, a fixing block, a rotating part, a locking part, a reinforcing block, a splicing plate, a boss and a mounting groove, wherein the fixing groove.
Detailed Description
In order to facilitate understanding of those skilled in the art, the present invention will be further described with reference to the following examples and drawings, which are not intended to limit the present invention. The present invention will be described in detail with reference to the accompanying drawings.
As shown in FIGS. 1-3, the utility model provides a splicing type ultra-high performance concrete formwork, which comprises a concrete formwork body 1, wherein one end of the concrete formwork body 1 is provided with a fixing groove 2, the other end of the concrete formwork body 1 is provided with an installation buckle 3, the installation buckle 3 comprises a fixing seat 4, a rotating part 5 and a locking part 6, the concrete formwork body 1 is fixedly installed on, the rotating part 5 is rotatably installed on the fixing seat 4, the locking part 6 is installed on the rotating part 5, a reinforcing block 7 is arranged inside the concrete formwork body 1, a mounting groove 10 is arranged on the reinforcing block 7, a top post 11 is installed on the mounting groove 10, a connecting end 12 is arranged on the top post 11, the concrete formwork body 1 is formed by ultra-high performance concrete pouring, the utility model can splice a plurality of concrete formwork bodies 1 through the fixing groove 2 and the installation buckle 3 to form a cavity, later at the inside ultrahigh performance concrete that pours into of cavity after the concatenation, the utility model discloses an ultrahigh performance concrete pouring forms, and after pouring into ultrahigh performance concrete, concrete form body 1 becomes whole with the ultrahigh performance concrete that pours into, need not to dismantle concrete form body 1, and the utility model discloses convenient transportation preparation, the effectual work efficiency of pouring that has improved.
As shown in fig. 1, during splicing, the concrete form bodies 1 are spliced into a row through the fixing grooves 2 and the mounting buckles 3, then the plurality of concrete form bodies 1 spliced into a row are fixed through the connecting ends 12 of the top pillars 11 to form a cavity, and then the ultrahigh-performance concrete is injected.
As shown in fig. 2, in this embodiment, splice plates 8 are disposed on two sides of the concrete form body 1, the fixing grooves 2 and the installation buckles 3 are both installed on the splice plates 8, in order to ensure the stability of the connection between two adjacent concrete form bodies, the fixing grooves 2 and the installation buckles 3 are both provided with a plurality of parts, and specifically, the number of the fixing grooves 2 and the installation buckles 3 is three.
As shown in fig. 1 to 3, in this embodiment, a boss 9 is disposed at the bottom of the concrete form body 1, the concrete form body 1 is disposed in an inclined manner, and the boss 9 can be used for placing a transverse plate, so that the ultra-high performance concrete can be conveniently poured into the concrete form body.
In the embodiment shown in fig. 2-3, in order to ensure the firmness of the connection end 12 of the top pillar 11 connecting with the adjacent concrete form body 1, the top pillar 11 is made of metal. .
As shown in fig. 3, in the present embodiment, in order to facilitate the rotation of the mounting buckle 3, the locking portion 6 is provided with a handle 13.
As shown in fig. 2, in this embodiment, in order to prevent the ultra high performance concrete from splashing into the side of the concrete form body 1 when the ultra high performance concrete is poured, an extension plate 14 is provided on the upper portion of the concrete form body 1.
The above description is only for the preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention is disclosed in the preferred embodiment, it is not limited to the above description, and any person skilled in the art can make some changes or modifications to equivalent embodiments without departing from the scope of the present invention, but all the technical solutions of the present invention are within the scope of the present invention.
Claims (7)
1. The utility model provides a concatenation formula ultra high performance concrete form which characterized in that: including the concrete form body, this body one end of concrete form is provided with the fixed slot, the other end of concrete form body is provided with the installation and detains, the installation is detained including fixing base, rotating part and locking portion, fixed mounting in on the concrete form body, the rotating part is rotatable install in on the fixing base, locking portion install in on the rotating part, this internal portion of concrete form is provided with the boss, set up the mounting groove on the boss, the fore-set is installed to the mounting groove, be provided with the link on the fore-set, the concrete form body adopts ultra high performance concrete placement to form.
2. The spliced ultra-high performance concrete form of claim 1, wherein: splice plates are arranged on two side portions of the concrete formwork body, and the fixing grooves and the mounting buckles are mounted on the splice plates.
3. The spliced ultra-high performance concrete form of claim 2, wherein: the fixed slot with the installation is detained and all is provided with a plurality ofly.
4. The spliced ultra-high performance concrete form of claim 1, wherein: the bottom of the concrete formwork body is provided with a boss, and the outer portion of the concrete formwork body is obliquely arranged.
5. The spliced ultra-high performance concrete form of claim 1, wherein: the top pillar is made of metal materials.
6. The spliced ultra-high performance concrete form of claim 2, wherein: the locking part is provided with a handle.
7. The spliced ultra-high performance concrete form of claim 1, wherein: and an extension plate is arranged on the upper part of the concrete template body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021742417.2U CN213477623U (en) | 2020-08-20 | 2020-08-20 | Concatenation formula ultra high performance concrete form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021742417.2U CN213477623U (en) | 2020-08-20 | 2020-08-20 | Concatenation formula ultra high performance concrete form |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213477623U true CN213477623U (en) | 2021-06-18 |
Family
ID=76361139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021742417.2U Active CN213477623U (en) | 2020-08-20 | 2020-08-20 | Concatenation formula ultra high performance concrete form |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213477623U (en) |
-
2020
- 2020-08-20 CN CN202021742417.2U patent/CN213477623U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207347929U (en) | Crash barrier template structure and anticollision barrier casting system | |
CN110295739B (en) | Construction method for vertical waterproof construction joint | |
CN202509763U (en) | Socket disk buckle type and fastener type steel tube combined template bracket device | |
CN105220619A (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN209482517U (en) | A kind of wall thermal insulating module connecting piece and heat insulation integrated structure | |
CN213477623U (en) | Concatenation formula ultra high performance concrete form | |
CN106320373A (en) | Supporting system at position of post-pouring belt of underground garage roof and construction method | |
CN106978898B (en) | Turnover combined die for cast-in-situ molding of reinforced concrete structure and construction method thereof | |
CN210946737U (en) | Water inlet flow passage template | |
TWI339236B (en) | ||
CN109763658A (en) | A kind of support device and its construction method for arrangement material distributing machine in elevator | |
CN207609427U (en) | A kind of simple multispan formula tunnel inverted arch trestle structure | |
CN207260636U (en) | Pipe die reinforced column supporting member | |
CN106884664B (en) | Tunnel inverted arch template and tunnel inverted arch filling rapid construction method | |
CN212104132U (en) | Cast-in-place afforestation concrete slope protection structure | |
CN208009909U (en) | A kind of built with ribbed bricks wall construction reinforced bar guide device | |
CN206467999U (en) | A kind of construction formwork for placing | |
CN114108499A (en) | Suspended casting beam reference section hinged type triangular bracket combined hanging basket integrated device and construction method thereof | |
CN107237497B (en) | The erection method of concrete cast template | |
CN110593554A (en) | Be applied to super thick vertical concrete structure template system interior angle reinforced structure | |
CN213829511U (en) | Prefabricated wall form | |
CN205975369U (en) | A reinforcing bar pinion rack template that is used for case liang fuwanjuchu | |
CN214195092U (en) | Wall column connecting node device | |
CN219175870U (en) | Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system | |
CN213837351U (en) | Prefabricated post of antidetonation type with reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220711 Address after: 100000 room 202-207, floor 2, building 4, No. 9 (south yard), Kangzhuang Road, Huangcun Town, Daxing District, Beijing Patentee after: Beijing China Railway New Material Technology Co.,Ltd. Address before: 510700 No.96, Fenghuang Avenue, Nansha District, Guangzhou City, Guangdong Province Patentee before: Guangdong Middle Road Protection Engineering Co.,Ltd. |