CN208009909U - A kind of built with ribbed bricks wall construction reinforced bar guide device - Google Patents
A kind of built with ribbed bricks wall construction reinforced bar guide device Download PDFInfo
- Publication number
- CN208009909U CN208009909U CN201820468895.5U CN201820468895U CN208009909U CN 208009909 U CN208009909 U CN 208009909U CN 201820468895 U CN201820468895 U CN 201820468895U CN 208009909 U CN208009909 U CN 208009909U
- Authority
- CN
- China
- Prior art keywords
- guide device
- built
- wall construction
- bar guide
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 239000011449 brick Substances 0.000 title claims 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 230000008093 supporting effect Effects 0.000 claims abstract description 5
- 229910052742 iron Inorganic materials 0.000 claims 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本实用新型公开了一种配筋砌块砌体墙施工钢筋引导装置,包括引导管和墙片,所述引导管的上下均通过紧固螺栓活动连接有支撑套,上下所述支撑套的左右对称连接有弹簧,所述弹簧的另一侧均连接有支撑板,所述支撑板的顶部均连接有铁链,所述铁链的顶部连接有横梁,所述墙片的内腔均匀的开设有孔洞,通过引导管通过引导管的上下均通过紧固螺栓活动连接有支撑套的设置,便于调节支撑套的上下位置,从而可以适应不同尺寸的墙片的孔洞,钢筋引导完成之后,再将引导管连同支撑套通过钢丝绳一并取出,具有很高的实用性,大大提升了该一种配筋砌块砌体墙施工钢筋引导装置的使用功能性,保证其使用效果和使用效益,适合广泛推广。
The utility model discloses a steel bar guiding device for the construction of a reinforced block masonry wall, which comprises a guiding pipe and a wall sheet. The upper and lower sides of the guiding pipe are movably connected with supporting sleeves through fastening bolts. Springs are symmetrically connected, the other side of the springs is connected with a support plate, the top of the support plate is connected with an iron chain, the top of the iron chain is connected with a beam, and the inner cavity of the wall piece is evenly opened There are holes, through the guide tube, through the upper and lower sides of the guide tube, the setting of the support sleeve is movably connected by fastening bolts, which is convenient for adjusting the upper and lower positions of the support sleeve, so that it can adapt to the holes of different sizes of wall pieces. The guide pipe and the support sleeve are taken out together through the wire rope, which has high practicability and greatly improves the use functionality of this kind of steel bar guide device for reinforced block masonry wall construction, ensuring its use effect and benefit, and is suitable for a wide range of applications. promote.
Description
技术领域technical field
本实用新型涉及砌块砌体墙施工技术领域,具体为一种配筋砌块砌体墙施工钢筋引导装置。The utility model relates to the technical field of block masonry wall construction, in particular to a reinforcing bar guide device for construction of a reinforced block masonry wall.
背景技术Background technique
配筋砌块砌体房屋,具有低碳、环保、造价低、性能好等绿色建筑的特点,在当今的建筑市场中具有较强的竞争力。配筋砌块砌体墙体是这样一种墙体,首先将混凝土小型空心砌块砌筑成为孔对孔、肋对肋的空心砌块砌体墙体,在砌筑的过程中即在系梁块凹槽形成的水平贯通孔洞中配置水平钢筋,砌筑完成后自上而下插入竖向钢筋,并在墙体底皮清扫孔块的孔洞处与圈梁上伸处的竖向钢筋完成连接,可采用单点绑扎或挤压式直螺纹套筒连接,最终浇筑灌芯混凝土,形成内部具有纵横混凝土条带和纵横钢筋网、砌块、砂浆、钢筋、灌芯混凝土合为整体的配筋砌块砌体剪力墙。Reinforced block masonry houses have the characteristics of green buildings such as low carbon, environmental protection, low cost, and good performance, and have strong competitiveness in today's construction market. Reinforced block masonry wall is such a wall. Firstly, small concrete hollow blocks are built into a hole-to-hole, rib-to-rib hollow block masonry wall. Horizontal steel bars are placed in the horizontal through holes formed by the grooves of the beam blocks. After the masonry is completed, the vertical steel bars are inserted from top to bottom, and the vertical steel bars at the bottom of the wall are cleaned at the holes of the hole blocks and at the extension of the ring beam. The connection can be connected by single-point binding or extruded straight thread sleeve connection, and finally the core concrete is poured to form a composite structure with vertical and horizontal concrete strips and vertical and horizontal steel mesh, blocks, mortar, steel bars, and core concrete. Reinforced block masonry shear walls.
现有的申请号CN201420481999.1的专利对比文件公开了用于一种配筋砌块砌体墙施工钢筋引导装置,包括导向横梁、钢丝绳、两个吊耳、数个铁链、数个引导管、数个引导管封头和数个卡扣,两个吊耳设置在导向横梁的上端面上,钢丝绳的两端分别与两个吊耳连接,数个铁链依次固装在导向横梁的下端面,每个引导管的上端安装一个引导管封头,每个引导管封头的上端连接一个卡扣,每个引导管对应一个铁链,且引导管上的卡扣与铁链连接,但是对比文件中存在的问题:虽然结构简单,但是引导管的直径与孔洞的直径不确定,因此引导管在放入至较大的孔洞中时不能稳定。The existing patent reference document with application number CN201420481999.1 discloses a steel bar guide device for the construction of reinforced block masonry walls, including guide beams, steel wire ropes, two lifting lugs, several iron chains, and several guide pipes , several guide pipe heads and several buckles, two lifting lugs are set on the upper end surface of the guiding beam, the two ends of the wire rope are respectively connected with the two lifting lugs, and several iron chains are fixed on the lower guiding beam in turn. On the end face, a guide tube head is installed on the upper end of each guide tube, and a buckle is connected to the upper end of each guide tube head, and each guide tube corresponds to an iron chain, and the buckle on the guide tube is connected to the iron chain, but Problems in the reference document: Although the structure is simple, the diameter of the guide tube and the diameter of the hole are uncertain, so the guide tube cannot be stabilized when it is placed into a larger hole.
发明内容Contents of the invention
本实用新型的目的在于提供一种配筋砌块砌体墙施工钢筋引导装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a reinforced block masonry wall construction steel bar guide device to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种配筋砌块砌体墙施工钢筋引导装置,包括引导管和墙片,所述引导管的上下均通过紧固螺栓活动连接有支撑套,上下所述支撑套的左右对称连接有弹簧,所述弹簧的另一侧均连接有支撑板,所述支撑板的顶部均连接有铁链,所述铁链的顶部连接有横梁,所述墙片的内腔均匀的开设有孔洞,所述引导管通过支撑板卡接至孔洞。In order to achieve the above purpose, the utility model provides the following technical solutions: a reinforced block masonry wall construction reinforcement guide device, including guide pipes and wall pieces, the upper and lower sides of the guide pipe are movably connected with support sleeves through fastening bolts , the upper and lower support sleeves are symmetrically connected with springs, the other side of the springs is connected with a support plate, the top of the support plate is connected with an iron chain, and the top of the iron chain is connected with a beam. Holes are uniformly opened in the inner cavity of the wall piece, and the guide pipe is clipped to the hole through the support plate.
优选的,所述弹簧每组设置有四个,且上下左右对称设置。Preferably, there are four springs in each group, and they are arranged symmetrically up, down, left, and right.
优选的,每个所述铁链的顶部均连接至横梁。Preferably, the top of each iron chain is connected to a beam.
优选的,所述横梁的顶部左右对称设有吊耳,所述吊耳的顶部连接有钢丝绳。Preferably, hanging lugs are symmetrically provided on the top of the crossbeam, and steel wire ropes are connected to the top of the lifting lugs.
优选的,所述引导管的上下端均超过墙片。Preferably, both the upper and lower ends of the guide pipe exceed the wall sheet.
与现有技术相比,本实用新型的有益效果是:本实用新型一种配筋砌块砌体墙施工钢筋引导装置,通过支撑套的左右对称连接有弹簧,弹簧的另一侧均连接有支撑板的设置,便于将引导管紧紧的卡接至墙片的孔洞中,通过支撑板的顶部均连接有铁链,铁链的顶部连接有横梁,横梁的顶部左右对称设有吊耳,吊耳的顶部连接有钢丝绳的设置,便于将引导管和墙片一起吊运到施工位置,然后将钢筋分别穿进每个导引管内,通过引导管通过引导管的上下均通过紧固螺栓活动连接有支撑套的设置,便于调节支撑套的上下位置,从而可以适应不同尺寸的墙片的孔洞,钢筋引导完成之后,再将引导管连同支撑套通过钢丝绳一并取出,具有很高的实用性,大大提升了该一种配筋砌块砌体墙施工钢筋引导装置的使用功能性,保证其使用效果和使用效益,适合广泛推广。Compared with the prior art, the beneficial effect of the utility model is: the utility model is a reinforced block masonry wall construction steel bar guide device, the spring is connected symmetrically through the left and right sides of the support sleeve, and the other side of the spring is connected with a The setting of the support plate facilitates the tight clamping of the guide pipe to the hole of the wall piece. The top of the support plate is connected with an iron chain, the top of the iron chain is connected with a beam, and the top of the beam is symmetrically provided with lifting lugs. The top of the lifting lug is connected with a wire rope, which is convenient for lifting the guide pipe and the wall piece to the construction location, and then the steel bars are respectively inserted into each guide pipe, and the upper and lower sides of the guide pipe are moved through the fastening bolts. The setting connected with the support sleeve is convenient for adjusting the upper and lower positions of the support sleeve, so that it can adapt to the holes of different sizes of wall pieces. After the reinforcement guide is completed, the guide tube and the support sleeve can be taken out together through the wire rope, which has high practicability , which greatly improves the use functionality of the reinforced block masonry wall construction steel bar guide device, ensures its use effect and use benefit, and is suitable for wide promotion.
附图说明Description of drawings
图1为本实用新型一种配筋砌块砌体墙施工钢筋引导装置的结构示意图;Fig. 1 is the structure schematic diagram of a kind of reinforced block masonry wall construction reinforcing bar guiding device of the present utility model;
图2为本实用新型一种配筋砌块砌体墙施工钢筋引导装置的引导管和连接套连接结构示意图;Fig. 2 is a schematic diagram of the connection structure of the guide pipe and the connecting sleeve of the construction steel bar guide device of a reinforced block masonry wall of the present invention;
图3为本实用新型一种配筋砌块砌体墙施工钢筋引导装置的支撑套俯视结构示意图;Fig. 3 is a structural schematic diagram of a top view of a supporting sleeve of a reinforcing bar masonry wall construction reinforcement guiding device of the utility model;
图4为本实用新型一种配筋砌块砌体墙施工钢筋引导装置的A处放大结构示意图。Fig. 4 is a schematic diagram of the enlarged structure at A of a reinforced block masonry wall construction steel bar guide device of the present invention.
图中:1引导管、2支撑套、3紧固螺栓、4弹簧、5支撑板、6铁链、7横梁、8吊耳、9钢丝绳、10墙片、11孔洞。In the figure: 1 guide pipe, 2 support sleeve, 3 fastening bolt, 4 spring, 5 support plate, 6 iron chain, 7 beam, 8 lug, 9 steel wire rope, 10 wall piece, 11 hole.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-4,本实用新型提供一种技术方案:一种配筋砌块砌体墙施工钢筋引导装置,包括引导管1和墙片10,所述引导管1的上下均通过紧固螺栓3活动连接有支撑套2,上下所述支撑套2的左右对称连接有弹簧4,所述弹簧4的另一侧均连接有支撑板5,所述支撑板5的顶部均连接有铁链6,所述铁链6的顶部连接有横梁7,所述墙片10的内腔均匀的开设有孔洞11,所述引导管1通过支撑板5卡接至孔洞11。Please refer to Figures 1-4, the utility model provides a technical solution: a steel bar guide device for reinforced block masonry wall construction, including a guide pipe 1 and a wall piece 10, the upper and lower sides of the guide pipe 1 are fastened The bolt 3 is movably connected with a support sleeve 2, and the upper and lower sides of the support sleeve 2 are symmetrically connected with a spring 4, and the other side of the spring 4 is connected with a support plate 5, and the top of the support plate 5 is connected with an iron chain 6. A crossbeam 7 is connected to the top of the iron chain 6 , holes 11 are uniformly opened in the inner cavity of the wall piece 10 , and the guide pipe 1 is clamped to the hole 11 through the support plate 5 .
具体的,所述弹簧4每组设置有四个,且上下左右对称设置,具有很好的支撑的作用。Specifically, there are four springs 4 in each group, and they are arranged symmetrically up, down, left, and right, and have a good supporting effect.
具体的,每个所述铁链6的顶部均连接至横梁7,便于很好的起吊。Specifically, the top of each iron chain 6 is connected to the beam 7, which is convenient for lifting.
具体的,所述横梁7的顶部左右对称设有吊耳8,所述吊耳8的顶部连接有钢丝绳9。Specifically, the top of the beam 7 is symmetrically provided with lifting lugs 8 , and the top of the lifting lugs 8 is connected with a steel wire rope 9 .
具体的,所述引导管1的上下端均超过墙片10。Specifically, both upper and lower ends of the guide pipe 1 exceed the wall piece 10 .
工作原理:本实用新型一种配筋砌块砌体墙施工钢筋引导装置,使用时,通过支撑套2的左右对称连接有弹簧4,弹簧4的另一侧均连接有支撑板5的设置,便于将引导管1紧紧的卡接至墙片10的孔洞11中,通过支撑板5的顶部均连接有铁链6,铁链6的顶部连接有横梁7,横梁7的顶部左右对称设有吊耳8,吊耳8的顶部连接有钢丝绳9的设置,便于将引导管1和墙片10一起吊运到施工位置,然后将钢筋分别穿进每个导引管1内,通过引导管1通过引导管1的上下均通过紧固螺栓3活动连接有支撑套2的设置,便于调节支撑套2的上下位置,从而可以适应不同尺寸的墙片10的孔洞11,钢筋引导完成之后,再将引导管1连同支撑套2通过钢丝绳9一并取出。Working principle: The utility model is a steel bar guiding device for the construction of a reinforced block masonry wall. When in use, a spring 4 is connected symmetrically through the left and right sides of the support sleeve 2, and the other side of the spring 4 is connected with the setting of the support plate 5. It is convenient to tightly clamp the guide tube 1 into the hole 11 of the wall piece 10, and the top of the support plate 5 is connected with an iron chain 6, and the top of the iron chain 6 is connected with a beam 7, and the top of the beam 7 is symmetrically arranged on the left and right. Lifting lug 8, the top of lifting lug 8 is connected with the setting of steel wire rope 9, it is convenient to lift guide pipe 1 and wall sheet 10 to the construction position together, then pass steel bars into each guide pipe 1 respectively, pass through guide pipe 1 The upper and lower sides of the guide tube 1 are movably connected with the setting of the support sleeve 2 through the fastening bolt 3, which facilitates the adjustment of the upper and lower positions of the support sleeve 2, so as to adapt to the holes 11 of the wall pieces 10 of different sizes. The guide tube 1 is taken out together with the support sleeve 2 through the wire rope 9 .
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制;术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性;此外,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间 接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, use a specific Therefore, it cannot be construed as a limitation on the present invention; the terms "first", "second" and "third" are only used for descriptive purposes, and cannot be interpreted as indicating or implying relative importance; in addition, Unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be interpreted in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, It can also be an electrical connection; it can be a direct connection, or an indirect connection through an intermediary, and it can be an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820468895.5U CN208009909U (en) | 2018-03-30 | 2018-03-30 | A kind of built with ribbed bricks wall construction reinforced bar guide device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820468895.5U CN208009909U (en) | 2018-03-30 | 2018-03-30 | A kind of built with ribbed bricks wall construction reinforced bar guide device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208009909U true CN208009909U (en) | 2018-10-26 |
Family
ID=63891893
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820468895.5U Expired - Fee Related CN208009909U (en) | 2018-03-30 | 2018-03-30 | A kind of built with ribbed bricks wall construction reinforced bar guide device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208009909U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114197296A (en) * | 2021-11-29 | 2022-03-18 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
-
2018
- 2018-03-30 CN CN201820468895.5U patent/CN208009909U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114197296A (en) * | 2021-11-29 | 2022-03-18 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
| CN114197296B (en) * | 2021-11-29 | 2023-10-20 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112064519A (en) | Long platform guy cable hanging basket and main beam segment construction method | |
| CN103485530B (en) | A kind of steel form of the modular stairway that is exclusively used in skyscraper and assemble method thereof | |
| CN209511266U (en) | A pull-up device for auxiliary drainage pipeline connection construction | |
| CN208009909U (en) | A kind of built with ribbed bricks wall construction reinforced bar guide device | |
| CN113529571B (en) | A positioning device for the cable saddle of the diamond-shaped wire-splitting pipe of a cable-stayed bridge with a short tower | |
| CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
| CN104196249B (en) | A kind of concrete slab special hanger with T-shaped rib | |
| CN209383265U (en) | A kind of prefabricated member lifting device | |
| CN204098508U (en) | A kind of concrete prefabricated board special hanger with T-shaped rib | |
| CN207175285U (en) | Tower crane attachment node suitable for construction in earthquake-prone area | |
| CN207890886U (en) | One kind is eated dishes without rice or wine pile cages lifting hook fixing device | |
| CN105888140A (en) | Novel rebar connecting structure for buildings | |
| CN113356587B (en) | Hanging mould | |
| CN110242649A (en) | A steel pipe butt joint lengthening device | |
| CN212927010U (en) | Steel form convenient to install for engineering | |
| CN208251133U (en) | Lift stable lifting lug and hangs muscle structure | |
| CN211523526U (en) | An industrial building masonry wall embedded part structure | |
| CN219971582U (en) | Hoisting structure of assembled concrete well plate | |
| CN219672202U (en) | Spring clamp for filling vertical wall hanging line of masonry wall | |
| CN222770491U (en) | Mixed tower embedded parts and mixed tower structure | |
| CN208948679U (en) | Assembled hanger | |
| CN220223211U (en) | Concrete pipeline hoist and mount auxiliary device | |
| CN209740482U (en) | Heavy pipeline hoisting device and hoisting system | |
| CN211369054U (en) | Interface structure of steel pipe bundle concrete structure masonry wall using ultrahigh-performance concrete | |
| CN223062040U (en) | Assembled building construction device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 Termination date: 20190330 |