CN205857709U - Air-conditioning template length governor motion and air-conditioning formwork support structure - Google Patents
Air-conditioning template length governor motion and air-conditioning formwork support structure Download PDFInfo
- Publication number
- CN205857709U CN205857709U CN201620803974.8U CN201620803974U CN205857709U CN 205857709 U CN205857709 U CN 205857709U CN 201620803974 U CN201620803974 U CN 201620803974U CN 205857709 U CN205857709 U CN 205857709U
- Authority
- CN
- China
- Prior art keywords
- conditioning
- air
- stull
- cell wall
- stulls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of air-conditioning template length governor motion and air-conditioning formwork support structure, including the slide construction that can slide on this stull length direction being placed in each stull, described slide construction can be fixed in described corresponding stull the fixed structure at any fragment position and baffle plate, the length direction of described baffle plate is perpendicular with the length direction of described stull, and the two ends of the bottom of described baffle plate are individually fixed on two slide constructions.Described air-conditioning formwork support structure includes and is detachably secured on wall face, is positioned at same level height and the two perpendicular supports being parallel to each other, the upper end being removably fixed in two perpendicular supports respectively and two stulls horizontal-extending to the direction away from described wall face, two diagonal braces and above-mentioned air-conditioning template length governor motions, the lower splay end of described two diagonal braces is detachably secured to the lower end of two perpendicular supports respectively, and the upper splay end of described two diagonal braces is detachably secured to the one end in two stulls away from wall face respectively.
Description
Technical field
This utility model relates to the air-conditioning template length in a kind of the realm of building construction being supported air-conditioning formwork for placing
Governor motion and air-conditioning formwork support structure.
Background technology
Along with the optimization of engineering construction design, the raising of construction material performance, build board-like component thickness and increasingly reduce.Add
Space utilized require more and more higher, in order to reach the maximum space that uses, great majority can arrange external on exterior wall
Air-conditioning plate.External wall construction all uses big template of assembling at present, can only use secondary construction technology for part primary structural component, i.e. lead
After external wall etc. shape, pour to form air-conditioning plate at wall face secondary, need to set up formwork-support when pouring air-conditioning plate,
Template pours after being placed on formwork-support again, and traditional formwork support structure is to use conventional steel fastener to set up, and one
Individual formwork-support needs to use many steel pipes and some fasteners, the most then add and set up and take-down time and difficulty, unfavorable
In improving efficiency of construction.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is: provide a kind of structure letter
List, firm supporting, lifting are set up the air-conditioning formwork support structure of efficiency and can regulate air-conditioning template length thus regulate sky
Tuned plate pours the air-conditioning template length governor motion of face length degree.
For solving above-mentioned technical problem, the technical scheme that this utility model uses is: provide a kind of air-conditioning template long
Degree governor motion, is located in two stulls of air-conditioning formwork support structure and can move along the length direction of stull and position, institute
State the slip can slided on this stull length direction knot that air-conditioning template length governor motion includes being placed in each stull
Structure, described slide construction can be fixed in described corresponding stull the fixed structure at any fragment position and a baffle plate, institute
The length direction stating baffle plate is perpendicular with the length direction of described stull, and the length of described baffle plate more than two slide constructions it
Between spacing, the two ends of the bottom of described baffle plate are individually fixed on two slide constructions.
As optimization, described slide construction is the mount structure mated with described stull, and the lower diapire at described mount structure is opened
Being provided with a screwed hole, described fixed structure is to fix bolt, described fixing bolt from the bottom to top through after described screwed hole
The one side of lower diapire towards described mount structure can be butted in described stull.
For solving above-mentioned technical problem, another technical scheme that this utility model uses is: provide a kind of air-conditioning template
Supporting construction, including be detachably secured on wall face, be positioned at same level height and the two perpendicular supports being parallel to each other, respectively can
The upper ends of two perpendicular supports and two stulls horizontal-extending to the direction away from described wall face, two diagonal braces and described are fixed in dismounting
Air-conditioning template length governor motion, the lower splay end of described two diagonal braces is detachably secured to the lower ends of two perpendicular supports respectively, described
The upper splay end of two diagonal braces is detachably secured to the one end in two stulls away from wall face respectively.
As optimization, two perpendicular supports are notch to the channel-section steel away from wall face direction, in the upper ends pair of the cell walls of two perpendicular supports
Claim to offer two first installing holes;Two stulls are that downwards and width of rebate is less than the channel-section steel of the perpendicular width of rebate supportted, two to notch
The inner end symmetry of the cell wall of stull offers two second installing holes;The inner end of described two stulls is the most laterally inserted in two perpendicular supports
Upper end, clamping screw sequentially passes through the first installing hole on first cell wall of perpendicular support, corresponding stull is in close proximity to first groove of perpendicular support
The second installing hole on one cell wall of wall, second installing hole of another cell wall of described corresponding stull and described perpendicular support the
Coordinate with nut check after the first installing hole on two cell walls.
As optimization, described two erect support is 6.5# thin-wall channel.
As optimization, described two stulls are 5# thin-wall channel.
As optimization, the lower splay end of described two diagonal braces is detachably secured to first cell wall of described two perpendicular supports respectively
On, the upper splay end of described two diagonal braces is detachably secured to two stulls respectively adjacent on a cell wall of this first cell wall.
As optimization, the lower splay end of described two diagonal braces is detachably secured to second cell wall of described two perpendicular supports respectively
On, the upper splay end of described two diagonal braces is detachably secured to two stulls respectively adjacent on a cell wall of this second cell wall.
As optimization, each diagonal brace all include an inner thread sleeve, respectively with the two ends threaded engagement of inner thread sleeve
Two external thread rods, are installed with a connection journal stirrup, in described company at two external thread rods respectively away from one end of described inner thread sleeve
Connect and on journal stirrup, offer the first connecting hole;In the lower end of described two perpendicular supports corresponding to the first connection of the lower splay end being positioned at two diagonal braces
The position in hole offers the second connecting hole respectively, and the first connecting hole and described second connecting hole that are positioned at splay end under diagonal brace pass through
A connection piece connects and coordinates;Distinguish corresponding to the position of the first connecting hole of the upper splay end being positioned at two diagonal braces in described two stulls
Offer the 3rd connecting hole, be positioned at the first connecting hole of splay end on diagonal brace and described 3rd connecting hole and be connected by a connection piece and join
Close.
Air-conditioning template length governor motion of the present utility model and air-conditioning formwork support structure, described baffle plate is as air-conditioning
In template, a side plate away from exterior wall uses, therefore when formwork, it is only necessary to a bed die can be formed with two relative side forms
Concreting groove;Air-conditioning template length governor motion can not only adjusting template length, make air-conditioning formwork support structure
Versatility is more preferable, it is possible to the air-conditioning plate adapting to different length requirement pours, the most cost-effective, it is not necessary to make the side away from exterior wall again
Template, reduces the formwork time.By this template length adjustment structure, before dynamic model, loosen the bolt of fender plate, be adjusted to
Tight a bolt after adapting to length fixing, thus carry out pouring the adjustment of plate face length degree.After the intensity of concrete reaches 100%, back-outing can
Gear shift crab bolt, reverse controllable register, then reversely rotate support bar screw shell shortening support bar length, shed support force,
Rear dismounting bolt, takes off gusseted system.The air-conditioning formwork support structure of the present embodiment is A-frame system, its stability
Well, fastness is preferable.Diagonal brace can rotate relative to the fixing point in perpendicular support, facilitates staff to install;Diagonal brace uses sleeve
Two termination screw rods, are adapted to the stull of different length, adapt to the support of different embodiment hollow adjustment mould plate length.Completely disengage from
The pattern of setting up of steel tube fastener formula, independent and exterior wall is attached and sets up gusseted system, and structural stability is high, each building
The air-conditioning plate of interlayer does not the most produce dependence, sets up simple and convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model air-conditioning formwork support structure one embodiment.
Fig. 2 is the longitudinal sectional drawing of this utility model air-conditioning formwork support structure.
Fig. 3 is the structural representation of diagonal brace in Fig. 1.
Fig. 4 and Fig. 5 is the structural representation of Fig. 1 hollow adjustment mould plate length adjustment mechanism.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to Fig. 1 to Fig. 5, air-conditioning formwork support structure of the present utility model, including being fixed on wall face, be positioned at together
One level height and be parallel to each other two erect support 1, be removably fixed in the upper ends of two perpendicular supports 1 respectively and to away from described wall face
Horizontal-extending two stull 2 and two diagonal braces 3 in direction, the lower splay end of described two diagonal braces 3 is detachably secured to two respectively and erects
The lower end of support 1, the upper splay end of described two diagonal braces 3 is detachably secured to the one end in two stulls 2 away from wall face respectively.Described
The upper splay end of diagonal brace 3, centered by fixing point, rotates in the face being perpendicular to exterior wall around this fixing point, same, the declivity of diagonal brace 3
End can also rotate in the face being perpendicular to exterior wall around this fixing point centered by fixing point.
In the present embodiment, two perpendicular supports 1 are the thin-wall channel of 6.5#, adopt and are bolted on exterior wall, are fixed on exterior wall
After on face, notch is towards away from the direction away from wall face, and the present embodiment is outside each perpendicular support 1 all uses two bolts to be fixed on
On wall.On the upper end cell wall of two perpendicular supports 1, symmetry offers two first installing holes, for installing the stull 2 of correspondence, each perpendicular support
The lower end of the external groove sidevall (following first cell wall, away from a cell wall of another perpendicular support 1) of 1 offers the second connecting hole, uses
Lower splay end in dismountable connection diagonal brace 3.
Two stulls 2 are that downwards and width of rebate is less than the channel-section steel of the perpendicular width of rebate supportting 1 to notch, and the present embodiment is the light of 5#
Type channel-section steel, on the cell wall of the inner end (near one end of exterior wall) of two stulls 2, symmetry offers two second installing holes;Described two is horizontal
The inner end of support 2 is the most laterally inserted in the upper end slot intracavity of two perpendicular supports 1, and clamping screw 4 sequentially passes through 1 first groove of corresponding perpendicular support
The first installing hole on wall, corresponding stull 2 be in close proximity to the second installing hole on one of them cell wall of 1 first cell wall of perpendicular support,
Second installing hole of another cell wall of described corresponding stull 2 and described correspondence erect the first installation on 1 second cell wall of support
Kong Houyu nut check coordinates.In certain embodiments, described stull 2 can also use other be detachably fitted to erect
The upper end of support 1, illustrates the most one by one.External groove sidevall (away from a cell wall of another stull 2) in each stull 2
Position, one end away from exterior wall offers the 3rd connecting hole, for dismountable upper splay end connecting corresponding diagonal brace 3.
In the present embodiment, each diagonal brace 3 all include an inner thread sleeve 31, respectively with the two ends spiral shell of inner thread sleeve 31
Two external thread rods 32 that stricture of vagina coordinates, are installed with a connection at two external thread rods 32 respectively away from one end of described inner thread sleeve 31
Journal stirrup 33, offers the first connecting hole 34 on described connection journal stirrup 33;Oblique corresponding to being positioned at two in the lower end of described two perpendicular supports 1
The position of the first connecting hole 34 of the lower splay end of support 3 offers the second connecting hole respectively, is positioned at the first of 3 times splay ends of diagonal brace and connects
Connect hole 34 and described second connecting hole and connect cooperation by connector;Described two stulls 2 corresponding to be positioned at two diagonal braces 3 upper tiltedly
The position of the first connecting hole 34 of end offers the 3rd connecting hole respectively, be positioned at the first connecting hole 34 of splay end on diagonal brace 3 with
Described 3rd connecting hole is connected by a connection piece and coordinates.
In the present embodiment, described second connecting hole can be opened in external groove sidevall (the most above-mentioned first groove of described perpendicular support 1
Wall) lower end position at, on the other side, described 3rd connecting hole can be opened in the external groove sidevall of described stull 2 away from outward
The position, one end of wall.Described second connecting hole can also be opened on the internal groove side wall of described perpendicular support 1 (the most above-mentioned second groove
Wall) lower end position at, on the other side, described 3rd connecting hole can also be opened in the internal groove side wall of described stull 2 away from
The position, one end of exterior wall.
Staff grips this diagonal brace 3, outside the inner thread sleeve 31 of described diagonal brace 3 at rotation diagonal brace 3 for convenience
Side face is provided with gripping handle 35.
Air-conditioning formwork support structure at the present embodiment is A-frame system, and its good stability, fastness are preferable.Tiltedly
Support 3 can rotate relative to the fixing point in perpendicular support 1, facilitates staff to install;Diagonal brace 3 uses sleeve two to terminate screw rod, permissible
Adapt to the stull 2 of different length, adapt to the support of different embodiment hollow adjustment mould plate length.
When installing the air-conditioning formwork support structure of the present embodiment, can first be connected fixing with perpendicular support 1 for stull 2, then
Again diagonal brace 3 is connected between perpendicular support 1 and stull 2, forms triangular support structure, then make the stull 2 of two triangular structures
It is positioned at same level, two triangular support structure are fixed on exterior wall;Can also be first by two perpendicular support 1 same level height
Be installed on exterior wall, the most again stull 2 is arranged on correspondence perpendicular support 1 upper end, then by the splay end up and down of diagonal brace 3 respectively with
Corresponding stull 2 and perpendicular support 1 connection.
After air-conditioning formwork support structure is installed on exterior wall, starts formwork, will be placed in two stulls 2 by end template,
Then being respectively provided with the side template of three sides, template is coordinated in groove-like by Zhi Haohou and metope;Last pour in groove for
Support the air-conditioning concrete slab of outdoor machine of air-conditioner.
In the present embodiment, in order to increase the versatility of air-conditioning template so that it is be applicable to the pouring of air-conditioning plate of different length,
Also have additional and be across in two stulls 2 and arbitrarily can slide and any section can be fixed on along described stull 2 length direction
The air-conditioning template length governor motion 5 of position.
This air-conditioning template length governor motion 5 includes that be placed in each stull 2 can slide on this stull 2 length direction
Dynamic slide construction 51, baffle plate 52 and slide construction 51 can be fixed in described stull 2 consolidating at any fragment position
Fixed structure, the length direction of described baffle plate 52 is perpendicular with the length direction of described stull 2, and the length of described baffle plate 52 is big
Spacing between two slide constructions 51, the two ends of the bottom of described baffle plate 52 are individually fixed on two slide constructions 51.So,
When the slide construction 51 moved in two stulls 2 simultaneously, two slide constructions 51 drive described baffle plate 52 along the length of described stull 2
Direction is moved, and when slide construction 51 moves to destination locations, uses fixed structure to fix this slide construction 51.By this side
Formula, can play the effect of the length of adjusting template, finally plays the extension that can regulate cast-in-place air-conditioning concrete slab, suitable
Demand for different embodiments.
In the present embodiment, described slide construction 51 in described stull 2 channel-section steel match can movement on translot
Mount structure, the lower diapire at described mount structure offers a screwed hole, and described fixed structure is to fix bolt 53, described fixing
Bolt 53 from the bottom to top through the one of the lower diapire can being butted in described stull 2 after described screwed hole towards described mount structure
Face.When the mobile described mount structure of needs, looser a bolt and i.e. may move described mount structure, after being displaced into destination locations, then twist
Tight described mount structure is i.e. securable to this position.
In the present embodiment, this baffle plate 52 uses as a side plate away from exterior wall in air-conditioning template, therefore when formwork,
Only need a bed die can form concreting groove with two relative side forms;Air-conditioning template length governor motion 5 can not only
Enough adjusting template length, the versatility making air-conditioning formwork support structure is more preferable, it is possible to the air-conditioning plate adapting to different length requirement waters
Build, the most cost-effective, it is not necessary to make the side template away from exterior wall again, reduce the formwork time.By this template length adjustment structure,
Before dynamic model, loosen the bolt of fender plate 52, tight a bolt after being adjusted to adapt to length fixing, thus carry out pouring plate face
The adjustment of length.After the intensity of concrete reaches 100%, back-out fender plate 52 bolt, reverse controllable register 52, then reversely rotate
Support bar screw shell shortens support bar length, sheds support force, finally removes M20 bolt, takes off gusseted system.
This utility model utilizes adjustable triangle support support shuttering to carry out pouring of air-conditioning plate at different level, simplifies tradition
Steel tube fastener formula support system, thus reach accelerating construction progress, improve the effect of construction quality.This utility model uses shaped steel
Setting up, intensity is high, fully meets pouring of thin plate, and reusable, improves the utilization rate of material, saves construction cost, carries
High construction quality.Between each support bar of the present utility model with bolts, lay down support can by level to channel-section steel draw in,
Storage is convenient, takes up room little.Owing to this gusseted system uses adjustable support, one can be entered by regulation support bar length
Step meets the thin plate of different angles and supports, and adds the range of this utility model.
These are only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every profit
The equivalent structure made by this utility model description and accompanying drawing content or equivalence flow process conversion, or directly or indirectly it is used in it
The technical field that he is correlated with, is the most in like manner included in scope of patent protection of the present utility model.
Claims (9)
1. an air-conditioning template length governor motion, it is characterised in that: it is located in two stulls of air-conditioning formwork support structure and energy
Enough length directions along stull move and position, and what described air-conditioning template length governor motion included being placed in each stull can
The slide construction that slides on this stull length direction, described slide construction can be fixed on any section in described corresponding stull
The fixed structure of position and a baffle plate, the length direction of described baffle plate is perpendicular with the length direction of described stull, and
The length of described baffle plate is more than the spacing between two slide constructions, and the two ends of the bottom of described baffle plate are individually fixed in two slip knots
On structure.
2. air-conditioning template length governor motion as claimed in claim 1, it is characterised in that: described slide construction is and described horizontal stroke
The mount structure of support coupling, the lower diapire at described mount structure offers a screwed hole, and described fixed structure is to fix bolt, institute
State fixing bolt from the bottom to top can be butted in described stull the lower diapire towards described mount structure after described screwed hole
One side.
3. an air-conditioning formwork support structure, it is characterised in that: include being detachably secured on wall face, being positioned at same level
Height and the two perpendicular supports being parallel to each other, upper ends being removably fixed in two perpendicular supports respectively and to the direction water away from described wall face
Flat two stulls, two diagonal braces and air-conditioning template length governor motion as claimed in claim 1 or 2, described two diagonal braces extended
Lower splay end be detachably secured to the lower ends of two perpendicular supports respectively, the upper splay end of described two diagonal braces is detachably secured to two respectively
Away from one end of wall face in stull.
4. air-conditioning formwork support structure as claimed in claim 3, it is characterised in that: two erect support is notch to away from wall face
The channel-section steel in direction, the upper end symmetry at the cell wall of two perpendicular supports offers two first installing holes;Two stulls be notch downwards and notch
Width is less than the channel-section steel of the width of rebate of perpendicular support, and the inner end symmetry at the cell wall of two stulls offers two second installing holes;Described
The inner end of two stulls is the most laterally inserted in the upper end of two perpendicular supports, and clamping screw sequentially passes through first on first cell wall of perpendicular support
Installing hole, corresponding stull be in close proximity to the second installing hole on a cell wall of first cell wall of perpendicular support, described corresponding stull another
Coordinate with nut check after the first installing hole on second installing hole of one cell wall and second cell wall of described perpendicular support.
5. air-conditioning formwork support structure as claimed in claim 4, it is characterised in that: described two erect support is the light-duty groove of 6.5#
Steel.
6. air-conditioning formwork support structure as claimed in claim 5, it is characterised in that: described two stulls are 5# thin-wall channel.
7. air-conditioning formwork support structure as claimed in claim 4, it is characterised in that: the lower splay end of described two diagonal braces is the most removable
On first cell wall being fixed on described two perpendicular supports unloaded, the upper splay end of described two diagonal braces is detachably secured to two stulls respectively
Adjacent on a cell wall of this first cell wall.
8. air-conditioning formwork support structure as claimed in claim 4, it is characterised in that: the lower splay end of described two diagonal braces is the most removable
On second cell wall being fixed on described two perpendicular supports unloaded, the upper splay end of described two diagonal braces is detachably secured to two stulls respectively
Adjacent on a cell wall of this second cell wall.
9. air-conditioning formwork support structure as claimed in claim 3, it is characterised in that: each diagonal brace all includes an inner screw sheath
Cylinder, respectively with two external thread rods of the two ends threaded engagement of inner thread sleeve, at two external thread rods away from described inner thread sleeve
One end be installed with a connection journal stirrup respectively, described connection journal stirrup offers the first connecting hole;Under described two perpendicular supports
Hold the position corresponding to the first connecting hole of the lower splay end being positioned at two diagonal braces to offer the second connecting hole respectively, be positioned under diagonal brace
First connecting hole of splay end and described second connecting hole are connected by a connection piece and coordinate;In described two stulls corresponding to being positioned at two
The position of the first connecting hole of the upper splay end of diagonal brace offers the 3rd connecting hole respectively, is positioned at the first connection of splay end on diagonal brace
Hole is connected cooperation with described 3rd connecting hole by a connection piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620803974.8U CN205857709U (en) | 2016-07-28 | 2016-07-28 | Air-conditioning template length governor motion and air-conditioning formwork support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620803974.8U CN205857709U (en) | 2016-07-28 | 2016-07-28 | Air-conditioning template length governor motion and air-conditioning formwork support structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857709U true CN205857709U (en) | 2017-01-04 |
Family
ID=57649878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620803974.8U Active CN205857709U (en) | 2016-07-28 | 2016-07-28 | Air-conditioning template length governor motion and air-conditioning formwork support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857709U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109016074A (en) * | 2018-09-29 | 2018-12-18 | 佛山科学技术学院 | A kind of Simple water mud vibration device |
CN112360150A (en) * | 2020-10-30 | 2021-02-12 | 中国一冶集团有限公司 | Socket pipe combined detachable triangular support frame for construction and construction method |
-
2016
- 2016-07-28 CN CN201620803974.8U patent/CN205857709U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109016074A (en) * | 2018-09-29 | 2018-12-18 | 佛山科学技术学院 | A kind of Simple water mud vibration device |
CN112360150A (en) * | 2020-10-30 | 2021-02-12 | 中国一冶集团有限公司 | Socket pipe combined detachable triangular support frame for construction and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204402041U (en) | A kind of inclined-plane body of wall cantilever adjustable angle formwork mechanism | |
CN102031868A (en) | Building construction erecting formwork | |
CN205857709U (en) | Air-conditioning template length governor motion and air-conditioning formwork support structure | |
CN205857710U (en) | Air-conditioning formwork support structure | |
CN206128634U (en) | Air conditioner shelf and window one -piece casting template support structure that wafts | |
CN107419897A (en) | A kind of reinforcing mould of windowsill coping formwork | |
CN204081475U (en) | A kind of adjustable floor one-piece keel structure | |
CN207077589U (en) | A kind of concrete plate is molded positioner | |
CN206530077U (en) | A kind of support frame | |
CN201972396U (en) | Steel pipe template support frame | |
CN204867188U (en) | Crooked bar straightener of portable many function high tensile reinforcements at most | |
CN211850824U (en) | Supporting unit and supporting device | |
CN205530324U (en) | Cold-formed thin-wall section steel micro pile | |
CN201390951Y (en) | Stepped formwork of roller compacted concrete dam overflow surface | |
CN212535081U (en) | Opposite-pulling plate fixing device for building beam side template | |
CN208280644U (en) | Open caisson and reverse-working internal mold supporting device | |
CN209907842U (en) | Floor concrete or mortar crack-resistant structure | |
CN207526113U (en) | A kind of reinforcing mold of windowsill coping formwork | |
CN215443112U (en) | Constructional column template structure with adjustable feed inlet | |
CN208718209U (en) | Based on the built-in assembled architecture for leading to high bellows prefabricated panel | |
CN203022337U (en) | Cooling tower construction support frame structure | |
CN214786040U (en) | Diagonal brace for construction of aluminum mold split screw and climbing frame wall-attached support | |
CN213626623U (en) | Supporting structure for building assembly | |
CN204081474U (en) | A kind of construction formwork false beam template supporting pillar | |
CN211899656U (en) | Template stabilising arrangement for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |