CN219175870U - Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system - Google Patents

Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system Download PDF

Info

Publication number
CN219175870U
CN219175870U CN202320229931.3U CN202320229931U CN219175870U CN 219175870 U CN219175870 U CN 219175870U CN 202320229931 U CN202320229931 U CN 202320229931U CN 219175870 U CN219175870 U CN 219175870U
Authority
CN
China
Prior art keywords
formwork structure
vertical
groove body
buckle
mould shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320229931.3U
Other languages
Chinese (zh)
Inventor
许光
郭振锋
罗文育
吴志坚
吴纪宁
陈泽盛
凌鹏
秦培成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Weite Construction Technology Co ltd
Original Assignee
Hainan Weite Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Weite Construction Technology Co ltd filed Critical Hainan Weite Construction Technology Co ltd
Priority to CN202320229931.3U priority Critical patent/CN219175870U/en
Application granted granted Critical
Publication of CN219175870U publication Critical patent/CN219175870U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses vertical reinforcing bar installation positioner of building industrialization toughness formwork structure system for fix a position the two when first formwork structure and second formwork structure butt joint installation, include: the buckle, first mould shell structure and second mould shell structure all include vertical reinforcing bar and mould shell, and two vertical reinforcing bars are located in the mould shell along vertical direction symmetry respectively, and the bottom of vertical reinforcing bar is located to the buckle, and the top of vertical reinforcing bar stretches out the mould shell and is equipped with the bending section, locates the bending section of first mould shell structure and locates the buckle joint fixedly of second mould shell structure. By adopting the structure, the bottom end of the vertical steel bar of the first formwork structure is provided with the buckle, and the bending section at the top end of the vertical steel bar of the second formwork structure is inserted into the buckle of the first formwork structure and is fixedly clamped with the buckle, so that the vertical steel bar of the first formwork structure and the vertical steel bar of the second formwork structure can be quickly in butt joint and installation, the installation accuracy and the construction speed can be improved, and the force transmission effect of the vertical steel bar is ensured to be good.

Description

Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system
Technical Field
The utility model relates to the technical field of building construction, in particular to a vertical steel bar installation positioning device of a building industrialized toughness formwork structure system.
Background
The fabricated building is based on the concepts of standardized design, industrial production, fabricated construction, informatization management and intelligent application, has the effects of efficient construction, high quality, low resource consumption and low environmental impact, accords with the development concept of energy conservation, environmental protection and green construction, and is the development direction of the building industry in the future. In recent years, prefabricated building has been rapidly developed, prefabricated wall panels are to be applied in a large amount, and the prefabricated building is actively driven to develop toward high quality, and prefabricated building components are gradually extended from horizontal components to vertical components.
The prefabricated vertical wallboard components are mainly connected through grouting sleeves, and because the prefabricated vertical wallboard is high in manufacturing precision and construction technical requirements, installation deviation is easy to cause, steel bars in the wallboard cannot be connected, and further the building structure is enabled to have quality defects, so that the safety of the building structure is affected, and particularly, the prefabricated vertical wallboard is used in areas with high anti-seismic fortification grades and has a great dispute. Therefore, the green tough formwork wall body in the building industrialization form can be adopted, the wall body system is formed by the formwork plates at two sides and the reinforcement cage, a plurality of walls are required to be spliced and installed into a whole, and after the wall body is installed, concrete is poured into the formwork, so that the reinforcement cage and the concrete poured later are consistent with structural design. In the prior art, the formwork wall body needs to be butted with vertical steel bars in the splicing and installing process, but the butt joint position is inaccurate and larger error exists in the butt joint process, and meanwhile, the butt joint installation efficiency is poor, and time and labor are wasted.
In summary, how to provide a device capable of ensuring accurate positioning of vertical steel bars of a building industrialized toughness formwork structure system during installation and improving installation efficiency is a problem to be solved by those skilled in the art.
Disclosure of Invention
In view of the above, the utility model aims to provide a vertical reinforcing steel bar installation positioning device for a building industrialized toughness formwork structure system, which can more accurately position vertical reinforcing steel bars and improve installation efficiency.
In order to achieve the above object, the present utility model provides the following technical solutions:
a vertical rebar installation positioning device of a building industrialized tough formwork structure system, which is used for positioning a first formwork structure and a second formwork structure when the first formwork structure and the second formwork structure are in butt joint installation, comprising: the buckle, first mould shell structure and second mould shell structure all include vertical reinforcing bar and mould shell, and two vertical reinforcing bars are located in the mould shell along vertical direction symmetry respectively, and the bottom of vertical reinforcing bar is located to the buckle, and the top of vertical reinforcing bar stretches out the mould shell and is equipped with the bending section, locates the bending section of first mould shell structure and locates the buckle joint fixedly of second mould shell structure.
The utility model provides a vertical reinforcing bar installation positioner of building industrialization toughness mould shell structure system, the buckle includes casing and cell body, and the one end of cell body is equipped with the opening, and the cell body is used for the fixed vertical reinforcing bar of joint.
The utility model provides a vertical reinforcing bar installation positioner of building industrialization toughness formwork structure system, the cell body is including the first cell body that is used for the fixed vertical reinforcing bar bottom of joint, and first cell body is close to the opening.
The utility model provides a vertical reinforcing bar installation positioner of building industrialization toughness mould shell structure system, the cell body still includes the second cell body that is used for the fixed bending section of joint, and the opening is kept away from to the second cell body, and the size of second cell body is less than first cell body.
The utility model provides a vertical reinforcing bar installation positioner of building industrialization toughness mould shell structure system, the section of buckling includes first section of buckling and second section of buckling, and interval and the width looks adaptation of second cell body between first section of buckling and the second section of buckling.
A vertical steel bar installation positioning device of a building industrialized toughness formwork structure system is characterized in that a first groove body and a second groove body are arranged as circular through grooves.
A vertical steel bar installation positioning device of a building industrialized toughness formwork structure system is characterized in that a plurality of supporting ribs are arranged between a shell and a groove body.
A vertical steel bar installation positioning device of a building industrialized toughness formwork structure system is characterized in that the buckle is made of plastics.
Compared with the background art, the vertical steel bar installation positioning device of the building industrialized toughness formwork structure system provided by the utility model is used for positioning a first formwork structure and a second formwork structure when the first formwork structure and the second formwork structure are in butt joint installation, and comprises the following components: the buckle, first mould shell structure and second mould shell structure all include vertical reinforcing bar and mould shell, and two vertical reinforcing bars are located in the mould shell along vertical direction symmetry respectively, and the bottom of vertical reinforcing bar is located to the buckle, and the top of vertical reinforcing bar stretches out the mould shell and is equipped with the bending section, locates the bending section of first mould shell structure and locates the buckle joint fixedly of second mould shell structure.
Through the structure, in the construction process, the buckle is fixed at the bottom end of the vertical steel bar of the first formwork structure, the buckle of the first formwork structure is inserted into the bending section at the top end of the vertical steel bar of the second formwork structure and is fixedly connected with the buckle in a clamping manner, so that when the wall body is installed, the vertical steel bar of the first formwork structure and the vertical steel bar of the second formwork structure can be quickly connected and installed, the construction quality of the formwork wall body can be guaranteed, the installation accuracy is improved, the construction speed is improved, the distance between the vertical steel bars in the first formwork structure and the second formwork structure is reasonable, the problem that the vertical steel bars deviate too far in the installation process, the performance of the wall body is influenced is solved, and the force transmission effect of the vertical steel bars is guaranteed.
In addition, the vertical steel bar installation and positioning device for the building industrialized toughness formwork structure system provided by the utility model has the advantages of simple structure, convenience in operation, low production cost and good manufacturability and economy.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are required to be used in the embodiments or the description of the prior art will be briefly described below, and it is obvious that the drawings in the following description are only embodiments of the present utility model, and that other drawings can be obtained according to the provided drawings without inventive effort for a person skilled in the art.
FIG. 1 is a block diagram of a vertical rebar installation positioning device of a building industrialized tough formwork structure system provided by the utility model in an installation state;
fig. 2 is a structural diagram of a buckle provided by the utility model.
Wherein:
01-first mould shell structure, 02-second mould shell structure,
1-buckle, 11-shell, 12-groove body, 121-first groove body, 122-second groove body, 13-supporting rib, 2-vertical reinforcing bar, 21-bending section, 211-first bending section, 212-second bending section,
3-mould shell, 4-drawknot piece, 5-horizontal reinforcing bar.
Detailed Description
The following description of the embodiments of the present application will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all, of the embodiments of the present application. All other embodiments, which can be made by one of ordinary skill in the art without undue burden from the present disclosure, are within the scope of the present disclosure.
The present utility model will be further described in detail below with reference to the drawings and detailed description for the purpose of enabling those skilled in the art to better understand the aspects of the present utility model.
The embodiment of the application provides a vertical reinforcing steel bar installation positioner of building industrialization toughness formwork structure system for to two location when first formwork structure 01 and second formwork structure 02 butt joint installation, can refer to description figure 1 and figure 2, include: the buckle 1, the first shuttering structure 01 and the second shuttering structure 02 both comprise vertical steel bars 2 and a shuttering 3, the two vertical steel bars 2 are symmetrically arranged in the shuttering 3 along the vertical direction, the buckle 1 is arranged at the bottom end of the vertical steel bars 2, the top end of the vertical steel bars 2 extends out of the shuttering 3 and is provided with a bending section 21, and the bending section 21 arranged on the first shuttering structure 01 is fixedly clamped with the buckle 1 arranged on the second shuttering structure 02.
The vertical steel bar installing and positioning device is characterized in that at least two formwork structures which are needed to be connected up and down are spliced into a whole, and then concrete is poured into the formwork structures to form a wall body. The wall body of the formwork structure comprises formworks 3 positioned at the left side and the right side, drawknot members 4 for fixing the formworks 3 at the two sides, vertical steel bars 2 distributed along the vertical direction, and horizontal steel bars 5 distributed along the horizontal direction, wherein the formworks 3 are shells of the wall body, the drawknot members 4 extend along the thickness direction of the wall body and are fixedly connected with the formworks 3 at the two sides, the vertical steel bars 2 extend towards the height direction of the wall body, and the horizontal steel bars 5 extend towards the width direction of the wall body. The wall body system adopting the structure is formed by the formwork 3 on two sides, the drawknot piece 4, the vertical steel bars 2 and the steel bar cage formed by the horizontal steel bars 5 into a whole, wherein the plate thickness of the formwork 3 is 1.5-2 cm, the traditional formwork is replaced in the installation of a construction site, the formwork is not removed after the installation, the wall surface is smoother compared with the traditional wall body, the consistency of the steel bar cage and the concrete poured later is kept better, and therefore, the structural performance of the wall body system is equivalent to that of the traditional construction, and the acceptance is better.
In the construction process, the buckle 1 is fixed at the bottom end of the vertical steel bar 2 of the first formwork structure 01, the bending section 21 at the top end of the vertical steel bar 2 of the second formwork structure 02 is inserted into the buckle 1 of the first formwork structure 01 and is fixedly clamped with the buckle 1, so that the vertical steel bar 2 of the first formwork structure 01 and the vertical steel bar 2 of the second formwork structure 02 can be quickly in butt joint installation when the wall body is installed. The vertical steel bars 2 are arranged on the inner side of the formwork 3, the formwork 3 on two sides is distributed at intervals along the width direction of the wall, the vertical steel bars 2 on two sides are symmetrically distributed relative to the central surface of the wall, the drawknot pieces 4 are distributed at intervals along the height direction of the wall, and the interval size between the drawknot pieces 4 and the vertical steel bars 2 is set according to practical conditions.
As shown in fig. 2 of the specification, the buckle 1 comprises a shell 11 and a groove body 12, one end of the groove body 12 is provided with an opening, and the groove body 12 is used for clamping and fixing the vertical steel bar 2. In this embodiment, the casing 11 is arc-shaped, and the tank 12 is two vertical steel bars 2 bottom ends respectively used for clamping and fixing the first formwork structure 01 and the vertical steel bars 2 top ends of the second formwork structure 02.
The groove body 12 comprises a first groove body 121 used for clamping and fixing the bottom end of the vertical steel bar 2, and the first groove body 121 is close to the opening. The size of first cell body 121 and the distance looks adaptation between the vertical reinforcing bar 2 that is located both sides, in this application embodiment, the arc is established to the both sides of first cell body 121, can be like this when being convenient for first cell body 121 and vertical reinforcing bar 2 joint are fixed, still prevent that vertical reinforcing bar 2 from breaking away from buckle 1.
The slot body 12 further comprises a second slot body 122 for clamping and fixing the bending section 21, the second slot body 122 is far away from the opening, and the size of the second slot body 122 is smaller than that of the first slot body 121. The dimensions of the second groove 122 are adapted to the distance between the bending sections 21 located on two sides, taking the direction of fig. 2 as an example, the second groove 122 is located above the first groove 121, and the second groove 122 is arc-shaped, so that the first groove 121 and the bending sections 21 can be conveniently clamped and fixed.
The bending section 21 includes a first bending section 211 and a second bending section 212, and the distance between the first bending section 211 and the second bending section 212 is adapted to the width of the second groove 122. Taking the direction of fig. 1 of the specification as an example, the first bending section 211 is a portion where the top end of the vertical steel bar 2 on the left side is bent, the second bending section 212 is a portion where the top end of the vertical steel bar 2 on the right side is bent, the first bending section 211 is bent towards the direction of the second bending section 212, the second bending section 212 is bent towards the direction of the first bending section 211, and the opening direction of the buckle 1 is upward, then the bending section 21 is located below the vertical section of the vertical steel bar 2, therefore, the first bending section 211 and the second bending section 212 are also bent downwards at the same time, and the specific bending distance is set according to the distance between the first groove body 121 and the second groove body 122. Of course, the buckle 1 is provided in various directions, and the bending section 21 and the second groove 122 can be fastened and fixed in an adaptive manner.
The first groove body 121 and the second groove body 122 are provided as circular through grooves. The first groove body 121 and the second groove body 122 are communicated, and the first groove body 121 and the second groove body 122 are approximate to circular holes, so that the whole of the first groove body 121 and the second groove body 122 is approximate to a calabash shape. Of course, according to the actual production design, the first groove body 121 and the second groove body 122 may be configured into various shapes such as square holes and polygonal holes, so long as they can be respectively fastened and fixed with the vertical section and the bending section 21 of the vertical steel bar 2.
A plurality of supporting ribs 13 are arranged between the shell 11 and the groove body 12. The supporting rib 13 can strengthen the buckle 1, prevents to break when vertical reinforcing bar 2 and buckle 1 joint are fixed, and the supporting rib 13 distributes between casing 11 and cell body 12, and its length and interval set up according to actual conditions.
The material of the buckle 1 is plastic. The buckle 1 of plastics material can integrated into one piece, can reduce the manufacturing cost of buckle 1 like this, and plastics have certain elasticity in addition, can make vertical reinforcing bar 2 and buckle 1 joint fixed. Of course, the buckle 1 can also be made of metal according to actual conditions, so long as the buckle can meet the requirement of being fixedly clamped with the vertical steel bar 2.
It should be noted that in this specification, relational terms such as first and second, and the like are used solely to distinguish one entity from another entity without necessarily requiring or implying any actual such relationship or order between such entities.
The vertical steel bar installation and positioning device for the building industrialized toughness formwork structure system provided by the application is described in detail above. Specific examples are set forth herein to illustrate the principles and embodiments of the present application, and the description of the examples above is only intended to assist in understanding the methods of the present application and their core ideas. It should be noted that it would be obvious to those skilled in the art that various improvements and modifications can be made to the present application without departing from the principles of the present application, and such improvements and modifications fall within the scope of the claims of the present application.

Claims (8)

1. A vertical reinforcement installation positioning device of a building industrialized toughness formwork structure system, which is used for positioning a first formwork structure (01) and a second formwork structure (02) when the first formwork structure and the second formwork structure are in butt joint installation, and is characterized by comprising: buckle (1), first mould shell structure (01) with second mould shell structure (02) all include vertical reinforcing bar (2) and mould shell (3), two vertical reinforcing bar (2) are located along vertical direction symmetry respectively in mould shell (3), buckle (1) are located the bottom of vertical reinforcing bar (2), the top of vertical reinforcing bar (2) stretches out mould shell (3) and is equipped with bending section (21), locates first mould shell structure (01) bending section (21) with locate buckle (1) joint of second mould shell structure (02) is fixed.
2. The vertical reinforcement bar installation positioning device of the building industrialized toughness formwork structure system according to claim 1, wherein the buckle (1) comprises a shell (11) and a groove body (12), one end of the groove body (12) is provided with an opening, and the groove body (12) is used for clamping and fixing the vertical reinforcement bar (2).
3. The vertical reinforcement bar installation positioning device of the building industrialized toughness formwork structure system according to claim 2, wherein the groove body (12) comprises a first groove body (121) for clamping and fixing the bottom end of the vertical reinforcement bar (2), and the first groove body (121) is close to the opening.
4. A vertical reinforcement mounting and positioning device for a construction industrialization toughness formwork structure system according to claim 3, wherein the groove body (12) further comprises a second groove body (122) for clamping and fixing the bending section (21), the second groove body (122) is far away from the opening, and the second groove body (122) is smaller than the first groove body (121).
5. The vertical reinforcement installation positioning device of a building industrialized toughness formwork structure system according to claim 4, wherein the bending section (21) comprises a first bending section (211) and a second bending section (212), and a space between the first bending section (211) and the second bending section (212) is matched with a width of the second groove body (122).
6. The vertical rebar installation and positioning device for a building industrialized tough formwork structure system of claim 4, wherein the first groove body (121) and the second groove body (122) are circular through grooves.
7. The vertical reinforcement installation positioning device of the building industrialized toughness formwork structure system according to claim 2, wherein a plurality of supporting ribs (13) are arranged between the shell (11) and the groove body (12).
8. The vertical steel bar installation positioning device of the building industrialized toughness formwork structure system according to claim 1, wherein the buckle (1) is made of plastic.
CN202320229931.3U 2023-02-15 2023-02-15 Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system Active CN219175870U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320229931.3U CN219175870U (en) 2023-02-15 2023-02-15 Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320229931.3U CN219175870U (en) 2023-02-15 2023-02-15 Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system

Publications (1)

Publication Number Publication Date
CN219175870U true CN219175870U (en) 2023-06-13

Family

ID=86662665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320229931.3U Active CN219175870U (en) 2023-02-15 2023-02-15 Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system

Country Status (1)

Country Link
CN (1) CN219175870U (en)

Similar Documents

Publication Publication Date Title
CN108678220B (en) Concrete shear wall with integrally installed reinforcing steel bar templates
CN219175870U (en) Vertical reinforcing steel bar installation positioning device of building industrialization toughness formwork structure system
CN211368733U (en) Prefabricated assembled concrete pipe props structure
CN211030587U (en) Integral mold-entering structure of semi-formed reinforcement cage
CN108843016B (en) Shear wall template internal stay and tie bar combined type component and method
KR101083403B1 (en) Foam block fixing bridge
CN210880135U (en) Be applied to floor drain positioning die of prefabricated building
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN214946842U (en) Electric power push pipe glue-stopping platform positioning device
CN219280940U (en) Connection structure of prefabricated template of civil structure
CN219219851U (en) Assembled type plate wall installation and connecting device
CN113107087B (en) Construction method of bottom assembled frame structure system
CN109610736A (en) A kind of mold and its localization method of abutment sleeve reserved steel bar
CN215319425U (en) Precast beam preparation mould device
CN219638409U (en) Finalized template reinforcing structure
CN216516450U (en) High-strength concrete prefabricated module
CN217123463U (en) Prefabricated well cover plate template of brick-built well reinforced concrete
CN217601854U (en) Prefabricated even roof beam of easy die stripping and coincide even roof beam of constituteing thereof
CN112681485B (en) One-step grooving die for U-shaped groove of slag sluiceway and construction method
CN215406912U (en) Socket joint formula precast concrete roof beam
CN215406517U (en) Precast concrete board component
CN218437199U (en) Deformation meets recess one shot forming frock
CN216864789U (en) Cast-in-place box girder small arc angle steel mould structure
CN220183845U (en) Hanging die mounting structure at chamfer of rainwater box culvert
CN217326469U (en) Adjustable shaping template for wall type friction damper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant