CN109610736A - A kind of mold and its localization method of abutment sleeve reserved steel bar - Google Patents

A kind of mold and its localization method of abutment sleeve reserved steel bar Download PDF

Info

Publication number
CN109610736A
CN109610736A CN201811415976.XA CN201811415976A CN109610736A CN 109610736 A CN109610736 A CN 109610736A CN 201811415976 A CN201811415976 A CN 201811415976A CN 109610736 A CN109610736 A CN 109610736A
Authority
CN
China
Prior art keywords
fixed plate
reinforcing bar
exterior wall
wall fixed
square beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811415976.XA
Other languages
Chinese (zh)
Other versions
CN109610736B (en
Inventor
安红飞
崔德润
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201811415976.XA priority Critical patent/CN109610736B/en
Publication of CN109610736A publication Critical patent/CN109610736A/en
Application granted granted Critical
Publication of CN109610736B publication Critical patent/CN109610736B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Abstract

A kind of mold of abutment sleeve reserved steel bar, including exterior wall fixed plate, plank sheathing and multiple groups square beam, wherein level frame is equipped with multiple groups square beam in exterior wall fixed plate, and multiple fixation holes are formed in exterior wall fixed plate;It is supported and is positioned by plank sheathing between multiple groups square beam, wherein being formed with opposite and perforation reinforcing bar preformed hole on each group of square beam, and be equipped with reinforcement welding reserved place between each group of square beam.The generation for the problems such as member reinforcing steel bar connection challenge that the mold and its localization method efficiently solve assembly of integral shearing wall structure avoids reinforcing bar and seriously bend, can not dock even random cutting reinforcing bar especially in conversion layer in-site installation.

Description

A kind of mold and its localization method of abutment sleeve reserved steel bar
Technical field
The invention belongs to technical field of building construction, the mold of especially a kind of abutment sleeve reserved steel bar and its positioning side Method.
Background technique
The current country is pushing Economic Development Mode Conversion energetically, adjusts the industrial structure and pushes energy-saving and emission-reduction work energetically Background under, local government using Housing Guarantee as handgrip, successively put into effect support building industrialization development local policy. Domestic Large Real Estate exploitation enterprise, general contractor enterprise and prefabricated components manufacturing enterprise also takes action one after another, increases building Industrialization investment.From the point of view of the whole nation, using novel precast concrete fabricated construction fast development as the building industrialization of representative into The high-speed development period of a new round is entered.
Currently, there are some the problem of being unfavorable for assembling while prefabricated concrete structure is greatly developed.
The member reinforcing steel bar connection of assembly of integral shearing wall structure in " prefabricated concrete structure technical regulation " is multiple Miscellaneous, when conversion layer in-site installation, it is serious that reinforcing bar bends phenomenon, be easy to appear fill not Shang, random the problems such as cutting reinforcing bar.
Summary of the invention
It is an object of the invention to provide a kind of mold of abutment sleeve reserved steel bar in place of overcome the deficiencies in the prior art And its localization method, the mold and its localization method efficiently solve the member reinforcing steel bar connection of assembly of integral shearing wall structure Challenge avoids reinforcing bar and seriously bends especially in conversion layer in-site installation, can not dock even random cutting reinforcing bar The problems such as generation.
A kind of mold of abutment sleeve reserved steel bar, including exterior wall fixed plate, plank sheathing and multiple groups square beam, wherein exterior wall is solid Level frame is equipped with multiple groups square beam on fixed board, and multiple fixation holes are formed in exterior wall fixed plate;Pass through plank sheathing between multiple groups square beam Support positioning, wherein being formed with opposite and perforation reinforcing bar preformed hole on each group of square beam, and between each group of square beam Equipped with reinforcement welding reserved place.
A kind of localization method of sleeve reserved steel bar mold, comprising the following steps:
Step 1: needing first to be laid with exterior wall fixed plate after the completion of the binding of conversion layer reinforcing bar, then set up one in exterior wall fixed plate Then the group lumps of wood sets up wooden model version on the top of the lumps of wood and both ends, then sets up another group of lumps of wood in wooden model version, reciprocal straight with this Until being equal to thickness of wall body to the distance at the top of exterior wall fixed plate bottom to most upper one layer of lumps of wood;
Step 2: drilling out horizontal multiple reinforcing bar preformed holes on the lumps of wood according to bar spacing, it is straight that aperture is greater than reserved joint bar Diameter 3mm;Exterior wall fixed plate is fixed on shear wall according to drawing size before casting concrete, it is pre- using the reinforcing bar on the lumps of wood It boxes out and corrects position and the verticality of reinforcing bar.To prevent the mold in casting concrete from positional shift occurs, fixed using exterior wall Fixation hole is fixed by bolts with shear wall formwork on plate.
Step 3: two sections of reinforcing bars from reinforcement welding reserved place two lumps of wood horizontal locations of welding and after docking, then pour mixed Solidifying soil, when casting concrete, checks the position that reinforcing bar is inserted into reinforcing bar preformed hole again, if any deviation in time by deviation adjusting Into specification and Design Requirement Drawing.
Step 4: when concrete strength reaches 1.25MPa, i.e., dismountable mold.
Advantages of the present invention and economic effect are:
The mold entire body of abutment sleeve reserved steel bar of the invention is built using wooden materials, simple with structure, The many advantages such as materials are convenient, reuse, is easy to operate, easy for construction, have not only standardized the construction of conversion layer reinforcing bar connection Technique is more reduction of operation difficulty, improves the structural strength and monolithic architecture quality of shear wall.
The localization method of sleeve reserved steel bar mold of the invention, is accurately positioned conversion layer sleeve reserved steel bar, It is serious to avoid reserved steel bar bending phenomenon, is easy to appear and does not fill, arbitrarily cuts the problems such as reinforcing bar, ensure that sleeve connection matter Amount.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is top view of the invention;
Fig. 3 is the side view of Fig. 1;
In figure: 1- exterior wall fixed plate;The 2- lumps of wood;3- reinforcing bar preformed hole;4- plank sheathing;5- welds reserved place;6- fixation hole.
Specific embodiment
For that can further appreciate that the contents of the present invention, feature and effect, the following examples are hereby given, and cooperates attached drawing detailed It is described as follows.It should be noted that the present embodiment be it is descriptive, be not restrictive, cannot thus limit guarantor of the invention Protect range.
A kind of mold of abutment sleeve reserved steel bar, including exterior wall fixed plate 1, plank sheathing 4 and multiple groups square beam 2, China and foreign countries Level frame is equipped with multiple groups square beam in wall fixed plate, and multiple fixation holes 6 are formed in exterior wall fixed plate;Pass through wood between multiple groups square beam Shuttering supporting positioning, wherein be formed with opposite and perforation reinforcing bar preformed hole 3 on each group of square beam, and each group square beam it Between be equipped with reinforcement welding reserved place 5.
A kind of localization method of sleeve reserved steel bar mold, comprising the following steps:
Step 1: needing first to be laid with exterior wall fixed plate after the completion of the binding of conversion layer reinforcing bar, then set up one in exterior wall fixed plate Then the group lumps of wood sets up wooden model version on the top of the lumps of wood and both ends, then sets up another group of lumps of wood in wooden model version, reciprocal straight with this Until being equal to thickness of wall body to the distance at the top of exterior wall fixed plate bottom to most upper one layer of lumps of wood;
Step 2: drilling out horizontal multiple reinforcing bar preformed holes on the lumps of wood according to bar spacing, it is straight that aperture is greater than reserved joint bar Diameter 3mm;Exterior wall fixed plate is fixed on shear wall according to drawing size before casting concrete, it is pre- using the reinforcing bar on the lumps of wood It boxes out and corrects position and the verticality of reinforcing bar.To prevent the mold in casting concrete from positional shift occurs, fixed using exterior wall Fixation hole is fixed by bolts with shear wall formwork on plate.
Step 3: two sections of reinforcing bars from reinforcement welding reserved place two lumps of wood horizontal locations of welding and after docking, then pour mixed Solidifying soil, when casting concrete, checks the position that reinforcing bar is inserted into reinforcing bar preformed hole again, if any deviation in time by deviation adjusting Into specification and Design Requirement Drawing.
Step 4: when concrete strength reaches 1.25MPa, i.e., dismountable mold.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (2)

1. a kind of mold of abutment sleeve reserved steel bar, it is characterised in that: including exterior wall fixed plate, plank sheathing and multiple groups square beam, Wherein level frame is equipped with multiple groups square beam in exterior wall fixed plate, and multiple fixation holes are formed in exterior wall fixed plate;The multiple groups square beam Between supported and position by plank sheathing, wherein being formed with opposite and perforation reinforcing bar preformed hole on each group of square beam, and each Reinforcement welding reserved place is equipped between the square beam of group.
2. a kind of localization method of sleeve reserved steel bar mold as described in claim 1, it is characterised in that: including following step It is rapid:
Step 1: needing first to be laid with exterior wall fixed plate after the completion of the binding of conversion layer reinforcing bar, a prescription is then set up in exterior wall fixed plate Then wood sets up wooden model version on the top of the lumps of wood and both ends, then sets up another group of lumps of wood in wooden model version, reciprocal until outer with this Until distance at the top of wall fixed plate bottom to most upper one layer of lumps of wood is equal to thickness of wall body;
Step 2: drilling out horizontal multiple reinforcing bar preformed holes on the lumps of wood according to bar spacing, aperture is greater than reserved joint bar diameter 3mm;Exterior wall fixed plate is fixed on shear wall according to drawing size before casting concrete, it is reserved using the reinforcing bar on the lumps of wood Hole corrects position and the verticality of reinforcing bar.To prevent the mold in casting concrete from positional shift occurs, exterior wall fixed plate is utilized Upper fixation hole is fixed by bolts with shear wall formwork;
Step 3: two sections of reinforcing bars from reinforcement welding reserved place two lumps of wood horizontal locations of welding and after docking, then pour coagulation Soil, when casting concrete, check the position that reinforcing bar is inserted into reinforcing bar preformed hole again, in time arrive deviation adjusting if any deviation Within the scope of specification and Design Requirement Drawing;
Step 4: when concrete strength reaches 1.25MPa, i.e., dismountable mold.
CN201811415976.XA 2018-11-26 2018-11-26 Die for positioning sleeve reserved steel bar and positioning method thereof Active CN109610736B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811415976.XA CN109610736B (en) 2018-11-26 2018-11-26 Die for positioning sleeve reserved steel bar and positioning method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811415976.XA CN109610736B (en) 2018-11-26 2018-11-26 Die for positioning sleeve reserved steel bar and positioning method thereof

Publications (2)

Publication Number Publication Date
CN109610736A true CN109610736A (en) 2019-04-12
CN109610736B CN109610736B (en) 2021-08-10

Family

ID=66004892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811415976.XA Active CN109610736B (en) 2018-11-26 2018-11-26 Die for positioning sleeve reserved steel bar and positioning method thereof

Country Status (1)

Country Link
CN (1) CN109610736B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805291A (en) * 2019-11-29 2020-02-18 湖南五新模板有限公司 PC building wallboard reserves sleeve pipe joint bar positioner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206591736U (en) * 2017-03-17 2017-10-27 中国建筑第五工程局有限公司安徽分公司 A kind of multistation can have enough to meet the need reinforcing bar posting
CN207044389U (en) * 2017-08-15 2018-02-27 中建五局第三建设有限公司 A kind of prefabricated post reserves anchor bar positioner
CN108104380A (en) * 2017-12-15 2018-06-01 中天建设集团有限公司 A kind of assembled conversion layer reinforcing bar positioning construction method
CN207727757U (en) * 2017-12-14 2018-08-14 神州长城国际工程有限公司 A kind of prefabricated wall column one-part form steel bar connecting structure
CN207829306U (en) * 2018-01-16 2018-09-07 中国建筑第二工程局有限公司 Assemble concrete structure prefabricated post reserved joint bar positioning sleeve board mold and vertical connection structure
CN207878799U (en) * 2017-12-14 2018-09-18 北京城建六建设集团有限公司 Build conversion layer bar reinforcement positioning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206591736U (en) * 2017-03-17 2017-10-27 中国建筑第五工程局有限公司安徽分公司 A kind of multistation can have enough to meet the need reinforcing bar posting
CN207044389U (en) * 2017-08-15 2018-02-27 中建五局第三建设有限公司 A kind of prefabricated post reserves anchor bar positioner
CN207727757U (en) * 2017-12-14 2018-08-14 神州长城国际工程有限公司 A kind of prefabricated wall column one-part form steel bar connecting structure
CN207878799U (en) * 2017-12-14 2018-09-18 北京城建六建设集团有限公司 Build conversion layer bar reinforcement positioning device
CN108104380A (en) * 2017-12-15 2018-06-01 中天建设集团有限公司 A kind of assembled conversion layer reinforcing bar positioning construction method
CN207829306U (en) * 2018-01-16 2018-09-07 中国建筑第二工程局有限公司 Assemble concrete structure prefabricated post reserved joint bar positioning sleeve board mold and vertical connection structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805291A (en) * 2019-11-29 2020-02-18 湖南五新模板有限公司 PC building wallboard reserves sleeve pipe joint bar positioner

Also Published As

Publication number Publication date
CN109610736B (en) 2021-08-10

Similar Documents

Publication Publication Date Title
CN107975160B (en) Shear wall structure with lateral connecting key groove, manufacturing and assembling method
CN108149825B (en) A kind of connection type and construction method for the prefabricated board of assembled architecture, prefabricated board and beam
CN108385904B (en) Roofing parapet wall and construction method thereof
CN107090909B (en) Reinforced sleeve of concrete frame beam column node steel tube bundle and assembly method thereof
CN106639052B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN109610736A (en) A kind of mold and its localization method of abutment sleeve reserved steel bar
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN111764299A (en) Pile-column integrated assembling type bridge cap beam elevation control equipment and control method
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN206599881U (en) Integral prefabricated individual layer steel plate concrete combined shear wall
CN218233483U (en) Detachable section steel trades to prop and concurrently makes side wall scaffold braced system
CN211368733U (en) Prefabricated assembled concrete pipe props structure
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN207568074U (en) A kind of secondary structure member reinforcing steel bar connecting node
CN206903060U (en) The concrete composite beam of strap end portion shaped steel
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN104294917A (en) Safe and convenient connection structure for precast reinforced concrete beam and steel pipe column
CN110984372A (en) Steel plate component for connecting frame structure support steel bar and beam steel bar
CN206599880U (en) Shear the side-stand type integral forming structure of steel plate and side bar-mat reinforcement
CN204959794U (en) Field word roof beam pile cap and flat slab floor structure system
CN204174756U (en) A kind of precast reinforced concrete beam and steel pipe column safe and convenient syndeton
CN113982310B (en) Structure for additionally arranging cantilever structure on existing reinforced concrete beam and construction method
CN212641233U (en) Pile and column integrated assembling type bridge cap beam elevation control equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant