CN213233138U - Lifting the operating platform - Google Patents

Lifting the operating platform Download PDF

Info

Publication number
CN213233138U
CN213233138U CN202021295319.9U CN202021295319U CN213233138U CN 213233138 U CN213233138 U CN 213233138U CN 202021295319 U CN202021295319 U CN 202021295319U CN 213233138 U CN213233138 U CN 213233138U
Authority
CN
China
Prior art keywords
operation platform
edge
length
expansion bolts
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021295319.9U
Other languages
Chinese (zh)
Inventor
刘振川
刘金伟
李鸿文
班鹏辉
班盛钧
李刚
王金梁
向韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202021295319.9U priority Critical patent/CN213233138U/en
Application granted granted Critical
Publication of CN213233138U publication Critical patent/CN213233138U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及顶升操作平台,包括两个以上由角钢焊接而成的矩形框,所述矩形框包括顶边、底边、两相对的侧边,任一所述侧边与工程界面侧壁可拆卸连接,在所述底边和侧边设置通长连接平行排列的所述矩形框的钢管,所述顶边靠近所述工程界面的一端搭接在所述工程界面顶端上。能够减少膨胀螺栓的使用量,节约了顶升操作平台的成本,同时减少了膨胀螺栓对盖梁的损坏,另外,顶升操作平台通过膨胀螺栓与盖梁连接,使得操作平台承受的重力能够通过膨胀螺栓传递到盖梁上,提高操作平台的稳定性。

Figure 202021295319

The utility model relates to a jacking operation platform, which comprises two or more rectangular frames welded by angle steel, the rectangular frame comprises a top edge, a bottom edge and two opposite sides, any one of the side edges and an engineering interface side wall For detachable connection, the bottom edge and the side edge are provided with steel pipes connecting the rectangular frames arranged in parallel, and one end of the top edge close to the engineering interface is overlapped on the top end of the engineering interface. It can reduce the amount of expansion bolts used, save the cost of lifting the operation platform, and reduce the damage of the expansion bolts to the cover beam. In addition, the jacking operation platform is connected to the cover beam through expansion bolts, so that the gravity of the operation platform can pass through. The expansion bolts are transmitted to the cover beam to improve the stability of the operating platform.

Figure 202021295319

Description

Jacking operation platform
Technical Field
The utility model relates to a bridge building technical field, concretely relates to jacking operation platform.
Background
With the increasing development of cities, many bridge capping beams constructed in early days are damaged or do not meet the requirements of current beauty and construction operation, so that the bridge capping beams need to be reconstructed and expanded. In reconstruction and extension engineering construction, an operation platform conventionally adopted at present is a support or a bridge inspection vehicle is used as an operation platform, a scaffold is erected as a construction operation platform, a foundation needs to be treated, accumulated water in part of areas is deep, so that a large amount of machinery, manpower and materials need to be consumed for construction, the construction cost is high, and the lease and erection costs of the scaffold are also high, so that the comprehensive cost is high; the bridge inspection vehicle is used for under-bridge operation, the rental cost of the bridge inspection vehicle is high, and the bridge inspection vehicle needs to occupy part of the existing traffic lane, so that the influence on traffic is large; therefore, the two operation platforms often need a large amount of manpower and material resources, and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
In order to overcome the technical problems, particularly the problems that in reconstruction and extension project construction, the construction cost of an operation platform is high, and a large amount of manpower and material resources are needed, the following technical scheme is proposed:
the embodiment of the application provides a jacking operation platform, include the rectangle frame that forms by the angle steel welding more than two, the rectangle frame includes topside, base, two relative sides, arbitrary the side can be dismantled with engineering interface lateral wall and be connected base and side set up to lead to long connection parallel arrangement the steel pipe of rectangle frame, the topside is close to the one end overlap joint at engineering interface is in on the engineering interface top.
Optionally, the engineering interface is a capping beam, and any one of the side edges of the rectangular frame is connected with a side wall of the capping beam through an expansion bolt.
Optionally, any one of the side edges of the rectangular frame is connected with the side wall of the cover beam through two expansion bolts.
Optionally, the distance between the center lines of the two expansion bolts is 750-755mm, and the distance between the center line of the expansion bolt close to the top end of the cover beam and the edge of the top end of the cover beam is 97-103 mm.
Optionally, the distance between the center lines of the two expansion bolts is 753mm, and the distance between the center line of the expansion bolt close to the top end of the cover beam and the edge of the top end of the cover beam is 100 mm.
Optionally, 4 rows of steel pipes with longitudinal full length connecting the rectangular frames arranged in parallel are arranged on the bottom edge.
Optionally, the side edges are respectively provided with 2 steel pipes which are connected with the rectangular frames in parallel through length.
Optionally, the length of the bottom side of the rectangular frame is 750-850mm, the length of the side is 1300-1500mm, the length of the top side is 1000-1200mm, and the ratio of the length of the top side lapped on the top end of the engineering interface to the suspended length of the top side is 3: 8.
Optionally, the length of the bottom edge of the rectangular frame is 800mm, the length of the side edge of the rectangular frame is 1400mm, the length of the top edge of the rectangular frame is 1100mm, the length of the top edge lapped on the top end of the engineering interface is 300mm, and the suspended length of the top edge is 800 mm.
Optionally, the rectangular frame is formed by welding L63 × 5mm angle steel.
Compared with the prior art, the utility model, following beneficial effect has:
the jacking operation platform that this application embodiment provided, include the rectangle frame that forms by the angle steel welding more than two, the rectangle frame includes topside, base, two relative sides, arbitrary the side can be dismantled with engineering interface lateral wall and be connected base and side set up to lead to long connection parallel arrangement the steel pipe of rectangle frame, the topside is close to the one end overlap joint at engineering interface is in on the engineering interface top. The use amount of the connecting piece for realizing detachable connection of the side edge of the rectangular frame and the engineering interface is reduced, the construction cost of the jacking operation platform is reduced, meanwhile, the top of the engineering interface bears the gravity borne by part of the rectangular frame, the use amount of the connecting piece for connecting the rectangular frame to the engineering interface is reduced, and the stability of the operation platform is ensured.
The jacking operation platform that this application embodiment provided, the engineering interface is the bent cap, because the angle steel part overlap joint of founding the rectangle frame top edge has increased jacking operation platform's stress point at the bent cap top, can be less expansion bolts's use amount, in the embodiment that this application provided, a rectangle frame can be dismantled through two expansion bolts with the bent cap side and be connected, has practiced thrift jacking operation platform's cost, has reduced the damage of expansion bolts to the bent cap simultaneously. In addition, the jacking operation platform is connected with the cover beam through the expansion bolts, so that the gravity borne by the operation platform can be transmitted to the cover beam through the expansion bolts, and the stability of the operation platform is improved.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is the structure schematic diagram of the jacking operation platform of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below by referring to the drawings are exemplary only for explaining the present invention, and should not be construed as limiting the present invention.
As used herein, the singular forms "a", "an", "the" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, but do not preclude the presence or addition of one or more other features, integers, steps, operations.
It will be understood by those within the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
The jacking operation platform provided by the embodiment of the application comprises more than two rectangular frames 1 formed by welding angle steels as shown in figure 1, each rectangular frame comprises a top edge 11, a bottom edge 12 and two opposite side edges 13, each side edge 13 is detachably connected with an engineering interface side wall 21, the steel pipes 3 are laid on the bottom sides 12 between the parallel rectangular frames 1, the side edges 13 are also connected with the parallel rectangular frames 1 of the jacking operation platform through the through steel pipes, so as to connect the rectangular frames 1 into a whole to construct a jacking operation platform, one end of the top edge 11 close to the engineering interface 2 is lapped on the top end 22 of the engineering interface 2, so that when the rectangular frame 1 is stressed, partial force can be dispersed and transmitted to the engineering interface, the use amount of detachable connecting pieces between the rectangular frame 1 and the engineering interface 2 is reduced, and the construction cost of bridge jacking and support replacement at the engineering interface is reduced. Optionally, the engineered interface in this application is a capping beam.
In the embodiment that this application provided, the steel pipe 3 vertically leads to long rectangular frame 1 of connecting jacking operation platform's parallel arrangement, the platform that the construction workman operated on jacking operation platform, side 13 also connects jacking operation platform's parallel arrangement's rectangular frame 1 through leading to long steel pipe equally to form jacking operation platform's railing skeleton, and connect jacking operation platform's parallel arrangement's rectangular frame and become a whole, protection workman's construction safety nature. Optionally, in order to enable the rectangular frames to be connected into a whole to construct the jacking operation platform, 4 rows of steel pipes 3 which are longitudinally arranged on the bottom edge, are connected with the rectangular frames arranged in parallel on one side of the capping beam in a through mode, and are scaffold pipes. Optionally, 2 steel pipes with through length are respectively arranged on the side edges and connected with the rectangular frames arranged in parallel on one side of the bent cap. In the embodiment provided by the application, after the structure is installed, the railing is welded on the railing framework to construct and complete the whole jacking operation platform.
In the embodiment provided for in the present application, the end of the top edge 11 near the lid beam 2 overlaps the top end 22 of the lid beam 2. The part of angle steel of constructing rectangular frame topside 11 overlaps on bent cap 2 top 22 promptly, and topside 11 angle steel part overlap joint has reduced the use amount of the connecting piece that realizes rectangular frame side 13 and 2 lateral walls detachable connections of bent cap on 2 tops 22 of bent cap, has reduced jacking operation platform's construction cost, and bent cap 2 top has born the bearing capacity of part strength rectangular frame 1 simultaneously, improves operation platform's stability. It should be noted that the angle steel forming the top edge of the rectangular frame 1 and the angle steel overlapping the top end 22 of the bent cap 2 are integrated. Optionally, the length of the bottom edge of the rectangular frame is 750-850mm, the length of the side edge is 1300-1500mm, the length of the top edge is 1000-1200mm, and the ratio of the length of the top edge lapped on the top end of the capping beam to the suspended length of the top edge is 3: 8. In one embodiment, the angle steel forming the bottom edge of the rectangular frame 1 is optionally 800mm long, the angle steel forming the side edge 13 of the rectangular frame 1 is 1400mm long, the entire angle steel forming the top edge 11 is 1100mm long, the angle steel overlapping the top edge 22 of the lid beam 2 is 300mm long, and correspondingly, the length of the top edge suspended on the side of the lid beam is 800mm long.
Optionally, in the embodiments provided in this application, the rectangular frame is formed by welding L63 × 5mm angle steels, and the material is Q235, so as to ensure the stress strength of the rectangular steel. In the application, the rectangular frames can be welded in advance, so that the rectangular frames and the cover beam are connected through the expansion bolts and the rectangular frames which are arranged in parallel on one operation platform are connected through the steel pipes when the lifting operation platform is used each time, the construction process of the lifting operation platform is simplified, the construction time is saved, and the construction efficiency is improved; the equipment quantity of the building personnel is simplified, the steel pipes and the rectangular frames are recycled, and the building cost of the jacking operation platform is saved.
Optionally, either side 13 of the rectangular frame 1 is connected to the side wall 21 of the capping beam 2 by expansion bolts 4. When jacking operation platform atress, the partial power that operation platform bore has been transmitted to bent cap 2 by beating expansion bolts 4 of establishing on the bent cap, partial power has been transmitted to bent cap 2 through the one end of topside overlap joint on bent cap 2 top 22 on, expansion bolts 4 are beaten and are established the convenience, and disposable input is few, the cost is lower, set up and bridge detection operation platform for former falling to the ground support, it is comparatively simple to construct, save the engineering time, the efficiency of construction is high, has higher economic nature. In the embodiment that this application provided, any one side of rectangle frame 1 is connected through two expansion bolts 4 with 2 lateral walls 21 of bent cap, and consequently, jacking operation platform needs expansion bolts 4 that use less in this application, has reduced expansion bolts's construction cost, owing to beat and establish expansion bolts and connect comparatively conveniently, has practiced thrift the engineering time, is convenient for carry out operation platform fast and builds. In the embodiment provided by the application, the distance between the center lines of the two expansion bolts is 750-755mm, and the distance between the center line of the expansion bolt close to the top end of the cover beam and the edge of the top end of the cover beam is 97-103 mm. Alternatively, in the embodiment provided by the present application, M14 × 150mm expansion bolts are used, the distance between the center lines of the two expansion bolts is 753mm, and the distance between the center line of the expansion bolt near the top end of the capping beam and the edge of the top end of the capping beam is 100 mm.
To sum up, the jacking operation platform that this application provided includes following beneficial effect:
(1) the jacking operation platform that this application embodiment provided, include the rectangle frame that forms by the angle steel welding more than two, the rectangle frame includes topside, base, two relative sides, arbitrary the side can be dismantled with engineering interface lateral wall and be connected base and side set up to lead to long connection parallel arrangement the steel pipe of rectangle frame, the topside is close to the one end overlap joint at engineering interface is in on the engineering interface top. The use amount of the connecting piece for realizing detachable connection of the side edge of the rectangular frame and the engineering interface is reduced, the construction cost of the jacking operation platform is reduced, meanwhile, the top of the engineering interface bears the gravity borne by part of the rectangular frame, the use amount of the connecting piece for connecting the rectangular frame to the engineering interface is reduced, and the stability of the operation platform is ensured.
(2) The jacking operation platform that this application embodiment provided, the engineering interface is the bent cap, because the angle steel part overlap joint of founding the rectangle frame top edge has increased jacking operation platform's stress point at the bent cap top, can be less expansion bolts's use amount, in the embodiment that this application provided, a rectangle frame can be dismantled through two expansion bolts with the bent cap side and be connected, has practiced thrift jacking operation platform's cost, has reduced the damage of expansion bolts to the bent cap simultaneously. In addition, the jacking operation platform is connected with the cover beam through the expansion bolts, so that the gravity borne by the operation platform can be transmitted to the cover beam through the expansion bolts, and the stability of the operation platform is improved. The foregoing is only a partial embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (10)

1.一种顶升操作平台,其特征在于,包括两个以上由角钢焊接而成的矩形框,所述矩形框包括顶边、底边、两相对的侧边,任一所述侧边与工程界面侧壁可拆卸连接,在所述底边和侧边设置通长连接平行排列的所述矩形框的钢管,所述顶边靠近所述工程界面的一端搭接在所述工程界面顶端上。1. A jacking operation platform is characterized in that, comprising two or more rectangular frames welded by angle steel, and the rectangular frame comprises a top edge, a bottom edge, two opposite sides, and any of the side edges is the same as the one. The side walls of the engineering interface are detachably connected, and the bottom edge and the side edge are provided with steel pipes that are connected to the rectangular frames arranged in parallel, and the top edge close to the engineering interface is overlapped on the top of the engineering interface. . 2.根据权利要求1所述的顶升操作平台,其特征在于,所述工程界面为盖梁,所述矩形框的任一所述侧边与盖梁侧壁通过膨胀螺栓连接。2 . The jacking operation platform according to claim 1 , wherein the engineering interface is a cover beam, and any one of the sides of the rectangular frame is connected to the side wall of the cover beam by expansion bolts. 3 . 3.根据权利要求2所述的顶升操作平台,其特征在于,所述矩形框的任一所述侧边与盖梁侧壁通过两颗膨胀螺栓连接。3 . The jacking operation platform according to claim 2 , wherein any one of the side edges of the rectangular frame and the side wall of the cover beam are connected by two expansion bolts. 4 . 4.根据权利要求3所述的顶升操作平台,其特征在于,两所述膨胀螺栓的中心线之间的间距为750-755mm,靠近所述盖梁顶端的所述膨胀螺栓的中心线与所述盖梁顶端边沿的距离为97-103mm。4. The jacking operation platform according to claim 3, wherein the distance between the centerlines of the two expansion bolts is 750-755mm, and the centerline of the expansion bolts close to the top of the cover beam is 750-755mm. The distance between the top edge of the cover beam is 97-103mm. 5.根据权利要求4所述的顶升操作平台,其特征在于,两所述膨胀螺栓的中心线之间的间距为753mm,靠近所述盖梁顶端的所述膨胀螺栓的中心线与所述盖梁顶端边沿的距离为100mm。5. The jacking operation platform according to claim 4, wherein the distance between the centerlines of the two expansion bolts is 753 mm, and the centerline of the expansion bolts near the top of the cover beam The distance between the top edge of the cover beam is 100mm. 6.根据权利要求1所述的顶升操作平台,其特征在于,在所述底边设置4排纵向通长连接平行排列的所述矩形框的钢管。6 . The jacking operation platform according to claim 1 , wherein 4 rows of longitudinally extending steel pipes connecting the rectangular frames arranged in parallel are arranged on the bottom edge. 7 . 7.根据权利要求6所述的顶升操作平台,其特征在于,在所述侧边各设置2根通长连接平行排列的所述矩形框的钢管。7 . The jacking operation platform according to claim 6 , wherein two steel pipes connected to the rectangular frames arranged in parallel are provided on each of the sides. 8 . 8.根据权利要求1所述的顶升操作平台,其特征在于,所述矩形框底边长度为750-850mm,侧边长度为1300-1500mm,所述顶边长度为1000-1200mm,所述顶边搭接在所述工程界面顶端上的长度与悬空长度的比例为3:8。8 . The lifting operation platform according to claim 1 , wherein the length of the bottom edge of the rectangular frame is 750-850mm, the length of the side edge is 1300-1500mm, the length of the top edge is 1000-1200mm, and the length of the top edge is 1000-1200mm. The ratio of the length of the top edge lapped on the top of the engineering interface to the suspended length is 3:8. 9.根据权利要求8所述的顶升操作平台,其特征在于,所述矩形框底边长度为800mm,侧边长度为1400mm,所述顶边长度为1100mm,所述顶边搭接在所述工程界面顶端上的长度为300mm,所述顶边悬空长度为800mm。9 . The lifting operation platform according to claim 8 , wherein the length of the bottom edge of the rectangular frame is 800mm, the length of the side edge is 1400mm, the length of the top edge is 1100mm, and the top edge is overlapped at the The length on the top of the engineering interface is 300mm, and the suspended length of the top edge is 800mm. 10.根据权利要求1所述的顶升操作平台,其特征在于,所述矩形框采用L63*5mm的角钢焊接而成。10 . The jacking operation platform according to claim 1 , wherein the rectangular frame is welded with L63*5mm angle steel. 11 .
CN202021295319.9U 2020-07-02 2020-07-02 Lifting the operating platform Active CN213233138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021295319.9U CN213233138U (en) 2020-07-02 2020-07-02 Lifting the operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021295319.9U CN213233138U (en) 2020-07-02 2020-07-02 Lifting the operating platform

Publications (1)

Publication Number Publication Date
CN213233138U true CN213233138U (en) 2021-05-18

Family

ID=75887040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021295319.9U Active CN213233138U (en) 2020-07-02 2020-07-02 Lifting the operating platform

Country Status (1)

Country Link
CN (1) CN213233138U (en)

Similar Documents

Publication Publication Date Title
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN103075020B (en) A kind of steel tray supports actuating system
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN209941511U (en) Supporting device for high-altitude folding of bridge steel box girder by section hoisting
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN201762663U (en) Reinforced concrete superposed beam wing board support
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN110593269A (en) A turnable structural support system and its construction method
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN102261043B (en) Assembled steel pipe upright post system
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN214834720U (en) Tool type unilateral formwork system
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN213233138U (en) Lifting the operating platform
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN111648229A (en) Assembled hoop platform for bent cap construction and mounting method thereof
CN217203594U (en) Underground space assembly type temporary construction road
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN211228136U (en) Combined construction platform for hogging moment tensioning of prefabricated T-shaped beam
CN108797365A (en) Formwork for bridge piers and its construction method
CN203795461U (en) Profile steel platform of tool type tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant