CN105544402B - A kind of hanging gang form support frame and construction method for pier capping beam high - Google Patents

A kind of hanging gang form support frame and construction method for pier capping beam high Download PDF

Info

Publication number
CN105544402B
CN105544402B CN201610031822.5A CN201610031822A CN105544402B CN 105544402 B CN105544402 B CN 105544402B CN 201610031822 A CN201610031822 A CN 201610031822A CN 105544402 B CN105544402 B CN 105544402B
Authority
CN
China
Prior art keywords
pier
support frame
capping beam
template
pier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610031822.5A
Other languages
Chinese (zh)
Other versions
CN105544402A (en
Inventor
王峰
纪尊众
袁长春
张亚锋
刘长辉
李志辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201610031822.5A priority Critical patent/CN105544402B/en
Publication of CN105544402A publication Critical patent/CN105544402A/en
Application granted granted Critical
Publication of CN105544402B publication Critical patent/CN105544402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Abstract

The invention provides a kind of hanging gang form support frame for pier capping beam high, including pier shaft steel form and bracket assembly, pier shaft steel form is connected horizontally between the reinforcing bar at pier shaft epimerite chamfering, bracket assembly includes support frame stull and capping beam template diagonal brace, support frame stull is connected horizontally between the pier shaft steel form of pier shaft both sides by the first coupling assembly, and capping beam template diagonal brace is inclined by the second coupling assembly and is connected between capping beam template and pier shaft steel form.Efficiently solve that harsher wind conditions high pier construction is difficult, the low problem of work efficiency, more conventional pier support technique high, it is to avoid operating personnel, plant equipment in operation in high wind, have effectively ensured construction safety, and improve work efficiency for a long time;More pre-buried bracket technique, reduces the installation of pre-embedded steel slab, reduces dismounting bracket risk, has simplified operation, improves work efficiency and architecture quality.

Description

A kind of hanging gang form support frame and construction method for pier capping beam high
Technical field
The invention belongs to bridge engineering construction technical field, more particularly, to a kind of hanging combination die for pier capping beam high Plate bracing frame and construction method.
Background technology
Bridge spanning the sea pier capping beam construction high belongs to work high above the ground under the conditions of marine site, and in adverse circumstances such as monsoon, typhoons, Operating personnel's operating difficulties, security risk is high, and equipment work efficiency is low.At present, it is over strait, across pier capping beam high construction in the large bridges such as river During frequently with pier support high is set up, wall pre-buried load-bearing bracket in pier shaft side sets up the construction technologies such as support frame.Face monsoon, platform Steel pipe in pier support high is set up in the bad weathers such as wind and sets up that precision is uncontrollable, pre-buried bracket sets up pre-buried ox in supporting frame construction Leg is installed and dismounting security risk is higher, and external quality of pier reparation need to be carried out to pre-buried position, and constructing operation personnel are in high-altitude Operation under high wind, potential safety hazard is big.
The content of the invention
In view of this, the present invention is directed to propose a kind of hanging gang form support frame and construction party for pier capping beam high Method, efficiently solve that harsher wind conditions high pier construction is difficult, the low problem of work efficiency, more conventional pier support technique high, it is to avoid makees Industry personnel, plant equipment in operation in high wind, have effectively ensured construction safety, and improve work efficiency for a long time;It is more pre-buried Bracket technique, reduces the installation of pre-embedded steel slab, reduces dismounting bracket risk, has simplified operation, improves work efficiency and structure Quality.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
A kind of hanging gang form support frame for pier capping beam high, including pier shaft steel form and bracket assembly, it is described Pier shaft steel form is connected horizontally between the reinforcing bar at pier shaft epimerite chamfering, and support frame as described above component includes support frame stull and lid Beam forms diagonal brace, support frame as described above stull by the first coupling assembly be connected horizontally on pier shaft both sides the pier shaft steel form it Between, the capping beam template diagonal brace is inclined by the second coupling assembly and is connected between capping beam template and the pier shaft steel form.
Further, support frame as described above stull includes template cross rib, square steel stull, gusset plate and triangle gad, the side Steel stull is connected between two template cross ribs being placed in parallel, and is welded between the square steel stull and the template cross rib There is the gusset plate, the triangle gad correspondence square steel stull is welded on the outside of the template cross rib.
Further, the template cross rib by two channel-section steel dorsal parts to being welded after spelling.
Further, the capping beam template diagonal brace includes that raker beam, the raker beam are welded after being spliced by two channel-section steel dorsal parts Connect and form.
Further, the capping beam template diagonal brace also includes batten plate, and the batten plate interval is welded in the raker beam.
Further, first coupling assembly includes bolt and steel plate.
Further, second coupling assembly includes bolt and top board.
A kind of construction method of hanging gang form support frame for pier capping beam high, comprises the following steps:
The first step:After the coxopodite pier shaft concrete strength of pier high meets requirement, erecting and welding pier shaft reinforcing bar, then in pier The pier shaft steel form is installed between the reinforcing bar at body epimerite chamfering;
Second step:Support frame as described above stull is connected horizontally on the pier of pier shaft both sides by first coupling assembly Between body steel form;
3rd step:Temporary working platform is laid in support frame as described above stull;
4th step:Rely on the temporary working platform to lift the capping beam template diagonal brace, the capping beam template diagonal brace is led to The second coupling assembly inclination is crossed to be connected between the capping beam template and the pier shaft steel form;
5th step:The capping beam template is up installed in continuation, and bug check, colligation bent cap are carried out to the capping beam template Reinforcing bar, pours bent cap concrete.
Relative to prior art, the hanging gang form support frame and construction method for pier capping beam high of the present invention Have the advantage that:
The load that concrete and capping beam template are born can be delivered on pier shaft steel form by bracket assembly, support Frame stull can be by the first coupling assembly, using the pier at the bolt and steel plate in the first coupling assembly and pier top section chamfering high Body steel form is bolted, and bears horizontal loading;Capping beam template diagonal brace can be by the second coupling assembly, using in the second coupling assembly Bolt and top board be connected between capping beam template and pier shaft steel form, bear bent cap vertical load and share horizontal loading.Have Solve to effect harsher wind conditions high pier construction difficulty, the low problem of work efficiency:More conventional pier support technique high, it is to avoid operation people Member, plant equipment in operation in high wind, have effectively ensured construction safety, and improve work efficiency for a long time;More pre-buried bracket Technique, reduces the installation of pre-embedded steel slab, reduces dismounting bracket risk, has simplified operation, improves work efficiency and architecture quality.
The gusset plate being welded between square steel stull and template cross rib, can strengthen between square steel stull and template cross rib Connection, strengthens weight capacity;Triangle gad contributes to the correspondence grafting of template cross rib to fix pier shaft steel form.
Brief description of the drawings
The accompanying drawing for constituting a part of the invention is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate, for explaining the present invention, not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the embodiment of the present invention
Fig. 2 is the support frame transverse brace structure schematic diagram of the embodiment of the present invention;
Fig. 3 is the capping beam template inclined support structure schematic diagram of the embodiment of the present invention;
Fig. 4 is the schematic diagram of first step construction of the present invention;
Fig. 5 is the schematic diagram of second step construction of the present invention;
Fig. 6 is the schematic diagram of the 3rd step construction of the invention;
Fig. 7 is the schematic diagram of the 4th step construction of the invention;
Fig. 8 is the schematic diagram of the 5th step construction of the invention.
Description of reference numerals:
1- pier shaft steel forms;2- support frame stulls;21- template cross ribs;22- square steel stulls;23- gusset plates;24- triangular steels Wedge;3- capping beam template diagonal braces;31- raker beams;32- batten plates;The coupling assemblies of 4- first;The coupling assemblies of 5- second;6- odd-jobs Platform;7- capping beam templates.
Specific embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score, The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are Based on orientation shown in the drawings or position relationship, it is for only for ease of and describes the present invention and simplify to describe, rather than instruction or dark Showing the device or element of meaning must have specific orientation, with specific azimuth configuration and operation therefore it is not intended that right Limitation of the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying phase To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi Two connections of element internal.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in figure 1, the present invention provides a kind of hanging gang form support frame for pier capping beam high, including pier shaft punching block Plate 1 and bracket assembly, the pier shaft steel form 1 are connected horizontally between the reinforcing bar at pier shaft epimerite chamfering, support frame as described above Component includes support frame stull 2 and capping beam template diagonal brace 3, and support frame as described above stull 2 is connected horizontally on by the first coupling assembly 4 Between the pier shaft steel form 1 of pier shaft both sides, the capping beam template diagonal brace 3 is inclined by the second coupling assembly 5 and is connected to lid Between beam forms 7 and the pier shaft steel form 1.
As shown in Fig. 2 support frame as described above stull 2 includes template cross rib 21, square steel stull 22, gusset plate 23 and triangle gad 24, the square steel stull 22 is connected between two template cross ribs 21 being placed in parallel, the square steel stull 22 and described The gusset plate 23 is welded between template cross rib 21, the correspondence of the triangle gad 24 square steel stull 22 is welded on the mould The outside of plate cross rib 21.
The template cross rib 21 is by two channel-section steel dorsal parts to being welded after spelling.
Shown in Fig. 3, the capping beam template diagonal brace 3 includes raker beam 31, and the raker beam 31 is spliced by two channel-section steel dorsal parts After be welded.
The capping beam template diagonal brace 3 also includes batten plate 32, and the interval of the batten plate 32 is welded in the raker beam 31.
First coupling assembly 4 includes bolt and steel plate.
Second coupling assembly 5 includes bolt and top board.
The construction procedure of this example is as follows:
The first step, as shown in Figure IV, after the coxopodite pier shaft concrete strength of pier high meets requirement, erecting and welding pier shaft steel Muscle, then installs pier shaft steel form 1 between the reinforcing bar at pier shaft epimerite chamfering;
Second step, as shown in Figure 5, pier shaft both sides is connected horizontally on by support frame stull 2 by the first coupling assembly 4 Between the pier shaft steel form 1;
3rd step, as shown in figure 6, lays temporary working platform 6 in support frame stull 2;
4th step, as shown in figure seven, relies on temporary working platform 6 to lift capping beam template diagonal brace 3, by capping beam template diagonal brace 3 Inclined by the second coupling assembly 5 and be connected between capping beam template 7 and pier shaft steel form 1;
5th step, as shown in figure 8, continuing up to install capping beam template 7, bug check, colligation is carried out to capping beam template 7 Bent cap reinforcing bar, pours bent cap concrete.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (8)

1. a kind of hanging gang form support frame for pier capping beam high, it is characterised in that:Including pier shaft steel form and support frame Component, the pier shaft steel form is connected horizontally between the reinforcing bar at pier shaft epimerite chamfering, and support frame as described above component includes support Frame stull and capping beam template diagonal brace, support frame as described above stull are connected horizontally on the pier of pier shaft both sides by the first coupling assembly Between body steel form, the capping beam template diagonal brace is inclined by the second coupling assembly and is connected to capping beam template and the pier shaft punching block Between plate.
2. the hanging gang form support frame for pier capping beam high according to claim 1, it is characterised in that:The support Frame stull includes template cross rib, square steel stull, gusset plate and triangle gad, and the square steel stull is connected to two and is placed in parallel Between the template cross rib, the gusset plate, the triangle gad are welded between the square steel stull and the template cross rib The correspondence square steel stull is welded on the outside of the template cross rib.
3. the hanging gang form support frame for pier capping beam high according to claim 2, it is characterised in that:The template Cross rib is by two channel-section steel dorsal parts to being welded after spelling.
4. the hanging gang form support frame for pier capping beam high according to claim 1, it is characterised in that:The bent cap Template diagonal brace includes that raker beam, the raker beam are welded after being spliced by two channel-section steel dorsal parts.
5. the hanging gang form support frame for pier capping beam high according to claim 4, it is characterised in that:The bent cap Template diagonal brace also includes batten plate, and the batten plate interval is welded in the raker beam.
6. the hanging gang form support frame for pier capping beam high according to claim 1, it is characterised in that:Described first Coupling assembly includes bolt and steel plate.
7. the hanging gang form support frame for pier capping beam high according to claim 1, it is characterised in that:Described second Coupling assembly includes bolt and top board.
8. it is a kind of as claimed in claim 1 be used for pier capping beam high hanging gang form support frame construction method, its feature It is:Comprise the following steps:
The first step:After the coxopodite pier shaft concrete strength of pier high meets requirement, erecting and welding pier shaft reinforcing bar, then on pier shaft top The pier shaft steel form is installed between reinforcing bar at section chamfering;
Second step:Support frame as described above stull is connected horizontally on the pier shaft steel of pier shaft both sides by first coupling assembly Between template;
3rd step:Temporary working platform is laid in support frame as described above stull;
4th step:Rely on the temporary working platform to lift the capping beam template diagonal brace, the capping beam template diagonal brace is passed through into institute The inclination of the second coupling assembly is stated to be connected between the capping beam template and the pier shaft steel form;
5th step:The capping beam template is up installed in continuation, and bug check, rotary ligating cover joist steel are carried out to the capping beam template Muscle, pours bent cap concrete.
CN201610031822.5A 2016-01-18 2016-01-18 A kind of hanging gang form support frame and construction method for pier capping beam high Active CN105544402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610031822.5A CN105544402B (en) 2016-01-18 2016-01-18 A kind of hanging gang form support frame and construction method for pier capping beam high

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610031822.5A CN105544402B (en) 2016-01-18 2016-01-18 A kind of hanging gang form support frame and construction method for pier capping beam high

Publications (2)

Publication Number Publication Date
CN105544402A CN105544402A (en) 2016-05-04
CN105544402B true CN105544402B (en) 2017-06-16

Family

ID=55823933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610031822.5A Active CN105544402B (en) 2016-01-18 2016-01-18 A kind of hanging gang form support frame and construction method for pier capping beam high

Country Status (1)

Country Link
CN (1) CN105544402B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137715B (en) * 2018-10-23 2021-08-10 邓泽仲 Steel constructs arch bridge
CN113756193B (en) * 2021-08-27 2022-12-23 中铁七局集团有限公司 Hollow pier construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB570661A (en) * 1943-05-24 1945-07-17 Albert Henry Hawes Improvements in the construction of concrete walls, beams and the like
DE202005020889U1 (en) * 2005-03-26 2006-11-02 Döllen, Heinz von Mobile stage for working and/or inspecting e.g. steel bridge, has retaining units, respectively, provided on both sides with roller, and working platform moveable along rollers by rails, where retaining units are fastenable by anchor
CN102296542B (en) * 2011-06-14 2013-06-12 汇通路桥建设集团有限公司 Method for constructing high pier capping beams
CN104404884B (en) * 2014-11-25 2016-03-30 中建六局第三建筑工程有限公司 For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN205617245U (en) * 2016-01-18 2016-10-05 中国铁建大桥工程局集团有限公司 A unsettled built -up plate support frame for high pier capping beam

Also Published As

Publication number Publication date
CN105544402A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN103967277B (en) Super High Core Walls Structure tilts the construction method of shear wall
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN205012629U (en) Assembled modularization platform of unloading of encorbelmenting
CN214245383U (en) Combined die system for bent cap construction
CN105544402B (en) A kind of hanging gang form support frame and construction method for pier capping beam high
CN111255138B (en) Construction method of continuous multi-span large-span high-altitude aluminum alloy latticed shell structure
CN107119576A (en) Pier construction security protection platform
CN202658590U (en) Integral assembled drilling platform
US20090313937A1 (en) Steel beams and related assemblies and methods
CN109775551B (en) Hoisting system for integral transportation of bailey bridge and construction method thereof
CN111809654A (en) Assembled tower crane foundation structure
CN209798542U (en) safety construction assembled bent cap operation platform
KR102085928B1 (en) Temporary bridge with end corner member and construction method therefor
CN205617245U (en) A unsettled built -up plate support frame for high pier capping beam
CN103615058B (en) A kind of constraint steel plate construction of super high-rise steel plate concrete shear wall and construction method thereof
CN206337555U (en) Steel reinforcement cage support and steel reinforcement cage erecting device
CN107654066A (en) A kind of detachable tower crane climbing device and construction method
CN208685457U (en) Cast-in-place box beam bracket device
CN209114884U (en) A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed
CN207568206U (en) A kind of temporary support system for annular building periphery steel construction
CN207073145U (en) The plug-in steel reinforced concrete combination foundation of Super High construction elevator wall
CN207296081U (en) T-shaped assembled Steel Reinforced Concrete Shear Walls
CN111676972A (en) Safe operation platform of construction usefulness on foundation ditch
CN213233138U (en) Jacking operation platform
CN105178188B (en) Triangular frame supporting formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant